Installation of Gantry

This document outlines the hazard identification, risk assessment, and risk control plan for installing gantries as part of a proposed fourth lane widening project from Shah Alam Interchange to Rawang in Malaysia. It identifies six key work activities and their associated hazards, including vehicular traffic, material dropping, mechanical hazards, and manual handling. For each activity, it analyzes the likelihood and severity of risks, and recommends control measures to reduce risks such as adhering to traffic management plans, emergency parking areas, machinery inspections, and minimizing manual handling. The overall goal is to conduct this infrastructure installation work safely near vehicular traffic.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
684 views3 pages

Installation of Gantry

This document outlines the hazard identification, risk assessment, and risk control plan for installing gantries as part of a proposed fourth lane widening project from Shah Alam Interchange to Rawang in Malaysia. It identifies six key work activities and their associated hazards, including vehicular traffic, material dropping, mechanical hazards, and manual handling. For each activity, it analyzes the likelihood and severity of risks, and recommends control measures to reduce risks such as adhering to traffic management plans, emergency parking areas, machinery inspections, and minimizing manual handling. The overall goal is to conduct this infrastructure installation work safely near vehicular traffic.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

f { t ~

Proposed Fourth Lane Widening From


RO!F' U
Shah Alam Interchange To Rawang
SAFETY
~ ~ . . ~
MANAGEMENT SYSTEM
/lalan Duta Toll Plaza and Nilai To
Seremban Page 1 of 2
PROPEL
Hazard Identification, Risk Assessment and
BERHAD Risk Control
HIRARC FORM NUMBER: FLW/GEN/10/2012/03
Company PROPEL-FLW Conducted by I
/; A
Process/Location : Installation of Gantry for Maj or (Rtd) Mohd Salahuddin
V I ~
Package A,B,C D,E Yaakob
.
Approved by
MOHD SALA HUDDIN HJ YAA
J(l
Hassan Samian
OB
SAFETY OFfiCER
PROPEL BHD
Date :18 Sept 2012 Review Date :
1. Hazard Identification 2. Risk Analysis 3. Risk Control
No Work Hazard Which can Existing Risk Likely Severity Risk Recommende PI
Activity cause/effect Control hood d Control c
Measures
1. Site Vehicular Vehicular Safe work 2 3 6 TMP stage 1 to
Preparation traffic traffic rammed practice from (Mediu be adhered.
onto. traffic mgt m)
plan. Site
preparation to
be carried out
during lane
closer on day
time.
2. Mobilization Slow Traffic To followMHA 2 2 4 (low) To adhere with
of the moving conjunction. heavy existing rqmts.
machineries machineries
permit able

Proposed Fourth Lane Widening From
YRr; Shah Alam Interchange To Rawang
SAFETY

/lalan Duta Toll Plaza and Nilai To
MANAGEMENT SYSTEM
Seremban Page 2 of 2
PROPEL
Hazard Identification, Risk Assessment and
BERHAD Risk Control
1. Hazard Identification 2. Risk Analysis 3. Risk Control
No Work Hazard Which can Existing Risk Likely Severity Risk Recommende PIC
Activity cause/effect Control hood d Control
Measures
period.
3. Installation of To be Vehicular Machineries 2 3 6 Emergency
machineries on parked on traffic rammed parking area (mediu lane and slow
site emergenc onto to be m) Jane to be
y lane. protected with closed.
Danger TMP.
towards
vehicular
traffic.
4. To hoist support -Vehicular -Vehicular Machineries 2 3 6
column using Traffic traffic rammed parking area (mediu
mobile crane -material onto lobe m)
and sky lift dropped protected with
TMP and
temporary Jive
lane closure.
5.
Hoisting main Mecha -Damage to To follow 2 3 6 -Machineries
span nical properties adequate (mediu inspection
hazard. -material method m) -Temporary
dropped statement live lane
closure
~ ~ -
Proposed Fourth Lane Widening From
l?R@I!'W
Shah Alam Interchange To Rawang
SAFETY
; ~
MANAGEMENT SYSTEM
~ ' : ; : , : : :
/lalan Duta Toll Plaza and Nilai To
Seremban Page 3 of 2
PROPEL
Hazard Identification, Risk Assessment and
BERHAD Risk Control
1.Hazard Identification 2. Risk Analysis 3. Risk Control
No Work Hazard Which can Existing Risk Likely Severity Risk Recommended PI
Activity cause/effect Control hood Control c
Measures
6. Site clearing -Manual -Muscular pain - to minimize 1 4 4
handling. -Traffic accident manual (low)
-Truck I handling.
transporter - EL closer to
to be adhere with
parked at TMP.
EL