Sop CPT

The document provides a weekly progress report for a soil investigation project from August 11-17, 2014 in Cilegon, Banten. It details the teams, equipment used, and daily activities which included good morning and afternoon progress for drilling, PLT, down hole, resistivity, and PMT tests. No tests were completed but work was ongoing. The report also provides weather conditions and a list of personnel involved in the project.

Uploaded by

sunartililik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
213 views7 pages

Sop CPT

The document provides a weekly progress report for a soil investigation project from August 11-17, 2014 in Cilegon, Banten. It details the teams, equipment used, and daily activities which included good morning and afternoon progress for drilling, PLT, down hole, resistivity, and PMT tests. No tests were completed but work was ongoing. The report also provides weather conditions and a list of personnel involved in the project.

Uploaded by

sunartililik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 7

1 Date:

2 Location:
Firm name Numbers
PT.CAPC Tbk 2
SOFOCO 20
Local 2
Local 2
Equipment Used:
boring machines and
so on
4 + 4
Car 2 B9737Z(4WD), B9972BK(4WD).
Description of job :
Dr illing Completed : 0 Number : 0 Number Drilling Progress : 0 Number
PLT Completed : 0 Number PLT Progress: : 0 Number
Down Holle Completed : 0 Number Down Holle Progress : 0 Number
Resistivity Completed : 0 Number Resistivity Progress : 0 Number
PMT Completed : 0 Number PMT Progress : 0 Number
Drilling UDS SPT PLT DH Resitivity PMT
0.00 m 0 tubes 0 test 0 Test 0 Test 0 Test 0 Point
Daily Progress
11-Aug 12-Aug 13-Aug 14-Aug 15-Aug 16-Aug 17-Aug
Morning good good good good good good good
Afternoon good good good good good good good



DATE, 11 August 2014
PT. CHANDRA ASRI PETRO CHEMICAL Tbk. P.T. SOFOCO
Wahyu Haryadi Abdulah
Client : PT. CAPC Tbk.
Project : BLOCK 2B AREA
Wahyu, Tonny
Soil investigation workshall use total 8 set of drilling Rig
watchman (night time)
Weekly Report for Soil Investigation
3
4
8/11/2014 t0 8/17/14
5
Setya Budi Nugroho, Masuki, jadi and 17 persons
boatman (daily tyme)
Cilegon - Banten
Driller C - SUPARDI
Driller A - WAHYU
PLT - JADI
Driller D - ONDI
Resistivity - Jauhari
Down Hole - Waluya
WEATHER

B
M
.

P
r
e
p
a
r
a
t
i
o
n
B
M
.

I
n
s
t
a
l
Manpower:
















K
i
c
k

o
f

M
e
e
t
i
n
g
7
6 Completed
PMT - MOORTRI
Driller B - MASFUR

1 Date:
2 Location:
Firm name Numbers
Guangzo o
Manggala
SOFOCO 6
Local (day time)
Local (night time)
Equipment Used:
boring machines and
so on
3
Car 2 H1933SR(4WD), B9737Z(4WD), B9972BK(4WD).
Description of job : Survey boring position
Team-A preparing drilling machine
Team-B preparing drilling machine
Team-C prepare access to boring point
Team-D already on B.5- start for driling 7/5
Team-E stand by
Team-F mob boring machine and setup
Team-G preparing Field Vane (Geonor) test
Drilling UDS SPT Vane
Weekly schedule
2-May 3-May 4-May 5-May 6-May 7-May 8-May
BH.05 BH.05 BH.05 BH.05 BH.05
BH.07 BH.07 BH.07 BH.07
BH.08 BH.08 BH.08 BH.08





PT. MANGGALA KRIDA P.T. SOFOCO
Sudarpo Haryadi Abdulah
Budi Nugroho/Jadi
Date: 8, May, 2014
Soil investigation workshall use total 6 set of boring rigs and 1 Field Vane test..
Manpower:
boatman
Ancol Timur
Sudarpo
2-May-14 Weather
Morning: , Afternoon:
Yoshiro Takahashi
Team G - RUDI (VANE)
Team E - SUPARDI
Team D - AJAD
watchman
Daily Report for Soil Investigation
3
4
5
Budi Nugroho, Masuki, Rukmana, , Ajat S., Buini,, .
S
u
r
v
e
y

b
o
r
i
n
g

p
o
i
n
t
7
6 Progress:
Team F - SUKIRNO
Team B - SARYANTO
Team C - MURIDIN
Team A - SUHADI
B.5
B.8
B.7
A Ajad
B - Muridin
C - Supardi
D - Suhadi
E - Saryanto
F - Sukirno
1 Date:
2 Location:
Firm name Numbers
Guangzo o
Manggala
SOFOCO 6
Local (day time)
Local (night time)
Equipment Used:
boring machines and
so on
3
Car 2 H1933SR(4WD), B9737Z(4WD), B9972BK(4WD).
Description of job : Survey boring position
Team-A preparing drilling machine
Team-B preparing drilling machine
Team-C prepare access to boring point
Team-D already on B.5- start for driling 7/5
Team-E stand by
Team-F mob boring machine and setup
Team-G preparing Field Vane (Geonor) test
Drilling UDS SPT Vane
Weekly schedule
2-May 3-May 4-May 5-May 6-May 7-May 8-May
BH.05 BH.05 BH.05 BH.05 BH.05
BH.07 BH.07 BH.07 BH.07
BH.08 BH.08 BH.08 BH.08





PT. MANGGALA KRIDA P.T. SOFOCO
Sudarpo Haryadi Abdulah
Budi Nugroho/Jadi
Date: 8, May, 2014
Daily Report for Soil Investigation
3
4
5
Soil investigation workshall use total 6 set of boring rigs and 1 Field Vane test..
Manpower:
watchman
Budi Nugroho, Masuki, Rukmana, , Ajat S., Buini,, .
Team A - SUHADI
2-May-14
S
u
r
v
e
y

b
o
r
i
n
g

p
o
i
n
t
boatman
Ancol Timur
Sudarpo
Morning: , Afternoon:
Yoshiro Takahashi
Weather
7
6 Progress:
Team G - RUDI (VANE)
Team E - SUPARDI
Team F - SUKIRNO
Team B - SARYANTO
Team D - AJAD
Team C - MURIDIN
B.5
B.8
B.7
A Ajad
B - Muridin
C - Supardi
D - Suhadi
E - Saryanto
F - Sukirno
20 May(Mon) 21(Tue) 22(Wed) 23(Thu) 24(Fri) 25(Sat) 26(Sun)
Not at site, But in door work.
Boring for onshore
Boring for offshore
Preparation for survey
off shore
Survey of boring
points off shore
Platform installation
for offshore
27(Mon) 28(Tue) 29(Wed) 30(Thu) 31(Fri) 1 Jun(Sat) 2 (Sun) 3(Mon)