DESIGN & PLANNING DEPARTMENT
MANCOM REPORT
DATE: SEPTEMBER 29, 2015
PROJECT
ITEMS
CURRENT STATUS
ON -GOING WORKS
REMARKS & ISSUES
IN-CHARGE
CURRENT TARGET
Horizontal Development Proposal
Updated Drawings (as of 9/18/15)
as per MBF comments
Vertical Development Proposal
Study scheme for condominium
development
Verify zoning and density compliance
A. SITE DEVELOPMENT PLAN
Land Data Computations
Single Detached
B. HOUSING COMPONENTS
Waiting for comments / corrections as per
concerning dept.
1. DASMARIAS
Updated Computations
(as of 9/18/15) as per MBF comments
Paolo
Revised as of 9/18/15
as per MBF comments
MJ
Routed drawings for comments (9/15/15)
MJ
Furnish template of design memo
Duplex
Revised as of 9/18/15
as per MBF comments
MJ
Routed drawings for comments (9/15/15)
MJ
Furnish template of design memo
C. AMENITIES
Clubhouse
Gate and Guardhouse
Commercial Center
D. ROAD SECTIONS
E. SCALE MODEL
For schematic
On-going
Submitted to Ms Linda G. Drawings (Walnut Creek
Residences) 9/15/15
Scheme as of 9/18/15
For design parameters verification
Scheme as of 9/18/15
Scheme as of 9/18/15
For design parameters verification
Scheme as of 9/18/15
Hold (September 24, 2015)
MJ
DONE
Mariz
DONE
MJ
DONE
Paolo
DONE
Paolo
Ist week of Oct.
PROJECT
ITEMS
A. MIRABELLE
CURRENT STATUS
ON -GOING WORKS
On-going
Interior Decoration- Final
Landscaping
B. CRISTELLE
For inventory and update w/ Romar
Mariz
Week 40 (Sep 28-Oct 2)
For liquidation and finalization of
inventory c/o Mariz
Mariz
Week 40 (Sep 28-Oct 2)
Mariz
Week 40 (Sep 28-Oct 2)
DONE
Reviewed by BRB as of Sept. 23, '15
Paolo
Ongoing
Ff up Engineering
Mariz
Week 40 (Sep 28-Oct 2)
Landscaping Update
Compilation of Engineering
Drawings as per Ar. Dupher's
update
Studies c/o BRB
Coordination with Ar. Dupher
MJ
aa. PHOEBE
For updating of plans comments For scheduling
Mariz & Paolo
Print engineering drawings c/o Pao
bb. TIARA
For updating of plans comments For scheduling
Mariz & Paolo
Print engineering drawings c/o Pao
For architectural working
drawings
D. SIGNAGE PYLON
For finalization of working
drawings
E. SHOPHOUSE
DONE
Working drawings
F. COMMERCIAL CENTER
For schematic layout
Schemes c/o Mariz
For scheduling
aa. Block 2 Cluster- 5 units
For scheduling
Paolo
bb. Block 5 Cluster- 2 units
For scheduling
Paolo
B. AMENITY AREA
For design concept
Interior Design
A. PLANTING STRIP
B. RFO UNITS
5. COSTA SMERALDA
C. FOR BUILDING PERMIT APPLICATION
Week 40 (Sep 28-Oct 2)
For inventory and update w/ Romar
C. LINEAR PARK
C. MODEL UNIT VICTORIA
Mariz
Landscaping
3. PACIFIC GRAND VILLAS 5
4. PACIFIC GRAND
TOWNHOMES
For liquidation and finalization of
inventory c/o Mariz
For schematic floor plan,
Perspective
A. SITE DEVELOPMENT PLAN
A. FOR BUILDING PERMIT APPLICATION (OLD
VICTORIA)
CURRENT TARGET
Interior Decoration- Final
D. Entrance Statement and Signage
B. HOUSE MODEL UNITS
IN-CHARGE
On-going
2. AUREVILLE
C. MODEL 66 SQ M
REMARKS & ISSUES
DONE
For schematic site development
For landscape quotation
layout
Mariz
Verify sales and docs department Ff up Ms. Al (Sales Doc)
Paolo
Janella- Blk 15 Lot 18;
(Ramon/Angelie Talaron)
Natalia- Blk 15 Lot 24
