PACiS
C264 Expert Utilisation
> L2 4A C264 Expert utilisation 02
C264 Expert
1 ) Hardware installation & Commissioning
2 ) Computers basic settings
3 ) Software Installation
4 ) Download DataBase and Switch
5 ) Communication Testing
> L2 4A C264 Expert utilisation 02
C264 Expert
Installation / Commissioning
1) Requirement
2) Checks Power Off
Hardware configuration (CORTEC)
3) Checks/install only Power Software Version
Ethernet/Front port
Database Version
Hardware Self tests
4) Checks with I/O
> L2 4A C264 Expert utilisation 02
IED Communication
DB
1.1) Set-up Requirements
1) Adapted DC Power supply (protected)
2) Personal Computer (WINDOWS 2000 administrator)
3) RS232C Null Modem Cable
4) Ethernet cable (cross if not hub/switch)
5) Screw-driver (Torque 10, POZ 1) extractor
19200 bauds
No parity
8 bit
1 stop
No flow control
> L2 4A C264 Expert utilisation 02
1.2 ) C264 Requirement
MANDATORY
From Business Ordering
1) C264 Delivery Form
2) C264 Hardware Version (kind of CPU, Power Supply)
3) C264 Software Version + System Release Note
4) C264 Business IP, Net name
5) C264 Business Board Configuration
CORTEC
Kind by Slot, Voltage, BIU port
6) C264 Business Data Bag
5
> L2 4A C264 Expert utilisation 02
2 ) Checks Power OFF
2 ) Power Off Hardware Checks
2.1) C264 Package Reception
2.2) Front panel Removal
Check Hardware configuration
Boards location and Voltage
2.3) Optional Bus removal
Check BIU ports jumpers
2.4) Mechanical Mounting
2.5) Wiring installation
> L2 4A C264 Expert utilisation 02
Shield
2.1 ) Delivery reception
1) Packing inspection and opening
2) Delivery Form checking / acceptance
3) Delivery Form Storage in Business Hardware Binder
4) Checking Front Panel Sticker
5) Opening Record Sheet
> L2 4A C264 Expert utilisation 02
2.2) Front Panel Removing
Rack mounting
Front Panel removal
> L2 4A C264 Expert utilisation 02
POZ 1
2.2 ) Checking Boards Slot / Voltage
Remove front panel and check boards location / Slot
Board Name
Board Number
BIU
CPU
DIU
9
> L2 4A C264 Expert utilisation 02
DOU
CCU
AIU
9
2.2 ) Checking Boards Slot / Voltage
Remove front panel and check Voltages
BIU / DIU / CCU
Sticker
10
> L2 4A C264 Expert utilisation 02
A01
A02
A03
A04
24 V
48V
110/125V
220V
10
2.3 ) BIU Port Setting
0) Check no power on BIU, get anti-static Brace
1) Get HW chapter (hardware)
2) Remove BUS with finger starting from left
3) Remove Torque Screw (Board + ruler)
4) Extract board with dedicated extractor tool
5) Checking PORT 1/2 setting via jumpers
6) Put Back Board / screws / Bus
11
> L2 4A C264 Expert utilisation 02
11
2.4 ) Mechanical Mounting
Front Panel Reinstall
C264 mechanical fixation (19 rack or other)
12
> L2 4A C264 Expert utilisation 02
12
2.5 ) Wiring Check (still no power)
1)
2)
3)
4)
5)
Shield wiring
Power supply wiring (BIU + neutral policy)
I/O board wiring
Ethernet Networks wiring
Serial TBUS/LBUS network wiring
Refer to CONNECTIONS chapter
(C264_EN CO documentation)
Good Practices
13
> L2 4A C264 Expert utilisation 02
Shield Scheme
wire color/diameter policy
naming e.g. DIU200_2_D
Write name on connector
13
3 ) Checks Power ON on BIU only
3 ) Checks on Computers basic settings
3.1) Run-time Requirements
3.2) C264 power up sequence
3.3) Setting commands
