Concrete Procedure

This document outlines procedures for concrete work on a petroleum project, including responsibilities, materials, mixing, placement, inspection, and safety. It specifies requirements for design mixes, aggregates, formwork, placement, curing, construction joints, embedded items, and hot and cold weather concreting. The contractor's quality control team is responsible for ensuring all concrete work conforms to specifications, quality plans, and inspection test plans.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
332 views8 pages

Concrete Procedure

This document outlines procedures for concrete work on a petroleum project, including responsibilities, materials, mixing, placement, inspection, and safety. It specifies requirements for design mixes, aggregates, formwork, placement, curing, construction joints, embedded items, and hot and cold weather concreting. The contractor's quality control team is responsible for ensuring all concrete work conforms to specifications, quality plans, and inspection test plans.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 8

The Petroleum Projects & Technical Consultations Co. Q. PL. No.

:
PETROJET
Page
: 1 Of 8
Issue
Revision
Concrete work procedure
Date :
KPC Approved Review Issued Prepared
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :
PETROJET
Page
: 2 Of 8
Issue
Revision :
Concrete work procedure
Date :
Table Of Contents
1.0 .
Purpose
2.0 .
Scope
3.0 .
Responsibilities
4.0 . e!inition "
#bbre$iation
%.0 . Concrete
&or's
(.0 . )nspection
*.0 . Sa!et+
)nstructions
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :
PETROJET
Page
: 3 Of 8
Issue
Revision :
Concrete work procedure
Date :
1. PURPOSE
The purpose of this document is to define the procedures for Concrete work and i!
Design at compression station pro"ect
2. SCOPE
The work inc#udes:
Tank $oundations
%&uipment $oundations
Light po#e $oundations
'ui#dings
isce##aneous $oundations
3. RESPONSIBILITIES
It is the overa## responsi(i#it) of the Construction Contractor to organi*e resources to
perform construction activities as per pro"ect specification+ in comp#iance with &ua#it)+
schedu#e and safet) re&uirements.
4. DEFINITION / ABBREVIATION
PROJECT C,PR%--I,N -T.TI,N
OWNER /0.LD. P%TR,L1 C,P.N2
CLIENT %NPPI
CONTRACTOR P%TR,3%T
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :
PETROJET
Page
: 4 Of 8
Issue
Revision :
Concrete work procedure
Date :
5. CONCRETE WORK
5.1 DESIGN MIX
4.5.5 .## concrete mi!es sha## (e designed mi!es in accordance with the
re&uirements of %g)ptian standards and sha## (e su("ect to the conditions
descri(ed in the pro"ect specification.
5.2 MATERIAL
4.6.5 The cement used for concrete+ reinforced concrete+ mortar+ grout 7
p#aster works sha## (e Port#and cement conforming to pro"ect
specification.
4.6.6 The Contractor sha## provide certificates of conformance.
4.6.8 1se cement in se&uence of receipt of shipments un#ess otherwise
directed () the ain Contractor.
4.6.9 Natura# sand or sand prepared from stone+ grave# or other inert materia#
having simi#ar characteristics+ conforming to Qua#it) Documents sha## (e
used.
4.6.4 The aggregates to (e used in the concrete sha## (e procured from a
source known to produce aggregate that is chemica##) inert+ strong+ hard+
dura(#e and of #imited porosit) and free from an) adhering impurities that
ma) impair the strength+ dura(i#it) or &ua#it) of concrete.
4.6.: -amp#ing and testing of coarse aggregate.
4.6.; %ach si*e of the aggregate sha## (e stored separate#) and in a manner
that wi## prevent contamination and intermi!ing. The e&uipment 7 method
of hand#ing the aggregates sha## ensure that the stockpi#es do not suffer
deterioration and contamination.
4.6.< The water used in the preparation of concrete 7 mortar sha## (e c#ean 7
free from in"urious amounts of impurities =Pota(#e water meets this
re&uirement>. The water sha## conform the pro"ect specification?.CI code
re&uirements. The water sha## (e stored in a c#ean container or tank and
