'\II.
LARSEN &. TOUBRO LIMITED
BUILDINGS & FACTORIES INDEPENDENT COMPANY
GODREJ GARDEN CITY PROJECT P -I & 1I,IUC & D
QUALITY MANAGEMENT SYSTEM
Project Quality Plan iSSUE No.1
QSF/B.5.3/F 01
Page 010f 01
PROJECT QUALITY PLAN 
PART- 02 
GODREJ GARDEN CITY PROJECT P- 1&11, IIIC&D
LARSEN & TOUBRO LIMITED 
BUILDINGS & FACTORIES 
INDEPENDENT COMPANY 
PQP-Part-02
Prepared by
QA/QC (Sit~)
Reviewed by PM (Site)
Reviewed and Approved
by PMCSTUP
Name:
S.MARIAPPAN
K.C.SEKHAR REDDY.
UPENDRA UPADHYAY.
Date:
20.03.13
Approved by Client 
GPL
VIVEKKHARE
23.03.13
Signature:
25.03.13
 LARSEN & TOUBRO LIMITED - BUILDINGS & FACTORIES IC - ALL RIGHTS RESERVED
LARSEN &TOUBRO LIMITED
BUILDINGS & FACTORIES
QUALITY MANAGEMENT SYSTEM
INDEPENDENT COMPANY
GODREJ GARDEN CITY PROJECTP-I & II,
Doc no: L&T/ITP/GGC/P-! & II- 01
Project Quality Plan
mc & D
Date:
INSPECTION TEST PLAN
Component / Process
Nature of Check/Test
Method of Check
Quantum of Check Reference Document Acceptance criteria
1 Antitermlltreatment
AntiTermite Chemicat
Chemical Composition
Review 01 Check
Physical Test
Review 01 MTC
Fineness
Consistency of cement.
Internal and Final Setling time.
Compressive Strength.
Lab Test
Soundness
Third Party
Covred Store is Provided
Material stored on raised platform,
Not more Ihan 10 Bags Stacked on one Heap.
Stacking are consignment wise,lype end Grade
wise.
Inspection
Sieve Analysis
Waler Absorption
Specific Gravily
DLBD
Lab Tesl
Weekly once
{Suppliers frequency
IS 2386 (PliO 3)
FlakinesSlndex& Elongation Index
Lab Tesl
Weekly once
IS 2386 (PI to 3)
Cement
Review 01 Check
-----
IS 6313-2001 part II
Once/Batch
IS 12269
Onceibatch
IS 4031( PI ,4,5 &6)
Once a month
When Required
Silt Content by volume
(Only for river sand)
---~
Lab test
Lab Test
Daily
k'
MTC
I-
------
---- 1--
Bf-
IS 2386 (Plio 3 )
----
l!;;'
"'.fl"
.t
.t
..,.t
.t
..,
}JiiI'I~il""':i
I,
1""
MTCFile
MTCFile
----
..,
..,
..,
GGC/QC. 002 to
005
007
Register
IS 3025& 456
l<,
----
Site Inspection
Report
Register
IS 3025 & 456
fl
..,
---
Test report
GGCiOC -006 to
._
..,
GGC/QC-OOI
Daily
Moisture-Content
~;",,",;,,;;
IS 4031 (Pl,4,5&6)
IS 4031 ( PI ,4,5 &
IS 4031 ( PI ,4,5 & 6)
IS4082 - - 
02
,'Agll~~Y:',"., ,'.,;,;: ;:'1",:1,;,;'
MTC
IS 12269
-----
f----
Format of
Record
IS 6313-2001 part II
Once a wesk
---
31~~'''' _
Once/Batch
19.03.13
Rev no:
,
SI.
No.
J:SSt1B No. 1
Water
Ensure that water from all Sources suitable lor
construction purposes
Third Party lab test
Hall yearly
Mix Design
Mix design by IS code method
Sources and grade of concrete,
Cement content,
Water ICement ratio,
Aggregate cement ratio,
Design slump,
Design Strength,
Admixture (Brand & Dosage)
Lab Test ITrials
Once per grade of
IS 456 & 10262 end
concrete / Change in Technical speciiicetion.
any sou rce of matenal.
Admixture
pH Value
Sp.Gravily
Ash conlent
Chlorides ion content
MTC I Third Party lab test
Once per Source
IS9103
IS9103
Test report
Fly Ash
Chemical Composition
Physical Fineness
Third Party lab test
Once in three month,
183812
183812
Test report
I--
..,
..,
..,
..,
-
..,
..,
..,
..,
..,
Test report
..,
IS 456 & 10262 and
Results I Reports
TeChnical specification.
..,
..,
--
--
..,
..,
..,
..,
-------
--
~
No. Component I Process
Nature of Check I Test
Method of Check
Quantum of Check Reference Document Acceptance criteria
IEnsure steel (or works from approved sources only. Conductlhe fOllowing test whenver required and ensure that the material are es per standard. Stacking 01 reinfon:ementto be carried out in a elevated position and separation by dimeter wise, supplier
6 Reinforcement
wise, lot wise, etc. es per IS 4082
'Review of MTC flndthird ....., ' - - - - - 
Chemical analysis
1-_ _ _ _ _+1_................
7 IConcrete
f..
...........
.....
Tensile Strength,Prool StressTElongation, Bend
party
r:R:-ev-'le-w-o"",7:M=Tc=-an-Cd--th--ird--i
and Re-bend
party
Roiling Margin
Third Party ISite lab
"Pour card Clearance,
Trip Sheet.
Inspection
Isampline for workability check
Field test
at the time of cube
casting I as per site
requirement
Ipl!lo)ing and compaction
Iinspection
iMajorpour
AS per IS 1786
Every lot
100%
v
AS per IS 1786
AS per IS 1786
IS 1786
IS 1786
Third party report'
Lab Report
Tech.
Specification
Tech.
Specification
IAOOI
IC032
1199
-----~-~~~~~-~
IS 456 & 516
,Monthly
----b.-~~~~----------~"'~...,----------~'-----
IS 456 & 10262
IS 456
IS 456 & 10262
IS 456
IS 456 & 10262
IS 456
Register
~--.
---+--1
L;-;-;-:-.,--------f--......-  . .
8
As per the site
Requirement
IS 5454
9 IPlastering
Compressive strength
Lab Test
Once per source,
10 IWooden doors I Door
shutter
Moisture Content,
Water Absorption,
Defects,
Density.
Thickness
Inspection
Once per source I
Supplier's frequency.
iWater absorption.
Dimensions.
Glossy index
Third party
Water absorption,
Dimensions.
Glossy index
13 ISelting out! Survey work
14 IEarth work & back filling
11 ICeramic I Glazed Tiles
12 Kota Stone IGranite /
Marble
IS 3495 pl to 3
GGClQC-Ol0
As per Specification
As per IS
Register
tS 10031994
Report
Report
v
IOnce per source I
Supplier's frequency.
As per IS 13006 & IS
As per IS 13006 & IS
13755 or Equal ent
13755 or Equal ent
Third party
IOnce per source I
Supplier'S frequency.
As per IS
As per IS
ICo-ordinates &permanent piller 01 Reduced level.
IMeaasurement
iPhYSI~al Test,
IAtterg s limit.
ILiquid limited & plastic limit,
lMDD/OMC
IThird party / Lab test! Field
Itest
I
Once Per Source
Drawing
IS 2720
I
I
Drawing
IS 2720
Iv .
Test report
I
Test report
B.QUAUTY ASSURANCE PLAN
lO0%l
GGC/QA-Q02
Ivlv
IV
Test Report I GGC i
IQC-Oll &
GGClQC- 012
Iv
-,--
vi
I
v
v
v
Iv
I,
SI.
No.
Component I Procells
Nature of Check I Test
15 An!itermit treatment
16 Emavation Work
I
Dilualio~
Method of Check
!InsOElt'l;on
& Application
:e~t==:i,n) ,& Dimensions (Before Start or
:!nspetlinn
IU~ing excavated earth layer depth of 300mm
Field test
100%
IS 63132001 1'11
Drawing
Every laye,
compaction test
18
IS 6313-2001 P-II
All foundations
17 IBack filling
Format of
Record
Quantum of Check Reference Document Acceptance criteria
I
Drawing
Check list
Checklist
I
IS 2720-1995 (Part 29) liS 2720-1995 (Part 29;'
!
GGClOCOI3
Drawing I BBS liS 2502 Drawing I BBS liS 2502
IAOOI
"
File Ref
.!WI.!:
I It
Iv'
R i ! I C IW
R
.~
v';
~'
v'
:.
v'
v'
Ensure only epparoved source
Steel Reinforcement
Ensure tieing of reinforcement by 1816 Gauge,
Visual Inspection
Approved BBS I Spacer bars
Inspection
Check for placement of reinforcement bar
,Inspection
100%
Ensure form work as per approved drawing
100%
'Randam
------
100%
----------
19 Form Work
Inspection
Drawing / IS 4562008
Check for staging If any
Drawing liS 4562008
IAOOI
As per drawing I
specification
IA DOt &IC 032
Check for form work fixing (Measurement)
20
Pour card Clearance at site
Concreteing
Inspection
1100%
As per drawing /
specification
Trip Sheet
ISampling for workability check
21
Measu rement
Mortar Mix Ratio
Inspection
Random
Specification
Check for workman ship
Mortar mix ratio,
Thickness of mortar,
Vertical jont,
Plumn,
Inspection
Random
Specification / Drawing
i!nspection
100%
ISample
Random
Iinspe~n
100%
Material (Chemical application)
Inspection
Random
Methodology
Methodology
Check list
Application &Testing
Water Pound test
100%
Methodology
Methodology
Check list
Door Frame Size,
Level, plump &
Opening Direction
Physical Check
Inspection
100%
AS per Drawing I
Methodology,
3 mm in plump &
level
Check list
25 UPVC Windows
Une, Level & Plump
Inspection
'00%
AS per Drawing /
Methodology.
Check list
26 Stone Work
Ensure epproved granite Stone &Finishing
Inspection
AS per Drawing I
Methodology.
Check list
27 Internal Panting
iCheck for workmanship &. Finishing.
Inspection
:Random
j
1100%
.J,~r Drawing /
Methodology.
Check list
28 External painting
Check for workmanship & Finishing.
Inspection
AS per Drawing I
Methodology.
Checklist
Masonry
8mm
!~~ut
~i'~L ,.,.1 !'ilon !'ihade variation &~ishing
Water Proofing
24 Door Frame
v'
v'
v'
v'
v'
v'
v'
v'
v'
v'
v'
v'
Check list
Une,Level,Slop &finishing
Inspection
v'
v'
v'
v'
v'
Check list
v'
v'
i
Drawing
Check lisl
v'
v'
7 --I'
'tOO%
100%
As per Methodology
Drawing
L
29 Handrails for staircase &
balcony
v'
v'
I
22 Flooring,Dadoing &tilir,g
v'
v'
v'
100% Dawing"
Check for brick layout
23
Agency
!<
AS per Drawing I \
t;thodology.
"
Asper IS
v'
v'+
v'
v' I
'
-t-_l
v'
v'
Check list
,/
v'
v'
v'
v'
v'
v'
v'
v'
v'
v'
v'
'I' v'
Iv'
Note: All Methodology and checks list are P!apared at the time of starting the activity. if nesessary and require7~al tests apart from th~tione~iII ~s per IS, ITP can be amended. \ \ )
LEGEND: I-Inspection; C - C~W- V{ltness;ff~ Review; E- Execute
Approved ~~ GPL
Revi~: KCSR
Prepareq'By: s.~~~~ {l,
A~v~WP
.~ 
'"
LARSEN&TOUBROCONSTRUCTIONB&F
GODREJGARDENCITYPROJECTAHMEADABAD
PROJECTQUALITYPLANPARTII
Sl.no
DetailsofMehodology
Pageno
ForSurveywork
EarthworkExcavation
Plaincementconcrete
11
RCCForFooting,Staterofverticalmembar,RCCShearwall,ColumnandSlab
13
ForFormWork
19
nd
rd
Formworkfor"SHEARWALL"2 and3 lift
21
BackfillingandCompaction
23
PlinthBeamdowelbars
25
FormWorkonAluminium
27
10 Antitermitetreatment
30
11 BrickMasonrywork
32
12 ConcreteBlockmasonrywork
34
13 Plasteringwork
36
14 FixingofdoorFrame
38
15 IPSFlooringwork
40
16 Staircasesteps&Landingflooring(KotaStone)
42
17 Paintingwork
44
18 ExternalPuttyfinishingwork
46
19
48
Internalputty&wallfinishingwork
20 Openterracewaterproofingwork
50
21 Waterproofingfortoiletsunkenarea(Bostick)
52
22 Waterproofingfortoiletsunkenarea(CERACHEM)
57
23 JointtreatmentbetweenRCC&Brickwork
62
24 Waterproofingfortoiletsunkenarea(MYK)
65
25 FixingofHandrials
70
26 Flooring&WallTilingwork
74
27 Countertabletopfixingwork
80
28 Waterproofingfortoiletsunkenarea(NINA)
84
29 Waterproofingfortoiletsunkenarea(PIDILITEsystem)
89
30 Waterproofingfortoiletsunkenarea(BASF)
94
31 FixingofUPVCwindows&Slidingdoors
99
32 WaterproofingforOHT&UGTank
103
33 Waterproofingfortoiletsunkenarea(CICONo:01)
108
34 CanopyWork
113
35
115
Falseceilingwork
LARSEN &TOUBROLTD.-ECCD 
GODREJ GARDEN CITY PROJECT. 
Quality Management
Method Statement
Methodology FOR SURVEY
CONTENT
1.
2.
3.
4.
S.
6.
7.
Introduction and scope of works,
Material delivery and storage,
Resources,
Quality control,
Safety,
Environmental,
Appendix.
1.0 Introduction and scope of works:
\
This document describes the work procedure for setting out o/building and structure
member base line marking in GODREJ GORDEN CllY Project work. This is prepared to
adopt for all the works in general conditions and if any uncommon circumstances arise
then suitable action will be communicated vide shop drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1) Calibrated Total Station, 
2) Auto - level, and necessary measuring tools 
Quality Assurance
Prepared by: S.MARIAPPAN .
Approved By KCS REDDY
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT. 
Quality Management
Method Statement
2.0 Resources! Manpower & Tools.
The following tools and tackles will be required for this activity,
1)
2)
3)
4)
Calibrated Total Station, 
Auto -level, 
and necessary measuring tools, 
Skilled workmen, 
4.0 Methodology for Survey
 	 Take over base coordinates furnished by LTSCPL
 	 Refer base coordinates and establish bench marks at location 20 m away from
grid lines as per survey layout plan.
 	 Construct masonry pillars for p::rmanent benich marks. Plaster ahd finish ','le top
surface neatly.
 	 Re-check with base coordinates and put paint marks on top.
 	 Run a traverse on all sides and establish set out stations on grid lines.( Refer
survey layout plans)
 	 Construct masonry pillars of size 300 x 300 mm and plaster the top surface &
finish smoothly.
 	 Mark grid lines with reference to permanent bench marks, close traverse 
establish joint record with PMC 
 	 For shear wall & column do the marking as per grid line shown in drawing X & y
axis.( As a main reference grid line)
 	 Do the shear wall & column Starter based on the main reference gird line by
using of measurement tape.
 	 Conduct routine survey as per plan and maintain record of work.
Quality Assurance
Prepared by: S.MARfAPPAN
Approved By KCS REDDY
LARSEN &TOUBROLTD.-ECCD 
GODREJ GARDEN CITY PROJECT. 
Quality Management
Method Statement
5.0 Quality Control & Documentation:
Quality checks for this activity will comprise:
 	 Check the center line as per the drawing,
 	 Check list.
6.0 Safety:
 	 All people will have to follow the safety procedures as per the project
safety plan.
 	 Ensuring good house keeping and lighting.
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by workmen on job.
Quality Assurance
Prepared by: S.MARJAPPAN
Approved By KCS REDDY
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Worlc Methodology
Methodology for Earth Work Excavation
CONTENT
1. Introduction and scope of works,
2. 	 Resources,
3. Methodology of Earth Work,
4. Quality control,
5. Safety,
6. Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for Earth work excavation in Godrej
Garden City Project work. This is prepared to adopt for all the works in general
conditions and if any uncommon circumstances arise then suitable action will be
communicated vide shop drawing.
~
2.0 Resources I Manpower & Tools.
The following
1)
2)
3)
tools and tackles will be required for this activity, 
Excavators, 
Tippers I Dumpers, 
workmen, 
3.0 Methodology for Earth Work ExCavation,
 	 Surface shall be cleared off from bushes and all vegetations to enable marking and
setting out of the raft dimensions.
 	 Setout raft dimensions taking reference from Bench Marks constructed vide
procedure of Survey Methodology considering a minimum workspace of 1000 mm
from the PCC plan area.
 	 Now mark the plan area of excavation at the existing ground level which includes
the workspace of around 1000mm,
 	 Ensure the functioning of all the dewatering system before excavation.
 	 Deploy the excavators and excavate the area starting from one end and never reach
the depth more than that of reduced water table. (Excavation during surplus seepage
will lead to earth collapse or caving)
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 24.07.2010
Quality Assurance
Approved By KGS REDDY
LARSEN & TOUBRO LID.-ECCD
GODREJ GARDEN CITY PROJECT - AHMEDABAD
Quality Management
Work Methodologv
 	 Complete the first stage excavation up to the required depth,
 	 Excavated earth shaH be removed thro dumpers over an access ramp located in the
planned direction.
 	 Excavate mechanically appx 150mm above required depth, and balance 150mm
manually to avoid over excavation and filling.
 	 Avoid the filling for below raft area,
 	 Complete excavation, trim to required level, Check level and dimensions at founding
levels.
 	 Seepage water shall be collected thro a surface drain provided all around the pit and
connected to a open sump. Open dewatering shall be done to pump the water
outside.
 	 Provide necessary barrication along the excavated area with reflective tape and
suitable scaffolding.
4.0 Quality Control & Documentation:
 	 Survey Report and Setting out of Building,
5.0 Safety:
 	 All person will have to follow the safety procedures as per the project
safety plan.
 	 Ensuring good housekeeping and lighting.
 Do the marking of all machinery moment as required,
6.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by workmen on job.
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 24.07.2010
Quality Assurance
Approved By KCS REDDY
10
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Wolf( Methodology
Methodology Plain Cement Concrete
CONTENT
1. Introduction and scope of works,
2. Material delivery and storage,
3. Resources,
4. Methodology of concrete,
S. 	 Quality control,
6. Safety,
7. Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for Plain Cement concrete in Godrej
Garden City Project work. This is prepared to adopt for all the works in general
conditions and if any uncommon circumstances arise then suitable action will be
communicated vide shop drawing.
i	
l
2.0 Material delivery and storage,
The following materials will be deployed for the activity, 
1) PCC Concrete with 1:2:4, 
2) Side Shutter material for PCC , 
2.0Resources I Manpower & Tools.
The following tools and tackles will be required for this activity, 
1) Finishing Trowel, 
2) Leveling Plate, 
3) Auto Level and Level staff, 
4) Measuring tape and thread line. 
5) Skilled workmen, 
4.0 Methodology of Plain Cement Concrete.
 	 Preparing the base to receive the leveling course of Plain cement concrete by
removing all loose and unwanted particles. Dressing the area to the required level if
it is excavated pit
 	 Marking the area that needs to receive the PCC with centerline/Grid linelBase line
references
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 24.07.2010
Quality Assurance
Approved By KCS REDDY
11
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Quality Management
Work Methodologv
 	 Providing the side shutters using plain runner / ply wood of 75mm height or as per
the requirement ensuring the top of shutters is same at all the area with proper
supporting arrangement.
 	 Placing the level pad using with cement mortar in frequent interval with required
level as per drawing few hours before starting the concrete works,
 	 Check the line, dimensions & level as per the drawing,
 	 Carrying out the anti-termite treatment as per the requirement if it is excavated
portion and allow the surface to get dried to receive the base concrete mix of I :2:4
 	 Obtaining the approval from STUP Consultant on the Pour Card format no.: IAOOI
for taking up the concreting works,
 	 Laying of concrete whether by manual or pumping arrangement including ramming /
vibrating the concrete to the required level with reference to level pads
 	 Carrying out the finishing for the top surface after required amount of leveling with
power trowel QI manually depends upon the area need to ~ finished
 	 Curing the surface for 7 days by making bunds arrangement and stagnating the water
5.0 Quality Control & Documentation:
Documentation will include:
 	 Clearance of the poured,
 	 Anti- termite treatment Check list
6.0 Safety:
 	 All person will have to follow the safety procedures as per the project
safety plan.
 	 Ensuring good house keeping and lighting.
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by workmen on job.
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 2';'.07.2010
Quality Assurance
Approved By KCS REDDY
12
LARSEN &TOUBRO LTD.ECCD 
GODREJ GARDEN CITY AHMEDABAD 
Quality Management
Work Methodology
Metbodolo2Y for RCC Footing;, Starter of Vertical
Member, RCC Shear wall, Column and Slab
CONTENT
1. Introduction and scope of works,
2.
3.
4.
5.
6.
7.
Material delivery and storage,
Resources,
Methodology of Rcc concrete,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for Reinforced Cement Concrete in
Godrej Garden City Project work. This is prepared to adopt for all the works in
general conditions and if any uncommon circumstances arise then suitable action
will be communicated vide shop drawing or Revision of Methodology.
2.0 Material delivery and storage,
The following materials will be deployed for the activity, 
1) RCC Grade ofM40, M35, M30 & M25. 
2) Reinforcement as per BBS. 
3) Shuttering material. 
2.0Resources / Manpower & Tools.
The following tools and tackles will be required for this activity, 
1) Finishing Trowel, 
2) Wire brush, 
3) Vibrator, 
4) Pump & Pipe line, 
5) Leveling Plate, 
6) Auto Level and Level staff, 
7) Measuring tape and thread line. 
8) Skilled workmen, 
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 12.03.13
Quality Assurance
Approved By KCS REDDY
13
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY AHMEDABAD 
Quality Management
Work Methodology
3.0Methodology of Construction.
3.0 A. Reinforcement work,
 	 Preparing the Bar Bending schedules (BBS) in prescribed format as per
requirements of drawing and IS code standards. Submitting the BBS to
consultants for necessary approval.
 	 Cutting and bending the reinforcement to the required shape as per BBS
with help of trained personnel. And shifting the reinforcements to the
required place by convenient mode of transport
 	 Taking the clearance from site engineer to ensure that the prior activities like
pipe fixing, waterproofing, Polythene sheeting, Cleaning, Shuttering, etc are
completed before starting up rebar activities
 	 With reference to the center linefGridline marking available in site,
positioning the rebar and tying at every junction with
18 -
16 gauge binding
to ensure the uniform spaces between rebar as required by drawing
 	 Inspecting the reinforcements tied at site to ensure that it is as per the
drawing, BBS and recording the laps, extra reinforcements provided to keep
the rebar in position
 	 Placing the cover blocks of required sizes in frequent interval to maintain the
uniform cover at every location 
3.0A Casting of RCC Raft f Footing. 
 	 Do the marking as per the drawing, for all outer line of raft as based on
the grid line.
 	 Do the reinforcement as per the BBS and specification for all stripes and
lap rods, with proper binding, using of 18-16 gauge binding wire.
 	 Provide the reinforcement cover as per the drawing and specification
 	 Complete the reinforcement work as per the drawing and check the
reinforcement details against BBS and approved drawing.
Revision no : 01
Prepared by: S.MARIAPPAN
. Date: 12.03.13
Quality Assurance
Approved By KCS REDDY
14
LARSEN & TOUBRO LTD.ECCD 
GODREJ GARDEN CITY AHMEDABAD 
Quality Management
Work Methodologv
 	 Prepare the side shuttering for vertical member as requ!red for cross
section, drawing / Requirement at form work yard and shift to site, store
the material in the proper manner, (Doka form work system)
 	 After doing shuttering work check the measurement as per the drawing.
 	 Give the offer to client for checking for pour clearance. Getting the
clearance from client
 	 Make the total arrangement for pouring of concrete,
 	 Give the order for concrete as per the pour Card quantity & grade of
concrete.
 	 After arrival of concrete wet the surface for the point of pouring. And lay
the concrete with proper manner.
 	 Carry out the concreting works by manual or pumping arrangement
depends upon the volume of works
 	 Do the proper compaction with help of needle vibratos to ensure the
density of the concrete without any leaving any hollowness inside the
concrete.
 	 Vibrator needle should be inserting immediately after pouring the
concrete the needle to remove slowly after air holes visible on the top
surface.
 	 Level the surface with level edges and maintaining the levels.
 	 Give the Shear Key as per the requirement of site location,
 	 After compaction of Concrete check the dimensions as per the drawing.
 	 Curing the surface for 7 days,
3-0 B. Making of Starters for vertical member.
 	 Prepare the side shuttering for starter the height of 160mm, the cross
section as per the drawing / Requirement,
 	 Clean the Bottom of the structure with help of wire brush,
 	 Do the Grid line marking as per the drawing and do the structure outer
marking with reference of grid line/Center line.
 	 Provide the reinforcement cover of 25mm / 40mm or as per drawing.
