1 Date:
2 Location:
Firm name Numbers
PT.CAPC Tbk 2
SOFOCO 20
Local 2
Local 2
Equipment Used:
boring machines and 
so on
4 + 4
Car 2  B9737Z(4WD), B9972BK(4WD).
Description of job : 
Dr illing Completed         :    0   Number :  0  Number Drilling Progress       :  0  Number
PLT Completed      :  0  Number PLT Progress: :  0  Number
Down Holle Completed :  0  Number Down Holle Progress :  0  Number
Resistivity Completed      :  0  Number Resistivity Progress :  0  Number
PMT Completed :  0  Number PMT  Progress :  0  Number
Drilling UDS SPT PLT DH Resitivity PMT
0.00 m  0 tubes 0 test   0  Test   0  Test   0  Test   0  Point
Daily Progress
11-Aug 12-Aug 13-Aug 14-Aug 15-Aug 16-Aug 17-Aug
Morning good good good good good good good
Afternoon good good good good good good good
   
       
     
DATE, 11 August 2014  
PT. CHANDRA ASRI PETRO CHEMICAL  Tbk.  P.T. SOFOCO  
Wahyu Haryadi Abdulah
Client   : PT. CAPC Tbk.
Project : BLOCK 2B AREA
 Wahyu, Tonny
Soil investigation workshall  use total  8 set of  drilling Rig
watchman (night time)
Weekly Report for Soil Investigation
3
4
8/11/2014 t0 8/17/14
5
Setya Budi Nugroho, Masuki, jadi and 17 persons
boatman (daily tyme)
Cilegon - Banten
Driller C - SUPARDI
Driller A - WAHYU
PLT - JADI
Driller D - ONDI
Resistivity - Jauhari
Down Hole - Waluya
WEATHER
 
B
M
.
 
P
r
e
p
a
r
a
t
i
o
n
B
M
.
 
I
n
s
t
a
l
Manpower:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
K
i
c
k
 
o
f
 
M
e
e
t
i
n
g
7
6 Completed
PMT - MOORTRI
Driller B - MASFUR
 
1 Date:
2 Location:
Firm name Numbers
Guangzo o  
Manggala
SOFOCO 6
Local (day time)
Local (night time)
Equipment Used:
boring machines and 
so on
3
Car 2 H1933SR(4WD), B9737Z(4WD), B9972BK(4WD).
Description of job : Survey boring position
Team-A  preparing drilling machine
Team-B  preparing drilling machine
Team-C prepare access to boring point
Team-D  already on B.5- start  for driling 7/5
Team-E stand by
Team-F mob boring machine and setup
Team-G preparing Field Vane (Geonor) test
Drilling UDS SPT Vane
Weekly schedule
2-May 3-May 4-May 5-May 6-May 7-May 8-May
BH.05 BH.05 BH.05 BH.05 BH.05  
BH.07 BH.07 BH.07 BH.07
    BH.08 BH.08 BH.08 BH.08
       
            
           
 
 
PT. MANGGALA KRIDA P.T. SOFOCO
Sudarpo Haryadi Abdulah
  Budi  Nugroho/Jadi 
Date: 8,   May,  2014
Soil investigation workshall  use total  6 set of boring rigs and 1 Field Vane test..
Manpower:
boatman
Ancol Timur
Sudarpo
2-May-14 Weather
Morning:           , Afternoon: 
Yoshiro Takahashi
Team G -  RUDI (VANE)
Team E - SUPARDI
Team D - AJAD
watchman
Daily Report for Soil Investigation
3
4
5
Budi Nugroho, Masuki, Rukmana, , Ajat S., Buini,, .
S
u
r
v
e
y
 
b
o
r
i
n
g
 
p
o
i
n
t
7
6 Progress:
Team F - SUKIRNO
Team B - SARYANTO
Team C - MURIDIN
Team A - SUHADI
B.5 
B.8 
B.7 
A Ajad 
B - Muridin  
C - Supardi 
D - Suhadi 
E - Saryanto 
F - Sukirno 
1 Date:
2 Location:
Firm name Numbers
Guangzo o  
Manggala
SOFOCO 6
Local (day time)
Local (night time)
Equipment Used:
boring machines and 
so on
3
Car 2 H1933SR(4WD), B9737Z(4WD), B9972BK(4WD).
Description of job : Survey boring position
Team-A  preparing drilling machine
Team-B  preparing drilling machine
Team-C prepare access to boring point
Team-D  already on B.5- start  for driling 7/5
Team-E stand by
Team-F mob boring machine and setup
Team-G preparing Field Vane (Geonor) test
Drilling UDS SPT Vane
Weekly schedule
2-May 3-May 4-May 5-May 6-May 7-May 8-May
BH.05 BH.05 BH.05 BH.05 BH.05  
BH.07 BH.07 BH.07 BH.07
    BH.08 BH.08 BH.08 BH.08
       
            
           
 
 
PT. MANGGALA KRIDA P.T. SOFOCO
Sudarpo Haryadi Abdulah
  Budi  Nugroho/Jadi 
Date: 8,   May,  2014
Daily Report for Soil Investigation
3
4
5
Soil investigation workshall  use total  6 set of boring rigs and 1 Field Vane test..
Manpower:
watchman
Budi Nugroho, Masuki, Rukmana, , Ajat S., Buini,, .
Team A - SUHADI
2-May-14
S
u
r
v
e
y
 
b
o
r
i
n
g
 
p
o
i
n
t
boatman
Ancol Timur
Sudarpo
Morning:           , Afternoon: 
Yoshiro Takahashi
Weather
7
6 Progress:
Team G -  RUDI (VANE)
Team E - SUPARDI
Team F - SUKIRNO
Team B - SARYANTO
Team D - AJAD
Team C - MURIDIN
B.5 
B.8 
B.7 
A Ajad 
B - Muridin  
C - Supardi 
D - Suhadi 
E - Saryanto 
F - Sukirno 
20 May(Mon) 21(Tue) 22(Wed) 23(Thu) 24(Fri) 25(Sat) 26(Sun)
Not at site, But in door work.
Boring for  onshore
Boring for  offshore
Preparation for survey 
off shore
Survey of boring 
points off shore
Platform installation 
for offshore
27(Mon) 28(Tue) 29(Wed) 30(Thu) 31(Fri) 1 Jun(Sat) 2 (Sun) 3(Mon)