Table Of Contents
1.0 .
Purpose 
2.0 .
Scope 
3.0 .
Responsibilities
4.0 . e!inition " 
#bbre$iation 
%.0 . Concrete 
&or's  
(.0 . )nspection
*.0 . Sa!et+ 
)nstructions
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :   
PETROJET
Page
:   3 Of  8         
Issue
Revision : 
Concrete work procedure
Date : 
1. PURPOSE
The purpose of this document is to define the procedures for Concrete work and i! 
Design at compression station pro"ect
2. SCOPE
The work inc#udes:
 Tank $oundations
 %&uipment $oundations
 Light po#e $oundations
 'ui#dings
 isce##aneous $oundations
3. RESPONSIBILITIES 
It is the overa## responsi(i#it) of the Construction Contractor to organi*e resources to 
perform construction activities as per pro"ect specification+ in comp#iance with &ua#it)+ 
schedu#e and safet) re&uirements.
4. DEFINITION / ABBREVIATION
PROJECT C,PR%--I,N -T.TI,N
OWNER /0.LD. P%TR,L1 C,P.N2
CLIENT %NPPI
CONTRACTOR P%TR,3%T
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :   
PETROJET
Page
:   4 Of  8         
Issue
Revision : 
Concrete work procedure
Date : 
5. CONCRETE WORK
5.1 DESIGN MIX
4.5.5 .##   concrete  mi!es   sha##   (e  designed   mi!es   in  accordance   with   the
re&uirements of %g)ptian standards and sha## (e su("ect to the conditions
descri(ed in the pro"ect specification.
5.2 MATERIAL
4.6.5 The  cement   used  for   concrete+   reinforced   concrete+   mortar+   grout   7
p#aster   works   sha##   (e   Port#and   cement   conforming   to   pro"ect
specification.
4.6.6 The Contractor sha## provide certificates of conformance. 
4.6.8 1se   cement   in   se&uence   of   receipt   of   shipments   un#ess   otherwise
directed () the ain Contractor.
4.6.9 Natura# sand or sand prepared from stone+ grave# or other inert materia#
having simi#ar characteristics+ conforming to Qua#it) Documents sha## (e
used.
4.6.4 The  aggregates  to  (e  used  in  the  concrete  sha##   (e  procured  from  a
source known to produce aggregate that is chemica##) inert+ strong+ hard+
dura(#e and of #imited porosit) and free from an) adhering impurities that
ma) impair the strength+ dura(i#it) or &ua#it) of concrete.
4.6.: -amp#ing and testing of coarse aggregate.
4.6.; %ach si*e of the aggregate sha##  (e stored separate#) and in a manner
that wi## prevent contamination and intermi!ing. The e&uipment 7 method
of hand#ing the aggregates sha## ensure that the stockpi#es do not suffer
deterioration and contamination.
4.6.< The water used in the preparation of concrete 7 mortar sha## (e c#ean 7
free   from  in"urious   amounts   of   impurities   =Pota(#e   water   meets   this
re&uirement>. The water sha## conform the pro"ect specification?.CI code
re&uirements. The water sha## (e stored in a c#ean container or tank and
sha## (e su("ected to chemica# ana#)sis as per specifications.
4.6.@ -amp#ing and testing of Re(ar () independent #a(.
4.6.5A .##   materia#s  sha##   (e  stored  and  hand#ed  in  such  a  manner   that   wi##
prevent damage or deterioration.
4.6.55 Concrete additives?admi!tures sha## on#) (e used after approva# from the
ain Contractor.
4.6.56 Tria# mi!es sha## (e prepared to determine the mi! proportions necessar)
to produce the strength of concrete as per Qua#it) Documents. %ach mi!
sha##  (e prepared to meet the worka(i#it) re&uirements for transporting+
p#acing 7 compacting of the concrete re#ative to the particu#ar situation it
is to (e used.
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :   
PETROJET
Page
:    Of  8         
Issue
Revision : 
Concrete work procedure
Date : 
4.6.58 The detai#s of the design?proposed mi!es sha## (e su(mitted to the ain
Contractor   ?   Consu#tant   for   his   approva#   and  no  concreting   sha##   (e
commenced unti# forma# approva# has (een received.
4.6.59 Preparation of mi! design and its approva#.
5.3 CONCERTING OPERATION
4.8.5 1n#ess  otherwise  authori*ed  ()  the  ain  Contractor+  concrete  sha##   (e
machine mi!ed.
4.8.6 achine mi!ing method and specification sha## (e in accordance with the
pro"ect specification.
4.8.8 .##   concrete  which  is  intended  for   use  in  structura#   e#ements  sha##   (e
prepared at centra# (atching p#ant specifica##) designed for this purpose.
4.8.9 The   concrete   sha##   (e   transported   to   site   in   transit   mi!ers   un#ess
otherwise a##owed () the Contractor.
4.8.4 The concrete sha## (e transported immediate#) after mi!ing and sha## (e
p#aced   within   the   re&uired   time   according   to   specifications   and   the
drawings. 
4.8.: No concreting operations sha## (e performed without the written approva#
of the ain Contractor.
4.8.; Prior to p#acing concrete+ air 7 concrete temperatures sha## (e recorded.
4.8.< P#acing  of   re(ar  and  formwork  sha##   (e  as  per  drawing  and  its  get   its
approva# from ain Contractor.
4.8.@ .##   e&uipment   that   are   necessar)   for   p#acing   concrete   i.e.   pumps+
vi(rators+   compressors   and   concrete   test   e&uipment   etc.   sha##   (e
checked for avai#a(i#it)+ operationa# capacit)+ re#ia(i#it) and ca#i(ration.
4.8.5A $or a## #arge pours+ prior to pouring+ stand() vi(rators+ concrete pumps+
(atching  p#ants  etc.   sha##   (e  provided  for   rep#acement   in  the  event   of
(reakdown.
4.8.55 During compaction+ vi(ration checks sha## (e made to ensure that re(ar
spacer   (#ocks   are   not   disp#aced   or   dis#odged.   Re(ar   that   sha##   (e
e!posed after concreting are protected during the pouring and su("ect to
c#eaning during 7 immediate#) after the comp#etion of the pouring.
4.8.56 .fter   p#acing+   compaction   sha##   (e   done   thorough#)   around   a##
reinforcement+   em(edded  fi!tures  and  interna#   corners  and  forms  with
interna#   vi(rators   according   to   the   procedure   conforming   to   Qua#it)
Documents or standards.
4.8.58 Bum(oots sha## (e used for entering into concrete.
4.8.59 Immediate#) after the concrete work has (een accomp#ished+ measures
sha## (e taken to protect the concrete () spra)ing the e!posed surfaces
with a curing compound. 
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :   
PETROJET
Page
:   ! Of  8         
Issue
Revision : 
Concrete work procedure
Date : 
4.8.54 Curing compound sha## (e approved () the Contractor and as per Qua#it)
Documents.
4.8.5: The concrete face sha##  (e checked for comp#iance as indicated in the
Qua#it) Documents or construction drawings. The concrete face sha## (e
c#ean and free from a## foreign matters etc.
4.8.5; $o##ow the correct instructions so that concrete is not damaged or is not
defective.
4.8.5< If some damage or defect e!ists+ conduct inspection of the #ocation "oint#)
with   ain   Contractor?consu#tant   and   su(mit   the   proposed   method
statement for performance of repairs and get it approved in writing (efore
commencing such repairs.
4.8.5@ Construction  "oints  sha##   (e  constructed  e!act#)  in  accordance  with  the
detai#   shown   in   the   p#ans   and   the   specifications   with   the   (est   of
workmanship.
4.8.6A Bet approva# of the ain Contractor (efore introducing such "oints if not
shown on the drawings.
4.8.65 .t #east 9< hours sha## e#apse (efore casting ad"oining concrete.
4.8.66 Construction "oints sha## (e perpendicu#ar to the p#ane of the mem(er.
4.8.68 Continue a## specified reinforcement through "oints.
4.8.69 3oints shou#d (e roughened.
4.8.64 Construction  "oints  sha##   (e  c#eaned  and  grouted  with  cement   mortar
(efore p#acing new concrete.
4.8.6: %!pansion "oints sha## (e constructed as per drawings?specifications.
4.8.6; Cater stops sha## (e fa(ricated and #ocated as shown on the drawings.
