PROJECT NAME
CLIENT NAME
PROJECT MANAGER
REMARKS
SL NO
1
2
3
SL NO
1
2
3
4
5
6
7
8
: INTEGRTED REFINERY EXPANSION PROJECT
ISGEC HEAVY ENGINEERING LTD
: VINEETH VINCENT
MATERIAL
NO OF JOINTS
Carbon steel
2570
Alloy steel
Stainless steel
483
223
TOTAL INCH DIA
16496
2466
1683
FITTER
RIGGER
WELDER
IBR
KHALASI
G/R
G/C
HELPER
9
27
15
8
18
9
3
25
CATEGORY
FITTER
RIGGER
WELDER
IBR
KHALASI
G/R
G/C
HELPER
MANPOWER COST
AVG RATE
9
350
27
350
15
350
8
35000
18
350
9
350
3
350
25
350
NOS
AYOKI CEMBOL ERECTORS PVT LTD
PIPING ESTIMATION FOR DEAERATOR AREA
MANPOWER ESTIMATION
INCH DIA
EQUIVALENT
INCH DIA
INCH DIA PER DAY
REQ
183.29
27.40
18.70
COST ESTIMATION
R COST
TOTAL
3150
9450
5250
280000
6300
3150
1050
8750
TOTAL FOR 90 DAYS TOTAL FOR 60 DAYS
283500
850500
472500
25200000
567000
283500
94500
787500
28539000
NO OF
WELDERS
REQ
INCH DIA PER WELDER AT
PRESENT CONDITION
10
10
10
18
3
2
D
NO OF DAYS REQ
JOINTS
FIT UP JOINTS
NO OF
JOINTS PER PER DAY AT
FITTERS
DAY REQ
PRESENT SITE
REQ
CONDITION
29
4
7
5
4
1
2
4
1
90 DAYS
AYO
PROJECT NAME
CLIENT NAME
PROJECT MANAGER
REMARKS
SL NO
1
2
3
4
: INTEGRTED REFINERY EXPANSION PROJECT
ISGEC HEAVY ENGINEERING LTD
: VINEETH VINCENT
MATERIAL
QTY
Electrode Required (KG)
800
Filler wire Required (KG)
Argon gas Required (NO'S)
Cutting Gas Required
800
800
800
APPROXIMATLELY 30 LAKH
REQUIRED FOR PIPING
AYOKI CEMBOL ERECTORS PVT LTD
PIPING ESTIMATION FOR DEAERATOR AREA
CONSUMABLES ESTIMATION
TOTAL INCH
DIA
20645
20645
20645
20645
EQUIVALENT
EXCESS TOLERANCE
CONSUMABLES REQ
INCH DIA
5%
3600
782
459
16
180
39
23
1
TOTAL (RS)
VT LTD
EA
NO OF DAYS REQ
5% + ACTUAL
3780
822
482
17
COST (RS)
945000.00
431323.08
937420.63
30408
2344151.72
90 DAYS
PROJECT NAME
CLIENT NAME
PROJECT CODE
PROJECT MANAGER
ESTIMATE BY
:
:
:
:
:
TOTAL ESTIMATED TIME
90 DAYS
SL NO
MATERIAL
NO OF JOINTS
TOTAL INCH DIA
1
2
3
Carbon steel
Alloy steel
Stainless steel
2570
483
223
16496
2466
1683
SL NO
1
2
3
4
5
6
7
8
CATEGORY
FITTER
RIGGER
WELDER
IBR
KHALASI
G/R
G/C
HELPER
NOS
9
27
15
8
18
9
3
25
AVG RATE
350
350
350
35000
350
350
350
350
CONSUMABLES CO
SL NO
1
2
3
MATERIAL
Electrode Required (KG)
Filler wire Required (KG)
Argon gas Required (NO'S)
QTY
800
800
800
TOTAL INCH DIA
20645
20645
20645
4
5
TOOLS & TACKLES
STAFF
Cutting Gas Required (LPG)
Oxygen
800
800
20645
20645
AYOKI CEMBOL ERECTORS PVT LTD
PIPING ESTIMATION FOR DEAERATOR AREA
INTEGRTED REFINERY EXPANSION PROJECT
ISGEC HEAVY ENGINEERING LTD
VINEETH VINCENT
PRASHOBE P
BOILER HOUSE PIPING
COST ESTIMATION
MANPOWER
INCH DIA PER DAY REQ
INCH DIA PER WELDER AT
PRESENT CONDITION
NO OF WELDERS REQ
183
27
19
10
10
10
18
3
2
TOTAL
3150
9450
5250
280000
6300
3150
1050
8750
TOTAL FOR 90 DAYS
283500
850500
472500
25200000
567000
283500
94500
787500
TOTAL COST (INR)
28539000
CONSUMABLES COST CALCULATION
EQUIVALENT INCH DIA
CONSUMABLES REQ
3600
782
459
EXCESS TOLERANCE 5%
180
39.122275
23
16
152
0.8
7.6
TOTAL (INR)
ORS PVT LTD
RATOR AREA
ON
JOINTS PER DAY REQ
FIT UP JOINTS PER DAY AT
PRESENT SITE CONDITION
NO OF FITTERS REQ
29
5
2
4
4
4
7
1
1
5% + ACTUAL
3780
821.567775
482
COST (RS)
945000
431323
937421
16.8
159.6
30408
44688
2388839.71520833
11.05.2015
REMARKS
CONSUMABLES ISSUED UPTO APRIL
NO'S
OYGEN CYLINDER (REF MT)
LPG (REF MT)
ARGON GAS (REF INCH DIA)
684
80
495
ELECTRODE USED
TOTAL
ELECTRODE / TONNAGE
ELECTRODE USED PER TON (KG)
FILLER WIRE CALCULATION
FILLER WIRES (90 S,80S B2)
16.148
0.0045549168
4.5549168166
KG
INCH DIA COMPLETED
827
21815
MABLES ISSUED UPTO APRIL
INCH DIA / MT COMPLETED
CYLINDER PER INCH DIA/MT REQ
3545.18
0.19
3545.18
0.02
21815
0.0227
ERECTED TONNAGE
3545.18
FILLER WIRE REQUIRED PER INCH DIA FOR 100 INCH DIA
0.0379096952 3.79 KG
FOR 100 INCH DIA
FOR 100 MT, 19 REQ
FOR 100 MT, 2 REQ
FOR ONE CYLINDER
2 50 INCH DIA