APQP Forms
APQP Forms
                                                               MI                               Application                                           0
  City                                             State                       Zip
Note: Does this part contain any restricted or reportable substances. Yes ✘ No
Are plastic parts identified with appropriate ISO marking codes Yes ✘ No
Level 1 - Warrant only (and for designated appearance items, an Appearance Approval Report ) submitted to customer.
Level 2 - Warrant with product samples and limited supporting data submitted to customer.
✘ Level 3 - Warrant with product samples and complete supporting data submitted to customer.
Level 5 - Warrant with product samples and complete supporting data reviewed at supplier's manufacturing location.
SUBMISSION RESULTS
  The results for         ✘ dimensional measurements                   ✘       material and functional tests              appearance criteria          ✘   statistical process package
  These results meet all drawing and specification requirements:                                     ✘ Yes               No            (if "No" - Explanation Required)
  Mold / Cavity / Production Process
  DECLARATION
  I hereby affirm that the samples represented by this warrant are representative of our parts, have been made to the applicable
  Production Part Approval Process Manual 3rd Edition Requirements. I further warrant these samples were
  produced at the production rate of                            / 8 hours. I have noted any deviations from this declaration below.
EXPLANATION/COMMENTS:
July                                                       The original copy of this document shall remain at the suppliers location                           Optional: customer tracking
1999     CFG-1001                                          while the part is active (see Glossary).                                                            number: # _______________
                                                   Production Part Approval ___
 Daimler                                 GM        Dimensional Results
 Chrysler
                                                                                                    Page 1 of 4
   1
   2
   3
   4
   5
   6
   7
   8
   9
  10
  11
  12
  13
  14
  15
  16
  17
  18
  19
  20
  21
  22
  MAY      CFG-1003                                SIGNATURE                                TITLE            DATE
  1995
                                                   Production Part Approval ___
 Daimler                               GM          Dimensional Results
 Chrysler
                                                                                                    Page 2 of 4
  23
  24
  25
  26
  27
  28
  29
  30
  31
  32
  33
  34
  35
  36
  37
  38
  39
  40
  41
  42
  43
  44
  MAY      CFG-1003                                SIGNATURE                                TITLE            DATE
  1995
                                                   Production Part Approval ___
 Daimler                                   GM      Dimensional Results
 Chrysler
                                                                                                    Page 3 of 4
  45
  46
  47
  48
  49
  50
  51
  52
  53
  54
  55
  56
  57
  58
  59
  60
  61
  62
  63
  64
  65
  66
  MAY      CFG-1003                                SIGNATURE                                TITLE            DATE
  1995
                                                   Production Part Approval ___
 Daimler                                  GM       Dimensional Results
 Chrysler
                                                                                                    Page 4 of 4
  67
  68
  69
  70
  71
  72
  73
  74
  75
  76
  77
  78
  79
  80
  81
  82
  83
  84
  85
  86
  87
  88
  MAY      CFG-1003                                SIGNATURE                                TITLE            DATE
  1995
                                                                     Production Part Approval ___
Daimler                                   GM                         Material Test Results
Chrysler
                                                                                                               Page 1 of 1 Pages
                           Store
Step
10
                                     n                Incoming Inspection
20
                                                         Store Material
30
                   l                                     Move To Press
40
       t                                                Load on Uncioler
50
       t                                                   Straighten
60
       t                                                         Oil
70
       t                                                        Form
80
                                     n                         Inspect
90
       t                                                        Pack
100
                   l                                   Move to Shipping
110
                                                       Store in Shipping
120
                   l                                            Ship
                                                                         OPERATOR KEY
                    TD                          TRUCK DRIVER                                     MO               MACHINE / PRESS OPERATOR
                    MH                          MATERIAL HANDLER / HI-LO                         AO               ASSEMBLY OPERATOR
                    ST                          STOCK / STORAGE                                  RC               RECEIVING CLERK
                    PT                          PROCESS / PRESS TECHNICIAN                       QA               QUALITY INSPECTOR
                                                                           Flow10/26/2009                                                  Page 11 of 23
                                                                                                         FAILURE MODES EFFECT ANALYSIS
                 PART NAME AND NUMBER:                                      /                                          PROCESS RESPONSIBILITY:                                     FMEA DATE (ORIG.):   1/4/2005
                             Rev Level/Date                                                                                KEY PRODUCTION DATE:                                    FMEA DATE (REV.):
                     CORE TEAM MEMBERS:                                                                             MODEL YEAR(S) / VEHICLE(S):                                         PREPARED BY:
Rec
Insp
10
20
30
                                                       GAGE
                                                                          6) WHEN THE CONTAINER IS FULLACCORDING TO
                                                       TABLE
                                                                             PACKAGING INSTRUCTIONS.
                          FINISH GOODS SKID
                                                                          7) APPLY COMPLETED PRODUCT INVENTORY LABEL TO
                                                                             SKID.
5.
                                                                                                                                                                     8.            6.
                                                                     5)
                                                                          INSERT 11.80MM STAB PIN INTO CENTER HOLE TO
                                                                          VERIFY POSITION
                                                                  FREQUENCY: FIRST PIECE, EACH COIL CHANGEOVER, BEGINNING OF EACH CONTAINER, AND AFTER ANY MACHINE OR DIE ADJUSTMENTS.
                                                                  RECORD ACCEPTANCE STATUS ON PRODUCTION INSPECTION SHEET.
                                                       DIE SETUP SHEET
            SUBJECT        REQUIREMENT
PRESS SIZE
STOCK (MATERIAL) SIZE
COUNTER BALANCE PRESSURE
SHUT HEIGHT
FEED ROLLER PRESSURE
MATERIAL FEED DISTANCE
MATERIAL FEED RATE
STRAIGHTENING PRESSURE
PILOT RELEASE PRESSURE
STROKES PER MINUTE
OIL (LUBRICANT)
AIR HOOK-UP                                                        Place picture of die in press here….
SENSOR HOOK-UP
            TONNAGE REFERENCE
     DIE LOCATION         TONNAGE
LEFT FRONT
LEFT REAR
RIGHT FRONT
RIGHT REAR
   TOTAL TONNAGE
           SHAKER REFERENCE
    TYPE          SIZE      LOCATION                COMMENTS
                                                 100,000
                                                           150,000
                                                                     200,000
                                                                               250,000
                                                                                         300,000
                                                                                                   350,000
                                                                                                             400,000
                                                                                                                       450,000
                                                                                                                                 500,000
                                                                                                                                                                       l
                                        50,000
                                                                                                                                            Do all activities marked   e
                                                                                                                                                                       t
               Cycle Frequency                                                                                                                     with an "x"         e
                        Comments:
       Actual Time Spent
Instructions:
1) Check punch and resurface as needed
6) Check heel and wear plates for proper clearance and wear. Tighten/replace as needed.
7) Check risers and punch mounting plates for loose and missing screws.
   Tighten/replace as needed.
Approval: Date:
Concurrence: Date: