898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
12 Aug 16
BY
CHKD
PRA
ASK
Cable Losses
Basic Data
Sheathing
Maxm Sheath Dia
Coef of Friction
Coeff of Wobble k
Strand System
Area of each strand
Mod of Elasticity
slip
Stressing Sequence
HDPE
75.0
0.17
0.002
7K15
140.000
1.95E+05
6.0
Total no of cables
No of Strands
G2/G3
mm
(Ref.IRC:112 Table 7.1 )
per metre
mm2
mpa
mm
Stage 1
5
30
14
Stage 2
0
0
14
Cable C G s
Location
dist from bottom
cable 5
Cable 6 cmbd 1,2
7 /D
0
& 5 ,6
nos
cable1&2
14
cable3
7
Cable 4
7
0.0L
160.0
482.0
742.0
1002.0
1332.76
0.1L
122.6
342.9
558.1
773.2
0.2L
110.0
241.0
423.3
0.3L
110.0
168.2
0.5L
110
110
cable1&2
cable3
Cable 4
cable 5
nos
14
0.0L
440.0
118.0
0.1L
479.5
0.2L
All cables
cmbd 3,4
440.7
509.2
612.0
1052.15
339.4
383.9
450.5
605.5
832.46
275.2
298.0
332.1
327.0
485.8
675.54
235.3
240.2
247.6
250
390
550.00
203.3
194.0
180.0
Cable 6
cmbd 1,2
All cables
7 /D
&5,6
-142.0
-402.0
-732.8
159.3
90.8
417.9
-12.0
259.1
44.0
-171.1
-450.1
262.6
218.2
566.3
151.6
494.1
363.1
180.8
-1.4
-228.3
328.9
306.1
675.2
272.0
0.3L
494.1
435.9
277.1
118.3
-71.4
368.8
363.9
733.0
356.5
0.5L
494.1
494.1
354.1
214.1
54.1
400.8
410.1
779.2
424.1
Loc
C G from N A girder alone
CG frm N A
with deck
cmbd 3,4
all cables
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
12 Aug 16
BY
CHKD
PRA
ASK
Wobble and friction losses :
x = o . e
-(+kx)
Friction coef k
Wobble coef
0.002
0.17
per metre
Distance upto centre
Distance upto other end
8.255
16.51
m
m
Section
length of
section
l in (m)
k*l
1,2
A-B
B-C
C-D
D-E
E- F
1.735
1.63
1.63
3.26
8.26
0.00347
0.00326
0.00326
0.00652
0.01651
0.026379 0.0044844 0.0079544
0
0
0.00326
0
0
0.00326
0
0
0.00652
0.026379 0.0044844 0.0209944
0.9920771
0.9967453
0.9967453
0.9935012
0.9792243
A-B
B-C
C-D
D-E
1.735
1.63
1.63
3.26
0.00347
0.00326
0.00326
0.00652
0.013501
0.017819
0.017819
0.035638
0.0022951
0.0030292
0.0030292
0.0060584
0.0057651
0.0062892
0.0062892
0.0125784
0.9942514
0.9937305
0.9937305
0.9875003
A-B
B-C
C-D
D-E
1.735
1.63
1.63
3.26
0.00347
0.00326
0.00326
0.00652
0.017824
0.023525
0.023525
0.04705
0.0030301
0.0039992
0.0039992
0.0079984
0.0065001 0.993521
0.0072592 0.992767
0.0072592 0.992767
0.0145184 0.9855864
A-B
B-C
C-D
D-E
1.735
1.63
1.63
3.26
0.00347
0.00326
0.00326
0.00652
0.022121
0.029196
0.029196
0.058392
0.0037606
0.0049633
0.0049633
0.0099267
0.0072306
0.0082233
0.0082233
0.0164467
Cable
No.
Angle in
rad
x=k*l+*
e-x calculated
for each
0.9927955
0.9918103
0.9918103
0.9836877
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Cable
No.