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 12.03.13
Quality Assurance
Approved By KCS REDDY
15
LARSEN & TOUBRO LTD.ECCD 
GODREJ GARDEN CITY AHMEDABAD 
Quality Management
Work Methodology
 	 Fix the pre make shuttering as per the marking done, and give the proper
support and proper cover blocks.
 	 Once again check the dimensions as per the drawing for internally.
 	 After internal checking is over give the offer to client, to check the starter
and get the pour card clearance. Getting the clearance of client.
 	 Make the total arrangement for pouring of concrete,
 	 Give the order for concrete as per the pour Card quantity & grade of
concrete.
 	 Pour the cement slurry before starting the pouring of concrete for all
construction joints,
 	 After arrival of concrete wet the surface for the point of pouring. And lay
the concrete with proper manner.
 	 Carry out the concreting works by manual or pumping arrangement
'. depends upon the volume of works
 	 Do the proper compaction with help of needle vibratos to ensure the
density of the concrete without any leaving any hollowness inside the
concrete.
 	 Vibrator needle should be inserting immediately after pouring the
concrete the needle to remove slowly after air holes visible on the top
surface.
 	 Level the surface with level edges and maintaining the levels.
 	 Give the Shear Key as per the requirement of site location,
 	 After compaction of Concrete check the dimensions as per the drawing.
 	 Curing the surface for 7 days,
3.0C- Methodology of Shear wall, column and Slab
 	 Prepare the side shuttering for vertical member as required for cross
section, drawing I Requirement at form work yard and shift to site, store
the material in the proper manner, (Doka form work system)
Do the reinforcement as per the BBS and specification for a11 stripes and
lap rods, with proper binding, using of 18-16 gauge binding wire.
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 12.03.13
Quality Assurance
Approved By KCS REDDY
16
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY AHMEDABAD 
Quality Management
Work Methodology
 	 Provide the reinforcement cover as per the drawing and specification
 	 After binding the reinforcement offer to client for checking the
reinforcement and get the qlearance from client.
 	 Fix the pre make shuttering as per the working drawing, and give the
proper support and required size of cover blocks for column 40mm and
shear wall 25mm or as per the drawing.
 	 Before fixing the shutters apply the mould releasing agent,
 	 Check the plump, Line, and center line and Dimensions of wall & column
at top of the shuttering as per the drawing,
 	 After Check the Dimensions give the offer to client and get the clearance
from client.
 	 Carry out the concreting works by manual or pumping arrangement
depends upon the volume of works
 	 Make the t0tal arrangement for pouring of concrete by manual or pump,
 	 Give the order for concrete as per the pour Card
quan~ity
& grade of
concrete.
 	 After arrival of concrete wet the surface for the point of pouring. And lay
the concrete with proper manner.
 	 Lay the concrete layer by layer, The layer of concrete should not be more
than 300mm and do the proper compaction with help of needle vibrator,
 	 Vibrator needle should be inserting immediately after pouring the
concrete the needle to remove slowly after air holes visible on the top
surface.
 	 Level the surface with level edges and maintaining the levels.
 	 Give the Shear Key as per the requirement of site location,
 	 After compaction of Concrete check the plump and dimensions as per the
drawing.
 	 Curing the surface for 7 days,
Revision no : 01 	
Date: 12.03.13
Quality Assurance
17
LARSEN & TOUBRO LTD.ECCD 
GODREJ GARDEN CITY AHMEDABAD 
Quality Management
Work Methodologv
5.0 Quality Control & Documentation:
 	 Bar Bending Schedule
 	 Clearance of the poured before concreting,
6.0 Safety:
 	 All person will have to follow the safety procedures as per the
project safety plan.
 	 Ensuring good house keeping and lighting.
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by workmen
on job.
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 12.03.13
Quality Assurance
Approved By KCS REDDY
18
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
Methodology for Form Work
CONTENT
1.
2.
3.
4.
5.
6.
7.
Introduction and scope of works,
Material delivery and storage,
Resources,
Methodology of concrete,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for Form Work in Godrej Garden City
Project work. This is prepared to adopt for all the works in general conditions and if
any uncommon circumstances arise then suitable action will be communicated vide
shop drawing.
\
2.0 Material delivery and storage,
The following materials will be deployed for the activity, 
1) Steel Form work material, 
2) Timber form work material, 
3) Ply wood, 
4) Consumables, 
5) Aluminum form work, 
6) Allufo materials for wall & Foundation, 
3.0Resources I Manpower & Tools.
The following tools and tackles will be required for this activity, 
1) Hammer, 
2) Carpentry cutting saw, 
3) Line tread, 
4) Work shop machineries, 
5) Carpenters & Helpers, 
---_.
Revision no : 00
Prepared by: SREE KUMAR
Date: 24.07.2010
Quality Assurance
Approved By KCS REDDY
19
LARSEN &TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
4.0Methodology for form Work.
 	 After complication of PCC survey marking to be done as per the approved drawing
and do the setting out of foundation, After completion raft reinforcement shuttering
to be done with steel, timber and allufo materials, with required line, level & plump.
 	 Carry the starter shutter, shear wall & columns making at carpentr~ yard with using
of ply wood and wooden runner in the standard method, and erect at site with the
proper manner,
 	 Carry forward the shuttering works for Raft, wall & column form works after getting
the approval of reinforcement,
 	 Before fixing the shutters apply the mould releasing agent,
 	 Fix the pre- make shutters as per the drawing and site location and give the proper
support,
 	 Carry the checking of all line, dimensions & plump as for drawing,
 	 After internal checking give the offer to client and get the clearance,
 	 Slab form work to be done as per the scheme drawing and change will done as per
the site condition,
5.0 Quality Control & Documentation:
Documentation will include:
 	 Clearance of the poured,
6.0 Safety:
 	 All person will have to follow the safety procedures as per the project
safety plan.
 	 Ensuring good house keeping and lighting.
7.0 Environmental requirement:
 	 Minimum wastage of timber and ply wood, and also minimize the usage of timber and
ply wood by achieving maximum repetition.
Revision no : 00
Prepared by: SREE KUMAR
Date: 24.07.2010
Quality Assurance
Approved By KGS REDDY
20
LARSEN &TOUBRO L.TD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Methodology for Form Work "SHEAR WALL 
CONTENT
1. Introduction and scope of works,
2. Material delivery and storage,
3.
4.
5.
6.
7.
Resources,
Methodology of concrete,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for Fonn Work shear wall-2nd & 3rd lift
in Godrej Garden City Project work. This is prepared to adopt for all the works in
general conditions and if any uncommon circumstances arise then suitable action
will be communicated vide shop drawing.
2.0 Material delivery and storage,
The following
1)
2)
3)
4)
5)
6)
materials will be deployed for the activity, 
Steel Fonn work material, 
Timber fonn work material, 
Ply wood, 
Consumables, 
Aluminum fonn work, 
Allufo materials for wall & Foundation, 
3.0Resources I Manpower & Tools.
The following
1)
2)
3)
4)
5)
tools and tackles will be required for this activity, 
Hammer, 
Carpentry cutting saw, 
Line tread, 
Work shop machineries, 
Carpenters & Helpers, 
Revision no : 00
Prepared by: SREE KUMAR
Date: 23.10.2010
Quality Assurance
Approved By KCS REDDY
21
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Quality Management
Wolk Methodology
4.0Methodology for form Work.
 	 Clean the first lift top concrete surface free from dust and loess concrete,
 	 Raise the RFI and Get the 2nd or 3rd lift reinforcement approval from STUP
consultant,
 	 Fix the foam sheet all around the wall to prevent the slurry leakage,(5Omm below the
construction joint)
nd
 	 Fix the timber H beam I Steel waler on the bottom of foam sheet to hold the 2 or
3rd lift wall shutter.
 	 Fix the aluminum or Ply wood shutter using with wall ties & tie rods as per the
requirement,
 	 Fix the steel waler bottom & top of the alu shutter, for ply wood shutter l00mm
from the bottom of shutter and CtC distance of waler to be maintained 1.00 m
maximum. For top waler should be 200mm from the top of shutter,
 	 Alignment props should be provide only top & bottom waler, the props should hold
on side staging, or as per the site condition,
 	 Check the line and plump as per the drawing, and get the approval from STUP
,.,
. >\
, consultant before co~creting,
 	 The concrete pouring for the 2nd or 3rd lift to be match with the bottom of slab &
Beam,
 	 After concreting compulsory carried out plumb and line checking any deviation it
should be rectified immediately, and all forrnwork should be water wash for
cleaning.
5.0 Quality Control & Documentation:
Documentation will include:
 	 Clearance of the poured,
6.0 Safety:
 	 All person will have to follow the safety procedures as per the project
safety plan.
 	 Ensuring good house keeping and lighting.
7.0 Environmental requirement:
 	 Minimum wastage of timber and ply wood, and also minimize the usage of timber and 
ply wood by achieving maximum repetition. 
Revision no : 00
Prepared by: SREE KUMAR
Date: 23.10.2010
Quality Assurance
Approved By KCS REDDY
22
LARSEN &TOUBRO LTD.ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
Methodology Back Filling and Compaction
CONTENT
1. Introduction and scope of works,
2. Material delivery and storage,
3. Resources,
4. Methodology of Back Filling,
5. Quality control,
6. Safety,
7. Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for back filling and compaction in
Godrej Garden CityProject 1Vork. This is prepared to adopt for all the works in
general conditions and if any uncommon circumstances arise then suitable action
will be communicated vide shop drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1) Back filling Soil, 
2) Water, 
3.0Resources / Manpower & Tools.
The following tools and tackles will be required for this activity, 
1) Plate compactor, 
2) Hand Rammer 
3) Roller, 
4) Measuring tape and thread line. 
5) workmen, 
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 12.03.13
Quality Assurance
Approved By KCS REDDY
23
LARSEN & TOUBRO LTD.ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodo/ogv
4.0 Methodology of Back filling and Compaction.
 	 Obtain approval for available excavated earth or for earth brought from outside pits
outside the project.
 	 Ensure the backfilling materials should be free from organic, deleterious matter and
dust. Also, ensure that the expansive silt is not used for refilling at site.
 	 Fill the trenches, around foundations, low lying areas, underfloor, plinth fill and
foundations oflayer not exceeding 300mm thick.
 	 Add water and check for optimum moisture content and adjust to within the range of
1% less to 3% more than the optimum moisture content.
 	 Trim and level the backfilled surface to proper profile as indicated in the drawing.
 	 Ram and compact and c4eck for field density. If field density is achieved clear for
next layer or recompact again to achieve the specified field density.
 	 Inspect and clear for next layer.
5.0 Quality Control & Documentation:
 	 Clearance of filed Density Report,
6.0 Safety:
 	 All person will have to follow the safety procedures as per the project
safety plan.
 	 Ensuring good housekeeping and lighting.
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by workmen onjob.
Revision no : 01 	
Date: 12.03.13
Quality Assurance
24
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
Methodology for Plinth Beam Dowel Bars
CONTENT
1. Introduction and scope of works,
2.
3.
4.
5.
Material delivery and storage,
Resources,
Methodology of Plinth Beam dowel bars,
Quality control,
6. Safety,
7. Environmental,
1.0 Introduction and scope of works:
This document describes the work procedure for Plinth Beam dowel bars
in Godrej Garden City Project work. This is prepared to adopt for all the
works in general conditions and if any uncommon circumstances a,rise
then suitable action will be c6mmunicated vide 1hop drawing.
~
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1) Conbextra GP-2,
2) Cement,
3) Bounding agent,
This conbextra GP2 availed in thin poly pack, and this material stored in
shaded and placed in dry place, these bags shall not be lift with hooks,
2.0Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1) Mason and Helper,
2) Mason trowel,
3) Mortar pan,
4) Measuring jar,
5) Wire brush.
Quality Assurance
Prepared by: S.MAR/APPAN
Approved By KGS REDDY
25
LARSEN &TOUBRO LTD.-ECCD
GODREJ GARDEN CITY PROJECT - AHMEDABAD
Quality Management
Wolk Methodologv
3.0Methodology for Rectification. 
Plinth Beam Dowel bars on Shear wall and Column 
 	 Provide the Dowel bar at time of reinforcement, on the Column and
shear wall as per the plinth beam reinforcement drawing,
 	 Check the plinth beam line and level as per the drawing before do the
shuttering of vertical member,
 	 Mter fixing the dowel bars provide the thermocol as per the cross
section of plinth beam and as per the site requirement,
 	 All dowel bars are provide only on the plinth beam location,
Re -Bend of Dowels:
 	 Remove the thermocol around the plinth beam cross section area and
re bend the dowel bar as per the plinth beam reinforcement drawing,
 	 Clean the surface with water, and remove the dirt or soil on the
surface,
 t Apply the bounding agent on the sufface with. using of~brush coating,
 	 Carry the plastering over the surface with using of Conbextra GP-2
the thickness of 12mm to 15mm,
 	 Finishing to be done as per the site requirement and line and plump,
 	 Do the curing for 3 day's
4.0 Quality Control:
 Check the surface after chipping, plastering,
 Get the clearance of Pour Cards for each pour,
5.0 Safety:
 	 All person will have to follow the safety procedures as per
the project safety plan.
 	 Ensuring good housekeeping and lighting.
6.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Quality Assurance
Prepared by: S.MARIAPPAN
Approved By KCS REDDY
26
LARSEN & TOUBRO LTD.ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
Methodology for Aluminium Form Work
CONTENT
1.
2.
3.
4.
5.
6.
7.
Introduction and scope of works,
Material delivery and storage,
Resources,
Methodology for fonn work on Aluminium,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for Form Work on Aluminium in
Godrej Garden City Project work. This is prepared to adopt for all the works in
general conditions and if any uncommon circumstances arise then suitable action
will be communicated vide shop drawing"
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1)
2)
3)
4)
5)
6)
7)
8)
500mm Stup pin, 
Rocker angle 50x50 mm, 
PE sleeve, 
PVC tubing, 
Plywood, 
kicker bolts M16x80mm, 
Wall tile, 
walk way jai12400*400 mm, 
3.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity, 
1) Hammer, 
2) Carpentry cutting saw, 
3) Line tread, 
4) Work shop machineries, 
5) Carpenters & Helpers, 
Revision no .' 01
Prepared by: SREE KUMAR
Date.' 08.12.2010
Quality Assurance
Approved By KCS REDDY
27
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PRO.IECT AHMEDABAD 
Quality Management
Work Methodologv
4.0 Methodology for Aluminium form Work.
 	 Wall centre line/Offset line From wall face, Doors and windows should be
marked ;level checking as per drawing,
 	 According to level; first external kicker(conventional) should be fixed,
 	 first shifting of internal panels to the identified location fix the rocker (angle
section 50x50 )to the std: wall panel,
 	 Application of approved shuttering oil to the panel and fix it in location ;
wall tie with PE sleeve and PVC tubing should be inserted,
 	 Assemble End beam Mid beam to Deck prop head and insert prop length and
fix in-between wall panels beam bars and 80mm stub pin is using for the
connection,
 	 Start fixing of deck panels (for height steel tables were used)
 	 External wall panel fixing above the wooden kicker bolting or nailing is reqd
 	 fixing of external kicker above the wall panel (kicker to kicker connection
with kicker strap)
 	 External panel alignment and plum checking,
 	 Soldier fixing: As per drawing mark the exact locatiot;l of brackets, from the
kicker below 300mm provide 20mm dia holes on external and internal walls.
Through the holes provide 25mm dia pvc pipe and mivan special tie rod
through soldiers. this will enable the alignment of kicker line and fixing of
brackets to next level,
 	 Insert kicker bolts M16*80mm nut bolt and washer with pvc cone and pvc
pipe (bolt is retrievable and nut washer is consumable)
 	 Slab leveling: Mivan supplied prop length and prop head (DP) having zero
tolerance no adjustment in up and down is possible so if slab level is down
we have to pack with ply and timer pieces otherwise chipping is reqd
verticality of props should be very perfect,
 	 All gapes between floor and wall should be packed with cement mortar 1: 4,
 	 Transfer box out should be provided in slabs for lifting internal panels to the
next level
 	 Ensure all wall ties (with PE sleeve and pvc tubing) ,pins and wedges are
provided
 	 Ensure the application of shuttering oil for every Alu-Form panels,
Revision no : 01
Prepared by: SREE KUMAR
Date: 08.12.2010
Quality Assurance
Approved By KCS REDDY
28
LARSEN & TOUBRO LTD.ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
4.0 A - Dismantling of Alu-Form shutters,
 	 First dismantle external and Internal wall panels where the soldier is fixed,
 	 Through the holes fix the Mivan access bracket with Dywidag tie rod and nut,
 	 Fix fabricated walk way jali 2400*400 mm 2 nos through the platform leaving 100
mm distance in between wall and jali and proper tying of safety net through 100 mm
distance we can lift the external wall panels
 	 Slab :dismantle all deck panel including EB MB without disturbing DP and PL this
will act as re propping after 36 hours DP and PL will be removed, .
 	 After dismantling all components should be cleaned and applied mould releasing
agent
5.0 Quality Control & Documentation:
Documentation will include:
 	 Clearance of the poured,
 	 Check list L&T/~S/C-13/Fl,
6.0 Safety:
 	 All person will have to follow the safety procedures as per the project
safety plan.
 	 Walkway jali should be tied with binding wire
 	 Bottom of the safety net should be tied very closely to the permanent
structure
 	 Floor to floor removing shifting and fixing of brackets should be very
carefully; safety belt of the workmen should be in already fixed top
bracket or in life line not in the operating bracket
 	 Ensuring good house keeping and lighting.
7.0 Environmental requirement:
 	 Minimum wastage of timber and ply wood, and also minimize the usage of timber and
ply wood by achieving maximum repetition.
Revision no : 01
Prepared by: SREE KUMAR
Date: 08.12.2010
Quality Assurance
Approved By KCS REDDY
29
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Wolk Methodology
Methodology for Anti Termite Treatment Work
CONTENT
1. 	 Introduction and scope of works,
2. 	 Material delivery and storage,
3. 	 Resources,
4. 	 Methodology of Anti Termite Treatment,
5. 	 Quality control,
6. 	 Safety,
7. Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for Anti termite Treatment in Godrej
Garden City Project work. This is prepared to adopt for all the works in general
conditions and if any uncommon circumstances arise then suitable action will be
communicated vide shop drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity, 
1) Chlorpyrifos 20 EC, 
2) Or Endosulfan 35 EC, 
2.0Resources I Manpower & Tools.
The following tools and tackles will be required for this activity, 
1) Sprayers 
2) Sprinklers, 
3.0Metbodology for form Work.
 	 Carry out the marking for the ATT area before starting the PCC,
 	 Holes will be dug at the distance of 150mm ctC up to the depth of 500mm, Do the
holes of
 	 After complication of PCC survey marking to be done as per the approved drawing
and do the setting out of foundation, After completion raft reinforcement shuttering
to be done with steel, timber and allufo materials, with required line, level & plump.
Quality Assurance
Prepared by: S.MAR/APPAN
Approved By KCS REDDY
30
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
 	 Carry the starter shutter, shear wall & columns making at carpentry yard with using
of ply wood and wooden runner in the standard method, and erect at site with the
proper manner,
 	 Carry forward the shuttering works for Raft, wall & column form works after getting
the approval of reinforcement,
 	 Before fixing the shutters apply the mould releasing agent,
 	 Fix the pre- make shutters as per the drawing and site location and give the proper
support,
. Carry the checking of all line, dimensions & plump as for drawing,
 	 After internal checking give the offer to client and get the clearance,
 	 Slab form work to be done as per the scheme drawing and change will done as per
the site condition,
5.0 Quality Control & Documentation:
Documentation will include:
 	 Clearance of the poure'd ,
6.0 Safety:
 	 All person will have to follow the safety procedures as per the project
safety plan.
 Ensuring good house keeping and lighting.
7.0 Environmental requirement:
 	 Minimum wastage of timber and ply wood, and also minimize the usage of timber and
ply wood by achieving maximum repetition.
Quality Assurance
Prepared by: S.MARIAPPAN
Approved By KCS REDDY
31
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Quality Management
Work Methodology
Methodology for Brick Masonry
CONTENT
1. Introduction and scope of works,
2.
3.
4.
5.
6.
7.
Material delivery and storage,
Resources,
Methodology of Brick work,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for Brick work in Godrej
Garden City Project work. This is prepared to adopt for all the works in
general conditions and if any uncommon circumstances arise then
suitable action will be communicated vide shop drawing.
"
~
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1.
2.
3.
4.
Brick 230mm & 115 thick,
Cement OPC-53 Grade
River Sand
Water
3.0 Resources I Manpower &, Tools.
The following tools and tackles will be required for this activity,
1.
2.
3.
4.
Mason trowel,
Plumb bob
Right angle
Thread line
Revision no: 01
Prepared by: S.MARIAPPAN
Date: 18.03.2011
Quality Assurance
Approved By KCS REDDY
32
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
4.0Methodology for brick work masonry.
01. 	 Marking the location of brick work with thread line over concrete
structure with reference to drawings and highlight openings
02. 	 Hack the concrete surfaces wherever block masonry joins with the
concrete surfaces,
03. 	 Construct the first layer 230mm or 115 mm as per drawing then
check for dimensions. Get the approval from STUP consultant
and proceed with further layers if dimensions are satisfactory,
04. 	 Maintain the cement mortar thickness as 12mm,
05. 	 Height of brick masonry shall not be raised more than 14courses
per day,
06. 	 In 115 mm thk brick masonry, provide the Smm dia
2nos
reinforcement at every 4th course.
07. 	 Put the date of construction on the brick work with paint and
Curing of brick work for 7 days.
OS. 	 Measuring box to be used for proportioning of Cement Mortar for
230mm wall CM1:5 & 115mm wall CM 1:4.
09. 	 Follow ,points listed in cpeck list while c~nstructions of blo~k
masonry work.
~
10. 	 Refer services drawings and co-ordinate service locations
. 11. Check each day's work for Line, Levels and conformances to
tolerances
12. 	 Raking out the joints for Smm depth.
5.0 Quality Control & Documentation:
L Check list for brick work masonry,
6.0 Safety:
 	 Ensuring good housekeeping and lighting.
 	 Bricks stacking at yard maximum height should not exceed
1.50m
 	 Working platform must be 600mm (min.) width and must be
tied at both sides.
 	 No. of bricks to be shifted by winch at one time to be
decided comparing with winch cage capacity,
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 18.03.2011
Quality Assurance
Approved By KCS REDDY
33
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Walk Methodology
Methodology for Concrete Block work Masonry
CONTENT
1.
2.
3.
4.
5.
6.
7.
Introduction and scope of works,
Material delivery and storage,
Resources,
Methodology of Concrete block Masonry,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for concrete block work
Godrej Garden City Project work. This is prepared to adopt for' all the
works in general conditions and if any uncommon circumstances arise
then ~uitable action will 'be communicated \.ride shop drawing.'
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. Block 200 mm & 100mm,
2. Cement OPC-53 Grade
3. River Sand
4. Water
3.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1.
2.
3.
4.
Mason trowel,
Plumb bob,
Right angle,
Thread line,
Revision no : 00
Prepared by: B.MARIAPPAN
Date: 20.10.2010
Quality Assurance
Approved By KGB REDDY
34
LARSEN & TOUBRO LTD.-ECCD
GODREJ GARDEN CITY PROJECT - AHMEDABAD
Quality Management
Work Methodologv
4.0 Methodology for block masonry.
01. 	 Marking the location of Block work with thread line over
concrete structure with reference to drawings and highlight
openmgs,
02. 	 Hack the concrete surfaces wherever block masonry joins with the
concrete surfaces,
03. 	 Construct the fIrst layer 200mm or 100 mm as per drawing then
check for dimensions. Get the approval from STUP consultant
and proceed with further layers if dimensions are satisfactory,
04. 	 Maintain the cement mortar thickness as 2Smm,
OS. 	 Height of block masonry shall not be raised more than 1m per
day,
06. 	 In 100 mm thk block masonry, provide the 8mm dia
reinforcement at every Sth course.
07. 	 Put the date of construction on the block work with paint and
Curing of brick work for 7 days.
08. 	 Measuring box (326x326x326mm) to be used for proportioning of
Cementfiortar as per the specification.
1
'1
09. 	 Follow points listed in check list while construction of block
masonry work,
10. 	 Refer services drawings and co-ordinate service locations
11. 	 Check each day's work for Line, Levels and conformances to
tolerances.
12. 	 Raking out the joints for 12mm depth
5.0 Quality Control & Documentation:
1. 	Check list for Concrete block work masonry,
6.0 Safety:
 	 Ensuring good housekeeping and lighting.
 	 Block stacking at yard maximum height should not exceed
1.S0m.
 	 Working platform must be 600mm (min.) width and must be
tied at both sides.
 	 No. of Blocks to be shifted by winch at one time to be
decided comparing with winch cage capacity,
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 20.10.2010
Quality Assurance
Approved By KCS REDDY
35
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
Methodology for Plastering
CONTENT
1. Introduction and scope of works,
2. Material delivery and storage,
3. Resources,
4.
5.
6.
7.
Methodology of Plastering,
Quality control,
Safety,
Environmental,
1.0 Introduction and scope of works:
This document describes the work procedure for wall plastering in 
Godrej Garden City Project work. This is prepared to adopt for all the 
works, in general conditi<?ns and if any uncqmmon circumstan~es arise
then suitable action will be communicated vide shop drawing. 