(Reynold/Flordenita Sazon)
Pouched to Iloilo (9/17/15)
Paolo
Follow up Romar c/o Mariz
Follow up on date received
PROJECT
ITEMS
A. FOR BUILDING PERMIT APPLICATION
CURRENT STATUS
ON -GOING WORKS
aa. Phase 4A (2 units)
OLIVIA-Blk 14 Lot 17
(Vincent/Emilyn Gocotano)
OLIVIA-Blk 13 Lot 17
(Ylette/Benjie Rocha)
For scheduling
Paolo
On going c/o Pao
aa. Phase 4B (2 units)
OLIVIA-Blk 1 Lot 10
Julie Ann Agbang
OLIVIA-Blk 1 Lot 12
Michael Delima
For scheduling
Paolo
For printing at CSI
6. PGV PHASE 1 to 4
7. MAIN OFFICE INTERIOR
RENOVATION
A. UPDATING OF FLOOR PLAN LAYOUT
Furnish copy to Logistics
B.COSTING STUDY OF CARPET
Review of supplier / contractors
quotation
C. INTERIOR LAYOUT STUDY OF
FINANCE DEPARTMENT
8. SCHEMATIC SITE
RESEARCH
Already got a copy of organizational
structure of Finance Department
For schematic study
IN-CHARGE
CURRENT TARGET
Paolo
DONE
Logistics
DONE
Paolo
A. MARILAO TOWNSHIP
Proposal's Comparative Analysis Submitted (Sept. 16, '15)
Mariz
Waiting for shorlisted consultants
B. JARO GRAND ESTATES, SOUTH HALF
Proposal's Comparative Analysis Submitted (Sept. 16, '15)
Mariz
Waiting for shorlisted consultants
C.JARO GRAND ESTATES, NORTH HALF
a. PHILCONSTRUCT
b. UP SURP
For Site Scheme
October 8 2015 @2:00pm
Venues: SMX, World Trade Tent, World
Trade Center
Topic: Mainstreaming Climate Change
Adaptation and DRRM in the CLUP
October 14 2015 @4:00pm
Cario Hall, UP SURP, Diliman, QC
9. CPE/Training and Expos
REMARKS & ISSUES
c. Manila FAME
October 15 2015 @2:00pm
SMX Convention Center, Pasay City
d. Real Estate Organizations
Research
aa. HOUSING FAIR 2015
e. PHILGBC
Arch. /EnP. Brando R. Bulosan
Design and Planning Department - HEAD
October 16 2015 @4:30pm
Megatrade Hall 1, 5th Floor, SM
Megamall, Bldg. B, Mandaluyong City
For inquiries: Application / Membership
forms
MJ
Furnish OB forms, Vehicle Request, and
Petty Cash
Bring calling cards and registration form
Mariz
Furnish OB forms, Vehicle Request, and
Petty Cash
MJ
Bring calling cards and email verification
if any
Copy of pre-registration confirmation
code on file
Mariz
Mariz
Furnish OB forms, Vehicle Request, and
Petty Cash
Mariz
Bring calling cards and email verification
if any
Acquired Application/Membership Forms
DPD ID: Complete
Mariz
DESIGN & PLANNING DEPARTMENT
MANCOM REPORT
DATE: SEPTEMBER 17, 2015
ON
ITEMS
CURRENT STATUS
-GOING
WORKS
PROJECT
A. Site
Developme
nt Plan
REMARKS
CURRENT
IN-CHARGE
& ISSUES
TARGET
Transfer
Dwgs to
CAD file
(Site Devt.
Updated Drawin
Plan, Topo
Maps) as
per MBF
comments
Paolo
Land Data
Computati Updated Comput Paolo
ons
Waiting for
comments
/
B. HOUSING corrections
as per
concerning
dept.
Single
Revised as
Detached of 9/14/15)
MJ
Routing of
drawings
for
comments
(9/15/15)
MJ
Revised as
of 9/14/15)
MJ
Routing of
drawings
for
comments
(9/15/15)
MJ
Scheme as
of 9/11/15
MJ
DONE
Gate and
Scheme as
Guardhous
of 9/14/15
e
Mariz
DONE
Commercia Scheme as
l Center of 9/14/15
MJ
DONE
For
Scheme as
schematic of 9/14/15
Paolo
DONE
Duplex
1. DASMA
C. AMENITIE
D. ROAD SE
Clubhouse
E. SCALE
Submitted
to Ms Linda
Preliminary
G. comments
Drawings
On-going
on Sept.