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
Reference Cable force
point
before slip
Stress in
cable
N/mm2
KN
12 Aug 16
BY
CHKD
PRA
ASK
Slip travel Cable stress Cable stress Cable force
length
at zero slip
after slip
after slip
N/mm2
N/mm2
KN
(Due to friction and
per strand
per strand
wobble effect)
( o * e-x)
1,2
A , o =
B
C
D
E
F
195.3
193.8
193.1
192.5
191.2
187.3
1395
1395.0
1383.9
1379.4
1375.0
1366.0
1337.6
1383.9
1379.4
18.883
>
16.51
1301.9
1312.3
1316.5
1320.8
1329.5
1337.6
1329.5
182.3
183.7
184.3
184.9
186.1
187.3
1375.0
1366.0
1329.5
128.0
106.8
98.1
1337.6
72.1
89.4
1293.9
1267.0
1277.2
1281.3
1285.5
`
E
Midspan
Effective area between the two curves
0.5*(128+106.8)*1.74+0.5*( 106.8+98.1)*1.63+0.5*(98.1+89.4)*1.63
=
+0.5*(89.4+72.1)*13.89) +0.5*(72.1*(18.88-8.26)
=
1170.0
N/mm
Hence slip
=
1170.0
1000
195000
6.00
mm
Area under the stress diagram
=
0.5*(1395+1383.9)*1.74+0.5*( 1383.9+1379.4)*1.63+0.5*(1379.4+1375)*1.63+0.5*(1375+1366)*3.26
0.5*(1366+1337.6)*8.26
22534.9
Average stress
=
22534.86
16.51
Elongation
=
22534.9
1364.92
N/mm2
1000
195000
115.6
1267.0
N/mm2
Stress at different points
At 0.0 L
=
mm
177.4
at stressing end
KN / strand
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
At 0.1 L
At 0.2 L
At 0.3 L
At 0.5 L
Cable
No.
=
=
=
=
Reference Cable force
point
before slip
KN
1277.2
1281.3
1285.5
1293.9
Stress in
cable
N/mm2
=
=
=
=
12 Aug 16
BY
CHKD
PRA
ASK
178.8
179.4
180.0
181.1
Slip travel Cable stress Cable stress Cable force
length
at zero slip
after slip
after slip
N/mm2
N/mm2
KN
(Due to friction and
per strand
per strand
wobble effect)
( o * e-x)
A
B
C
D
E
1395.0
195.3
194.2
193.0
191.8
189.4
1395.0
1387.0
1378.3
1369.6
1352.5
15.097
>
8.255
1316.6
1387.0
1378.3
1369.6
137.2
120.6
104.0
1249.8
1257.7
1265.6
1242.6
1249.8
1257.7
1265.6
1352.5
174.0
175.0
176.1
177.2
189.4
1352.5
1316.6
152.4
1242.6
E
midspan
Effective area between the two curves
=
0.5*(152.4+137.2)*1.74+0.5*( 137.2+120.6)*1.63+0.5*(120.6+104)*1.63
+0.5*(104*(15.1-1.63-1.63-1.74)
1170.0
Hence slip
=
1170.0
N/mm
1000
195000
6.00
mm
Area under the stress diagram
=
0.5*(1395+1387)*1.74+0.5*( 1387+1378.3)*1.63+0.5*(1378.3+1369.6)*1.63+0.5*(1369.6+1352.5)*3.26)
=
11343.75
Average stress
=
11343.75
8.255
1374.2
N/mm2
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
Elongation
=
11343.8
1000
195000
58.2
Stress at different points
At 0.0 L
At 0.1 L
At 0.2 L
At 0.3 L
At 0.5 L
=
=
=
=
=
1242.6
1249.8
1257.7
1265.6
1352.5
N/mm2
=
=
=
=
=
Cable
No.