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. Cement OPC-53 Grade
2. River Sand 
3 .. Water 
3.0 Rt',Sources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1.
2.
3.
4.
5.
Mason trowel,
Plumb bob
Right angle
Thread line
Straight edge,
nevision no : 01
Prepared by: B.MARIAPPAN
Date: 25.03.2011
Quality Assurance
Approved By KGB REDDY
36
LARSEN & TOllBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Quality Management
Work Methodologv
5.0Methodology for plastering work.
01. 	 Hack any exposed faces of concrete which form substrate for
plastering
02. 	 Fix all conduits, chases with chicken wire mesh 150mm wide
03. 	 Fix sub frames for all door openings,
04. 	 Prepare scaffold to ensure access to all locations. Ensure safety of
scaffolding and provide lighting of adequate intensity
05. 	 Fix plaster thickness reference by mortar pads with respect to sub
frames using thread line,
06. 	 For interior walls shall be done in a single coat and Exterior
plaster shall be carried out in two coats, the first coat being 12mm
thick in cement mortar 1:4 and the second coat being 6 to 8mm
thick in CM 1:3,
07. 	 Wet all substrate minimum of 2 hours before application of plaster
08. 	 Provide chicken mesh 100mm wide wherever block masonry joins
with the concrete surface using nails,
09. 	 Use GI tray at bottom for mixing the cement mortars and
measurin~ box for measuritw the fine aggregat~.
!
10. 	 Making the grooves 6mm x 6mmat the junction of concrete and
masonry or as per the architectural drawing,
11. 	 Always stop a day's work at comer,
12. 	 Put the date of plastering on the plastered area with paint and
Curing to be done for 7 days.
13. 	 Follow the check list for plastering works.
5.0 Quality Control & Documentation:
1. Check list for plastering work,
6.0 Safety:
 Ensuring good housekeeping and lighting.
 	 Ensure lifeline before starting plastering at height
 	 Sufficient lighting to be provided at night work
 	 All walkway platforms are 600mm (min.) and tied both
sides
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 25.03.2011
. Quality Assurance
Approved By KCS REDDY
37
LARSEN &TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Quality Management
Work Methodology
Methodology fixing of door frame
CONTENT
1.
2.
3.
4.
5.
6.
7.
Introduction and scope of works,
Material delivery and storage,
Resources,
Methodology of fixing of door frame,
Quality control,
Safety,
Environmental,
1.0 Introduction and scope of works:
This document describes the work procedure for fixing of door frame in
Godrej Garden City Project work. This is prepared to adopt for all the
works in general conditions and if any uncommon circumstances arise
then suitable action will be communicated vide shop drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1.
2.
3.
4.
5.
Door frame
750mm x 2100mm,
900mrnx 2100mm,
1000mm x2100mm,
HRD Frame anchor - HRD-C-I Oxl20
3.0 Resources I Manpower & Tools.
1.
2.
3.
4.
5.
6.
7.
The following tools and tackles will be required for this activity,
Hammer,
Drilling. machine,
Angle Grinder,
Chipping machine,
Plump bob
Right Angle
Line third
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 08.04.2011
Quality Assurance
Approved By KCS REDDY
38
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
,- Wort< Methodology
7.0Methodology for fixing of door frame,
01. 	 Check the dimensions & levels as per the drawing,
02. 	 l.OOm height from STRL marking to be done for all door opening
jambs,
03. 	 If any changes in dimensions do rectification as per the as per the
requirement,
04. 	 Marking to be done for I.10m from top of the door frame,
05. 	 Insert the frame on the opening and match the level marking on
point no 2 & 4,
06. 	 Check the plumb and line and marking to be done for the HRD
Frame anchors as per the drawing,
07. 	 Drill the frame with wood drill bit and drill the RCC wall with
concrete drill bit IOmm dia, at the time of drilling the
reinforcement is there the location of hole to be change as per the
site requirement,
08. 	 The excess holes on the frame to be close on the same wood
pIece,
09. 	 Clean the drilled holes using with Brush,
IO. 	 Insert the Fisher plug in the cleaned hole after that put the bolt to
same direction,
11. 	 The bolt should be tightened using with machine,
12. 	 The bolt should be 5 to IOmm inside of the door frame face,
13. 	 Final line, level & plump to be check,
5.0 Quality Control & Documentation:
L Check list for door frame (to be checked each one flat after complication
all door fixing ),
6.0 Safety:
 	 Ensuring good housekeeping and lighting,
 	 Ensure trained work men for doing drill holes,
 	 'Sufficient lighting to be provided at night work, .
 	 All walkway platforms are 600mm (min.) and tied both
sides
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 08.04.2011
Quality Assurance
Approved By KCS REDDY
39
LARSEN & TOLIBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Quality Management
Wolk Methodology
Methodology for IPS flooring
CONTENT
1. Introduction and scope of works,
2. Material delivery and storage,
3. Resources,
4.
5.
6.
7.
Methodology of IPS Flooring,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for IPS flooring in Godrej
Garden City Project work. This is prepared to adopt for all the works in
general conditions and if any uncommon circumstances arise then
suitable action will be communicated vide shop drawing.
a
,
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. Screed concrete with 10mm down, Grade M20,
2. Cement OPC - 53 Grade,
3. River Sand,
4. Water
3.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1. Mason trowel,
2. Wire brush,
3. Morter pan,
4. Straight edge,
Revision no : 00
Prepared by: S.MAR/APPAN.
Date: 12.12.12
Quality Assurance
Approved By : KGS REDDY
40
LARSEN &TOUBRO LTD.-ECCD
GODREJ GARDEN CITY PROJECT - AHMEDABAD
Quality Management
Work Methodologv
4.0 Methodology for IPS flooring,
1. 	 Clean the surface and remove and all loose materials using with wire
brush,
2. 	 Fix the button mark for the top of IPS flooring as per the drawing.
3. 	 Clean the surface and remove and all loose materials using with wire
brush,
4. 	 Get the approval from client,
5. Ensure the Panel top level of concrete should be proper.
6. 	 Lay the concrete thickness of 40mm do the finishing at the time of finial
setting time of concrete,
7. Ensure the line & level as per the requirement,
8. 	 Do the Curing for 7 days.
5.0 Quality Control & Documentation:
1. 	Pour card for IPS nooring,
\
6.0 Safety:
 	 Ensuring good housekeeping and lighting .
. 	Electrical equipment must be routed through ELCB only,
 	 Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 00
Prepared by: S.MARIAPPAN.
Date: 12.12.12
Quality Assurance
Approved By: KCS REDDY
41
LARSEN &TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
Methodology for Staircase Steps & Landing flooring
(Kotha Stone)
CONTENT
1.
2.
3.
4.
5.
6.
Introduction and scope of works,
Material delivery and storage,
Resources,
Methodology of Staircase Steps & landing Flooring,
Quality control,
Safety,
7. Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for Staircase Steps &
landing Flooring in Godrej Garden City Project work. This is prepared
to adopt for all the works in general conditions and if any uncommon
circu~tances arise then sl;litable action willl?e communicated vide shop
i
drawing.
'
I
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1.
2.
3.
4.
30mm & 18mm Kotha stone.
Cement,
River Sand,
Water,
3.0 Resources / Manpower & Tools.
The following tools and tackles will be required for this activity,
1.
2.
3.
4.
5.
6.
Mason trowel,
Plumb bob
Right angle
Thread line
Cutting/Grinding machine
Spirit level
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 04.11.2010
Quality Assurance
Approved By KCS REDDY
42
LARSEN &TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PRO.IECT  AHMEDABAD 
Quality Management
Wolk Methodology
4.0 Methodology for Staircase Steps & Landing flooring Laying.
01. 	 Mark the FFL of floor to floor and mid landing as per the
drawing, Check the Steps Riser & Tread.
02. 	 Get the approval from STUP Consultant.
03. 	 Mack the Riser ISmm thk kotha stone & Tread 30mm thk kotha
stone at yard.
04. 	 Nosing, Groove cutting, chamfering and joint as per the drawing
and ensure the same.
05. 	 Transport the stones to near the stair case as per the requirement
without any damage.
06. 	 Clean the all surface free from dust & oiL
07. 	 Start to lay the first step tread with CM 1:4 based on the FFL and
fix the riser for second step with CM 1:4 as per the drawing check
the level & line.
OS. 	 Continue the same step no: 06 for all steps and ensure the cutting
line & level as per the drawing.
09. 	 Final check to be done for steps & landing floor to floor in teams
all steps ~
,
l
10. 	 Do the Pointing for all joint as per the requirement.
11. 	 Do not allow the people to walk on the stair case up to 3days.
12. 	 Curing to be done for 7 days.
5.0 Quality Control & Documentation:
1. Check list for kitchen table top fixing,
6.0 Safety:
 Ensuring good housekeeping and lighting.
 	 Engage only expertise person for cutting the stone and
proper machine for cutting
 	 Electrical equipment must be routed through ELCB only
 	 Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shall be used by
workmen on job.
Revision no : 00
Prepared by: S.MARIAPPAN
Dale: 04.11.2010
Quality Assurance
Approved By KCS REDDY
43
LARSEN &TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
Methodology for Painting work,
CONTENT
1. Introduction and scope of works,
2.
3.
4.
5.
6.
7.
Material delivery and storage,
Resources,
Methodology of Painting work,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for Painting work in
Godrej Garden City Project work. This is prepared to adopt for all the
works in, general condition~ and if any uncotmpon circumstances, arise
then suitable action will be communicated vide shop drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. White Cement,
2. Oil Bound Distemper,
3. Waterproof cement paint,
4. Varnishing,
3.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1.
2.
3.
4.
Approved Paint
brush
Metal drums for mixing
Emery paper
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 20.10.2010
Quality Assurance
Approved By KGS REDDY
44
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PRoJECT AHMEDABAD 
Quality Management
WoTk Methodologv
4.0Methodology for Painting Work.
01. 	 Allow the plastered surface to dry completely
02. 	 Make the surface free from mortar drops, dust, efflorescence etc.
03. 	 . Apply a coat of paint on patches if any and allow it to dry before
the regular coat of paint is applied
04. 	 Apply alkali resistant primer of approved quality
05. 	 Check the paint for its approved brand, shade and sealed
container
06. 	 After the primer coat has dried, lightly sandpaper the surface to
make it smooth for receiving the paint
07. 	 Apply one coat of paint with brushes in horizontal strokes
followed immediately by vertical ones which together constitutes
one coat
08. 	 Apply subsequent coats in the same way after allowing a time
interval of at least 24 hrs between successive coats
09. 	 Follow the checklist for painting works
5.0 Quality Control & Documentation:	
1. Check list for Painting,
6.0 Safety:
 Ensuring good housekeeping and lighting.
 	 Whenever doing outside ensure the proper walk way,
working platform(width is 600mm min) and lifeline are
provided before starting job
 	 Liquids/chemicals are to be stored at site with proper
labeling etc.
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 20.10.2010
Quality Assurance
Approved By KCS REDDY
45
LARSEN &TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
Methodology for External Putty rmishing work,
CONTENT
1. Introduction and scope of works,
2. Material delivery and storage,
3. Resources,
4. Methodology of Painting work,
5. Quality control,
6. Safety,
7. Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for External putty finishing
work in Godrej Garden City Project work. This is prepared to adopt for
all the works in general conditions, and if any uncommon circumstances
arise then' suitable action wiil be communicateA vide shop drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. Putty approved brand,
2. Water,
3. Cement
4. Primer
5. Cebx-100
3.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1. Brush,
2.
3.
4.
5.
Metal drums for mixing,
Emery paper,
Paint roller,
Putty Blade,
Revision no: 01
Prepared by: S.MARIAPPAN
Date: 18.11.2011
Quality Assurance
Approved By KCS REDDY
46
LARSEN &TOLIBRO LTD.ECCD
GODREJ GARDEN CITY PROJECT AHMEDABAD
Quality Management
Work Methodology
5.0 Methodology for Painting Work.
01. 	 Clean all the surface of external and do the grinding for total area
as per the requirement ensure all tie rod selves to be removed
before the grouting.
02. 	 Do chambering for all sunshades top with CM 1:4 and ensure the
proper slop.
03. 	 Do the grouting of all balance tie rod hole with CEBX - 100
mixing one pack 22Sgrm of Cebx - 100 in one bag of cement.
04. 	 After 12 hours apply the flrst coat of putty for all areas.
05. 	 After 24 hours do the water test for 2 hours and check the
leakages,
06. 	 If any leakages found do the chipping of tie rod holes and
grouting to be done as per site requirement.
07. 	 If any undulation is visible do the marking for the undulation.
08. 	 All marking area grinding to be done as per the requirement.
09. 	 Apply the first cote of putty for all rectification area.
10. 	 Start the second coat of putty for all areas.
11.
sanding above the second coat putty.
, 	 Do the surface
;	
.
12. 	 Check the final water test 2hours for the total area.
13. 	 After completion of water test do one coat of approved primer.
14. 	 Follow the checklist.
~
5.0 Quality Control & Documentation:
1. Check list.
6.0 Safety:
 Ensuring good housekeeping and lighting.
 	Mack ensures the proper training was given for handling the
Gandola & Fracco as per the requirement.
 	 Liquids/chemicals are to be stored at site with proper
labeling etc.
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no: 01
Prepared by: S.MARIAPPAN
Date: 18.11.2011
Quality Assurance
Approved By KGS REDDY
47
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Quality Management
Worlc Methodology
Methodology for Internal Putty & wall finishing work,
CONTENT
1. Introduction and scope of works,
2.
3.
4.
S.
6.
7.
Material delivery and storage,
Resources,
Methodology of Painting work,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for External putty finishing
work in Godrej Garden City Project work. This is prepared to adopt for
all the works
, in general conditions and if any uncommon circumstances
:.
arise then suitable action will be communiGated vide shop drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. Putty approved brand,
2. Water,
3. Cement
4. Primer
5. Cebx 100
3.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1.
2.
3.
4.
5.
Brush,
Metal drums for mixing,
Emery paper,
Paint roller,
Putty Blade,
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 18.11.2011
Quality Assurance
Approved By KGS REDDY
48
LARSEN &TOUBRO LTD.-ECCD
GODREJ GARDEN CITY PROJECT - AHMEDABAD
Quality Management
Wolk Methodology
5.0 Methodology for Putty Work.
01. 	 Clean all the surface of external and do the grinding for total area
as per the requirement ensure all tie rod selves to be removed
before the grouting.
02. 	 Do the grouting of all balance tie rod hole with CEBX - 100
mixing one pack 225grm of Cebx 100 in one bag of cement.
03. 	 Mter 12 hours apply the first coat of putty for all areas.
04. 	 If any undulation is visible do the marking for the undulation.
05. 	 All marking area grinding to be done as per the requirement.
06. 	 Apply the first cote of putty for all rectification area.
07. 	 Start the second coat of putty for all areas.
08. 	 Do the surface sanding above the second coat putty.
09. 	 Follow the checklist.
5.0 Quality Control & Documentation:
1. 	Check list.
6.0 Safety:
\
~ Ens~'in~ good housekeepn!g and lighting.
 Mack ensures the proper training was given for handling the
Gandola & Fracco as per the requirement.
.
 	 Liquids/chemicals are to be stored at site with proper
labeling etc.
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 18.11.2011
Quality Assurance
Approved By KCS REDDY
49
LARSEN & TOUBRO LTD.ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
Methodology for open Terrace water proofing
CONTENT
1.
2.
3.
4.
5.
6.
7.
Introduction and scope of works,
Material delivery and storage,
Resources,
Methodology of Painting work,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This document describes the workprocedure for Terrace water proofing
work in Godrej Garden City Project work. This is prepared to adopt for
all the works in general conditions and if any uncommon circumstances
arise then suitable action will be communicated vide shop drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. Brick bats,
2. Water,
3. Cement
4. Pidiproof LW+
5. Broken Glass tiles
3.0 Resources / Manpower & Tools.
The following tools and tackles will be required for this activity,
1.
2.
3.
4.
5.
Wire Brush,
Third line,
Finishing travel,
Measurement box,
Broom stick,
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 17.01.2012
Quality Assurance
Approved By KCS REDDY
50
LARSEN & TOllBRO LTD.ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Wolk Methodologv
4.0 Methodology for Terrace water proofing Work.
Appling a slurry coat of neat cement using 2.5 kg. Per /sqm with LW.C.
2. 	 Laying Brickbats in slope as per the drawing by using different size of
brickbats with LW.C. added cement mortar of l:5 (lcement: 5coarse
sand).
3. 	 The minimum thickness of the brickbat with base mortar should not be
less than 50mm at rain water pipe.
4. 	 Treating the adjoining walls up to 300 mm height (from finished level of
water proofing) including rounding ofjunction of walls and slabs.
5. 	 After one day of proper curing, finish the surface with 20 mm thick
LW.C. added cement mortar of 1:4 proportions and finally finishing the
surface with trowel with neat cement slurry and mild booming to receive
base of the china mosaic flooring.
6. 	 Complete the china mosaic flooring in all area.
7. 	 The whole terrace so finished shall be flooded with water for sufficient
time of curing and for final test.
8. 	 Follow the checklist.
1. 	
N.B. : LW.C. is integral waterproofing compound. (PidiproofLW+)
Dosage of PIDIPROOF LW is 150 to 200ml per bag of cement.
5.0 Quality Control & Documentation:
1. 	Check list.
6.0 Safety:
 Ensuring good housekeeping and lighting .
 Mack ensures the proper training was given for handling the
Gandola & Fracco as per the requirement.
 	 Liquids/chemicals are to be stored at site with proper
labeling etc.
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 00
Prepared by: S.MARfAPPAN
Date: 17.01.2012
Quality Assurance
Approved By KCS REDDY
51
LARSEN & TOLIBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Quality Management
Worlc Methodology
Methodology for Water Proofmg for toilet sunken area
(BOSTIKJ
CONTENT
1. Introduction and scope of works,
2.
3.
4.
S.
6.
7.
Material delivery and storage,
Resources,
Methodology of water proofing for toilet sunken area,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This~document describ~:.3 the work proced..ke for water proofmg:oftoilet
sunken area in Godrej Garden City Project work. This is prepared to
adopt for all the works in general conditions and if any uncommon
circumstances arise then suitable action will be communicated vide shop
drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. Hydroment 476 Crete HS I Boscocrete bounding agent,
2. Boscolastic water proofing compound,
3. Fill-A-Gap Sealant,
4. Cement OPC-53 Grade
5. River Sand
6. Water
3.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1. Mason trowel,
2. Wire brush,
3. Painting brush,
4. Mixing pan 10 liter capacity,
... :
5. Morter pan,
6. Straight edge,
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 04.04.2011
Quality Assurance
Approved By KCS REDDY
52
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
4.0 Methodology for water proofing for toilet sunken area.
1. 	 Remove all protruded reinforcements by gas cutting up to 25mm below
RCC.
2. 	 Clean the surface and remove and all malba and flaked slurry from the
surface
3. 	 RC sunken slab to be treated with water proofing shall be checked for
any leakage by water pounding for 24 hours
4. If any leakage found shall be marked and grouting shall be done.
5. Grouting should be repeated till leakage arrested,
6. 	 After cleaning the surface, all the cracks and pot holes should be patched
with cement and bonding material HYDROMENT 476 of BOSTIK in a
proportion of 1 part HYDROMENT 476 and 4 parts of cement.
7. 	 After of2 hours, apply one slurry coat made ofHYDROMENT 476 and
cement in a proportion of 50 kg cement and 16 liters of water and 2 kg
HYDROMENT 476. All mixing of chemical shall be carried out with ,
electrical driveh mixture. ..;..
1
;,
.:;. 
8. 	 After 2 hours apply flIst coat of BOSCOLASTIC and follow 2nd and
3rd coat in minimum 2 hours by brush (in direction perpendicular to the
previous coat). Proportion of BOSCOLASTIC is 10 kg powder and 7.5
kg polymer. Minimum consumption of material is 1.8 kg to 2 kg per
sqm.
9. 	 After 24 hours, protective plaster of minimum 15rum thickness along
with HYDROMENT 476 is a must. Proportion of plaster is 200 kg sand,
50 kg cement and 2 liters ofHYDROMENT 476.
10.Do the water supply & wastage line as per the plumbing methodology,
11.Complete the all plumbing work as per the drawing,
12.After 24 hours only all the pipe ducts shall be sealed with cement mortar
with a depth of 10rum and width of 10rum around the periphery of pipe
ducts. (l part HYDROMENT 476 and 4 parts cement.
13.After 24 hours ACRYLIC sealant of BOSTIk shall be applied in to the
groove.
14.Hydro test can be done after 72 hours of curing of the sealant for a
period of 48 hours.
15.In case of any leakage after all these exercise we will go for injection
grouting with non shrink chemicals BOSTIK ADO mix.
Note: For sides the water proofing coating shall be ext~ilded up to .a.height
of 100mm above the FFL level.
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 04.04.2011
QualityAssurance
Approved By KCS REDDY
53
LARSEN &TOUBRO LTD.-ECCD 
. GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Quality Management
Worlc Methodology
5.0 Quality Control & Documentation:
1. 	Check list for water proofing,
6.0 Safety:
Ensuring good housekeeping and lighting.
Engage only expertise person for mixing the chemical.
Electrical equipment must be routed through ELCB only,
Use hand gloves for water proofing chemical mixing.
Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
~
'.....
a.
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen onjob.
Revision no: 01
Prepared by: S.MARIAPPAN
Date: 04.04.2011
Quality Assurance
Approved By KCS REDDY
54
LARSEN &TOUBROLTD.-ECCD
Goderi Garden City Proiect- Ahmedabad
, I
lock :_ _
loorLevel:
CHECK LIST FOR TOILET WATER PROOFING.
-5J.::..::-:..-rg~I.'-Q-=-J<.~_ _ _-,---t-_ _--;-:_ _
63'6h'O ~
I~t-:r- ~ Y FW-A"": .tP~
(
I.no
Description
Date
Toilet
Location
YES
Signature
NO
W/PCon/
L&TECCD
Execution
.47.J-..
'r~'~
Cleaning of the surface
A)",i
2
Water pounding Test for 24 hrs
If leakage found do the grouting
;V
&iw...J -
L&TECCD
STUP
QA/QC
Consultant
1/\
r-
Yd;(
,t,.
Il ]!C j-I~'LJ J
1'-
fiK'.
isase preparation
I"
"II ,41'1'}/;"
1
,,11/
0 ~v
11
rIlK,/""~
1'111' "
/\G~~ / l J
(1n1~~1 V\,
\1 '" '?!X'b
f:~
1 //'
'1' ,,,,,,
'7 ! It!"'
j'
1",1
.<
Jd L
:
'1
Applying of water proofing coating,
I
Protective plaster of minimum 15mm thick,
11<. t;.. ;/ I(1.---
11210'/.. /)
We"
,~dl.- tX1~
l(l\v\<)1;
t~/
,nit. ,\-<-' t
WI'.~
, I,
'eM
including groove of 12mm
Sore packing with
around the pipe line & cut out
Apply the sealant around the groove
Water pounding Test for 48 hrs
10
If leakage found do the grouting
11
After grouting do the pound test for 48 hrs
:,1
I
55
LARSE" & TOUBRO LTD.-ECCD
MOCKUP APPROVAL
GODREJ GARDEN CITY PROJECT
Ahmedabad
QUALITY MANAGEMENT
No.
Name of Work:
WATER PROOFING FOR TOILET SUNKEN AREA
Submitted To:
IThe Project Manager
STUP Consultants P. ltd.
Godrej garden city project,
Jagatpur
Ahmedabad
L&T/GGClMlJ.OO2ISubmit. Date: 17.06.2011
L&TECCD,
Approval Reqd. by: GGC project,
Ahmedabad.
o
Source I Supplier:
Bostick
. . . . . ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ._
. . . . .n
Aiff(jliefsunkeoareai..................................
Area of Application:
Sample
[kt"Catalogue
Statutory submission
Test Certificates
iB"'Mockup Details
Others:
Methodology
!!1
~
:~:ry::~~!~!?:!!i~~:~~!~:~~:::::::::::::::::::::::::::::::::::::::::::::::::::::::~:::::: ~
Contract Specification:
3mm thk APP reinforcement modified bltuminous membrane including primer coat,
Sample Spec.-;Jication:
As per the attached methodology.
DEVIATION
Reasons for Deviation if any:
YES
NO
L&TECCD Rep.
STUP Consultants
Sign &Da'.
Sign & Date
Tourching around the pvc pipeline, vendor not suggesting bcas of hole
formation and melting of pipe, Formation of groove in concrete wall for
termination of WP in not possible bcas groove provision not considered in
construction stage, reinforcement need to cut
Distribution to:
I STIlP
II
GPI
II
I I
Comments from Consultr.t:
Dist. Date:
Comments from Client:
K..........................................................................................................................................................................................................................................
).)
(\,
\
Approved
Approved with Reservations
IApproval Date:
Remarks:
56
./ 
LARSEN &TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Worle Methodology
Methodology for Water Proofing for toilet sunken area
(CERA-CHEM)
CONTENT
1.
2.
3.
4.
5.
6.
7.