2.3) Checking default settings
2.4 ) Input new settings
14
> L2 4A C264 Expert utilisation 02
14
3.1) Run-time Requirement
1)
2)
3)
4)
Connection IP, Serial link
Launch HyperTerminal on the PC
Launch CMT and WFTP
Power up delivered MiCOM C264
>p CR
The following information should be displayed:
boot device
: tffs=0,0
processor number
:0
host name
: <factory host PC name>
file name
: <factory C264 IP addres xxx.xxx.xxx.xxx>
inet on backplane
: CR
host inet
: <factory host IP adresse xxx.xxx.xxx.xxx>
gateway inet
: 0.0.0.0
user
ftp password
ALSTOM
: /flash/bin/vxWorks
inet on ethernet
: <user name>
: <password>
flags
: 0x0
target name
: <factory target name>
startup script
other
: motfec
Serial link
RS232
15
> L2 4A C264 Expert utilisation 02
15
3.2 ) C264 Starting
1) Pre boot
First Count Down
[VxWorks]
2) Booting Software(network, flash)
Second Count Down
->
3) Starting Software
4) Loading Data Base
16
> L2 4A C264 Expert utilisation 02
16
3.3 ) settings commands
BASIC COMMANDS
Default settings visualization :
VxWorks level
> use p command
application level > use bootChange command
Default settings setup :
VxWorks level
> use c command
application level > use bootChange command
Reboot the computer :
VxWorks level
> use ^X @ command
application level > use reboot command
power off - power on
17
> L2 4A C264 Expert utilisation 02
17
3.3 ) Checking default settings
>p CR or bootChange (CR)
Tffs=0,0 boot from flash
The following information should be displayed:
motfec=0 boot from PC
boot device
processor number
host name
file name
inet on ethernet
inet on backplane
host inet
gateway inet
user
ftp password
flags
target name
startup script
other
18
: tffs=0,0
:0
: <factory host PC name>
: /flash/bin/vxWorks
: <factory C264 IP addres xxx.xxx.xxx.xxx>
: CR
: <factory host IP adresse xxx.xxx.xxx.xxx>
: 0.0.0.0
c264_cpu0 cpu 8mega flash-old LCD
: <c264_cpu2>
c264_cpu1 cpu 16mega flash-old LCD
: <password>
: 0x0
c264_cpu2 cpu 16mega flash-new LCD
: <factory target name>
:
: motfec
> L2 4A C264 Expert utilisation 02
18
4 ) Computers Software Installation
3 ) Computers Software Installation on PC
3.1 ) Computers Software Installation Requirements
3.2 ) Install computers software on the PC
3 ) Computers Software Installation on C264
3.3 ) Transfer computers software on the C264
3.4 ) Input settings for Software Installation
3.5 ) Transfer computers software on the C264
3.6 ) Change settings after Software Installation
19
> L2 4A C264 Expert utilisation 02
19
4.1 ) Computers Software Installation
Requirements
Requirements for new software installation
Ethernet link
COM1
or
COM2
9600/19200
8 bit
no parity TTY
mode
Serial link cable for HyperTerminal application
Ethernet Connection may be direct or via Ethernet switch
Use a crossed Ethernet cable for direct connection
20
> L2 4A C264 Expert utilisation 02
20
4.2 ) Install computers software on the PC
Step 1 : agreement acceptance
21
> L2 4A C264 Expert utilisation 02
21
Install computers software on the PC (next)
Step 2 : choose default directories recommended
recommended
recommended
CAUTION : Computers software and FTP server are configured to be
installed to the default directories. If you dont choose default directories
FTP server must be reconfigured.