Reference Cable force
before slip
point
KN
Stress in
cable
N/mm2
12 Aug 16
mm
A
B
C
D
E
1395.0
195.3
194.0
192.6
191.2
188.5
1386.0
CHKD
PRA
ASK
at each end
174.0
175.0
176.1
177.2
189.4
KN / strand
Slip travel Cable stress Cable stress Cable force
length
at zero slip
after slip
after slip
N/mm2
N/mm2
per strand
BY
KN
per strand
1395.0
1386.0
1375.9
1366.0
1346.3
1375.9
14.088
>
8.255
1311.1
1232.2
1240.2
1249.3
1258.4
1346.3
172.5
173.6
174.9
176.2
188.5
1366.0
1311.1
1346.3
162.8
1232.2
145.7
126.7
107.6
1240.2
1249.3
1258.4
E
midspan
Effective area between the two curves
=
0.5*(162.8+145.7)*1.74+0.5*( 145.7+126.7)*1.63+0.5*(126.7+107.6)*1.63
+0.5*(107.6)*(14.09-1.74-1.63-1.63)
1170.0
Hence slip
=
1170.0
N/mm
1000
195000
6.00
mm
Area under the stress diagram
0.5*(1395+1386)*1.74+0.5*( 1386+1375.9)*1.63+0.5*(1375.9+1366)*1.63+0.5*(1366+1346.3)*3.26)
=
=
11319.12
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
Average stress
=
11319.12
8.255
1371.2
N/mm2
Elongation
=
11319.1
1000
195000
58.0
Stress at different points
At 0.0 L
At 0.1 L
At 0.2 L
At 0.3 L
At 0.5 L
=
=
=
=
=
1232.2
1240.2
1249.3
1258.4
1346.3
N/mm2
=
=
=
=
=
Cable
No.
Reference Cable force
point
before slip
KN
Stress in
cable
N/mm2
12 Aug 16
mm
172.5
173.6
174.9
176.2
188.5
A
B
C
D
E
1395.0
195.3
193.9
192.3
190.7
187.6
1384.9
N/mm2
N/mm2
1222.6
1395.0
1384.9
1373.6
1362.4
1340.1
1373.6
13.270
>
8.255
1222.6
1231.5
1241.6
1251.9
1340.1
1306.0
1362.4
153.5
132.0
110.5
1231.5
1241.6
1251.9
1340.1
E
midspan
Effective area between the two curves
=
0.5*(172.4+153.5)*1.74+0.5*( 153.5+132)*1.63+0.5*(132+110.5)*1.63
+0.5*(110.5*(13.27-1.63-1.63-1.74)
1170.1
N/mm
PRA
ASK
at each end
KN / strand
KN
per strand
1306.0
172.4
CHKD
Slip travel Cable stress Cable stress Cable force
length
at zero slip
after slip
after slip
per strand
BY
171.2
172.4
173.8
175.3
187.6
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
Hence slip
=
1170.1
1000
195000
6.00
12 Aug 16
BY
CHKD
PRA
ASK
mm
Area under the stress diagram
=
0.5*(1395+1384.9)*1.74+0.5*( 1384.9+1373.6)*1.63+0.5*(1373.6+1362.4)*1.63+0.5*(1362.4+1340.1)*3.26)
=
11294.71
Average stress
=
11294.71
8.255
1368.2
N/mm2
Elongation
=
11294.7
1000
195000
57.9
At 0.0 L
At 0.1 L
At 0.2 L
At 0.3 L
At 0.5 L
=
=
=
=
=
1222.6
1231.5
1241.6
1251.9
1340.1
N/mm2
=
=
=
=
=
4.2.1
mm
171.2
172.4
173.8
175.3
187.6
at each end
KN / strand
Average Cable force along Girder per strand after Wobble , Friction and slip Losses
G1 / G5
G2 / G3
0.0L
.1L
.2L
.3L
.5L
Force/ strand ave say
174.5
175.7
176.7
177.7
185.6
178.04
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Notional size of member in mm ( h )
=
=
2 Ac
u
Area of concrete
perimeter in contact with atmosphere in mm
1023000
3670
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
=
12 Aug 16
BY
CHKD
PRA
ASK
278.75
