Muhammad Jahanzeb Khan
Career Objective :
To work with an organization that offers challenging opportunity and dynamic growth
in the field of construction.
Personal Information:
Fathers Name:
Saghir Khan
N.I.C #:
36302-8072355-7
D.O.B:
11th March 1987
Nationality:
Pakistani
Marital Status:
Single
Postal Address:
H#1457 Muhalla Khatka Ghani Bukhari Road, Near Mesco
Power House, Multan.
Cell # :
0313-6154884, 0302-5550830
Email:
jahanzebkhan100@yahoo.com
P.E.C Reg #:
CIVIL-29352
Qualification:
2004-2008
GRADE / %
71.20%
Govt. Emerson College, Multan
2004
74.73%
The Public School Multan
2002
80.35%
Degree
Institution
Bsc-Civil Engg
Bahauddin Zakariya University, Multan
Fsc (Pre-Engg)
Matriculation
Year
Additional Qualification:
Courses
MS Office, Windows XP and VISTA application, Adobe Acrobat, Networking, Internet applications
Computer Software & Hardware Program
SAP 2000, MATLAB, AUTOCAD, Primavera, Microsoft Project Planner, VIRTUAL CONSTRUCTOR &
ESTIMATOR 2008-09
Done final project on estimation software VICO CONSTRUCTOR & ESTIMATOR
Quantity surveying, & Estimation of construction projects (both manually and with the help of software)
Experience:
Currently working as PLANNING ENGINEER in SARCO Pvt Ltd, Head Office, Multan on
various projects in different provinces of Pakistan Since 2011.
Worked as PROJECT ENGINEER in SARCO Pvt Ltd Multan from April 2010 to October 2011,
on the project of National Highway Authority Multan named as IMPROVEMENT OF INNER CITY
RING ROAD MULTAN PACKAGE III, on Construction of three flyovers at Kalma Chowk &
Double Phatak, Multan, Pakistan.Total cost of Project is approximately Rs.1596 Million.
Currently assisting and also nominated as the PROJECT ENGINEER in SARCO Pvt Ltd Multan
for the project named as CONSTRUCTION OF SULTAN BAHOO BRIDGE LINKING SHORKOT
& GARH MAHARAJA in Jhang, Pakistan. Total cost of Project is approximately Rs.770 Million.
Worked as a SITE ENGINEER in SARCO Pvt Ltd Multan from August 2009 to April 2010. The
project was the construction of Roads, Residential Houses, Water Supply System, and Sewerage
System in Fatimah Jinnah Town Phase II Vehari Road Multan. Also supervised construction of an
Overhead Water tank and Servant Quarters in Fatimah Jinnah Town. The project was issued by
Multan Development Authority, Multan. Total cost of Project was approximately Rs.810 Million.
Worked as a SITE SUPERVISOR from June 2009 to August 2009 with Lahore based company
CONSTRUCT (Architects And Designers). The project was a 5 storeyed building named as
RAAZIQ INTERNATIONAL at Multan Road Lahore.
Professional skills:
Have generated the entire bar bending schedules of all structural items of Kalma Chowk Multan
Bridge, and got them approved from the competent authorities.
Have made Interim Payment Certificates, Escalation Payment Certificates and Variation Orders &
Work Programmes as additional assignments of different projects.
Have also worked in planning section while generating Interim Work Schedules and Contractual
Work Schedules.
Have generated X-sections and L-sections of road works.
Have generated Drainage Plan along with L-sections.
Have done all kinds of written correspondences with Consultants & Employer personnel.
Have performed and supervised steel cutting according to approved bar bending schedules at site.
Have done surveying in road construction projects, using auto-level and total station.
Have supervised all the road work activities and Bridge structure activities, including formwork
installation, steel fixing,
concrete pouring, concrete finishing, installation of expansion joints,
Retaining wall structures, Asphalt laying, cold milling, road widening etc.
Have supervised building construction works, including site layout, Foundation construction, Brick
Masonry works, RCC Slabs, Electrification works layout.
Keen knowledge of site layout and map studying.
Good experience in estimation of quantities in roads and buildings projects.
Have a thorough experience in generating construction bills, bills of quantities, level and
measurement sheets etc.
Got registered from Pakistan Engineering Council (PEC) in December 2009.
Other Activities:
Has always been a confident presenter in site and official issues.
Vocal correspondence with competent authorities in English and Local languages.
Served as a leader of social activities and as an event organizer in UCE&T BZU Multan.
Served as a leading proctor in entry test conducting committee BZU Multan.
Participated in the survey camp conducted by UCE&T BZU Multan in august 2008, and won the prize of
BEST GROUP IN THE SURVEY CAMP
Reference:
Will be furnished on demand.