4.8.6< Cater stops sha## (e accurate#) cut+ fit and integra##) "ointed at sectiona#
"oints and angu#ar "unctions to provide a continuous watertight diaphragm
at a## points.
4.8.6@ ake   ade&uate   provision   for   the   support   of   water   stops   during   the
progress of work.
4.8.8A .nchor (o#ts+ edging ang#es and other misce##aneous meta# em(odiments
in  concrete  sha##   accurate#)  (e  #ocated  and  secured  in  position  within
approved to#erance to resist #oads incidenta# to p#acing of concrete.
4.8.85 Derif)   a##   anchor   (o#ts   and   em(edded   items   #ocations   are   as   per
construction drawings.
4.8.86 %&uipment sha## not (e insta##ed ti## the approva# of concrete strength ()
ain Contractor ? consu#tant.
4.8.88 In   the   event   of   (reakdown   of   mechanica#   e&uipment+   handEfinishing
method ma) (e used to finish the concrete a#read) deposited when the
(reakdown occurs and no additiona# concrete sha## (e p#aced unti# such
e&uipment is repaired to the satisfaction of ain Contractor.
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :   
PETROJET
Page
:   " Of  8         
Issue
Revision : 
Concrete work procedure
Date : 
4.8.89 During hot weather the Contractor sha## take a## necessar) instructions to
ensure  that   the  temperature  of   the  mi!ed  concrete  does  not   e!ceed
specified temperature.
4.8.84 These   measures   sha##   inc#ude+   (ut   not   (e   #imited   to+   shading   of
aggregates+ spra)ing water on aggregates+ #inking the mi!ing water to a
chi##ed unit+ chi##ing the mi! ingredients with ice and when ice is used in
the mi!+ maintain the correct amount of water re&uired.
4.8.8: ReEtempering of concrete or mortar+ which has partia##) hardened+ sha##
not (e permitted.
6. INSPECTION
:.5 Contractor   QC  team  sha##   ensure  that   a##   the  re#evant   work  is  carried  out   in
conformance with Pro"ect -pecification+ PQP and ITP.
:.6 ,n each da) when concrete  is  poured a minimum of  si! tests cu(es sha##  (e
produced  from  the  same  (atch  and  for   ever)  5AA  m8  thereafter   of   as   per
specifications.
:.8 The  characteristic  strength  of   the  concrete  p#aced  in  the  formwork   sha##   (e
determined for ; da)s and 6< da)s () the compressive strength testing of test
cu(es as per Qua#it) Documents.
:.9 /eep a comp#ete record of specimen of test concrete with #ocation and date of
p#acement+ proportion of mi! (#end and t)pe of cement etc.
:.4 -#ump Test sha## (e performed and recorded as per the pro"ect speciation.
:.: .##   other   tests   mentioned   in   the   pro"ect   specification   sha##   (e   performed
according#).
7. SAFETY INSTRUCTIONS
;.5 Concrete  work   sha##   (e  performed  in  accordance  with  re#evant   pro"ect   0-%
instructions 7 0-% po#ic) of the ain Contractor.
;.6 .## efforts sha## (e made to keep the environment c#ean.
;.8 ateria# or e&uipment shou#d (e maintained in an order#) manner and #a(e#ed in
accordance with statutor) re&uirements and use in safe manner.
;.9 Concrete p#acing to (e a##owed on#) after ain Contractor approva#.
;.4 'eware from fa##ing or f#)ing concrete whi#e pouring is in progress.
;.: If (uckets are used for pour+ riding the (ucket is prohi(ited.
;.; %#ectric powered trowe#s+ f#oats 7 vi(rators sha## (e dou(#e insu#ated or grounded
for operator protection.
;.< .n)  #i&uid  fue#   spi##s   and  accidenta#   waste  disposa#   shou#d  (e  avoided  and
proper#) c#eaned up.
;.@ No**#eEmen must use PP% for head 7 face protection.
;.5A ,+e protection re-uire. !or labor area placin/ concrete.
The Petroleum Projects & Technical Consultations Co. Q. PL. No. :   
PETROJET
Page
:   # Of  8         
Issue
Revision : 
Concrete work procedure
Date :