22
> L2 4A C264 Expert utilisation 02
22
Install computers software on the PC(next)
Step 3 : Dont choose FTP server if is not the first
installation via the Personal Computer
23
> L2 4A C264 Expert utilisation 02
23
4.3 ) Transfer computers software on the C264
0) if already loaded
CLEAN_DB
1) Change to motfec, start wftp, reboot
loading software from network to RAM
2) cleaning flash by
eraseFlash
+ reboot
3) stop 2nd count down Stop Computer with CMT
4)
bootInstall
copy from RAM to flash
5) change to tffs=0,0, stop wftp, reboot
loading software from flash
6) Check Software version
24
> L2 4A C264 Expert utilisation 02
LCD, VERSION with front link
24
4.4 ) Input settings for Software Installation
Change settings for new software installation
->c
CR
(or bootChange
CR)
boot device
: tffs=0,0 enter <motfec0> CR
processor number
:0
CR
host name
: <Enter host PC name>
CR
file name
: /flash/bin/vxWorks enter <vxworks> CR
inet on ethernet
: xxx.xxx.xxx.xxx> CR (@IP change if needed)
inet on backplane
:
CR
host inet
: xxx.xxx.xxx.xxx> CR (@IP change if needed)
gateway inet
: 0.0.0.0
CR
user
: c264_cpu2(or c264_cpu1) CR
ftp password
: vxworks
CR
flags
: 0x0
CR
target name
: <target name>
CR
startup script
:
CR
other
: motfec
CR
->@
CR
(or reboot
CR)
25
> L2 4A C264 Expert utilisation 02
25
computers software on the C264
4.5 ) Transfer computer
1) Launch FTP server on your PC
2) Reboot the computer
3 ) hit CR on the HyperTerminal after loading C264 software
4 ) enter eraseFlash+ CR
5 ) Reboot the computer
6 ) enter bootInstall + CR after loading C264 software (can
take some minutes)
If the computer cant loading C264 software check
Ethernet link and verify settings with p or
bootChange command
26
> L2 4A C264 Expert utilisation 02
26
Transfer computers software on the C264(next)
1) At the end of software installation reboot the
computer
2 ) select the service panel and check the version of
the new software
3 ) The computer must be in maintenance mode
4 ) Check software installed version
27
> L2 4A C264 Expert utilisation 02
27
4.6 ) Change settings after Software Installation
Change settings for taking in account the new software
-> c
CR
(or bootChange
CR)
boot device
: motfec0 enter < tffs=0,0 > CR
processor number
:0
CR
host name
: <Enter host PC name> CR
file name
: vxworks enter </flash/bin/vxWorks > CR
inet on ethernet
: xxx.xxx.xxx.xxx>
CR
inet on backplane
:
CR
host inet
: xxx.xxx.xxx.xxx>
CR
gateway inet
: 0.0.0.0
CR
user
: <user name>
CR
ftp password
: <password>
CR
flags
: 0x0
CR
target name
: <target name>
CR
startup script
: CR
other
: motfec
CR
->@
CR
(or reboot
CR)
28
> L2 4A C264 Expert utilisation 02
28
4.7) Checking Software version
Check software version via the service panel
S E R V .
N F O
Purchased version
29
C O M P U T E R
S E R I A
N B :
S O F T W A R E
V E R S I
O N :
D A T A B A S E 1
V E RS
& S T A T E :
D A T A B A S E 2
V E RS
& S T A T E :
O P E R A T I
N G
H O UR
S :
O P E R A T I
N G
M O DE
R E D U N D A N C Y M O DE
> L2 4A C264 Expert utilisation 02
No data base
29
4.8) Database Downloading
Checking connection
Loading DB under SMT
Download DB unto C264
Switch to downloaded data base
30
> L2 4A C264 Expert utilisation 02
30
5 ) Communications Testing
5 ) Communications Testing
5.1 ) Communications Testing Requirements