Introduction and scope of works,
Material delivery and storage,
Resources,
Methodology of water proofing for toilet sunken area,
Quality control,
Safety,
Environmental,
1.0Introduction and scop~ of workS:
This document describes the work procedure for water proofing of toilet
sunken area in Godrej Garden City Project work. 1bis is prepared to
adopt for all the works in general conditions and if any uncommon
circumstances arise then suitable action will be communicated vide shop
drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. Ceralastic compound Liquid A & powder B,
2. Ceralatex SBR,
3. Cera crystalline integral,
4. Cera Expan 250,
5. Cement OPC-53 Grade
6. River Sand
7. Water
3.0 Resources / ManI!ower & Tools.
The following tools and tackles will be required for this activity,
1. Mason trowel,
2. Wire brush,
3. Painting brush,
4. Mixing pan 10 liter capacity,
5. Morter pan,
6. Straight edge,
Revision no : 00
Prepared by: S.MAR/APPAN
Date: 25.05.2011
Quality Assurance
Approved By KGS REDDY
57
LARSEN &TOUBRO LTO.-ECCD
GODREJ GARDEN CITY PRO.IEeT - AHMEDABAD
Quality Management
Wolk Methodology
4.0 Methodology for water proofing for toilet sunken area~
1. 	 Clean the surface and remove and all malba and flaked slurry from the 
surface 
2. 	 RC sunken slab to be treated with water proofing shall be checked for 
any leakage by water pounding for 24 hours 
3. 	 If any leakage found shall be marked and grouting shall be done.
4. 	 "V" grooves shall be cut along the construction joint on wall - slab 
joints and shall be fLIed with Polymer modified mortar admixed with 
CERALATEX SBR @ 2% by weight of cement. 
5. 	 G.l. Nipple shall be fIxed if necessary at weak locations and pressure
grouting shall be carried out cement slurry admixed with expanding 
,grouting additive CERA EXPAN 250@ 225gms per bag of cement. 
6. ~Grouting should berepeated tiIlleakagd;arrested,' 	
7. 	 Acrylic polymer based two-component water proofing system 
CERALASTIC shall be applied in two coats on floor and wall. 
8. 	 Mixing ratio of Ceralastic is 1:1:S> (One part of Ceralastic- Liquid. One 
part of water and five part of Ceralastic- powder). 
9. 	 The second coat shall be applied after the fIrst coat is dry. However it is 
advisable to wait for 8 hours berore the second coat is applied. 
1O.Polymer bounding agent CERALATEX SBR @ 2% by weight of 
cement shall be mixed with neat cement slurry and applied as bounding 
coat in all vertical members only. 
11.The slab treated area shall be plastered using CM 1:4 admixed with 
CERA CRYSTALLINE INTEGRAL @ 400 grro per bag of cement to 
an average thickness of 20mm and cured for minimum 3 days. 
12.Do the water supply & wastage line as per the plumbing methodology,
13.Complete the all plumbing work as per the drawing.
I4.Bore packing on wall shall be done after the pipeline have been aligned 
& placed, using CM 1:4 polymer modified mortar admixed with CERA 
LATEX SBR @ 2% by weight of cement. 
IS.Above the bore packing two coat of the point no: 7 same to be applied. 
16.The treated area shall be cured and tested by pounding water for at least 
48 hours. 
17. In case of any leakage after all these exercise we will go for injection 
grouting with non shrink chemicals CERA EXPAN.~50@ 22Sgrns per 
bag of cement.
.
Note: For sides the water proofing coating shall be extended up to a height 
of 100mm above the FFL level. 
ReVision no : 00
Prepared by: S.MARIAPPAN
Dale: 25.05.2011
4..
Quality Ass.urance
Approved By KGS REDDY
58
.'/ 
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Walk Methodology
5.0 Quality Control & Documentatio,!!:
1. 	Check list for water proofing,
6.0 Safety:
	
	
	
	
	
Ensuring good housekeeping and lighting.
Engage only expertise person for mixing the chemical.
Electrical equipment must be routed through ELCB only,
Use hand gloves for water proofing chemical mixing.
Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
 	 Nose masks (iffequired) and Hand gloves (Rubber) sAell-be'used by
workmen onjob.
:-
Revision no : 00
Date: 25.05.2011
Prepared by: S.MARIAPPAN
.'
Quality Assurance
~pproved By KCS REDDY
59
LARSEN & TOUBRO LTD.-ECCD
GODREJ GARDEN CITY PROJECT  AHMEDABAD
Block:
Floor Level:
51.no
lei
CHECK LIST FOR TOILET WATER PROOFING.
"'~'n(lk
f\PPL i(gpPAb~j.\j~ ':i.'s:r&MS <}
53.~.~n
frsJl
Description
r1oAll)'ptAINO. 102,..
ToMal
Location
Date
Signature
YES
NO
rr
Cleaning of the surface
Water pounding Test for 24 hrs
If leakage found do the grouting
~~V\C. rv'f. if))
. JM ~il4
WIP Coni
L&T ECCD L&T ECCD
STUP
E*ulion
OAIQC
Consultant
\V~ tt<T (,ot., .~
\
/
,l1/S 1'f\1/1' (rJ V
! 'M rr,(rot
ito/1
,.
I
L
f,
Base preparation
't<1r
, ti~l.:3
4
if
II~'L
".
2-~/ G
5
Nr.
--,;
Applying of water proofing coating.
(lot) ,V
M:r (,o~
~4r/~
..,/'
Protective piaster of minimum 15mm thick.
Bore packing willi C~groove or 12mm
around the pipe line & cui out
MA
Apply the sealant aroulld the groove
~~-+------~--~1-~~
10
If leakage found do the grouting
11 . After grouting do the pound lasHor 48 hrs
~- , ~  '''''''', """dIU
csrare, p.o, Box 278, Mumbal- 40 ...-. .:: .. ","...........,.."!!!
Web 't '
0001. Tel.. 261 8181/ 62 Fax; +022-262 0223
Sf e . 1\'ww.!arsentoubro.com
60
lARSEN &TOUBRO LTD.ECCD
MOCKUP APPROVAL
GODREJ GARDEN CITY PROJECT
Ahmedabad
QUALITY MANAGEMENT
L&T/GGCIMUOO3ISubmit. Date: 17.06.2011
No.
WATER PROOFING FOR TOILET SUNKEN AREA
Name of Work:
1111e Project Manager
STUP Consultants P. ltd.
Godrej garden city project,
Jagatpur
Ahmedabad
Submitted To:
L&TECCD,
Approval Reqd. by: GGC project, '
Ahmedabad.
Description of mock up : ..~.~!~!..~!'?~!.!~~..~~~.!?..!~~.~..~~.~.~~.~..~r.!!:
...............................
~S~o-u-rc-e~/~S~u-p-p~lie-r-:------~C~E~R~A~-~C~H~E=M~------------------------~
-g
..............................................................................................................................1
Area of Application:
.................................................................................................................................-1
A1i"Toliefsunkenarea..,;....... . ....... ,,..........................
!!2
~
:~:&.::~~!~:~~i:~~:~:~~~:~~~:::::::::::::::::::::::::::::::::::::::::::::::::::~::::::::::
Sample
,6a" Catalogue
o
o
Statutory submission
Test Certificates
(jd""Mockup Details
Others:
Methodology
Contract Specification:
3mm thk APP reinforcement modified bituminous membrane including primer coat,
ill:nple Specification:
As per the attached methodology.
rs;(' YES
DEVIATION
Reasons for Deviation if any:
D
L&T ECCD Rep.
Sign & Date
NO
STUP Consultants
Sign & Date
Tourching around the pvc pipeline, vendor not suggesting bcas of hole
formation and melting of pipe, Formation of groove in concrete wall for
termination of WP in not possible'bcas groove provision not considered in
construction stage, reinforcement need to cut
~:!:JP~~I~I~G~p~!~~II~~~~~~~~II~~~~~~~~==~~~~__====D=ls=t.=Da=M=;========~
~
. . . . . . . . . . . .:.. . . .
y~
~.\\
SIGN
/'~~\J-
....
Approved
Comments from Client:
...................................................... .. ...........................................................
l~V
~OL P~O"".J...
MmJ~
~
J,;t, ,.fIt--
NAME
DATE
Approved w~h Reservations
SIGN
o ~ot
NAME
Approved
IApproval Date:
Remarks:
61
 LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Quality Management
Wolk Methodology
Methodology for joint treatment between RCC & brick
work (Bostik sealant)
CONTENT
Introduction and scope of works,
Material delivery and storage,
Resources,
Methodology of joint treatment between RCC & Brick work,
Quality control,
Safety,
7. Environmental,
1.
2.
3.
4.
5.
6.
1.0 Introductiov. and scope of works:
This document describes the work procedure for joint treatment between
RCC & Brick work for both sides of wall in Godrej Garden City Project
work. This is prepared to adopt for all the works in general conditions
and if any uncommon circumstances arise then suitable action will be
communicated vide shop drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. Seal 'N' Flex FC
2. Masking tape,
3.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1. Air blower,
2. Barrel Gun,
3. Wire Brush
Revision no: or
Prepared by: S.MARIAPPAN
<-
Date: 09.05.2011
,; ,
Quality Assurance
Approved By KCS REDDY
62
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
3.0Methodology for joint treatment between Rcc & brick work
01. 	 Do the Plastering as per the methodology and provide the groove
of 6mm x 6mm in between RCC & brick work joint all around,
02. 	 After curing the plastering start the joint treatment,
03. 	 Clean the Joints to be sealed using suitable mechanical means for
removing Dust / Debris etc filled in the joints.
04. 	 Blowout the Dust / Debris by using an Air Blower.
05. 	 Ensure that the joint is Dry and totally free of Dust! Debris / Oil /
Grease Etc.
06. 	 Fix masking tapes on either side of the joints. This would ensure
a neat finish of the joint and would not leave any sealant on
concrete road surface in case of any spillage of the sealant outside
the joint at the time of application.
07. 	 Cut the Seal n Flex 1 sausage and apply the sealant on the groove
by manual application.
08.
':
Match the sealant on rcc & bw surface,
09. 	 Remove the masking tape after one hour of tooling the sealant.
10. 	 Allow the sealant to cure for at least 7 days.
11. 	 Ensure that the sealant is not disturbed during the curing period.
12. 	 The Painting work to be started after 7days from the application
of sealant.
5.0 Quality Control & Documentation:
1. Check list for joint treatment between RCC & BW,
6.0 Safety:				
Ensuring good housekeeping and lighting.
Ensure lifeline before starting the work at height
Sufficient lighting to be provided at night work
All walkway platforms are 600mm (min.) and tied both
sides
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 09.05.2011
Quality Assurance
Approved By KGS REDDY
63
LARSEN & TOUBRO LTD.-ECCD
MOCKUP APPROVAL
GODREJ GARDEN CITY PROJECT
Ahmedabad
QUALITY MANAGEMENT
No.
L&T/ GGC/MU-Q041 Submit. Date: 17.06.2011
Name of Work:
JOINT TREATMENT BElWEEN RCC & BRICK WORK
Submitted To:
The Project Manager
STUP Consultants P.ltd.
Godrej garden city project,
Jagatpur
Ahmedabad
L&TECCD,
Approval Reqd. by: GGC project,
Ahmedabad.
"0
Q)
Source / Supplier:
Bostick
{3
...............................................................................................................................
:m
...............................................................................................................................
ttl
!!l
A~U~:!~f~:~~~::~~~::~::~f.!~~:~~f.~:~~~~::::::::::::::::::::::::: ~
Area of Application:
D
M
D
D
Sample
Catalogue
Statutory submission
Test Certificates
56"Mockup Details
D Others: Methodology
Contract Specification:
NP
Sample Spec:ficatlon:
As per the attached methodology.
DEVIATION
DYES
Reasons for Deviation if any:
NO
STUP Consultants
L&TECCO Rep.
/'"'\
Sign & Oat\-.
Distribution to:
SllJP
II
GPI
II
Comments from Consultant:
II
Sign & Da~
"
Dist. Date:
Comments from Client:
~:_~_=~t~~~:=~_=:==::-_:=::~=:_-_:_=-_=-_-_-_-_:===-_::
(\/...............................................................................................................
..........................~ ....... ~...................................................................................................................
DATE
SIGN
Approved
Approved with Reservations
rnot~pproved
QS. 0 (,... ''VoL!
IApproval Date:
Remarks:
64
LARSEN & TOUBRO LTD.-ECCD
GODREJ GARDEN CiTY PROJECT AHMEDABAD
Quality Management
Methodology for Water Proofmg for toilet sunken area
(MYK)
CONTENT
1. Introduction and scope of works,
2. Material delivery and storage,
3. Resources,
4. Methodology of water proofing for toilet sunken area,
5. Quality control,
6. Safety,
7. Environmental, 
Introduction and scope of works: 
This document describes the work procedure for water proofing of
sunken areaiin Godr~j Garden City Project work. This is prepared to;
adopt for all the works in general conditions and if any uncommon
circumstances arise then suitable action will be communicated vide shop
drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
L
2.
3.
4.
5.
6.
7.
MYKTOPGUARED.
MYKWP-IO
MYK GROUT ADD
MYK latex 45 R
Cement OPC-53 Grade
River Sand
Water
3.0 Resources I Manpower & Tools. 
The following tools and tackles will be required for:this activity, 
1. Mason trowel,
2. Wire brush,
3. Painting brush,
4. Mixing pan 10 liter capacity,
5. Morter pan,
6. Straight edge,
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 02.08.2011
Approved By KGB REDDY
65
LARSEN & TOLIBRO LTD.-EceD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
4.0 Methodology for water proofing for toilet sunken area.
1. 	 Clean the surface and remove and all malba and flaked slurry from the
surface' ,
2. RC sU1~enslab to be treated for water proofing shall be ~hecked for
any leakage by water pounding for 24 hours
3. 	 If any leakage found shall be marked then we will go for injected
grouting with MYK GROUT ADD-250grms per one bag of cement and
re-check for water pounding test
4. The surface should be clean, sound and free from loose particles,
5. 	 If any contamination such as oil, grease etc is removed by mechanical
mean like wire brushing, vacuum cleaning.
6. 	 After cleaning the surface, all the cracks and pot holes should be patched
with cement and bonding material MYK WP 10 with CM 1:4 (one
bag of cement -200ml of MYK WP 10).
7. 	 After 2 hours first Coating of water proofing using within the mixing
of MYK
ratio 1: 3 (One part of MYK TOP GUARD liquid & three
TOP GUARD powder).First coat should be applied horizontal direction.
8. Before applying the first coat the surface to be SSD condition
Y. 	 The second coat is applied in vertical direction as soon as the fIrst coat is
sufficiently hardened.
IO.After 48 hours, protective plaster up to FFL, minimum 15mm thickness
along with MYK WP -10 with CIv! 1:4, (one bag of cement - 200ml of
MYK WP-10).
lI.Complete the all plumbing work as per the drawing,
12.Do the bore packing for cutout using with MYK latex 45 R 200ml for
one bag of cement and CM 1:1.5:3 by volume (cement, river sand and
10mmCA).
I3.After the bore packing completion & harden, one coat ofMYK top
guard to applied on the bore packing area.
14.Hydro test to be done for 48 hours after curing time of bore packing.
I5.In case of any leakage after all these exercise we will go for injection
grouting with MYK GROUT ADD - 250grm per one bag of cement
part
Note: For sides the water proofing coating shall be extended up to a height
of IOOmm above the FFL level.
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 26.05.2011
Quality Assurance
Approved By KCS REDDY
66
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Quality Management
Work MethodologV
5.0 Quality Control & Documentation:
1. Check list for water proofing,
6.0 Safety:
	
	
..
	
Ensuring good housekeeping and lighting.
Engage only expertise person for mixing the chemical.
Electrical equipment must be routed through ELeB only,
Use hand gloves for water proofing chemical mixing.
Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
!fj
Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
,
Revision no : 00
Prepared by: B.MAR/APPAN
Date: 02.08.2011
Quality Assumnce
Approved By KGS REDDY
67
(9
LARSEN & TOUBRO LTD.-ECCD
GODREJ GARDEN CITY PROJECT AHMEDABAD
CHECK LIST FOR TOILET WATER PROOFING. d=
,.
a l.. {L.,....,g)
Floor Level: B~~ C2' W\~)
BOck,
Sl.oo
Description
Hoc4vp Q!!I
Y
\j \3ro
M I'-c, __
7J1 .. 
-
Signature
Toilet
Location
Date
YES
NO
W/P Coni..
L&T ECCD
Execution
L&T ECCD  STUP
QAlQC
Consultant
1 . Cleaning of the surface
Water pounding Test for 24 hrs
If leakage found do the grouting
Base preparation
Applying of water proofing coating,
IProtective plaster of minimum 15mm thick,
v_-+___+-_---I__-+-__----I_'_ _+r--_'_4i;-JrJiL-'_'1dl7l-'hX'-;;f-~~~
__
.<f(
/cV5"
I!
Bore packing with CM-.diil!f~112mm
al'el:lfld ti,e pipe Ihle &: ~9I:It Qyt
\I
IA
Apply the sealant around the groove
~ ~
10
If leakage found do the grouting
'je
H'f f) ~t"rt:-5r
~XJ1J{)t)C~f'I 1=~ ~ tJ\lH ~
68
LARSEN &TOUBRO LTO.-ECCD
MOCKUP APPROVAL
GODREJ GARDEN CITY PROJECT
Ahmedabad
QUALITY MANAGEMENT
L&TI GGClMU-DD5ISubmil. Date: 05_08.2011
No.
Name of Work:
WATER PROOFING FOR TOILET SUNKEN AREA
Submitted To:
The Project Manager
STUP Consultants P. ltd.
Godrej garden city project,
Jagatpur
Ahmedabad
L&TECCD,
Approval Reqd. by: GGC project,
Ahmedabad.
Description of mock up : _~.~~.~!..~~.~.!.!~~..!~~.!'~.!!.~..~~~.~!.!'.. ~~...............................
MYK
Source I Supplier:
i.r:::
o
.!!!
Area of Application:
:!?:f.Y.::~~I~:?:~i:~~:~~!.~:~~!i.::
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . "*
D
ia
Sample
Catalogue
D Statutory submission
D Test Certificates
~ Mockup Details
kI Others: Methodology
Cl
Contract Specification:
3mm thk APP reinforcement modified bituminous membrane including primer coat,
Sample Specification: \
As per the attached methodology.
DEVIATION
DYES
Reasons for Deviation if any:
L&T ECCD Rep.
Tourching around the pvc pipeline, vendor not suggesting bcas of hole
formation and melting of pipe,Formation of groove in concrete wall for
termination of WP in not possible bcas groove provision not considered in
constructio!:l stage, reinforcement need to cut
Distribution to:
I SlUP
II
Gpi
II
Approved
Remarks:
NO
s~ Consultants
s'\&Date
Sign & Date '"
I I
Comments from Consultant:
Dist. Dale:
Comments from Client:
Approved with Reservations
Not Approved
lApproval Date:
 ' . n H . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ._ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .u . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .~  u . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...
69
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodologv
Methodology for Handrail fixing work
CONTENT
1.
2.
3.
4.
5.
6.
Introduction and scope of works,
Resources,
Methodology of handrail fixing
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for handrail fixing work in
Godrej Garden City Project work. This is prepared to adopt for all the
works in general conditions and if any uncommon circumstances arise
then suitable action will be communicated vide shop drawing.
2.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1. Right angle
2. Tube level
3. Plumb bob
4. Line dory
5. Welding machine
6. Face shield
Revision no : 01
Prepared by: S.MARIAPPAN
Date: 13.03.13
Quality Assurance
Approved By KCS REDDY
70
LARSEN &TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
3.0 Methodology for Handrail fIXing:,
Balcony handrail
 	 Level mark need to be checked and marked as per GFC drawing.
 	 Fixing cover plate of size 80x60mm with a 10mm hole in the center to
the shear wall with 10mm anchor bolt
 	 Fixing the fabricated handrail (60 x 40mm handrail & 25 x 25mm
baluster ) to the cover plate as well to the up -stand beam with tack
welding at necessary location
 	 Level, line and plumb need to be checked,
 	 Final welding and filling to be done to attain the required finish and
quality.
 	 Up-stand beam to be cast as per GFC drawing to attain clean finish to
the interior as well to the exterior.
Staircase -Handrail.
 	 Kota stone marking to done as the drawing and Hole to cut on the steps,
 	 Pre-fabricated railing bottom section need to be weld on the fixed base
plate.
 	 Line and level need to be ensure properly as per the drawing.
 	 The mid landing and landing locations level and line to be ensure as per
the drawing.
4.0 Quality Control & Documentation:
 	 Check list for Handrail work.
5.0 Safety:
 	 All people will have to follow the safety procedures as per
the project safety plan.
 	 Ensuring good housekeeping and lighting.
 Do the marking of all machinery moment as required,
6.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 01 	
Prepared by: S.MARIAPPAN 	
Date: 13.03.13
Quality Assurance
Approved By KCS REDDY
71
".",:
CHECK LIST FOR FIXING OF MS RAILING,
p~:r
ZJ f bk,c-k
location:
4-44\J~
-4+~~.LT
Drawing Ref:
. ".
-~.
/'
Hight of MS Railing
._.-_._._--
".-.-.
..
-_P-_._-
_. --
Signature
-.~--
".-~-
.. -..
.".
-~~-
....
---
1-
.......
"--.""-
living
bal
.. - ..... _-
,_."
.......
_. __ . -- .. _._._._,-_.
w_ ._._ ._.'__
._._- _.--_._"
".
--
.-
...
.- ..~".
..
...
"_.
..
._.
.....
..--._.
..
---'
..,
.~
.-_..
_-_.-.
--,
-.~-
-
. ".'
>
\(~jf
--~~,~---------~
'.
Living
MBBAl "Kbal
bal
..
~L___\ ~.--. .- --.... _.._ . __ .........
STUP
.. _.........
.. ' ...
\/1 --~
l&TECCD
..
--,.,-"---,_. _.--.-
Joint Finishing between MS Railing
& Upstand
-_ _._--..
..
.--- ...--.-- - - - _ .. -------
__
.... .
'~-
<.../"
\/
Kbal
'
.2."\~U/L '
..
V
.
Fixing Details for MS Railing
... ...
...
---.~ -.~.--.-
__
~ .'\/i
Plump of MS Railing
;G~
1--
'V
level :
._-----_.
-.- ... .
Line oF;MS Railing
:J ~
Living MBBAl
bal
Kbal
_.
~ ~
'~
...
...
Location of MS Railing
"
-_ -_._-.
.. ' r ' 
--~-'-
Living
MBBAl
bal
Kbal
MBBAl
Block:
Up
_._---_.
...
.t9.~a-=.~ ..:.~,.L. -
Location
Slno
~t
-.
Ma~
fB- o~tf
Date:
~44-2--br
Plot NO
LARSEN & TOUBRO LTD.-ECCD 
BUILDINGS & FACTORIES INDEPENDENT COMPANY 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
l1..
_'iN
.
.
/'
72
LARSEN & TOLIBRO LTD.ECCD
MOCKUP APPROVAL.
'iClPIlEJ GAAOEN CITY PROJECT
Ahmedabad
QUALITY MANAGEMENT
L&ilGGClMU-007ISubmit. Date: 25.08.2011
No.
Name of Work:
Handrailing fixing for balcony.
The Proler.:~ Manager
IGodrej garden city pr\))ect,
!Jagatpur
Ahmedabad
Submitted To;
:S"~\.f~?,.C~~~,~.aitants ~~ tt~~
Approval Reqd,
~y~
h)l,f ,1\:''";:CO.
IGGC prni~t,
Ahmedabad.
!!?r...~.~~~.~.Y...~~~.!!........................................
Description of mock up: ..!':!.~!~fi! ..!?!.!:!~~.~.~!~~..
Sample
Catalogue
Statutory submission
D Test Certificates
[i3""Mockup Details
M""'Others:
Methodology
i)
~--~~--~----------------------------------------~ ~
Source I Supplier:
.::::::.::::::.::::...................................................................................................... (.)
Area of Application:
Contract Specification:
50mm MS & 20 mm Ms pipe
Sample Specification:
60 x 40 mm & 25 x 25 mm MS tube
DEVIATION
YES
Reasons for Deviation if any:
NO
STUP C~~Ultants
L&T ECCD Rep.
As per the approved drawing no :
Sign & DaU,
Sign &
?,.'
Ie
\\.
G-440-LT - R1,
G-442-LT - R1
G-444-LT - R1
Distribution to:
II
\ _STUP
C;PI
11'---_------'1 1'---_----'1
Comments from Consultant:
~~4('\
Sl~~~'
D
Approved
NAME
D.
Dlst.DaC
Comments from Client:
()
l(A+WL~I\1-H'Y1A
Approved with R.aservations
I f\ /
DATE
SIGN
tLAPproved
~;VI'\f
NAME
~:::e(U(
!Approval Date:
I
V
J..-blo11,...,,/
DATE
Remarks:
73
LARSEN &TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
Methodology for Tiling work
CONTENT \.
1.
2.
3.
4.
5.
6.
7.
Introduction and scope of works,
Material delivery and storage,
Resources,
Methodology of Ceramic tile flooring,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
l
This document describes the work procedure for tiling work in Godrej
Garden City Project work. This is prepared to adopt for all the works in
general conditions and if any uncommon circumstances arise then
suitable action will be communicated vide shop drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1.
2.
3.
4.
5.
Ceramic floor tile Johnson & Nitco Tile,
Cement OPC-53 Grade
River Sand
White Cement,
Water
3.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1.
2.
3.
4.
5.
6.