sha## (e su("ected to chemica# ana#)sis as per specifications.
4.6.@ -amp#ing and testing of Re(ar () independent #a(.
4.6.5A .## materia#s sha## (e stored and hand#ed in such a manner that wi##
prevent damage or deterioration.
4.6.55 Concrete additives?admi!tures sha## on#) (e used after approva# from the
ain Contractor.
4.6.56 Tria# mi!es sha## (e prepared to determine the mi! proportions necessar)
to produce the strength of concrete as per Qua#it) Documents. %ach mi!
sha## (e prepared to meet the worka(i#it) re&uirements for transporting+
p#acing 7 compacting of the concrete re#ative to the particu#ar situation it
is to (e used.
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :
PETROJET
Page
: Of 8
Issue
Revision :
Concrete work procedure
Date :
4.6.58 The detai#s of the design?proposed mi!es sha## (e su(mitted to the ain
Contractor ? Consu#tant for his approva# and no concreting sha## (e
commenced unti# forma# approva# has (een received.
4.6.59 Preparation of mi! design and its approva#.
5.3 CONCERTING OPERATION
4.8.5 1n#ess otherwise authori*ed () the ain Contractor+ concrete sha## (e
machine mi!ed.
4.8.6 achine mi!ing method and specification sha## (e in accordance with the
pro"ect specification.
4.8.8 .## concrete which is intended for use in structura# e#ements sha## (e
prepared at centra# (atching p#ant specifica##) designed for this purpose.
4.8.9 The concrete sha## (e transported to site in transit mi!ers un#ess
otherwise a##owed () the Contractor.
4.8.4 The concrete sha## (e transported immediate#) after mi!ing and sha## (e
p#aced within the re&uired time according to specifications and the
drawings.
4.8.: No concreting operations sha## (e performed without the written approva#
of the ain Contractor.
4.8.; Prior to p#acing concrete+ air 7 concrete temperatures sha## (e recorded.
4.8.< P#acing of re(ar and formwork sha## (e as per drawing and its get its
approva# from ain Contractor.
4.8.@ .## e&uipment that are necessar) for p#acing concrete i.e. pumps+
vi(rators+ compressors and concrete test e&uipment etc. sha## (e
checked for avai#a(i#it)+ operationa# capacit)+ re#ia(i#it) and ca#i(ration.
4.8.5A $or a## #arge pours+ prior to pouring+ stand() vi(rators+ concrete pumps+
(atching p#ants etc. sha## (e provided for rep#acement in the event of
(reakdown.
4.8.55 During compaction+ vi(ration checks sha## (e made to ensure that re(ar
spacer (#ocks are not disp#aced or dis#odged. Re(ar that sha## (e
e!posed after concreting are protected during the pouring and su("ect to
c#eaning during 7 immediate#) after the comp#etion of the pouring.
4.8.56 .fter p#acing+ compaction sha## (e done thorough#) around a##
reinforcement+ em(edded fi!tures and interna# corners and forms with
interna# vi(rators according to the procedure conforming to Qua#it)
Documents or standards.
4.8.58 Bum(oots sha## (e used for entering into concrete.
4.8.59 Immediate#) after the concrete work has (een accomp#ished+ measures
sha## (e taken to protect the concrete () spra)ing the e!posed surfaces
with a curing compound.
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :
PETROJET
Page
: ! Of 8
Issue
Revision :
Concrete work procedure
Date :
4.8.54 Curing compound sha## (e approved () the Contractor and as per Qua#it)
Documents.
4.8.5: The concrete face sha## (e checked for comp#iance as indicated in the
Qua#it) Documents or construction drawings. The concrete face sha## (e
c#ean and free from a## foreign matters etc.
4.8.5; $o##ow the correct instructions so that concrete is not damaged or is not
defective.
4.8.5< If some damage or defect e!ists+ conduct inspection of the #ocation "oint#)
with ain Contractor?consu#tant and su(mit the proposed method
statement for performance of repairs and get it approved in writing (efore
commencing such repairs.
4.8.5@ Construction "oints sha## (e constructed e!act#) in accordance with the
detai# shown in the p#ans and the specifications with the (est of
workmanship.
4.8.6A Bet approva# of the ain Contractor (efore introducing such "oints if not