5.2 ) Debug port testing
5.3 ) IED communication testing
5.4 ) IED communication Debug commands
5.5 ) Printer communication testing
5.6 ) Ethernet Communication testing
31
> L2 4A C264 Expert utilisation 02
31
5.1 ) Communications ports
Debug port (serial link)
Scc1 port (serial link RS232 or RS485)
Scc2 port (serial link RS232 or RS485)
Scc3 port (serial link RS232)
Scc4 port (serial link RS232)
Ethernet port
32
> L2 4A C264 Expert utilisation 02
32
5.2) Communications Testing Requirements
Computer must be in operational mode (SCE DB loaded)
Ethernet link
Printer cable
Serial link cable for HyperTerminal application
Ethernet Connection may be direct or via Ethernet Hub
Use a crossed Ethernet cable for direct connection
33
> L2 4A C264 Expert utilisation 02
33
5.3 ) Debug port testing
>p CR
The following information should be displayed:
boot device
: tffs=0,0
processor number
:0
host name
: <factory host PC name>
file name
: /flash/bin/vxWorks
inet on ethernet
: <factory C264 IP addres xxx.xxx.xxx.xxx>
inet on backplane
: CR
host inet
: <factory host IP adresse xxx.xxx.xxx.xxx>
gateway inet
: 0.0.0.0
user
ftp password
: <user name>
: <password>
flags
: 0x0
target name
: <factory target name>
startup script
other
: motfec
COM1
or
COM2
9600 / 19200
8 bit
no parity
TTY mode
Serial link cable for HyperTerminal application
No Communication check :
> serial cable
> check PC COMx settings
34
> L2 4A C264 Expert utilisation 02
34
5.4 ) Ethernet Communication testing
Ethernet link
Ethernet Connection may be direct or via Ethernet switch
Use a crossed Ethernet cable for direct connection
If no communication :
check IP addresses settings/Mask/Negotiation of both equipment
use ping command via MS-DOS window
Launch the CMT
35
> L2 4A C264 Expert utilisation 02
35
5.4 ) Serial communication testing
Use the TEST_COM
TEST_COM debug command to send a frame
from one port to the other
<TEST_COM ( port_E,Port_R,type,text,1)>
Transmitter port
Receiver port
Always=1
0=RS232,1=RS485
ASCII string
Use the S_APICOM_ShowConfig
S_APICOM_ShowConfig debug command to
verify the business DB port setting (and if initialized)
<S_APICOM_ShowConfig Nport>
36
> L2 4A C264 Expert utilisation 02
36
5.4 ) IED communication testing
1 ) Link together scc1 and Scc2 as follow
2 )Via the HyperTerminal launch the TEST_COM
command
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
BIU 200
connector
Scc2 TGND
Scc2 T+
GND
Scc1 T+
Scc1 T-
example TEST_COM (1,2,1,test port 1 to 2,1)
example TEST_COM (2,1,1,test port 2 to 1,1)
37
> L2 4A C264 Expert utilisation 02
37
5.4 ) IED communication testing
1 ) Link together scc3 and Scc4 as follow
2 )Via the HyperTerminal launch the command
test_com to send frame from one port to another
example TEST_COM (3,4,0,test port 3 to 4,1)
example TEST_COM (4,3,0,test port 4 to 3,1)
1
2
3
4
5
6
7
8
9
Scc3
38
> L2 4A C264 Expert utilisation 02
1
2
3
4
5
6
7
8
9
Scc4
38
5.5 ) IED communication Debug commands
>p CR
The following information should be displayed:
Debug Commands
Traces_scc1=16
Traces_scc2=16
RS485
boot device
: tffs=0,0
processor number
:0
host name
: <factory host PC name>
file name
: /flash/bin/vxWorks
inet on ethernet
: <factory C264 IP addres xxx.xxx.xxx.xxx>
inet on backplane
: CR
host inet
: <factory host IP adresse xxx.xxx.xxx.xxx>