7.
Mason trowel,
Plumb bob
Right angle
Thread line
LeveIPipe,
Tile Cutter,
Measuring Tap,
Revision no : 02
Prepared by: S.MARIAPPAN
Date: 05.08.2011
Quality Assurance
Approved By KCS REDDY
74
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
4.0 Methodology for Tiling.
01. 	 Checking the tile for approved brand, shade, free from cracks,
crazing spots, batch number, chipped edge and comers
.
02. 	 Drying, cleaning ~d mopping the base
03. 	 Making the top le~el of flooring with water level or leveling \
instrument
04. 	 Spreading of CM 1:4 average thicknesses of 20mm should not
less than 1Smm on single point, tamping and correcting to proper
level and allowing it to harden sufficiently to offer a fairly rigid
cushion for the tiles.
05. 	 The tiles previously soaked in water (in case of ceramic tiles) to
be cleaned and to be fixed on the mortar surface one after another.
Each tile to be gently tapped with wooden mallet till it is properly
bedded and in level with the adjoining tiles
06. 	 Tht:( joints shall be kept in as thin as POSS1ble and in straight,1ine or
suit to the required pattern
07. 	 The surface of flooring during laying to be checked with a straight
edge for about every 2m
08. 	 Where full size cannot be fixed, these tile shall be cut to required
size and their edge to be rubbed smooth to ensure straight and true
joints,
09. 	 Before laying the skirting tile do the hacking on the skirting tile
area.
10. 	 Tiles adjoining the walls shall enter not less than 10mm under the
plaster I skirting or dodo
11. 	 Cleaning the joints to a depth of 2 to 3mm with putty blade,
12. 	 Curing the floor for 7 days
13. 	 Flush pointing the joints with cement paste added with pigments
to match the color of tiles
4.1 DODOING
1. 	 Do the rough plastering for all brick work with CM 1:4,
2. 	 Above the rough plastering I RCC surface with hacking do the plastering
thickness of 10mm with CM 1:4,
3. 	 Apply the cement paste on the back side of tile and put the tile on the
wall from starting of tile point, (Ratio of Cement & RlSand 1: 1)
4. 	 Sfartfug tile plump, lirie & leveltobe eiisure,c
5. 	Each tile to be gently tapped with wooden mallet till it is properly
bedded and in level with the adjoining tiles.
Revision no : 02
Prepared by: S.MARIAPPAN
Date: 05.08.2011
Quality Assurance
Approved By KCS REDDY
75
LARSEN &TOUBRO LTD.-ECCD
GODREJ GARDEN CITY PROJECT AHMEDABAD
Quality Management
Wolk Methodology
6. Ensure the Finished
floor & wall tiles shalf not sound hollow when
tapped with wooden mallet.
~ 	
5.0 Quality Control & Doc~l1entation:
1. 	Check list for tile layout,
6.0 Safety:
 Ensuring good housekeeping and lighting.
 	 Engage only expertise person for cutting the tile and proper
machine for cutting
 	 Electrical equipment must be routed through ELCB only
 	 Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
~	
Nose masks
required) and Hand gloves (Rubber) shell be used by workmen onjob.
1-<"""'<''''''' no : 02
Prepared by: S.MAR/APPAN
Date: 05.08.2011
Quality Assurance
Approved By KCS REDDY
76
LARSEN & TOUBRO LTD.-ECCD
BUILDINGS & FACTORIES INDEPENDENT COMPANY
GODREJ GARDEN CITY PROJECT AHMEDABAD
~-'~-=r
Area I Building:
_./t:).
l
ru b ~
1'ftf7Ji
Block:
~- 4-bo
:"."'1
Drawmg Refl.. No:
~._A.r.!f
G _ ~2....,
'MoJwfJ
7
Checklist for Wall Tiling
- T~I;"..t 1
-
...J. I
Level: Z ~ tJ/L.
_ '~\Qt--.2,.
. - - - - - ----~-~15_6~(;-,:+
Plot no : .
k-btn<:m~~+ I('1.;\:kM~W)~L~ N't.dtuW~ lJ11 '
Location
to- o&....l}
Date:
-;o1l~ L..
/1 .
I,
wall Location
CHECKI
Room Size
Diagonal
.~D:3oi\JO.
Signature
L&T ECCD Site Engineer with
[:
Datemme
:"1
~
Post check
Tile LaIno:
'.'
~url
Tiles Joint
AU\
J~~{\'f
'~o~~ .
STUP sign with Datemme'
vL ,..(
,'t'\~J ~r tt
f.. Undulances
It check I
Slope on
flooring
Overall
workmanship
i;i,
---
-=r '-t.-td+
~~
Flii I I~ 11.J:;d-/ I - I
 -y
..,
Signature
--!'--I--4I-:.-4--1-----1---/
I----l--I----I--+---I---+-:---ii--l
Level
Shade Variation
CuLJIf VI
/1 vI V1~~~~~\;.~Y1~)-~~Lt;rbh ,~\I
Vertical Joint
Plump
~~
"'T~~\!,QL11~f'l
-~-~ .
"
~~~,;r!?~
?/.p~ "".
STUP sign with Datemme
77
9'
Block
Plot no :
,
'
Name of the: Room
,i
Level
Signature
Room Size
Diagonal
POST
Q~'S
/j
../
~3?
l'-il7 Gl.Oy
\
~ &T~
-t~,...
Jtf"l....
"'!?>
1.\1.-
-o\'\..., tN- ~
tN
, fl..,L
,~
~ .~~ 't)\L
.-6\L
QinnahlrA
Nko
"t::
Jc~
t--
Sldrtingline
<.l~,' ~
'\~~
A~~ \/
~~1- V- ~\~ ~~- <1:~ ,,)
~ 6\,..
, Overall
, workmanship
U!L.."
9:P
19...0~
~c3
,~
s~ ~!e
"
Post check
(Skirting top
. finishing ,
~?,'.
y~4
IteEnglneerwlthDate!Time
:Undulances
'Shade Variation
~...g-.-u
Date:
V'"
~ ",,\JL.. .'()\L
Level
IMIO ~\~ !i',~ I~~ ~~ ~~\(()~ ~c\G~ \~ I) ~ \~~ t>t9d
V
/
V
'\.., V
V
V"
V
V
Y
V
V"
 TIles Joint
CHECK , Skirting
Thickness
"
Level:.!Z
t-I-'
'-"
5: c,....f,"ttJ
:.i~;\ i I!.,.,t.\..r
\J\' -....
fta--:A
Tile Lot no:
,!)a1Jt;; ...20~
'~ 1
Bed Thickness
, PRECHECK
...
Drawing Ref/. No:
.::rbk\~
::f~,
Building
J1cJ.u.J);
Checklist for Flooring
'P~I
Areal
"
LARSEN & TOUBRO LTD.ECCD
BUILDINGS & FACTORIES INDEPENDENT COMPANY
GODREJ GARDEN CITY PROJECT. AHMEDABAD
r)~
V'
""",.
~~
t\l ~
~\t
~\~~~t0.~~ /
~
~
.~;;::-
1;""
V-- 'i -
*
"
~ ~
~
,....
~/
..
JJ)s sMi'rV1"'"' '
.J.n.
r<IV
-t~.
~~
~
11k
-k'btL ~
~ ..tL ~
Nro
,f_.... ~C
~7'V-
V ...
\ r....
$v..
~'"V"
-..::.
, t
'
"i111~ ~~~'1~
.... - [~ "-1
~f
'O)-. ~"
~"" V,.~
C$JO'"
- it::) .\< be- 0 oYlV"
C~""f'
r-
"
/'
STUpdt~~ n('~
.-
;ft,-"
78
lARSEN &. TOUBRO LTD.-ECCD
MOCKUP APPROVAL
GODREJ GARDEN CITY PROJECT
Ahmedabad
QUALITY MANAGEMENT
L&TI GGC!'''U-009! Submit. Date; 29.09.2011
No.
Name of Work:
TILING WORK
Submitted To:
The Project Manager
STUP Consultants P.ltd.
Godrej garden city project,
Jagatpur
Ahmedabad
. ..
L&.TECCD,
Approval Req\ by: GGC project,
Ahmedabad.
Description of mock up: ..~!~.?'~!.~.9..!.~!~ ~ ~~!! ~~~~.~~9..~~r.!:t........................................
..
o
o
Sample
Catalogue
Statutory submission
Test Certificates
~ockup Details
~thers:
Methodologv
o
o
Source I Supplier:
Area of Application:
46~e~~~~
Contract Soecification:
F=~==~==~~-~-----------------------------~-------------------.-----4
Vertified lIoor tile, Ceramic floor & wall tile
Sample Specification:
do
~----~-----~-----~I--------~/--------~
0
rI"
DEVIATION
YES
Reasons for Deviation if any:
NO
l&T ECCD Rep.
"-I
Sign & Dat\"v
S1UP Consultants
Sign & Date
Distribution to:
Comments from Consultant:
~APproved
Comments from Client:
D~o
Approved with Reservations
Approved
IApproval Date:
Remarks:
,    " n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ~.un n . n H
.....
~ . . . . uO....................... ~.~_
 u~ ...... ~:-:...;... _ ...... ~_;.; .:-  _ -.;.;._ _.... _ _  _ _ .;..,;.~ . . . . .-;.;~ ~.~.;,. . . . .-;.;..:..
79
LARSEN &TOUBRO LTD.ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Wo'* Methodology
Methodology for Counter Table Top Fixing
CONTENT
1. Introduction and scope of works,
2. Material delivery and storage,
3. Resources,
4. Methodology of Kitchen table top fixing,
5. Quality control,
6. Safety,
7. Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for kitchen table top fixing
in Godrej Garden City Project work. This is prepared to adopt for all the
works in general conditiQns and if any uncommon circumstanc~s arise
then suitable action will be communicated vide shop drawing. ~
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. 25 mm thick Kota stone,
2. Granite jet Black,
3. Janatha paste,
4. Cement,
5. River Sand,
6. Water,
3.0 Resources / Manpower & Tools.
1.
2.
3.
4.
5.
6.
7.
The following tools and tackles will be required for this activity,
Mason trowel,
Plumb bob
Right angle
Thread line
Cutting/Grinding machine
Spirit level
Measuring Tap,
Revision no : 03
Prepared by: S.MARIAPPAN
Date: 13.03.13
Quality Assurance
Approved By KCS REDDY
80
LARSEN &TOUBRO LTD.ECCD 
GODREJ GARDEN CITY PRO.IECT  AHMEDABAD 
Quality Management
Work MethodologV
4.0 Methodology for kitchen table tOR fIXing.
01. 	 Mark the kitchen table top on the flooring,
02. 	 Locate the Kota stone on the flooring & fix the kota stone
vertically & right angle with wall as per the drawing using with
CM 1:3,(stone is uniform thick for all vertical member)
03. 	 Check the plumb, line and level for all vertical stone,
04. 	 After one day, Fix the table top ( Kota Stone 25mm thick) using
with janatha paste above the vertical Kota stone,(if brick work or
RCC supports are there, ensure the bearing of counter slab as per
the site requirement, some locations like toilet counter,)
05. 	 Make sure that joint of top is at center of the vertical Kota stone.
06. 	 Make the sink opening as per the requirement,
07. 	 Fix the approved Granite (Jet block) table top with CM 1: 5 above
the Kota stone.
08. Nosing and chamfering as per drawing, 
,09. Ensure level of granite top as per the requirement, 
10. 	 Fix the fascia ofjet block granite using with Janatha paste as per
the drawing.
11. 	 Do the cleaning and pointing as per the requirement. Color of
pointing to be match with the granite.
12. 	 Note in toilet counters top stones are as per the drawing and
approved stones.
5.0 Quality Control & Documentation:
1. Check list for Counter table top fixing,
6.0 Safety:
 Ensuring good housekeeping and lighting.
 	 Engage only expertise person for cutting the stone and .
proper machine for cutting
 	 Electrical equipment must be routed through ELCB only
 	 Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shall be used by
workmen onjob.
Revision no : 03 	
Prepared by: S.MARIAPPAN 	
Date: 13.03.13
Quality Assurance
Approved By KCS REDDY
81
~.
LARSEN & TOUBRO LTD.-ECCD
BUILDINGS & FACTORIES INDEPENDENT COMPANY
GODREJ GARDEN CITY PROJECT. AHMEDABAD
CHECK LIST FOR KITCHEN TABLE TOP
::r b k~\t. ~ P\~ ,.::]: -
Location:
~03
Bp- +\\0 ~Rl
. Drawing Ref:
,.
Sl.no
t<ikb De-k.':U. _
Flat no:
:r
Block.~
'
Date:
'b-oq_)f
Level:'.Q~ ~,f.
bt~Jr _
&03
~~\'J;;
-,,'
MOUL ~lf>
Decription
i;
-~
Settingiout of Table top layout
Top leYe.1 of table top
Vt\
V'~~~
,.
~VerticaUty of Kota Stone
~-,",fJ,r
,I
,v.'
Location of Sink
Top
Nosingiand chamfering
Facia
V~
Gt~mite Joint
V}J
1','
V#
~~.1"~\e.- ~
Gas pi,~e Sleeve ( Holes)
i
Signature
L&TECCD
STUP )
-~
-
~
(,sl'f
"
'
6~ \ ~I U
~o
..
"
82
.9
LARSEN & TOUBRO LTD.-Ecce
MOCKUP APPROVAL
GODREJ GARDEN CITY PROJECT
Ahmedabad
QUALITY MANAGEMENT
L&TI GGC/MU010 I~l!bmit. Date: 29.09.2011
No.
Name of Work:
Kitchen Table top fixing
Submitted To:
The Project Manager
STU~ Cons.ultants P. ltd.
Godrej garden city project,
Jagatpur
Ahmedabad
L~TECCD,
Approval Reqd. by: GGC project,
Ahinedabad.
Description of mock up: ..~.!!~~!~ ..~!:!~.!!.~~p'..!!?!:j.~.!1. ...................................................................
Q)
SQurce I Supplier:
. ~.~~..~.!~!?~..~.~.!~..~!~.~!........................................................................
.!!l
:~~!::~~!~~~~:~~~:~~:!~p.I~~!~~~~::~:~~~!:::::::::::::::::::::::::::::::::::::: ~
Area of Application:
Sample
Catalogue
Statutory submission
Test Certificates
~ockup Details
o
' o
o
TI
Q)
M~Zhhl.__
SI
Black Granite & Kadappa I kota stone
"
S'lmple Specification:
do
?'NO
DYES
DEVIATION
Reasons for Deviation if any:
STUP Consultants
L&T ECCD Rep.
Sign!!. Date
~&Date ,
Distribution to:
LSJ~I
GPI
11
Comments from Consultant:
r--~
Dist. Date:
Comments from Client:
  . .. r. A~L . .  . ..eJJ
... .   .   
.srV
v..~rr
rvI'
NAME
Approved
NJt--fJSY\
Approved with Reservations
SIGN
1./
./!7_
o 4t ~proved
9vNIt
NAME
M",...,J ~
DATE
l 0. pall
!Approval Date:
Remarks :
83
LARSEN &TOUBRO LTD.-ECCD
GODREJ GARDEN CITY PROJECT - AHMEDABAD
Quality Management
Work Methodo/bgy
Methodology for Water Proofing for toilet sunken area
\\
(NINA1
CONTENT
1.
2.
3.
4.
5.
6.
7.
Introduction and scope of works,
Material delivery and storage,
Resources,
Methodology of water proofing for toilet sunken area,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
, 1 '
This document describes the work procedure for water proofing of
sunken area in Godrej Garden City Project work. This is prepared to
adopt for all the works in general conditions and if any uncommon
circumstances arise then suitable action will be communicated vide shop
drawing.
2.0 Material delivery and storage, 
The following materials will be deployed for the activity, 
1. NIOPOL,
2. HYDROGROUT,
3. WETTITE,
4. PROOFSOL.LWP,
5. Cement OPC-53 Grade
6. River Sand
7. Water
3.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1. Mason trowel,
2. Wire brush,
3. Painting brush,
4. Mixing pan 10 liter capacity,
5. Morter pan, .
6. Straight edge,
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 05.10.2011
Quality Assurance
Approved By KGS REDDY
84
LARSEN &TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
4.0 Methodology for water proofing for toilet sunken area.
1. 	 Clean the surface and remove and all malba and flaked slurry from the
surface.
2. 	 Pounding the slab with water for 24 hours to indentify existing leaking
spots, marking the same and grouting all such leakage spots,
construction joints, honeycomb locations and cracks etc. if any leakage
founds then grouting the same with "Hydrogrout" crystalline based non
shrink cementitous grout to full saturation with gravitational pressure or
grout pump as per our judgment.
3. 	 Making cavity covings (Wattas) at the junction of walls and slab.
4. 	 Applying two coats of Ni-O~Pol acrylic polymer modified cementitious
coating to the RCC slab and extending up to 100mm above the FFL on
the vertical surface second coat.
shall
,be
' applied
	 after first coat has dried
and brush stokes shall be perpendicular or at right angles to each other.
5. 	 After 24 hours of NIOPOL coating, laying waterproof and protective
screed !Plaster of average ISmm thk. In one coat to the floor and wall up
to 100mm ht from FFL in cement mortar (1:4) including and mixing
Proofsol LWPI Plastocrete Plus integral waterproofing compound @
100ml per bag keeping the surface rough to receive further finishing.
6. 	 Do the water supply & wastage line as per the plumbing methodology,
7. 	 Complete the all plumbing work as per the drawing,
8. 	 Bore packing: Grouting and sealing around the periphery joints of pipe
by filling micro concrete of sika I Fosroc in the gap between the cut outs
in the slab and the pipe surface and applying "Comproof wettite" SBR
based water borne liquid applied seamless treatment in two coats around
the periphery joints of the pipes at the top etc.
9. 	 Final Pounding should be done for 48hrs. if leakage found then
grouting to be done as per the point no :02
.'
Note: For sides the water proofing coating shall be extended up to a height
of 100mm above the FFL level.
no:OO
Prepared by: S.MARIAPPAN
Date: 05.10.2011
Quality Assurance
Approved By KCS REDDY
85
LARSEN & TOUBRO LTD.-ECCD
GODREJ GARDEN CITY PROJECT AHMEDABAD
Quality Management
Work Methodology'
5.0 Quality Control & Documentation: 	
1. 	Check list for water proofing,
6.0 Safety:
	
	
	
	
	
Ensuring good housekeeping and lighting.
Engage only expertise person for mixing the chemical.
Electrical equipment must be routed through ELeB only,
Use hand gloves for water proofing chemical mixing.
Obstacles to be cleared for shifting the materials to the work
,spot
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by 
workmen on job. 
Revision no : 00
Prepared by: B.MARIAPPAN
Date: 05.10.2011
Quality Assurance
Approved By KGB REDDY
86
LARSEN & TOUBRO LTD.ECCD
GOOREJGAROEN CITY PROJECT AHMEDABAD
n
CHECK LIST FORTOILET WATER PRPOFIt\lG .
~~~.__~6~,W~~i+--r______~~____~+~~l~~~_~~f.~'~~~'~~~~_
Floor Level : _ _....::Q~_I"---fJMLl.1~~.y"'_~_~\J'_~lJ\~
~
_ _----JA:...lI!J:...LrI'-!::rb~~Fr>--:...L"-\;:(-..::.'fJ~(tI.;...:...I}.::!...~
,
Q
'
~
81.no
Description
Cleaning of the surface
Water pounding Test for 24 hrs
Signature
Toilet
Location
Date
YES
1:2101, t-.rr
NO
W/PCon/.
STUP
L&TECCD L&TECCD
Execution . QA]QC
Consultant
v ..... rlt.. .1'"
~ I/kk
\1\.--1 ' t ... 'I v
f\
Base preparatIon
Applying of water proofing coating.
IL/
I}.-
lf~
\ r11
re packing with eM including groove of 12mm
und the pipe line & cut out
1
,..
o/L.d.i l
9
10
11
"
1Apply the sealant around the groove
Water pounding Test for 48 hrs
Iflea,~age found d()th~grouting .
After grouting do the pound test for 48 hrs
I~-
'~"
Q""
~~
1'-'
.",
~--~------~~~--~~----+-----+-----+-----i
<,.~ ..
87
LARSEN &lOUBRO LTD.-ECCD
MOCKUP APPROVAL
GODREJ GARDEN CITY PROJECT
Ahmedabad
QUALITY MANAGEMENT
L&T/GGCIMU-011 Submit. Date: 08.10.2011
No.
Name. of Work:
WATER PROOFING FOR TOILET SUNKEN
ARE~
The Project Manager
STUP Consultants P. ltd.
Godrej garden city project,
Jagatpur
Ahmedabad
Submitted To:
L&TECCD,
Approval Reqd. by: GGC project,
Ahmedabad.
Description of mock up : ..~~.~.~.~.. ~!~.~.!.~~~..!.~~.!.~.~~.~~..~~.~.~~.~.. ~~~~ ...............................
"0
Q)
..~.~~.~..~.~.~~~~~~.. :?.Y.~~~~.~.. ~Y.!: .. ~I!?.............................................
Source / Supplier:
................
:a::
ell
..............................................................................................................................
.!!!.
All Toilet sunken area &
iii
...............................................................................................................................
115
.pry..~':lI.c:.().rl.Y~~.~.I<.E!.[j.':l~~13:.......................................................
0
Area of Application:
o Sample
o Catalogue
o Statutory submission
o )"est Certificates
~ Mockup Details
[W=:ctJeu~l?y
Contract Specification:
3mm thk APP reinforcement modified bituminous membrane including primer coat,
Sample Specification:
As per the attached methodology.
~YES
DEVIATION
I
Reasons for Deviation if any:
NO
STUP Consultants
L&T ECCD Rep.
Sign & Date
Sign & Date
Tourching around the pvc pipeline, vendor not suggesting bcas of hole
formation and melting of pipe,Formation of groove in concrete wall for
termination of WP in not possible bcas groove provision not considered in
construction stage, reinforcement need to cut
Distribution to:
1 SllJP
II
GPI
IL-I_------'11
Dis!. Date:
L -_ _- - '
Comments from Consultant:
Comments from Client:
. . . . (h.c.(/<~cl . . .g . . . . . fJf.p.P...9..y.e. . d . . . . .. . . . . . . . . . . . . . ~~ . . ~.~. . . ~ . . ~~
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ~;i3. . . . ~~cJ:.~I;;{f. . .~ .
.................................................................................................................................................................(Z.. . .ij;.. .~. . . ~I.~7. . . ,.:~;. .L;?
OV} NLS)1
Ik.-tlJJ1.J,cM
SIGN (
J<1'" 7J
Approved
NAME
DATE
Approved with Reservations
! 't. ./
[()'l(dj
SIGN
~ ----,,!AME
S)...J,./lL-'[
M...p...J:JC:"JC.r
"
DATE
J
(.Q,
~. :::2.c.q
IApproval Date:
Remarks:
.....................................................................................................................................................................................................................................................................................
88
LARSEN & TOUBRO LTD.-ECCD
GODREJGARDEN CITY PROJECT AHMEDABAD
Quality Management
Wolk Methodology
Methodology for Water Proofmg for toilet sunken area
,(PIDILITE)
~
\
CONTENT
1.
2.
3.
4.
5.
6.
7.
,.
Introductiori and scope of works,
Material delivery and storage,
Resources,
Methodology of water proofing for toilet sunken are~,
Quality control,
Safety,
Environmental,
1.0Iniroduction and scope of works:
This document descAbes the work procbdure for water prciofing of
sunken area in Godrej Garden City Project work. This is prepared to
adopt for all the works in general conditions and if any uncommon
circumstances arise then suitable action will be communicated vide shop
drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. Dr. Fixit Pidifin 2k,
2. Dr.Fixit Pidicrete AM,
3. Dr.Fixit Pidigrout 5M,
4. Cement OPC-53 Grade
5. River Sand
6. Water
3.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1. Mason trowel,
2. Wire brush,
3. Painting brush,
4. Mixing pan 10 liter capacity,
5. Morter pan,
6. Straight edge,
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 12.09.2011
Approved By KCS REDDY
89
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
..
'
4.0 Methodology for water proofing for toilet sunken area.
1. 	 Cr~an the surface and remove and all malba and flak~d slurry from the .
surface
\
2. 	 RC sunken slab to be treated with water proofing shall be checked for
any leakage by water pounding for 24 hours.
;
3. 	 If any leakage found shall be marked and grouting shall be done with
usage of Dr.Fixit Pidicrete AM. ( Mixing ratio 225 grm per/50 kg of
cement)
4. Grouting should be repeated till leakage arrested,
5. The surface should be clean, sound and free from loose particles,
6. 	 After cleaning the surface, all the cracks and pot holes should be patched
with Dr.Fixit super latex (Super Latex: Water: Cement, 1:4:7).
7. 	 Apply the first coat of Dr. Fixit pidinfin 2k polymer modified
cementitious waterproofing coating (Mixing Powder: Liquid, 2: 1 py
weight) and allow to dry for 4 - 6 hours.
8. 	 The second coat is applied in vertical direction as soon as the first coat is
sufficiently hardened.
9. After 24 hours, protective plaster of minimum 15mm thickness along
with CM 1:4,
10.Do the water supply & wastage line as per the plumbing methodology,
11.Complete the all plumbing work as per the drawing, 
12.Do Bore Packing with Dr.Fixit Pidigrout 5M, 
13.Final Water pound test can be done after 24 hours of curing of bore 
packing for the period of 48 hours. 