shown on the drawings.
4.8.65 .t #east 9< hours sha## e#apse (efore casting ad"oining concrete.
4.8.66 Construction "oints sha## (e perpendicu#ar to the p#ane of the mem(er.
4.8.68 Continue a## specified reinforcement through "oints.
4.8.69 3oints shou#d (e roughened.
4.8.64 Construction "oints sha## (e c#eaned and grouted with cement mortar
(efore p#acing new concrete.
4.8.6: %!pansion "oints sha## (e constructed as per drawings?specifications.
4.8.6; Cater stops sha## (e fa(ricated and #ocated as shown on the drawings.
4.8.6< Cater stops sha## (e accurate#) cut+ fit and integra##) "ointed at sectiona#
"oints and angu#ar "unctions to provide a continuous watertight diaphragm
at a## points.
4.8.6@ ake ade&uate provision for the support of water stops during the
progress of work.
4.8.8A .nchor (o#ts+ edging ang#es and other misce##aneous meta# em(odiments
in concrete sha## accurate#) (e #ocated and secured in position within
approved to#erance to resist #oads incidenta# to p#acing of concrete.
4.8.85 Derif) a## anchor (o#ts and em(edded items #ocations are as per
construction drawings.
4.8.86 %&uipment sha## not (e insta##ed ti## the approva# of concrete strength ()
ain Contractor ? consu#tant.
4.8.88 In the event of (reakdown of mechanica# e&uipment+ handEfinishing
method ma) (e used to finish the concrete a#read) deposited when the
(reakdown occurs and no additiona# concrete sha## (e p#aced unti# such
e&uipment is repaired to the satisfaction of ain Contractor.
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :
PETROJET
Page
: " Of 8
Issue
Revision :
Concrete work procedure
Date :
4.8.89 During hot weather the Contractor sha## take a## necessar) instructions to
ensure that the temperature of the mi!ed concrete does not e!ceed
specified temperature.
4.8.84 These measures sha## inc#ude+ (ut not (e #imited to+ shading of
aggregates+ spra)ing water on aggregates+ #inking the mi!ing water to a
chi##ed unit+ chi##ing the mi! ingredients with ice and when ice is used in
the mi!+ maintain the correct amount of water re&uired.
4.8.8: ReEtempering of concrete or mortar+ which has partia##) hardened+ sha##
not (e permitted.
6. INSPECTION
:.5 Contractor QC team sha## ensure that a## the re#evant work is carried out in
conformance with Pro"ect -pecification+ PQP and ITP.
:.6 ,n each da) when concrete is poured a minimum of si! tests cu(es sha## (e
produced from the same (atch and for ever) 5AA m8 thereafter of as per
specifications.
:.8 The characteristic strength of the concrete p#aced in the formwork sha## (e
determined for ; da)s and 6< da)s () the compressive strength testing of test
cu(es as per Qua#it) Documents.
:.9 /eep a comp#ete record of specimen of test concrete with #ocation and date of
p#acement+ proportion of mi! (#end and t)pe of cement etc.
:.4 -#ump Test sha## (e performed and recorded as per the pro"ect speciation.
:.: .## other tests mentioned in the pro"ect specification sha## (e performed
according#).
7. SAFETY INSTRUCTIONS
;.5 Concrete work sha## (e performed in accordance with re#evant pro"ect 0-%
instructions 7 0-% po#ic) of the ain Contractor.
;.6 .## efforts sha## (e made to keep the environment c#ean.
;.8 ateria# or e&uipment shou#d (e maintained in an order#) manner and #a(e#ed in
accordance with statutor) re&uirements and use in safe manner.
;.9 Concrete p#acing to (e a##owed on#) after ain Contractor approva#.
;.4 'eware from fa##ing or f#)ing concrete whi#e pouring is in progress.
;.: If (uckets are used for pour+ riding the (ucket is prohi(ited.
;.; %#ectric powered trowe#s+ f#oats 7 vi(rators sha## (e dou(#e insu#ated or grounded
for operator protection.
;.< .n) #i&uid fue# spi##s and accidenta# waste disposa# shou#d (e avoided and
proper#) c#eaned up.
;.@ No**#eEmen must use PP% for head 7 face protection.
;.5A ,+e protection re-uire. !or labor area placin/ concrete.
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :
PETROJET
Page
: # Of 8
Issue
Revision :
Concrete work procedure