ESTIMATE OF LOSSES
STRESSING SCHEDULE AND SEQUENCE
For losses consider Girder G1 /G5 which is critical
Cable No 3,4
30
Concrete M
STAGE I:
32.00
Ec =
33000
Ec =
Days
35000
age minm 7 days
STAGE II :
DECK SLAB
Force/ strand
Cables 1,2&5,6
M 40
Ec = 33000
ave say
Concrete M
N/mm2
178.04 kn
Es =
(178.04*1000/140/1860)
50
28
195000
n/mm2
(0.75*1860)
0.6837 fp
fs =
stage I cables will be
1395
n/mm2
30
SECTION Properties GIRDER ALONE
Ag =
0.512
Ztg = 0.1311
SECTION Properties with DECK
Ag+s =
1.148
Ztg g+s = 1.1329
Zts g+s = 0.4806
at mid span
Zbg =
I=
Zbg g+s =
I=
0.1185
0.072
0.206
0.200
yb= 0.604
SECTION Properties GIRDER at support
Ag =
0.667
Ztg =
0.141
SECTION Properties with DECK
Ag+s =
1.303
Ztg g+s =
1.017
Zts g+s =
0.490
Zbg =
I=
Zbg g+s =
I=
0.129
0.078
0.244
0.227
yb= 0.600
STAGE I LOSSES
Elastic Shortening
Stress at level of cable
Midspan :
= 185.6*30
0.5115
185.6*30*0.4101*0.4101
0.072
21444.4 kn/m2
174.5*30
Support :
+
0.6665
7863.3
174.5*30*0.0908*-0.012
0.0775
kn/m2
yb= 0.973
yb= 0.927
440*0.4101
0.071560094
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
Ave stress along cable =
14214.27 kn/m2
Elastic Shortening loss =
(14214.3*
195000
stress
Es
39896.86 kn/m2 =
12 Aug 16
BY
CHKD
PRA
ASK
Considering a factor of 0.97 for losses during period
(Ref. IRC18 cl. 11.1)
II
Creep Loss 7d to 28d
Ave stress along cable=
Creep co- efficient
where
33000)/2
Ec
ave
39.90 n/mm2
14214.3 kn/m2
cc ( t )
ci ( t )
cc ( t )
Creep strain at time t > t0
ci ( t )
initial strain at loading
Development of creep with time may be taken as
( t , to )
( t , to )
( t , to ) x ( , t )
0.3
H +
RH
=
=
t - to
(t -t0)
1.5 ( 1 + ( 1.2 * Rh )18
R0
x h0
+ 250
for fcm <
Relative humidity expressed as percentage
50
%
100
%
Rho
h0
278.75
668.16
age of concrete in days at time considered =
t0
age of concrete in days at time of loading =
t- t0
( 25550, 7 )
=
=
< 1500
45
25543
<
1500
days
((25543)/(625.8+25543))^0.3
0.99228
25550
days
7
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
12 Aug 16
BY
CHKD
PRA
ASK
(25543 , 7 )
Age at loading to ( Days
7
For notional size
278.75
=
=
(25550, 7 )
initial strain
RH
Notional Size
150
600
3.45
2.85
3.28
3.32*0.99276
3.25
14214.27
0.000431
=
=
=
h0
278.75
668.16
=
=
t- t0
<
age of concrete in days at time considered =
25522
days
((25543)/(625.8+25543))^0.3
0.992277
(25543 , 28 )
Age at loading to ( Days
28
278.75
=
=
(25550,28 )
1500
age of concrete in days at time of loading =
( 25550, 7 ) =
For notional size
/1000
Relative humidity expressed as percentage
50
%
100
%
Rho
t0
/33000
Notional Size
150
600
2.65
2.2
2.52
2.55*0.99276
2.50
25550
days
28
days
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
creep strain loss = (
=
Stress loss =
=
III
3.25
3.24E-04
63.101
n/mm2
0.000
n/mm2
2.50 ) *
-For G2/G3
Shrinkage Strain =
Ca
CS
CS