(Walnut
28-29;
Creek
follow-up
Residences
) 9/15/15
Interior For
A. MIRABELL On-going Decoration inventory
- Final
encoding
For
Landscapin inventory
g
and update
w/ Romar
Interior For
B. CRISTELL On-going Decoration inventory
- Final
encoding
2.
AUREVIL
LE
Paolo
Ist week of
Oct.
Mariz
Week 38
(Sept 1418)
Mariz
Mariz
Week 38
(Sept 1418)
For
Landscapin inventory
g
and update
w/ Romar
Mariz
For
For
schematic
comments
floor plan,
c/o BRB
Perspective
Paolo
9/17/2015
D. Entrance Statement
Ff up
Landscapin
Engineerin
g Update
g
Mariz
Week 38
(Sept 1418)
A. Planting
Strip
For
schematic For
site
landscape
developme quotation
nt layout
Mariz
Week 38
(Sept 1418)
Verify sales
Ff up Ms.
and docs
Al (Sales
departmen
Doc)
t
Paolo
Janella- Blk
Pouched to
15 Lot 18;
Iloilo
Natalia- Blk
(9/17/15)
15 Lot 24
Paolo
C. MODEL 6
DONE
3. COSTA B. RFO
SMERAL Units
DA
C. FOR
BUILDING
PERMIT
APPLICATIO
N
DONE
4. PGV
PHASE 1
to 4
aa. Phase
A. FOR BUIL
4A (2
units)
OLIVIA-Blk
14 Lot 17 For
OLIVIA-Blk scheduling
13 Lot 18
Paolo
Next Week
aa. Phase
4B (2
units)
OLIVIA-Blk
1 Lot 10 For
OLIVIA-Blk scheduling
1 Lot 13
Paolo
Next Week
For
scheduling
Paolo
For
scheduling
Paolo
A. FOR
BUILDING
aa. Block 2
5.
PERMIT
Cluster- 5
PACIFIC APPLICATIO
units
N (OLD
GRAND
TOWNHO VICTORIA)
MES
bb. Block 5
Cluster- 2
units
Compilatio
n of
Engineerin
6.
g Drawings
Coordinatio
PACIFIC
as per Ar.
A. Site Development Pla
n with Ar.
Dupher's
GRAND
Dupher
update
VILLAS 5
Studies c/o
BRB
aa.
B. House Mo
PHOEBE
MJ
For
updating of For
Mariz & Paolo
plans
scheduling
comments
For
updating of For
bb. TIARA
Mariz & Paolo
plans
scheduling
comments
C. Linear Park
For
architectur
al working
drawings
D. Signage Pylon
For
finalization
of working
drawings
E. Shophouse
F. Commercial Center
Working
drawings
For
For
schematic
scheduling
layout
DONE
Proposal's
Comparativ
e Analysis
A. Marilao Township
7.
SCHEMA
TIC SITE
Proposal's
RESEARC
B. Jaro Grand Estates, S Comparativ
H
e Analysis
For Site
Scheme
Furnish
A. Updating of Floor Pla copy to
Logistics
Mariz
8-Sep
Mariz
8-Sep
8-Sep
C. Jaro Grand Estates, N
Review of
supplier /
B. Costing study of carp
contractors
quotation
8. MAIN
OFFICE
INTERIO
R
RENOVAT C. Interior
ION
layout
For
study of
schematic
Finance
study
Departmen
t
Paolo
DONE
Logistics
DONE
Already got
a copy of
organizatio
nal
Paolo
structure of
Finance
Departmen
t
registered
9.
Sept
CPE/Trai
a. Green Co 24,2015;
ning and
Expos
SMX, MOA
Complex,
registered
Oct
b. PHILCON
8-11,
2015;
10:00am6:00pm
SMX, MOA
Complex,
Copy of
preregistration
Mariz
confirmatio
n code on
file
Copy of
preregistration
Mariz
confirmatio
n code on
file
Approved
by AAH
registered
Oct
8-11,
2015;
10:00am6:00pm
SMX, MOA
Complex,
d. Real Esta Research
c. Manila F
For
inquiries:
Application
e. PHILGBC
/
Membershi
p forms
Copy of
preregistration
Mariz
confirmatio
n code on
file
Mariz
MMY/MJM
ID ff up
HRD
Mariz