14.In case of any leakage do the grouting for the point no : 3, 
Note: For sides the water proofing coating shall be extended up to a height
of 100mm above the FFL level.
Revision no : 00 	
Prepared by: S.MARJAPPAN 	
Date: 12.09.2011
Approved By KCS REDDY
90
LARSEN &TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Quality Management .
Wolk Method%Qll
5.0 Quality Control & Docume~tation:
1. 	Check listJor water proofing,
6.0 Safety:
	
	
	
	
	
Ensuring good housekeeping and lighting.
Engage only expertise person for mixing the chemical.
Electrical equipment must be routed through ELCB only,
Use hand gloves for water proofing cherirical mixing.
Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
j
workmen on job.
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 12.09.2011
Quality Assurance
Approved By KCS REDDY
91
~------------------------------------------------~,----------------~
LARSEN & TOUBRO LTD.-ECCD 
GODREJGARDEN CITY PROJECT - AHMEDABAD 
f':" "'I. . !-l-=_.:. . .J.. Ji!j.k4p;.LC~H~E.!. . .: .C: f"k. .,.l_IS-:-cTt-FO_R-r-TO_I_lE_T- : :W; ;:-'AL~-! -ER~.~P.! : : O: :! :'.O~F..--!----'Dr~.__!.p_L~~\--_"'_.
~.IN_G~ 
__
Block :-.'_ _
Floor Level : - _ _ _ _----i-i?..L7_J:::-\-J(fl4WL:::..:!:!..l.-.-_ _
Sl.no
Description
Toilet
Location
Date
&!2~~'-,;;L,
"I..-..._ _ _ _ _ _ _ _ __
Signature
NO
YES
C n1
W/P 0..
L&T ECCD
Execution
L&T ECCD
STUP
.OAJQC
Consultant
Cleaning of the surface
Water pounding Test for 24 hrs
Base preparation
Appiying of water proofing coating.
Protective plaster of minimum 15mm thick,
Iti~~
"\
~~~
V
G!.'-
.\ I I
I,',',J 17
'. 
-t"
"'\
~---4,~-----+-~"-+----+-----~~~J--~-----,~~~\',"~'
Bore packing with eM including groove of 1iIMI
dfOtllid tRS ~ille liil\il=<t CJt.t
Apply the sealant around the groove
r\
"
\x
t~t{!{
Water pounding Test for
10
If leakage found do the grouting
11
After grouting do the poynd test for 4& hrs
IL1~'
/'
"
~----+------+----4-~--~----+---~~-----+------1
92
LARSEN & TOUBRO LTD.-ECCD 
MOCKUP APPROVAL
GODREJ GARDEN QTY PROJECT
Ahmedabad
QUALITY MANAGEMENT
L&TI GGClMU-012!Submit. Date: 08.10.2011
No.
Name of Work:
WATER PROOFING FOR TOILET SUNKEN AREA
~
F===========~=P-~~~~===================r======~===r======~=====~
\ The Project Manager
. \
\ STUP Consultants P. ltd.
\
L&TECCD,
Godrej
garden
city
project,
Approval
Reqd.
by: GGC project,
Submitted To:
Jagatpur
Ahmedabad.
Ahmedabad
Description of mock up : ..~~!~!..~~~!.\~S . !.~.r..!~.!~!:!..;?~.~.~!:.~.. ~~~ ...............................
Source I Supplier:
.!:'!.!?!.~!I~ . ~y.~.~.~.~....................................................................................
Area of Application:
AifToHEit'sunkenarea..&...................................
Sample
catalogue
Statutory submission
Test Certificates
[B"Mockup Details
IB' Others: Methl1Y
D
D
D
!!!.
.~
:~i.y-:~~rc.:?~y.:~.li:ii~~:ii::~r.~~:::::::::::::::::::::::::::::::::::.::::::::::.:::::::::::::::: ~
CheClL
Contract Specification:
3mm thk APP reinforcement modified bituminous membrane including primer coat,
Sample Specification:
As per the attached methodology.
DEVIATION
~ES
Reasons for Deviation if any:
o
L&TECCD Rep.
Sign & Dale
NO
, STUP Consultants
Sign & Dale
'
Tourching around the pVC pipeline, vendor not suggesting bcas of hole
formation and melting of pipe,Formation of groove in concrete wall for
. termination of WP in not possible bcas groove provision not considered in.
construction stage, reinforcement need to cut
Distribution to'
SIlJP
II
GPI
IIL---___I 1"---_ _1
Comments from Consultant:
Dist. Date:
Comments from Client:
DATE
9"" Approved
Approved with Reservations
0 ~JApproved
LN'" v.:.- J..4
Approval Date:
Remarks:
, . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .H
......... n
............................... n
.............................. n
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .n
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .U
   h H. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .n
. . . . ._
 H n . n . . H
. . . .H
. . . . . . . . . . . . . . . . . . . . . . . . . .n
. . . . . . . . .  . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .H
. . . . ..
93
In 	
'-ll
LARSEN'&'TOLIBRO LTD.-ECCD
GODREJ-GARDEN CIt\' PROJECT AHMEDABAD
Quality Management
"	
Work Methodology
Methodology for Water Proormg. for toilet sunken area
(BASF)
CONTENT
1. Introduction and scope of works,
2. Material delivery and storage,
3. 	 Resources,.
4. Methodology of water proofmg for toilet sunken area,
5.
Quality control,
6. Safety,
7. 	Environmental,
1.0Introdu~tion
and scope of works:
This document describes the work procedure for water proofing of
st1;nken area in Qodrej Garden City,Project work.
is prepared to
adopt for all the works in general conditions and if any uncommon
circumstances arise then suitable action will be commuflicated vide shop
drawing.
This
2.0 Material delivery and storage, 
The following materials will be deployed for the activity, 
1. Flowcable 50,
2. RP-~mi~41
3. Masterseal550
4. Rheomac i07
5. 	Emaco S 48 CT fiber
6. Masterflex 612
7. Cement
8. Water
. 3.0 Resources ll)1anpower & Tools.
The following tools and tackles will be required for this activity,
1. 	 Mason trowel,
2. Wire brush,
3. Pamting brush,
4. Mixing pan 10 liter capacity,
5. Morter pan,
6. Straight edge,
Revisiofl'no:'OO
Prepared by:. S.MARIAPPAN
Date: OB.11.2011
Quality Assurance
Approved By KCS REDDY
94
,. LARSEN &TOUBRO LTD.-ECCD
GODREJ GARDEN CITY PROJECT AHMEDABAD
Quality Management 	
Work MetfJodotoav
,4.0 Methodology for water proormg for toiletsunkenarea. 
1. 	 Remove all protruded reinforcements by gas cutting up to 25mm below
RCC.
'
2: Clean thesace'& remove all "ebris, flaked slurry/loose co~crete.
3. W,drolWater test by pounding entire sump with water to be carried out
along with temporary sealing cut out/openings ..
4. 	 If any leakage is observed, it will be ,marked and grouting shall be done
with appropriate water proofing material, cement slurry admix with Non
shrink compound Flowcable 50
5: HydrolWater test by pqunding entire sump with water to be carried out _
after setting of grouting material. If any leakage is observed, it will be
marked and grouting, shall be done with appropriate water proofmg
material (as above). This exercise may be repeated till no
leakage/seepage or dampness is observed.
6. 	 All the cracks and potholes should be patched with cement and bonding
matetial (Rheomix 141 9f BASF) in proportion of 1part of Rqeomix 141
with 4 parts of cement. Watta at comer jonits (between verticill and
horizontal surface) to be made with the same material ..
, 7. 	 After minimum 4 hours, apply one slurry coat made of Rheomix 141 and
cement in a proportion of 50 kg cement and 30 liters of water (more or
less as per site condition) and 2 kg Rheomix 141. All mixing of
chemical shall be carried out with electrical driven mixture.
8. 	 After gape of minimum 8 hours apply first coat of Masterseal 550 and
follow 2nd coat in minimum 4 hours by bristlelblock brush (in diiection
perpendicular to the previous coat). Proportion of Masterseal550 is 15
kg powder and 5 kg polymer.
9. During 2nd coat apply 1st coat of protective plaster of CM 1:4 ( dash
coat) to provide mechanical key for second coat of plaster
10.Water curing for minimum 24 Hrs
11.After 24 hrs of the above application, 2nd coat of Protective plaster to be
. applied CM 1:4, Average thickness 15mm(including 1st & 2nd coat)
admix with Rheomac 707 Proportion of plaster is 200 kg sand,50 kg
cement & 100 Ml of Rheomac 707
12.Do the water supply & wastage line as per the plumbing methodology, 
13.Complete the all plumbing work as per the drawing, 
14.All the cut out pipe gap shall be sealed with Emaco S 48 CT -Single 
component, fiber reinforced,thixotropic repair mortar in the gape at
- juIictionofpipe&R;(;:Grnember{walJ.tlJeamJs:labetc.);mfuimum.:gap oof."
25 should be maintain from the top.
Revision
no :00 , 	
Prepared by: S.MARIAPPAN 	
Date: 08.11.2011 .,
Quality Assurance
Approved ByKeS REDDY
95
LARSEN &TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Worl< Methodology
15.24 hrsafter sealing gape by using Masterflex612 - Advanced hydro
swelling gasket in paste form of RASF shall be applied in the gape, bead
size shall be minimum 5- 10 mm.
16.After 24 Hrs. Fill the balance gape with Emaco S 48 CT"- Single
component, fiber reinforced, thixotropic repair mortar17.Final pounding to be done for 48 hours,
18.Incase of leakage is found after all these exercises, Injection grouting
with non - shrink chemical Flowcable 50 of BASF
Note: For sides the water proofing coating shall be extended up to a height
of 100mm above the FFL level.
5.0 Quality Control & Documentation:
L Check list for water proofing,
6.0 Safety:
	
	
	
	
	
Ensuring good housekeeping aftd lighting.
Engage only expertise person for mixing the chemicaL
Electrical equipment must be routed through ELCB only,
Use hand gloves for water proofing chemical mixing.
Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 00
Pr~pared by: S.MARfAPPAN
Date: OB.11.2011
Quality Assurance
Approved By KCS REDDY
96
13 A- S P:
r--
CHECK LIST FOR TOILET WATER PROOFING.
I?>. -
Block:
n. L" a... . t ! l t J c k , j .
2"1'7"" ~h (L.
Floor Level:.
81.no
: LARSEN & TOUBRO LTD.-ECCD
GODREJGARDEN CITY PROJECT AHMEDABAD
C::>"
Description
Itlu
Water pounding Test for 24 hrs
,..,  lot''''"'
IV,
~-
'2.~\!oJ"
124110 II
90
it
If
,;
...
L~-
.1: It
()
...,.t
.~
~ hl~~
1'P'
Protective plaster of minimum 15mm thick.
\0
l4t!:j ~
~
~erj
'~
------
IV""
~ b~~ J2OV1'
IT "
~ ~ (I M
II tV"
.......
J2-:W~
is
t lur
.--
7 Illore packing with eM including groo.ve of 12mm
",/ around the pipe line & cut out
t J ~PIY
.v
()
kCl~e.
12.0\ \-.)~ i\
J i't
1'-,
gcro4 tr"V\
':l.~, t~ It
t/f
j1.~
:...----- ,
IW'0- ?-~ll - ~
nv -.;r/
~ ~W? ~ lJo/"J'"
.~ ~ ~
~ \r ~
Che.I- :~ Ii..-<M""
,
v
I.~
IApplying of water proofing coating.
':74"1
'
'"
v--5
IU"v '''''' tJ
1 14;(). C
2COJI,'}JI
J' Base preparation
~~
L&TECCD
STUP
OAlQC
Consultant
.,
-~~
V.v--
1,..0-"'"
11'
- )
L&TECCD
Execution
W/PConJ.
I-- -
'" jO j L.-
Signature
( '2..<>3).
:2 "
If leakage found do the grouting
t2- Oc!J ~
NO
YES
'f""til-LT
2.q to r\
Y
~ ecL
(r1,
Toilet
Location
Date
7.. ~J
1/ Cleaning of the surface
~)
Ins--lll
;qJ
th, - , "
~ hrs.
After grouting do the pound test for 48 hrs
1"- L iL1~
ru- ~
r
r
\J.gofV'J
1/'\
V
y-./.
1'1.
JAJ}
V,"-
\V
r-
VJ.J?r\, } l~
k0\ .
tch\1J I
lJY If leakage found do the grouting
l ........
~J-II /) [J1/
t
.Jy L.
oro"'" tho 9""'"
Water pounding Test for
'r
........-
<Ts)lll\\
~ ~~~ ~ l~t~
9)or:
iL
.1/
I
ll\t;l
~L L
'V
b
f
,,9~
~
.;-1
L
/
1
97
. . ($
LARSEN & TOUBRObTD.-ECCD
MOCKUP APPROVAL
GODREJ GARDEN CITY PROJECT
Ahmedabad'
QUALITY MANAGEMENT
L&T/GGCIMU-013ISubmit. Date: 11.11.2011
No.
WATER PROOFING FOR TOILET SUNKEN AREA
Name of Work:
The Project Manager
STUP Consultants P. ltd.
Godrej garden city project,
Jagatpur
Ahmedabad
Submitted To:
\ L&TECCD,
Approval Reqd. by: GGC project,
Ahmedabad.
Description of mock up: .~!!!~!..~!~.~.!.!~S...!~~.!.~.!~.~..~~.~.~~.~.. ~!~~...............................
0
0
0
0
Sample
Catalogue
Statutory submission
Test Certificates
u;;r- Mockup Details
~ Others:
Methodol0W
..~A~.!:.~.y..~!~~........................................................................................... -
Source I Supplier:
...............................................................................................................................j
'Aii"Toliet'suil'kenareai...................................
Area of Application:
:!5.:f.Y.:y.~~~:~~i~~:~~~~:~~~~::
.!!l
..................................I
,0
-
cLe ,J>Ll.i'lL
Contract Specification:
3mm thk APP reinforcement modified bituminous membrane including primer coat,
Sample Specification:
As per the attached methodology.
I
Reason~s for Deviation if any:
DYES
DEVIATION
'..............................................................-:-........................................................... ~
,~
"
Tourehing around the pvc pipeline, vendor not suggesting beas of hole
formation and melting of pipe,Formation of groove in concrete wall for
termination of WP in not possible bcas groove provision not considered in
construction stage, reinforcement need to cut
Distribution to:
I cJllP
II
Gpi
II
.. Comments from Consultant:
NO
L&T.ECCD Rep.
;;.H
I '.
\
STUP Consultants
Sign & Date
.
Sign & oat\..
I----~-+-~--_r-=..,---v
~\V
~.
Dist. Date:
Comments from Client:
.---,--,-,--------?;i((-~.
. . .'.b.'..J.H..(J.... . . . . g. . . . .A.e.~e~o~~_:_
::~=~::=~-'-~-1~:::!JZ~=~-~=-~~=:-<!:j'/
'3'"up --, , I
t?(c
. . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . .~. . . \. . . . . . . . . . . . . . . . . . . . . . . . . .. t.....~l.;;~. ~:~. i
(~l""""~""""'"''''''
NAME
Approved
Approved with Reservations
Remarks:
98
Jlariappan
:rom:
;ent:
'0:
~c:
iubject:
abhishek (abhishek.anand@fenesta.coml 
Monday, November 07,2011 4:37 PM 
sma@lntecc.com 
hitesh .chauhan @fenesta.com 
Installation Methodology. 
lear Sir,
'tease fihd the Installation Methodology for installation of Windows/Doors at Godrej Properties Site.
,)Check The Measurement,for windows/sliding door openings. 
)Cleanthe surface if any extra particles are there ,for measurements. 
)Pre fix the frame on.the openings and check the alignment and level. 
,)Mark the fasteners holes as per the site requirements. 
,)Make the holes with drilling machines using with 8mm,drill bit,clean the holes properly. 
i)fix the fasteners 8*100mm and do the fixing of the fasteners. 
')fill the gap between wall and frame with Wacker manufactured; (Silicon sealant with inside and outside) 
:)AII the fillings of the silicones are made by the Chemical gun. 
I) Backer rod is to be provided if the gap is more than 8 -10 mm 
.0) Fix the Sliding door on the frame along with the following listed materials: 
I)silicon-Wacker Ltd . 
)fasteners-Avocet Ltd.
:)Fasteners Caps-Fenesta make
I)Anti lift -Fenesta make
!)Shim Packers-Fenesta make
)Bumstoppers-Feries~a make
:)Drainage Caps -Fenesta make
I)Keeps-Fenesta make
)Push lock.-Fenesta make
~egards,
\bhishek Anand
eam Leader -Installation and :Customer Service
511101059
-'
1
99
FAftI
HANDING OVER
SHEET
08-11-11
DATE:
UPV';: W!'~~oow Moil!) OOO.:t 5t5T~"15 
iADi.i,,""" <If
OCMShrlftltm C<mSolidn!.~NI Limrted i 
.lENT: larsen & Toubro ECC.Div.
TE:
GODREJ GARDEN CIl1Y .AHMEDABAD
3PJ-304
TOWER:
Ie are pleasesd to hand over following units in complete and satisfactory wor~ll]g condition
..
).NO
INSPECJ;IONPOINTS fLOCATION
Windows position is as per client requirements
Packing shims are not visible from sealant
,<v
~.
-4
-5
All frames are straight in plumb and at equal diagonal
t-'
All fasteners are tightened properly and cover cap is fixed
V--
~.
Gasket is fixed properly from all sides
Sash operation is proper (Hinges ,rollers ,and all track)
if
The overlapping gap between sash and frame is equal
Handle lock and hinges .are working properly
10
Bump stop,anti lift block and interlock fixed properly
11
Corners of beads and gaskets are matching
Keeps for slider windows and doors
13
Silicon sealant is proper -inside and outside
14
Bug screen is fixed with window
15
Protective Ta pe remo,!ed properly
---
--~
'"
,~
~-
..
....,~
,-
'"
.. - , -
~-
--
~.
--V"
---
--
~-.
._- ._--
""
i'-..
--
--
--- ---
' - '
.-~
---
~.--
--~
-I-
\/""""
'-
"-- -' - -- . -
--- ~
._- ---
", -r--
~,
"" "'"""
N,A
12
.-
.'\L2.
- -Cavity locking block and casement wedge are fixed
V'
---:V' 1 - - . , -
'-
/._-- ,~ ~ "..
MR.KAMlESH
ABHISHEK ANAND
,cPt
W1.
TECHNICIPN;
SUPERVISOR;
---
/'
N'/';
---
FENESTJ\ ENGINEER
..
.
A
j}fIs,~~ 7fW~
11"
STUP
,?~V \1'\ \
.J <.J ()
V:J r
_..-""'"
~tte 	 6Jt~,
&~
100
101
LARSEN & TOUBRO LTO.-ECCD
MOCKUP APPROVAL
GODREJ GARDEN CITY PROJECT
Ahmedabad
QUALITY MANAGEMENT
No.
Name of Work:
L&Tf GGCIMU.0141Submil. Dale: 12.11.2011
FIXING OF UPVC WINDOWS AND SLIDING DOORS
The Project Manager
STUP Consultants P.ltd.
Godrej garden city project,
Jagatpur
Ahmedabad
Submitted To:
L&TECCD,
Approval Reqd. by: GGC project,
Ahmedabad.
!!l
o
o
o
o
o
[3-
Description of mock up: ".F.:!~!!!!t~!.Y~Y!? ~~.!!~~~~..~..~.~!~.~~~..~~.~~~........................
..
ti
~~~~~~----~~~==~--------------------------~
Source I Supplier:
FANESTA
~"
:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~
":~!.!:y~!~~:~~~:~::~!@~~:~~:~r.~::::::::::::::::::::::::::::::::::::::::::::::::::::::
Area of Application:
.*
Sample
Catalogue
Statutory submission
Test Certificates
Mockup Details
O~:~ce;J~A4?
Contract Specification:
UPVC Siding Door & Window, And Powder coated Aluminium windows
Sample Specification:
UPVC Sliding doors & Windows
"DEVIATION
DYES
Reasons for Deviation if any:
NO
L&TECCD Rep.
Sign &
STUPConsultants
Sign & Date
~/);?{
Distribution to:
I STUP
I 1L--__- - J1
\1
!comments from Consultant:
Commen1S from Client:
ro Iyv-j4 dM ~ JJ"1' Sn
SIGN
()
Approved
~e""
D
--O;;t. Date:
'"
Hr JI- I )
DATE
(\
Approved with Reservations
~A-tr' .. ~,r'::--~ -;---
S1GN~~
Not1f;prove~
(II.
...;.,v
... A
DATE
fA
_'Y'" Il'>'L...........
lApprOval Date:
Remarks:
. . . . . . . . . . . . . : . . . . . . . ._
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .O# . . . . . . . . . . . . . . . . . . . . . . . . . . . . n
~.H.........._ ..............._ ..................._ ...............H~.; .............u
H ............... 
 u . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
102
'/'
e
. '
LARSEN &TOUBRO LTD.-ECCD
'
GODREJ GARDEN CITY PROJECT - AHMEDABAD
"
Quality Management
Work Methodology
Methodology for Water Proormg. for Over Head'l UG
water tank (CERA-CHEM) .
CONTENT
1. Introduction and scope of works,
2. Material delivery and storage,
3. Resources,
4. Methodology of water proofmg for toilet sunken area,
5. Quality control,
6. Safety,
7. Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for water proofing of ~oilet
sunken artfa in Godrej Garden City ProJect work! This is prepared t'o
adopt for allthe works in general "conditions and if any uncommon
circumstances arise then suitable action:' will be communicated vide shop
drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
Ceralastic compound I & II,
Ceralatex SBR,
Cera crystalline integral,
Cera Expan 250,
r
r
Cement OPC-53 Grade
River Sand
Water
3.0 Resources I Manpower & Tools.
The following tools and tacki~s will be required for this activity,
1. Mason trowel,
.
2. Wire brush,
3. Painting brush,
4. Mixing pan 10 liter capacity, 
. 5 )vioTIy!'pan, 
6. Straight edge,
1.
2.
3.
4.
5.
6.
7.
Revision 00";00
Prepared by: S.MARIAPPAN
Date: 13.12.2011
QualityAssurance
Approved By KGS REDDY
103
LARSEN & TOUBRO LlJ).-ECCD
GODREJ GARDEN CITY PROJECT AHMEDABAD
. Work Methodolow
Quality Management 	
4.0 Methodology for water proofing for Over Head I UG Tank.
1. 	 Clean the surface and remove and an malba and flaked slurry from the
surface
2. 	 "V" ~ooves shall be cut aldng the ~onstruction joint on wall wall
joints and shall be filed with Polymer modified mortar admixed with
CERALATEX SBR @ 2% by weight of cement and ~outing to be done
with CERA EXPAN 250@ 225gms per bag of cement.
3. 	 RC water tank initial pounding shall be checked for any leakage by
water-pounding f()r 24 hours.
4. If any leakage found shall be marked <4ld ~outing shall be done.
5. 	 "G.!. Nipple shall be fixed if necessary at weak locations and pressure
~outing shall be carried out cement slurry admixed with expanding
~outing additive CERA EXP AN 250@ 225 gms per bag of cement.
6. Grouting should be repeated till leakage arrested,
7. 	 Acrylic polymer basd two-component Water proofing system
CERALASTIC silall~e applied in two ~oats on floor and Wall.
8. 	 Mixing ratio of Ceralastic is 1:1:5, (One part of Ceralastic, One part of '
water and five part of Ceralastic component).
,
9. 	 The second coat shall be applied after the first coat is-dry. However it is
advisable to wait for 8 hours before the second coat is applied.
10.During 2nd coat apply 1st coat of protective plaster of CM 1:4 (dash
coat) to provide mechanical key for second coat of plaster
l1.The slab/Wall treated area shall be plastered using CM 1:4 admixed
with CERA CRYSTALLINE INTEGRAL @ 400 grm per bag of cement
to an average thickness of 20mm and cured for minimum 3 days.
12.The treated area shall be cured and tested by pounding water for at least
5 Days.
1'
Note: For s!des the water proofing coating shall be extended up to a height
of water tank cover slab bottom l e v e l . '
5~0
Quality Control & Documentation:
1. Check list for water prQofing,
Revision no : 00
Prepared by: S.MARfAPPAN
Date: 13.12.2011
Quality Assurance
Approved By KGS REDDY
104
LARSE,N & TOUBRO LTD.-ECCD 
GOD~ GARDEN CITY PROJECT - AHMEDABAD 
. Quality Management
\
Work Methodology
6.0 Safety: .
Ensuring good housekeeping and lighting:
Engage only expertise person for mixing the chemical.
E\ectrical equipment must be routed through BLeB '~y,
Use hand gloves for water proofmg chemical mixing.
Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 13.12.2011
Quality Assurance
Approved By KGS REDD~
105
. :
; i2::J.
....'
''lJ
LARSEN&TOUBRO LTD.-feeD" '
PROJECTQUAUTY PLAN - GODREJ GARQE~ CITY PROJECT.
\n\
Chedc Ustfor OVerhead Water tank
'.