gateway inet
: 0.0.0.0
user
ftp password
: <user name>
: <password>
flags
: 0x0
target name
: <factory target name>
startup script
other
: motfec
RS232
-> traces_scc1=16
traces_scc1 = 0x516fd8: value = 16 = 0x10
0x1274568 (T35IECM20): 0065ms -->P=1 L=5 :10 5B 02 5D 16
0x1274568 (T35IECM20): 0015ms <<<P=1 L=5 :10 09 02 0B 16
Frame : C264 to IED
Frame : IED response
No Communication with the IED : check C264 configuration
and IED settings, check wiring with the IED
39
> L2 4A C264 Expert utilisation 02
39
IED communication - frames IEC
IEC 60870-5-103 Frames
->
-> traces_scc1=16
traces_scc1 = 0x516fd8: value = 16 = 0x10
0x1274568 (T35IECM20): 0065ms -->P=1 L=5 :10 5B 02 5D 16
0x1274568 (T35IECM20): 0015ms <<<P=1 L=5 :10 09 02 0B 16
0x1274568 (T35IECM20): 0065ms -->P=1 L=5 :10 7B 02 7D 16
0x1274568 (T35IECM20): 0015ms <<<P=1 L=5 :10 09 02 0B 16
0x1274568 (T35IECM20): 0070ms -->P=1 L=5 :10 5B 02 5D 16
0x1274568 (T35IECM20): 0015ms <<<P=1 L=5 :10 09 02 0B 16
0x1274568 (T35IECM20): 0070ms -->P=1 L=5 :10 7B 02 7D 16
1 IEC 103 Device
Devices Address =2
40
> L2 4A C264 Expert utilisation 02
40
IED communication frames
ModBus
ModBus Frames
-> traces_scc2=16
traces_scc2 = 0x516fdc: value = 16 = 0x10
0x129d068 (T42MBM21): 0025ms -->P=2 L=8 :02 02 00 00 00 10 79 F5
0x129d068 (T42MBM21): 0020ms <<<P=2 L=7 :02 02 02 00 00 FD B8
0x129d068 (T42MBM21): 0240ms -->P=2 L=4 :01 07 41 E2
0x129d068 (T42MBM21): 0015ms <<<P=2 L=5 :01 07 01 E3 F0
0x129d068 (T42MBM21): 0025ms -->P=2 L=8 :02 02 00 00 00 10 79 F5
0x129d068 (T42MBM21): 0020ms <<<P=2 L=7 :02 02 02 00 00 FD B8
0x129d068 (T42MBM21): 0245ms -->P=2 L=4 :01 07 41 E2
0x129d068 (T42MBM21): 0010ms <<<P=2 L=5 :01 07 01 E3 F0
0x129d068 (T42MBM21): 0025ms -->P=2 L=8 :02 02 00 00 00 10 79 F5
0x129d068 (T42MBM21): 0020ms <<<P=2 L=7 :02 02 02 00 00 FD B8
2 ModBus IED devices
Address 1 and 2
41
> L2 4A C264 Expert utilisation 02
41
5.6 ) Printer communication testing
Scc1 & Scc2 port (serial link RS232 or RS485)
Central
Processing Unit
board
CPU260
PIN
12 3 4 5 6 7 8
10/100 BaseT
Ethernet-based link
RJ-45
(female)
OPTIONNAL LINKS:
1
2
P2
DCD
RXD / T-
RS232/
RS485
TXD / T+
Serial
1 2 3 45 6 7 8
Scc3, Scc4 used (usually) for printer or
SCADA link (protocols ModBus, IEC
60870-5-101)
GND
RTS
RJ-45
(female)
P3
1 2 3 45 6 7 8
2
3
link 2
CTS
DCD
RXD / T-
RS232/
RS485
TXD / T+
Serial
5
RJ-45
(female)
7
8
42
> L2 4A C264 Expert utilisation 02
link 1
GND
RTS
CTS
42
Printers communication
SS WESPEELAR CAS 36 - C264WESP
09:07:37.890
* 02/01/88
Set
* 02/01/88
Set
* 02/01/88
Reset
* 02/01/88
Reset
* 02/01/88
Set
* 02/01/88
Set
* 02/01/88
Reset
* 02/01/88
Open
* 02/01/88
Reset
* 02/01/88
Set
* 02/01/88
Set
02/01/88
09:07:37.890 C264 WESPELAART3
REENCL ES NON BL
09:07:37.890 WESPELAAR
/DV
SPS REENCL EN NB
09:07:37.890 WESPELAAR
/DV
AR BLOCKING
09:07:38.079 WESPELAAR
/IN FROM COM TRAN UHT< ET UMT<
09:07:38.094 WESPELAAR
/IN FROM COM TRAN UHT >
09:07:38.094 WESPELAAR
/IN FROM COM TRAN UMT>
09:07:40.521 WESPELAAR
/P142 TPR
09:07:40.798 WESPELAAR
/INP FROM SYN RTU ENCL/DECL MAN DV
09:07:40.924 WESPELAAR
/sd
09:07:40.924 WESPELAAR
09:07:40.940 WESPELAAR
GenStart
SPS DEVERROUILLA
TC EN COURS
/DV+
SPS DECL PH C
If no printing check : printers settings and C264 DB
settings
43
> L2 4A C264 Expert utilisation 02
43