F!!!8'odc~.:~""1.~i,.M!.llr:e~:*~~rt""P9"'"~
b-8:;..!::L.--::::....-r-~~'::""
'.' -:---..-------r--.:.--"1""'"'-------:;:--:-:-:--~
te
Sl.no
Descripetion
I - : -__
DilF-'-,--I
location
No
Remarks
End
Start
..
Yes
Signature
L&T
l&T Q<;'
Contractor
'.' .
STUP
,
\
Cleaning of tank
Construction joint
Tretment
3 . ''''tinal Water pound test
If leakage found do
the grouting
Al~
B'Ye
l.,nk ~3!Lt
~H
\/
~k~4 1'5:\",
h.,
~~ V "1
\;0;;'
ID~~,-b- e.,J ,'9
Ir'-I~ \.aV\.fi P ",)
nlr'2 ,,/
1 i \~ ~ '\ \ /
I \
V'
(
r
\
~,.t11
~
\It [}f .,v
~~ \.~ IC-~
)~
\5
Jo.
Jl
',.'"
k-,
tV
.P.~ fll;
f~~. . ~tf\
r'\.t
\"
1 I
/ft'f{j "
i{)\~~r~:.\ill?
9
tg
Plaste~ngWithCM1:4 "I~ ~k !~<?j nf~'v ~
::.........
,.
'.
D~/
10
Final pounding Test
/
~
vW
\l
.JJ,J
"P' ,
il) . .Jl
r"
..
...
"
;.
~,
I)
I).
~
I?~, /'
/'
if
3rd Coate
1/ "
D
8
"
~ IA'~W
I,:' 12-~l\-~ 12 Y
,,}:!'" rr~lJ ~'\\
''{
Ij
):" " f~
~onili~r k~~jk1d\2Jls-117~..;:/
~rJ-
Ar
Q~
1st Coate
2nd Coate
~\v
~\I
,j
~ ~
10/
5 . No leakage found
'
\ .
;'1
'I"~
....
C-
i\
~L r
.~~~ ~ t(~
:,-\~. ~
J~ '\
' 'l.1O
C\\Q)"\
106
lARSEN & TOUBRO LTD.-ECCD
~OCKUP'. APPROVAL
GODREJ GARDEN CITY PROJECT
Ahmedabad
QUALITY MANAGEMENT
No.
Name of Work:
WATER PROOFING FOR OHT/uG TANK
Submitted To:
The Project Manager
STUP Consultants P.ltd.
Godrej garden city project,
Jagatpur
Ahmedabad
l&T/GGClMU-D1S!Submlt. Date: 06.01.2012
L&TECCD,
Approval Reqd. by: GGC project,
Ahmedabad.
r,S~o-u-rc-e~/~s~u-pp~l~ie-r:~'------P~....~~=~~~~:~~.~~.E~.~~. . _
..._.. _.._.._.. _.._.._.. _.._..
m . ._. . . .
_....
_ . . ._. . . .-. . . .-. . . .
- ....
- . . .. . . .. . . .
~===.
AiTOHfiiJtrTAfiifAREA................................................
Area of Application:
o
o
o
o
.S2
~
Sample
CatalOgue
Statutory submission
Test Certificates
IYrMockup Details
~Others:
MethodologL
_ _~ J[j~l'----m
Q)
o
Contract Specification:
Providing waterproof plastering average 25m thick for bottom slab and average 15mm thick for side walls of water tank with CM 1:4
with waterproofing compound.
Sample Specification:
As per the attached methodology.
~.__________________________________~I___D_EV_IA_T_IO_N_ ____[J___Y,E_S____~
_ ____N,O__________________1
. . . . . . . . . . . . . . . . . . . . .=:.. . kl' . : : : :. . . . . . . . . . . . . . . . . . . . . . .
Reasons for DeViation if any:
.::.,~
sTUP~onsultanls
l&T ECCD Rep.
Sig
Sign & Date\
~ate.
Distribution to:
I SIU~ !I Gpi 11L..-.__--11 I
r==~
Disl. Date:
=:-----,=-.,~=~~~~;:;;;;;;;;;~~::::::;;;;;;;~~~~--====::=====4
Commerits from Consultant:
Cpmments from Client:
. . . . . . . . . . . c.h.((..I(I!...J.........l . . . O"~. I,!.'r!..J.... .Y....l.~. . . . . . . . :. . . . . . .  . . . ~~E
. .. . . . . . . . . ~o.~
.......-............................:..........................................n................. ........"..................u..................... ..............
:.~
. . . . .~. . . . . :1.. . . . .~.===. . . . .
. .... ... .............................................................................:..:...................
~
. . .. .. . .  . . JLtA~.~.  ::.. . ...  . . . . . ~. .:. . . .. . . . . . . . . . . . . . . . . . . . . . . .-r,;;.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . :.. . . ..
I
SIGN
.
NAME
Approved
DATE
SIGN
Approved with Reservations
Remarks:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ;       ' . . . . . .H
k1
~~.
'#yt-f(
NAME
Not Fpproved.
............ .................................... u
<-- Il'a..l'
~ ~r
 . .  . .  , . .  . .   . .   . . . . . . . . . . . . . .n
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .H
.................................................................
, . . . . . . . . . . . .u
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .~*'
. . . . . . . . . ." ,   U H . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .~ . . . . ._
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .H . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . " . . . . . . . . . . . . . . . . . . . .n
................................................................."
. . . . . . . . . . . . . . . . . . . ._
I G~ I
'-"
,e.
t' ~
IApproval Date:
,
. . . .  . .   . .  . . . . . .  . . . . . .  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .u
%
DATE
..............n
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .
. . . . . . . . . ~, . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ."
....................................................~............................H
. . . . . . ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ~ . . . . ._
. . . . . . . . . . . . . . . . . . . . . . . . . . . .H . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .n u . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _~ . . . . ~ . . . . . . . . ._
107
LARSEN & TOUBRO LTD.ECCD 
GODREJ GARDEN CITY PRO.IECT  AHMEDABAD 
Quality Management
Work Methodologv
Methodology for Water Proofing for toilet sunken.area
(CleO)
CONTENT
1.
2.
3.
4.
5.
6.
7.
Introduction and scope of works,
Material delivery and storage,
Resources,
Methodology of water proofing for toilet sunken area,
Quality control,
Safety,
Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for water proofing of toilet
sunken area in Godrej Garden City Project work. This is prepared to
adopt for all the works in general conditions and if any uncommon
circumstance arise then suitable action will be communicated vide shop
drawing.
2.Q Material deliverY and stora&e, .
t
The following materials will be deployed for the activity, 
1. CICONO:I
2. TAPECRETE PI51 - CICO,
3. Cement OPC-53 Grade
4. River Sand
5. Water
3.0 Resources I Manpower & Tools. 
The following tools and tackles will be required for this activity, 
1. Mason trowel,
2. Wire brush,
3. Painting brush,
4. Mixing pan 10 liter capacity,
5. Morter pan,
6. Straight edge,
Date: 14.03.2012
108
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
4.0 Methodology for water proofing for toilet sunken area.
1. 	 Remove all protruded reinforcements by gas cutting up to 25mm below
RCC.
2. 	 Clean the surface and remove and all malba and flaked slurry from the
surface.
3. 	 RC sunken slab to be treated with water proofing shall be checked for
any leakage by water pounding for 24 hours.
4. 	 If any leakage found shall be marked and grouting shall be done.
5. 	 PVC nozzles shall be fixed into the slab section. Up to 2" the depth of
the slab section. The nozzles shall be grouted with CICO no 1(Mixing of
CICO no: 1 will be 1kg of CICO NO: 1 in 1 bag of cement)
6. 	 After cleaning the surface, all the cracks and pot holes should be patched
with CM 1:3 mixing ofCICO no: 1(1 kg per one bag of cement)
7. 	 Surface to be wet before applying the Acrylic Polymer at least one hour
priorto the application Acrylic Polymer coating.
8. 	 Apply two coats of T APECRETE acrylic polymer in the interval of 
5hours.(Mixing ratio 1:2,one part ofTAPECRETE and two part of 
cement) 
9. 	 After 24 hours, do the I5mm average thick protective plaster of CM 1:4
mixing ofCICO No: 1, Ikg/Bag of cement.
IO.Do the water supply & wastage line as per the plunibing methodology,
and pomplete the aU p'lumbing work as per the drawing. \
t
II.After 24 hours bore p~cking is to be done for all pipe cutouts with CM
1:3 mixed with CICO NO 1. ( Mixing ratio is 150kg sand, 50 kg cement
. and Ikg CICO NO 1)
12.Final pounding test should be done for 48 hours.
1J.If any leakage found, grouting is to be done for the same area as per the
point no: 5.
Note: For sides water proofing coating shall be extended up to a height of
IOOmm above the FFL level.
5.0 Quality Control & Docllmentation:
1. 	Check list for water proofing,
Revision no: 00
Date: 14.03.2012
Prepared by:
109
LARSEN & TOUBRO LTD.ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodologv
6.0 Safety:
	
	
	
	
	
Ensuring good housekeeping and lighting.
Engage only expertise person for mixing the chemical.
Electrical equipment must be routed through ELCB only,
Use hand gloves for water proofing chemical mixing.
Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no: 00
Prepared by: S.
Date: 14.03.2012
Approved By G. SURESH
110
LARSEN & TOUBRO LTD.-ECCD
GODREJ GARDE~ CITY PROJECT -AHMEDABAD
CHECK LIST FOR TOILET WATER PROOFING.
SI.no
Description
Cleaning of the surface
Water pounding Test for 24 hrs
TOitet: .
location
Date
YES
I.
II/otl12 TmJ~t-:1
'Ill,
1 tlmlt!
1n-11.1:- :;
'1.Lh
1\101112"
Ylh
HUoIJu.
TC'Iihl-3
'faiW.. i
Va...0
I.1.JD 1).2.
.7rri'iJl: .. ,_
YEA
n ..Jflt),~ IIf'milt.1:  .3
1'/>eA
l~jI)IJI~
If leakage found do the grouting
I~J'!I\"'t
10,,~I&~'t.tit
I
4 . Base preparation
Applying of water proofing coating,k
Bore packing with eM iAell:ldiAg gFaelle of 12mm
~he pipe IiRil & Cllt owl
ApplY the sealant around the groove
A'.!. L
'4,
~"';'I""'"
"'
f'~,.
Nt,
r,m]~t:-~
,.jc.
1If';" I: - , 'I!.t.A
1'11i1L.J:- -1. '1M
Water pounding Test for 48 hrs
10
If leakage found do the grouting
l&TEC.CD
STUP
QAlQC.
Consultant
1'\ ,.
N'.,P
'Mmh
'2. r,';'hl ~.~ Y..c
I
IV
~o}--1
'dNtL
')
- .
l&T ECCD
Execution
NO
'l. fj
: J..,l112
I
Wrr_~fjn/..
1.1.. 111.,.1'
NO
NO
..
.
11
After grouting do the pound test for 48 hrs
,
I
111
LARSEN & TOUBRO LTD.ECCD
<9
GODREJ GARDEN CITY PROJECT
----.~
Ahmedabad
QUALITY MANAGEMENT
MOCKUP APPROVAL
,
L&TJ GGC/PH3/MOKlO2
No.
WATER PROOFING FOR TOILET SUNKEN AREA
I ne !"-roJect mcmagt:lr
STUP Consultants P. ltd.
Godrej garden city project,
Jagatpur
Ahmedabad
Name of Material:
Submitted To:
L&T ECCD,
Approval Reqd. by: GGC project.
Ahmedabad.
Description of Material : yy_~t.!-:.r:.~_r~<?fi_l'!!t~~~ !.:<?!I.!'l_t_~_l!'J~.!'l_~ _~~~~ ___ .' ___ .. __
i::i
(j)
..___ .____ ..
.r::
------------- .. _---------------.------------------_.
ro
!!!.
~!~)~.l:'~ ~9_'=~_~t9~~_ (~!~g.~g_~L._
Source I Supplier:
ALL Toflet"si:irikerl area &-- ----- --. - - ----. ---
A .''') of Application:
I
~~~~~~~~~i:~~~~~~:~f~~: :~~::: ~ ~:::~: ~ ::::~: :~~ ~:
ISubmit. Date: 26.04.2012
0
0
'iii
a;
Sample
Catalogue
Statutory submission
Test Certificates
Mockup Details
Others: Methodology. checklist &
Material datasheet
IContract Sl!ecification:
As per Contract documents.
Sample Sl!ecification:
As per the attached methodology.
DEVIATION
DYES
Reasons for Deviation if any:
NO
L&T ECCD Rep.
Sign & Date
r.
'ibution to:
Dist. Date:
Comments from Consultant:
Comments from Client:
---------------------------------------------------------------
---------~~:;:~~-~~--~;---
::::::::::::::::::::::::::::::::::::::::::::::::::::--::::::::: ::::::~:::::~:<;:;:::~~~:::::::::
".
NAME
SIGN
Approved
DATE
Approved with Reservations
SIGN 
'D 
Remarks:
112
LARSEN &TOUBRO L'ro.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
Methodology for GRC Canopy work
CONTENT
1. 	 Introduction and scope of works,
2. 	Material delivery and storage,
3. 	Resources,
4. 	Methodology of Painting work,
5. 	 Quality control,
6. 	 Safety,
7. Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for GRC Canopy work in
Godrej Garden City Project work. This is prepared to adopt for all the
works in general conditions and if any uncommon circumstances arise
then suitable action will be communicated vide shop drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. 	 Pre-fabricated GRC Board,
2. 	 Heavy Duty Chemical Anchor (HVU with HAS-E)
(HILTI).
3. 	 Base plate,
4. 	 Pre-fabricated steel frame,
5. 	 Epoxy,
6. 	 Tie rod.
7. 	 Screws.
3.0 Resources / Manpower & Tools.
The following tools and tackles will be required for this activity,
1. 	 Drilling machine,
2. 	 Thread line,
3. Level tube,
4. Hammer.
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 21.08.12
Quality Assurance
Approved By KCS REDDY
113
LARSEN & TOUBRO LTD.-ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
4.0 Methodology for GRC Canopy Work.
1. 	 Mark the location of base plate as per the drawing and mark the holes as
per the base plate holes,
2. Drill the holes using of 18mm drill bit and fix M16 Heavy duty chemical
anchor HILTI brand. (HVU with HAS-E)
3. Fix the base plate using with anchor nuts on the fixed anchor,
4. Erecting the pre-fabricated steel frame as per required line and level,
5. 	 Provide the support for steel frame as per the requirement,
6. 	 Welding to be done on the joint between base plate and pre-fabricated
steel frame,
7. 	 Fix the suspended tie rod as per the drawing requirement in three 
locations. 
8. 	 Fix the GRC pre-fabricated boards and screw with steel structure.
9. 	 Ensure the line and level as per the drawing.
10. All GRC board joints are to be filled with epoxy,
11. Light fixture cutting to be done as per the drawing. 
12.After completion of all activates final water test to be done for 24 hours. 
5.0 Quality Control & Documentation:
1. 	Check list.
6.0 Safety:
 	 Ensuring good housekeepin-g-and-lighting:
 	 Engage only expertise person for cutting the board and
handling the drilling machine.
 	 Electrical equipment must be routed through ELCB only
 	 Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 21.08.12
Quality Assurance
Approved By KCS REDDY
114
LARSEN & TOUBRO LTD.ECCD 
GODREJ GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
Methodology for Gypsum False Ceiling work
CONTENT
1. Introduction and scope of works,
2. Material delivery and storage,
3. Resources,
4. Methodology of Painting work,
5. Quality control,
6. Safety,
7. Environmental,
1.0Introduction and scope of works:
This document describes the work procedure for Gypsum false ceiling
work in Godrej Garden City Project work. This is prepared to adopt for
all the works in general conditions and if any uncommon circumstances
arise then suitable action will be communicated vide shop drawing.
2.0 Material delivery and storage,
The following materials will be deployed for the activity,
1. G I Channels,
2. Screws,
3. G I Cleat,
4. Gypsum board,
5. Fiber tape.
3.0 Resources I Manpower & Tools.
The following tools and tackles will be required for this activity,
1.
2.
3.
4.
Drilling machine,
Thread line,
Hammer,
Screw driver,
Revision no : 00
Prepared by: S.MARfAPPAN
Date: 16.01.13
Quality Assurance
Approved By KCS REDDY
115
LARSEN & TOUBRO LTD.-ECCD 
GODRE.I GARDEN CITY PROJECT AHMEDABAD 
Quality Management
Work Methodology
4.0 Methodology for gypsum false ceiling Work.
1. 	 Mark the false ceiling level and line as per the approved drawing.
2. 	 Providing and fixing of GI perimeter channels size of .4Smm thick
having flange of 20mm and other flange of 30mm and web of 27mm
along with perimeter of ceiling using with screws 610 clc.
3. 	 Suspending GI intermediate channels size of 4Smm 0.8 mm thick with
two flanges of lSmm each from soffit at 1200 c/c with ceiling angle
2Smm x 10mm x .4Smm and GI cleat to be fixed using fasteners, the
height as per the marking.
4. Fix the intermediate channels at 600mm CIC,
S. 	 Fix the gypsum board using with screws and ensure the line and level as
per the drawing.
6. 	 All gypsum board joints are to be jointed with fiber tape.
7. Ensure the final level and line as per the drawing before final screwing.
8. 	 Light fixture cutting to be done as per the drawing.
5.0 Quality Control & Documentation:
1. 	Check list.
6.0 Safety:
 	 Ensuring good housekeeping and lighting.
 	 Engage only expertise person for cutting the board and
handling the drilling machine.
 	 Electrical equipment must be routed through ELCB only
 	 Obstacles to be cleared for shifting the materials to the work
spot
7.0 Environmental requirement:
 	 Nose masks (if required) and Hand gloves (Rubber) shell be used by
workmen on job.
Revision no : 00
Prepared by: S.MARIAPPAN
Date: 16.01.13
Quality Assurance
Approved By KCS REDDY
116
LARSEN&TOUBROCONSTRUCTIONB&F
GODREJGARDENCITYPROJECTAHMEADABAD
PROJECTQUALITYPLANPARTII
Sl.No
CheckListforsiteworks
Pageno
Determanicationofdegreeofcompactiononsite
118
Antitreatmentwork
119
PourCard
120
AluFormWorkChecklist
121
BrickWork
122
ConcreteBlockwork
123
DoorFrameFixing
124
JointtreatmentbetweenRCC&Brickwork(External)
125
Plasteringwork
126
10
FixingofMSRailing
127
11
FixingofMSRailinginStaircaseareaandmidlanding
128
12
Toiletwaterproofingwork
129
13
Kitchentabletop/Italianmarble
130
14
WallFinishing(InternalPutty)
131
15
WallTilingwork
132
16
Forflooringwork
133
17
DoorShutterFixing
134
18
UPVCwindows/VentilatorsFixingwork
135
19
Externalputtyandpaintingwork
136
20
Openterracewaterproofingwork
137
21
ChecklistforCanopy
138
22
ChecklistforGypsumfalseceiling
139
23
OverHeadTankWaterproofing
140
24
LiftGraniteCladdingwork
141
25
Doorframe&Shutterpainting
142
26
DoorFrame&shutterpolishing
143
23
FinalHandingoverChecklist
144
LARSEN & TOUBRO LTD.-ECCD
PROJECT rlUALITY PLAN GODREJ GARDEN CITY PROJECT
Quality Management
Fornat no : GGC/QC013
DETERMANJCATION OF DEGREE OF COMPACTION ON SITE
Date:
Source of Material
.. Location
No:
OMC
MOD
glee
Volume of Core
glee
<.
I
Sample no : 01
Sample no
Sl.no
Sample no : 02\ Sample no : 03 Sample no : 04 Sample nc : 05
!
Location of Sample
.~
Top level of Layer
i.
f.1oisture Content by
Rapied moisture meter =MC
Weight of Soil sample =W1
I
.1
Wet Density of Soil
WD=W1/MC glee
Dry DeAsity of Soil
DD = WD/(1 +MC)!1 00
Degree of Compaction
DC = DD/MMD*100
QC L&T -ECCD
STUP ConsultantA
118
LARSEN & TOUBRO LTD.ECCD
PROJECT QUALITY PLAN GODREJ GARDEN CITY PROJECT
Quality Management _
Format No.: GGC/QA- 003
CHECK LIST FOR ANTI-TERMITE TREATMENT
Structure:
--
Location :
Date of Application :
Name of the Chemical with Batch No. :
SI.No.
Items Description
Check for
01
Chemical conforming to IS 6313
02
Application of diluted chemical as per IS
Specification.
(A)
Status
Signature
L&T
Remarks
STUP
Below Pee of Grade slab @ 5 liter per sqm area
Identifications:
(B)
Back Filled Soil around Column I Wall @ 7.50 liter per sqm area
Identifications:
119
LARSEN & TOUBRO LTD.ECCD
GODREJ GARDEN CITY PROJECT
QACopy
QuaJIty Management
Format'No.: IAOO1
POUR CARD
SI.No
Date
.9801
DETAILS OF CONCRETE POUR
Quantity of Concrete
Location
Date of Commencement
Drawing No.
Tune of Commencement
structure
BBSNo.
Grade of Concrete
Expected Time of Completion
---~--------.--
.. -------------"------~---------------- -------._-----------------------------------------
CLEARANCE FROM SERVICES DEPARTMENT
Fonnwork
L.& T
Dimensional checking as per the drawing
T
'
I:
~
STUP'
l
L&T
Safety
PPE. Access & Walkway
Alignment
Hou~
Plumb and level
Lighting
Condition of fonnwork surface
:
:
:
L&T
Reinforcement
Reinforcement as per BBS
Check for service conduits
Relaease agents I.shuttering oils
Extra reinforcement around openings if any :
Expansion jOints I Construction joints
Anchorages and lap length
Service Departments (Cleared by) for
Cover blocks in place I Sizes
Elecbical
HVAC
Any others
Unk, stirrups. spacers
Rebarsclean
:
L&T
Equipment avaiiabUity
Pump. Vibrator act I..
STUP
Wedges
Plumbing
Wall ties
Pins
keeping
<:
STUP
STUP
I:
-----------------------------_._---------------------- ~------------------------------------------------
Remarks:
-------------.--_._- .. -----------------.--------------------------------------------------------------
L&T ECCO  Execution
STUP Consultants
120
LARSEN & TOUBRO LIMITED
BUILDINGS & FACTORIES INDEPENDENT COMPANY
GODREJ GARDEN CITY PROJECT - Ahmeadabad
L&TIMS/C-13/F01
Checklist for Aluminium Formwork
AreaJ Building
L
Date:
Level:
Block
,..
Fiat no
Room Name
Wall reinforcement
Cover provision
Extra bar at Opening
Signature
L&T OA IQC Engineer with DatelTime
L&T ECCD Site Engineer with DatelTime
STUP sign with DatelTime
Verticality of Wall form
Perpendicularity of Wall form
Levels
-"
Position of !)cor blocks
Room Measurements at
Lintel Level
POSition of Window blocks
Position of M&E accessories
Signature
L&T ECCD Site Engineer with DatelTime
Line and Level of Kicker
frames(Outer to Outer) .
Position of Kicker
moulds(Sunken)
L&T OA IOC Engineer with DatelTime
STUP sign with DatelTime
_L&LOA IOC Engineer with DatelTime
STUP sign with DatelTime
Slab reinforcement
Extra At Opening
Signature
L&T ECCD Site Engineer with DatelTime
121
L& T Construction
Buildings & Factories
PROJECT QUALITY PLAN - GODREJ GARDEN CITY PROJECT, AHMEDABAD
CHECK LIST FOR BRICK WORK
Block:
Floor Level:
Drawing Ref I.. No :
Date:
-"""1
Signature
Sl.no
Location
Surface
Setting out of
Cleaning
Brick wOrk
Concrete
Wall Thickness
surfaces hacking
Remarks
STUP
L&T
1
2
3
-
6
7
~~
8
.
9
~
~~
10
~
"
122
LARSEN&TOUBRO LTD.-ECCD
PROJECT QUALITY PLAN - GODREJ GARDEN CITY PROJECT.
CHECK LIST FOR CONCRETE BLOCK WORK
Block:
Floor Level:
Drawing Ref / . No :
Date:
"W
Signature
SI.no
Location
Surface
Setting out of
Cleaning
Block work
Wall Thickness
foncrete
surfaces hacking
Remarks
L&T
STUP
1
2
3
4
"
5
6
8
9
-"
, 10
,.. 
123
LARSEN & TQUBRO LTD.-ECCD
PROJECT QUALITY PLAto!. GODREJ GARDEN CITY PROJECT
CHECK LIST FO~ DOOR FARME FIXING
Block:
Flat no :
Floor Level:
Drawing Ref I.. No :
Sl.no
Location
Door
Door Farme Size
Door Shutter
Plumb for door
Open direction
farme
Line & level
Remarks
Name
YES
YES
No
No
YES
No
YES
No
3
4
:J
I
I
'I
;~,
7
--!
10
11
12
13
14
15
16
17
..
18
124
125
LARSEN &TOUBRO l.TD.-ECCD .
PROJECT QUALITY PLAN GODREJ GARDEN CITY PROJECT
CHECK LIST FOR PLASTERING WORK
Block:
floor level:
Drawing Ref / .. No :
Description
Slono
Location
Outer I Inner
Surface Cleaning
Button Marks
YES
!
5
If Checken mess Fixed
Groove Location
Opening Level
CM Ratio
Plump
10
Remarks
. NO
YES
NO
NO
YES
YES
NO
L&T
11
Signature
STUP
126
L& T Construction
Buildings & Factories
PROJECT QUALITY PLAN GODREJ GARDEN CITY PROJECT, AHMEDABAD
CHECK LIST FOR FIXING OF MS RAILING,
Location:
Date:
Ontwing Ref:
Block:
level:
Plot NO
.t
Location
SLno
1
Location of MS Railing
Hight of MS Railing
MSSAl
Kbal
--
Line of MS Railing
Plump of MS-Railing
living.
bal
MSSAl
Kbal
Living
bal
MSSAl
Kbal
Living
bal
MSSAl
Kbal
Living
bal
--
Fixing Details for MS Railing
& Upstand
Joint Finishing between MS Railing
l&T Construction
-
-----.--
Sign~ture
-~-,--
STUP
- -.........
'---
127
LARSEN & TOUBRO LIMITED
BUILDINGS & FACTORIES INDEPENDENT COMPANY
GODREJ GARDEN CITY PROJECT - Ahmeadabad
CHECK LIST FOR FIXING OF MS RAILING at STAIRCASE AREA.
Location:
Date:
Drawing Ref:
LEVEL
Location
SLno
Location of MS Railing
Hight of MS Railing
Line of MS Railing
Plump of MS Railing
Fixing Details for MS Railing
Joint of MS Railing at landing Level
Joint Finishing between MS Railing
& Floor finishing
From
st
1 Flight
to
2
nd
From
st
Fight
Block:
1 Flight
to
Level:
From
nd
Fight
st
1 Flight
to
2
nd
Fight
_.
L&TECCD
Signature
STUP
128
LARSEN & TOUBRO LTD.ECCD
GODREJGARDI:N CITY PROJECT - AHMEDABAD
CHECK LIST FOR TOILET WATER PROOFING.
Block:
Floor Level:
Slono
Description
Cleaning of the surface
Water pounding Test for 24 hrs
If leakage found do the grouting
Base preparation
Date
Toilet
location
YES
Applying of water proofing coating,
Protective plaster of minimum 15mm thick, .
Bore packing with eM induding groove of 12mm
around the pipe line & cut out
Apply the sealant around the groove
Water pounding Test for 48 hrs
10
If leakage found do the grouting
11
After grouting do the pound test for 48 hrs
W/PCon/.
l&TECCD
Execution
l&TECCD
STUP
QAlQC
Consultant
"
Signature
NO
.'
129
....
L& T Construction
Buildings & Factories
PROJECT QUALITY PLAN GODREJ GARDEN CITY PROJECT, AHMEDABAD
....
CHECK LIST FOR KITCHEN TABLE TOP
'Location:
Date:
Drawing Ref:
Flat no:
.1
' Decription
. Sl.no
Level:
Block:
Setting out of Table top layout
Top level of table top
Verticality of Kota Stone
Location of Sink
Top Granite Joint
Nosing and chamfering
Facia
Gas pipe Sleeve ( Holes)
~,':/I
,..: .
">:
"
Signature
....
;'~
L&TECCD
i
STUP
i
130
i
i
I
e
Area JBuilding
LARSEN & TOUBRO LTD.-ECCD
BUILDINGS & FACTORIES INDEPENDENT COMPANY
GODREJ GARDEN CITY PROJECT - AHMEDABAD
Checklist for wall finishes
..
'.
Block
Date:
Drawing Refl .. No :
Level:
POST gHECK
,
Plot no :
--
~.-.-
Name of the Room
--
North Wall
SoulhWall
East Wall
West Wall
-~--
..
.~
--'
i
I
."
Signature
STUP sign with Dateffime
L&T EeeD Site Engineer with Dateffime
POST CHECK for PUTTY FINISHING
"
Date:
North Wall
South Wall
,n
East Wall
,
SoulhWall
I'",,'
'i
EDGES of ANGLE
Signature
-'.
,."'
L&T EeeD Site Engineer with Dateffime
STUP sign with Daleffime
131
.-
.~
LARSEN & TOUBRO LTD.-ECCD
BUILDINGS & FACTORIES INDEPENDENT COMPANY
GODREJ GARDEN CITY PROJECT - AHMEDABAD
Checklist for Wall Tiling
Area I BuildIng:
Block:
Date:
Drawing Ref/.. No :
Level:
Plot no : .
location
----
wan Location
East
wall
West
wall
North
Wall
South
Wall
East
wall
West
wall
,--
---
North
Wall.
South
Wall
East
wall
West
wall
North
Wall
South
Wall
East
wall
West
wall
-- -
PRE-CHECK
Room Size
North
Wall
South
Wall
East
wall
West
wall
North
Wall
South
Wall
East
wall
West
wall
North
Wall
South
Wall
'"
-- I
Diagonal
Signature
L&T ECCD Site Engineer with
Datemme
STUP sign with Datemme
"''IiP'
Post check
TIle Lot no :
TIles Joint,
'  --
Undulances
Vertical Joint
t--- Plump
Post check
--~
_.
--
- - .
1----
-- I----
Level
i
---~
1-----
--~
---
---
.  ----
Overall
'  ---- ,
-  - - I-
- - 
---- - . 
--- -- -
I-
.'
-
Slope on
floOring
~-
---
--
Shade Variation
----
~.
-----'
._ - - !-
wOrkmanship
Signature
L&T ECCD Site Engineer with
Dale/Time
-
STUP sign with Datemme
-
132
LARSEN & TOUBRO LTD.-ECCD 
BUILDINGS & FACTORIES INDEPENDENT COMPANY 
GODREJ GARDEN CITY PROJECT - AHMEDABAD 
Checklist for Flooring
Area /
Drawing Ref/ 
Building
No :
Date:
Tile Lot no:
Level:
Block
Plot no :
Name of the Room
.,
...."
Bed Thickness
PRECHECK
level
r-
'Signature
STUP sign with Datemme
l&T ECCD Site Engineer with Dalemme
Post check
Room Size
; - - -r
Diagonal
-
Tiles Joint
-
Undulances
POST
,CHECK
--~
Skirting line
Skirting
Thickness
level
Shade Variation
.-
Skirting top
finishing
---
Overall
workmanship
Signature
L&TECCD S~e Engineer with Datemme
- - ...
~-
...
-- 
STUP sign with Datemme
.....
133
LAR&EN & TOUBRO LIMITED
(9
Area
BUILDINGS & FACTORIES
INDEPENDENT COMPANY
GODREJ GARDEN CITY PROJECT - Ahmeadabad
Checklist for Door Shutter
I Building
Block
Date:
Drawing Reff.. No :
--
fiat no:
... "'.<
Lor.ation of the Door
-,
1
DIRECT10N OF THE DOOR
OPENING
JOINT @ DOOR FRAME &
TILE
BABY LATCH LOCK
fUNCT10N
BABY LATCH SIDE
LATCH/SIDE BOLT
DOOR SHUTIER HINGE
WITH SCREWS
BABY LATCH & HINGES
CLEANING
MORTISE LOCK BODY WITH
HANDLE/ H- TYPE HANDLE
DOOR f;1AGNETIC CATCH
LOCK COVER PLATE WITH
SCREW
-"
REMARKS
Signature
~~,.
STUP sign with Date/Time
L&T ECCD Site Engineer with DatelTime
~-
134
L& T Construction
8uildings & Factories
PROJECT QUALITY PLAN - GODREJ GARDEN CITY PROJECT, AHMEDABAD
Checklist for UPVC
W~ndowsNentiiators
Area I Building
Block
Date:
Drawing Ref/ No :
Level:
PRE CHECK
,
.....
,~
Plot no :
i-
-t
Name of the Room
~--
f -
-~
SIZE
---~
DIAGONAL
~
....J'.1M"..
Signature
L&T ECCD Site Engineer with
STUP sign with Datemme
Datemme
POST CHECKS
AlC Opening
--,
- -
Direction of opening
~-
~--
'I'
Mosquito rail
I
~---
~--
Functionalchacks
Hardware:
Lock
, Friction Hinges
---
I Glass
~
--J
~-~
--~
-~~--
Louvers
-
Other
~
---
EDGES
--
Sealing of Joint
-
~---
Overall workmanship
-
Signature
- -
I--~-
~-- f--~
~-
f--
---
~-~~
~~
~~-~---
~"-----~-'----.----"-'--- ~-~--
L&T ECCD Site Engineer with DatelTime
STUP sign with DatelTime
135
LARSfN&TOUBRO LTD.-fCCD
PROJECT QUALITY PLAN  GODREJ GARDEN CITY PROJECT.
CHECK LIST FOR EXTERNAL PUTTY & PAINTING WORK
BLOCK:
Location:
Grid NO:
Floor level
Signature
~~-
Sl.rlO
Description
Date
Stilt
1"
nd
rd
4th
th
th
]'h
~-~
th
~~~
c~~~
~--~~
th
~--~~
th
10
11th
12'h&
Parapet
STUP
l&T
Surface Checking
Tie rod holes Grouting &
Surface Grinding
Sunshade top chamber
Sunshade drip mould
Major Buldging if any
2
Clearance of 1" coat putty
Undulations marking
Straight line of corners
Window jams & niches line
Rectification of Ma rking
Water test up 2 hours
Clearance of 2
Final Water test 2 hou rs
10
Clearance of Primer coate
nd
coat of putty
-
""~
-~
136
LARSEN & TOUBRO LIMITED
BUILDINGS & FACTORIES INDEPENDENT COMPANY
GODREJ GARDEN CITY PROJECT - Ahmeadabad
CHECK LIST FOR FIXING OF TERRACE FLOOR WATER PROOFING
Drawing Ref:
Date:
Level:
Sl.no
Block:
Description
Date
Yes
-
1
Cleaning for Terrace floor
Water Pound Test 24 Hours
If Leakage found do the grouting
Botton mark as per the Slop requirement,
Clearance Of laying for Brickbats with CM 1:4
Signature
No
L&T ECCD
L&TQA/QC
STUP
--
,~","
Waterproof Plastering 1:4
Water Pound Test for 48 Hours
If Leakage found do the grouting
--
--
137
LARSEN& TOUBRO LTD.ECCD
PROJECT QUALITY PLAN . GODREJ GARDEN CITY PROJECT.
(9
CHECK LIST FOR CANOPY
BLOCK:
Location:
Grid NO:
Signature
Sl.no
Description
Date
Yes
No
Remarks
L&T
Lock set and Fixing of Base Pleate as per Drawing
Erecting of Fabrication Frame
Suspended tie rod fixing
GRC sheet level checking
GRC Sheet joint filing with Epoxy
Final Water pound test 24 Hours & Slope Testing
Final Painting & Finishing.
STUP
...
-'
138
LARSEN& TOUBRO LTD.-ECCD
PROJECT QUALITY PLAN - GODREJ GARDEN CITY PROJECT.
CHECK LIST FOR GYPSUM FALSE CEILING
BLOCK:
Location:
Grid NO :
Signature
Sl.no
Description
G.I Channels And Web fixing
Gypsum Board Fixing
Date
Yes
No
Remarks
L&T
STUP
Bottom Level
Joint filling
Light fixture Fixing
Putty Finishing
Final Painting
--.
....... -
139
LARSEN&TOUBRO Construction B&F
PROJECT QUALITY PLAN  GODREJ GARDEN CITY PROJECT.
!J!~,k Ust for Overhead
Water link
Block :
Sl.no
Descripetion
location
Start
Da~t
No
Yes
Remarks
Signature
Contractor
l&T
L&TQC
STUP
.
1
Cleaning of tank
Construction joint
Tretment
Intinal Water pound test
If leakage found do
the grouting
No leakage found
1st Coate
f-
2nd Coate
3rd Coate
Plastering With CM 1:4
10
Final pounding Test
140
..
LARSEN&TOUBROL&TCONSTRucnON
PROJECT QUALITY PLAN - GODREJ GARDEN CITY PROJECT.
. CHECK LIST FOR GRANITE DADO ATLIFT ENTRANCE LOBBY
Block:
"
Location:
Level:
Date:
Sl.no
lift Door No:1
lift Door No:2
Yes
Yes
Signature
Description
No
No
L&T
STUP
t
1
Check the Button mark
based on the lift door frame
Thickness Of Granite 18mm
Groove 10mm at all Corners
Top level of Granite at front side
Groove cleaning at joint between
Granite And Wall Plastering .'
Vertical Plump at front & Jame Side
141
LARSEN & TOUBRO L1MITEQ
BUILDINGS & FACTORIES
INDEPENDENT COMPANY
GODREJ GARDEN !:;ITY PROJECT - Ahmeadabad
Checklist for Door Frame & Shutter Paintina work
Building:
Date:
Flat no:
DrawIng Ref/.. No :
Flat no:
r-
SL.No
-- r
----~--
Flat no:
Location of Door I Room
--
-~
Initial Surface Cleaning
Primer application
Papering
Primer application
1st coat of pai nt
2nd coat of paint
-~
--
r--
-
--
Signature
r-
STUP sign with DatefTime
L&T ECCD Site Engineer with DatelTime
-
142
LARSEN &TOUBRO LIMITED
BUILDINGS & FACTORIES
INDEPENDENT COMPANY
GODREJ GARDEN CITY PROJECT - Ahmeadabad
CheckList for Door Frame & Shutter Polishing work
Building: ___________________
Date : ____________
Drawing Ref/.. No : _________________________
SL.No
Floor:
Location of Door / Room
Main door
Main door
Main door
Floor:
Floor:
Main door
Main door
Main door
Main door
Main door
Main door
Main door
Main door
Floor:
Main door
Main door
Main door
Main door
Main door
Flat No
1
SurfaceCleaning
1stcoatofPowderapplication
Materialcoating(LacquerPolish)
Papering
1stcoatofPolishing
2ndcoatofPolishing
Signature
L&T ECCD Site Engineer with Date/Time
STUP sign with Date/Time
143
LARSEN &TOUBRO Construction B&F
GODERJ GARDEN CITY PROJECT Phase -I & II - AHMEADABAD
Final Handing over'Cfieck list.
Cluster:
~--~~
Tower Name:
SI.no
Floor Level:
Flat no
Description
Flat no
Flat no
Including Stair case.
f---~~-
-~~
Common area
Flat no
Snag list details
Final Snag list given date:
No of Snag Given
Final Snag list Completion date:
~~~~-~
~-~
No of snag Completed
Key Details
Key Details
Door Shutter Keys Details
Key
Number
No of
Keys
KeyD.etails
No of
Keys
Key
Number
Key
Number
Key Details
No of
I(eys
Key
Number
No of
Keys
Main Door
~-~
Master bed Room
Child Bed Room
~-~
Guest bed Room
Handing Over Date
~-~
..,..,...
4
Remarks
~-~
Handed over by L&T
Signature with date.
Taken Over bv
Signature with date.
-~
-~
.f~<
144
LARSEN&TOUBROCONSTRUCTIONB&F
GODREJGARDENCITYPROJECTAHMEADABAD
PROJECTQUALITYPLANPARTII
Sl.no
Lab&Sitetestreports
Pageno
Cementtestreport
146
Aggregategradationreport
147
AggregateSpecificgravety
148
AggregateWaterabsorptionReport
149
DryLoosebulkdensity(DLBD)test
150
Flakiness&ElongationTestfor20mmCA
151
Flakiness&ElongationTestfor10mmCA
152
CubetestingRegisterfor3,7&28Days
153
Brick&ConcreteBlockTestingreport
158
10
AggregateImpactvalueTestreport
157
'9
LARSEN & toUBRO LTD.-ECCD
PROJECT QUAUTY PLAN  SODW GARDEN ,OITY PROJECT
QualIty Management
Format No.: GGC IQC- 001
CEMENT TEST REPORT
Date of Sample
Date of Testing -,
Lo~tion
Report No.;
of Sample
Type of Sample
Batch No.
SI.no
Date of
Testing
Details of Test
Results
Relevent
IS Code
Acceptable Limit
IS 12269
Should not be
moren than 10%
Remarks
Fineness
Normal Consistency
Setting Time,
,,'
-1
Sieved by 90
micron
"
Should not be less
than 30min.
Initial ( min.)
.
Should not be
more than 600min.
Final (min.)
Compressive Strength
Cube casting date:
3 Days
Should not be less
than 27N/Sqmm
7 Days
Should not be less
than 37N/Sqmm
28 Days
Should not be le!;!s
than 53N/Sqmm
QC L&T-ECCD
STUP Consultants
146
LARSEN&TOUBRO LTO.ECCD
PROJECT QUALITY PLAN  GODREJ GARDEN CITY PROJECT.
AGGREGATE GRADATION REPORT
Date
Type
Source
IS Sieves
(mm)
Format No.: GGC/QC"()02
: Coarse Aggregate 20 mm
Weigllt Retained (gm)
%Weight Retained
Cum % Retained
Cum
% Weight Retained
Cum % Retained
Cum % Passing
40
20
16
12.5
10
4.75
Pan
: Coarse Aggregate 10 mm
Type
Source
IS Sieves
(mm)
Weight Retained (gm)
16
IS 383 Limits
100
12.5
10
85-100
4.75
0..20
,~
2.36
Pan
Type
: River sand
Source
IS Sievl!S
(mm)
Weight Retained (gm)
% Weight Retained
Cum % Retained
Cum % Passing
Zone I
IS 383 Limits
Zone II
Zone III
Zone IV
100
100
100
100
90-100
90-100
90..100
95-100
2.36
60..95
75-100
85-100
95-100
1.18
30..70
55-90
75100
90-100
35-59
6Q..79
80-100
Ei-30
12-40
(}-10
(}-10
10
4.75
0.60
15-34
0.30
=5-20
(}-10
0.15
Pan
F.M=
STUP Consultants
QCL&TECCD
Page 1 of 1 
147
LARSEN & TOUBRO LTD.-ECCD 
PROJECT QUALITY PLAN  GODREJ GARDEN CITY PROJECT 
Quality Management
Date of Testing
Source
..
..
Fomat no : GGCIQC-003
SPECIFIC GRAVITY 20 mm
SI.No
Details
Wt. Of Pycnometer (W1) 
Wt. Of Pycnometer + Sample (W2) 
Wt. Of Pycnometer + Sample + Water (W3) 
Wt. Of Pycnometer + Water (W4)
Specific Gravity
Trail I
Trail II 
Trail I
Trail II
= (W2-W1 )I[(W4-W1 }-(W3-W2)] 
Average 
SPECIFIC GRAVITY 10 mm 
SI.No 
Details
wt. Of Pycnometer (W1)
Wt. Of Pycnometer + Sample (W2) 
wt. Of Pycnometer + Sample + Water (W3) 
Wt. Of Pycnometer + Water (W4)
Specific Gravity
"
= (W2-W1 )I[(W4-W1 )-(W3-W2)] 
Average 
SPECIFIC GRAVITY - River Sand 
SI.No 
Trail I
Details
Wt. Of Pycnometer (W1)
Wt. Of Pycnometer + Sample (W2) 
Wt. Of Pycnometer + Sample + Water (W3) 
Wt. Of Pycnometer + Water (W4)
5'
Specific Gravity
Trail II
= (W2-W1 )I[(W4-W1 )-(W3-W2)] 
Average 
QAL&TECCD
STUP Consultants
148
LARSEN & TOUBRO LTD.-ECCD 
PROJECT QUALITY PLAN  GODREJ GARDEN CITY PROJECT
Quality Management
Date of Testing
Source
..
..
Fornat no : GGC/QC-004
!
I
WATER ABSORPTION - 20 rnm
SI.No
Trail I
Details
Trail II
Wt. of Aggregate in SSD Condition (W1 )
Wt. Of Dry Sample ( W2 )
Water Absorption
=(W1 - W2 ) I W2 x 100
Average
WATER ABSORPTION - 12,,5 mm
SI.No
Details
~
Wt. of Aggregate in SSD Condition (W1 )
wt. Of Dry Sample ( W2 )
Water Absorption
Trail I
Trail II'
=(W1 - W2 ) I W2 x 100
Average
WATER ABSORPTION - River Sand
I
SI.No
I
i
Details
Wt. of Aggregate in SSD Condition (W1 )
Wt. Of Dry Sample ( W2 )
I
Water Absorption
Trail I
Trail II
=( W1 - W2 ) I W2 x 100
Average
I
i
QCL&TECCD
STLlP Consultants
149
150
151
LARSEN & TOUBRO LTD.-ECCD
PROJECT QUALITY PLAN - GODREJ GARDEN CITY PROJECT
Quality Management
Fomat no : GGC/QC-007
-_.
'.
FLAKINESS INDEX TEST REPORT
Type of material :10 mm Agg
Source of Material :
..
-.
Date:
SLno IS Sieves (mm) (2) Wt.of Sample Retained % of Wt. Retained (Yi)
No.of Sample
No.of Sample Passing % of No.of Sample Flakiness Index
(1 )
. (gm) (3)
(4)
Retained (Nos) (5)
(Nos) (6)
Passing (Xi)
(Fi = (Xi x Yi)/100)
."
(7=6/5x100)
1
'63 - 50
50 40
'40 25
i~5 20
20 16
16 12.50
:12.5 10
',106.30
Remarks
,.
FI ===>%
Total
ELONGATION TEST REPORT
IType of material :10 mm Agg
IS SieStes
. (mm)
Date:
Source of Material :
Return
(b)
Passing
(a)
Total
(c=a+b)
16-12.5
12.510
;>
..
10-6.3
.'
ElongatiorHndex =>
%
cQ
STUP Consultants
QC L&T ECCD
-
152
.~
t::
::!
e
SLno
GradeC.lf
Concrete
LARSEN & TOUBRO LTD ECCD GODREJ GARDEN CITY PROJECT.
CUBE TESTING REGISTER
Date:
'.-
.Dale of
Casting
Location
Identification
Mark
Dale of
Testing
Age of
Cube
Weighl of cube in
Kg
Load in KN
Compressive
strength
inN/mm2
Avg Compressive
strength
in NI mm
Remarks
,,
3
.""
3 _..
L&T QC ENGINEER
.,,"
STUP CONSTULTANT
153
LARSEN & TOUBRO LTD  ECCD GODREJ GARDEN CITY PROJECT.
--fZJ
I.no
Grade of
Concrete
CUBE TESTING RI::GISTER
Date of
Casting
location
Identification
Mark
Date of
Testing
Date:
Weight of cube in
Kg
Age of
Cube
load in KN
Compressive
strength
in Nt mm
Avg Compressive
strength
in NI mm
Remarks
----
~8
days
--
--
--
28 days
--
--
.....
28 days
--
--
28 day~
-
28 days
----
--~
28 days
28 days
--
----
,
STUP CONSTULTANT
L&T QC ENGINEER
154
e
Sl.no
Grade of
Concrete
LARSEN & TOUBRO LTD ECCD GODREJ GARDEN CITY PROJECT.
CUBE TESTING REGISTER
Date of
Casting
Location
Identification
Mark
Date of
Testing
Age of
Cube
Weight of cube in
Kg
Date:
Load in KN
Compressive
strength
in NI mm
Avg Compressive
strength
inN/mm2
Remarks
7days
I
-----
7 days
.,Mo/lII;i"
-------
7 days
-----------
7 days
...
-----
------------
---------
---
7 days
7 days
~.
------
7 days
STUP CONSTULTANT
L&TQC ENGINEER
155
LARSEN & TOUBRO LTD.ECCD
PROJECT QUALITY PLAN  GODREJ GARDEN CITY PROJECT
QUlillity Management
Fomal no : GGC/QC-010
I
BRICK & BLOCK TESTING
Date
Source :
De No
..
Compressive Strength
Required Dimensions:
SI.no
Date of
Testing
Dimensions in mm
Load in KN .
L
Avg
Compressive
Compressive
Strength
Strength
Rmarks
;,.
"
.'
Water absorption
SI.no
Date of
Testing
W10nSSD
W2Dry
Difference
(W1-W2)
0/0 Water
Absortion
Avg %of
Water
Absorption
Remarks
QCL&T-ECCD
STUP Consultants
156
L&T ECCD
"
GODREJGARDEN CITY PROJECT
AGGREGATE IMPACT VALUE TEST
1. SOURCEox
2. TYPE
d'F~AGGREGATE :
3. DATE OF TESTING:
SI no.
OBSERVATION
DETAILS
Total weight of aggregates sample filling the cylinder measure (gms) (A)
1
I
Weight of aggregates passing through 2.36 mm 1.5. Seive afterthe test
2
(gms)(B)
Weight of aggregates retained on 2.36 mm 1.5. 5eive after the test (gms)(C)
"
'3
Aggregate Impact value (B/A x 100 )%
QC L&T ECCD
STUP Consultant
L&T ECCD
GODREJ GARDEN CITY PROJECT
AGGREGATE IMPACT VALUE TEST
L SOURCE:
2. TYPE OF AGGREGATE:
.3. DATE OF TESTING:
SI no.
DETAILS
OBSERVATION
Total weight of aggregates sample filling the cylinder measure (gms) (A) 
Weight of aggregates passing through 2.36 mm 1.5. Seive after the test 
(gms)(B)
Weight of aggregates retained on 2.36 mm 1.5. Seive after the test (gms)(C) 
Aggregate Impact value (B/ A x 100 )% 
.'
QC L&TECCD
.- --.:<-<.--
 -->.
~-
<-
----'"'-~~
---
~-
-- - - - "
----
STUP Consultant
157