Total shrinkage strain
cd
Drying shrinkage strain
Ca
Autogenous shrinkage strain
Grade of concrete
Autogenenous Shrinkage
Strain
Ca
Ca
Ca
cd
=
h0
100
200
300
>300
cd
M35
M45
45
65
75.0
1.00E-06
7.50E-05
cd ,
Kh
1
0.85
0.75
0.7
kh
Kh
=
0.700
cd , = depending on grade and relative Humidity
fck
25
50
75
95
cd , =
cd , =
cd
420
Relative humidity ( %)
535
420
330
260
x
1.00E-06
0.700
4.20E-04
4.20E-04
12 Aug 16
BY
CHKD
PRA
ASK
0.000431
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
12 Aug 16
BY
CHKD
PRA
ASK
2.94E-04
Development of autogenous shrinkage with time can be taken as
Ca ( t )
as (t)
ca
as (t) x
1 xp (-0.2 * sqrt( t))
=
Day
7
28
60
90
ca
as (t)
4.10E-01
7.50E-05
6.52E-01
7.50E-05
7.87E-01
7.50E-05
8.49E-01
7.50E-05
Ca
3.07E-05
4.89E-05
5.90E-05
6.37E-05
Development of drying Shrinkage
ds ( t , ts ) x Kh x cd
cd (t) =
ds
( t , ts ) =
(
(
t - ts)
t - ts)
0.04
ho3
age of concrete in days at time of considered ie 7th
ts
Age of concrete in days at beginning of drying shrinkage . Ie oth day .
ds ( 28, 14 )
6.99E-02
cd (28) =
0.06995
cd (28) =
1.44E-05
Stress loss =
0.70000
Ca
CS
3.07E-05
6.33E-05
Days
cd
7
28
0.00E+00
3.07E-05
1.44E-05
4.89E-05
6.33E-05
3.25E-05
6.3
n/mm2
3.07E-05
day
28
0.00029
14
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
n/mm2=
109.34
For others girder
TOTAL LOSSES STAGE I
STAGE II LOSSES
Creep Loss 28d to 60d
CHKD
PRA
ASK
kn
kn
(14214.3+0)
st I loss
=
=
where
297.26
26.65
BY
28d to 60d
Ave stress along CG of cable =
Creep co- efficient
12 Aug 16
14214
0
st II loss
G1 and G5
G1 and G5
kn/m2
kn/m3
cc ( t )
ci ( t )
cc ( t )
Creep strain at time t > t0
ci ( t )
initial strain at loading
Development of creep with time may be taken as
RH
=
=
Relative humidity expressed as percentage
50
%
100
%
Rho
h0
278.75
668.16
age of concrete in days at time considered =
t0
age of concrete in days at time of loading =
t- t0
25490
(25550 , 60)
0.99227
(25550, 60 )
2.3069
<
days
1500
25550
days
60
days
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
(25550 , 60 )
initial strain
BY
CHKD
PRA
ASK
2.29
0.000406
creep strain loss = (
=
=
II
12 Aug 16
2.50E+00
8.64E-05
8.64E-05
2.29 ) *
0.000406
-For G1/G5
on conservative side
-For G2/G3
Shrinkage Strain =
cd
=
t
=
age of concrete in days at time of considered ie 28th
ts
Age of concrete in days at beginning of drying shrinkage . Ie oth day .
ds
( 28, 14 ) =
(28.0 -
14.0)
(28.0 -
14.0) +
=
=
0.07
cd (28) =
cd (28) =
1.44E-05
0.07
day
28
14
0.04* sqrt (2503)
0.70
0.000294
ds ( 60,14 )
t
ds ( 60, 0 )
=
=
cd (60 , 0)
0.20
cd (60 , 0)
4.08E-05
Age of concrete in days at time considered ie
60
Day
0.20
x
0.70
Days
cd
Ca
CS
28
60
1.44E-05
4.89E-05
4.08E-05
5.90E-05
6.33E-05
9.98E-05
CS =
Total strain loss =
9.98E-05
6.33E-05
1.23E-04
Creep+shr Loss =
TOTAL LOSSES STAGE II
100.6 kn
101 kn
0.00029
3.65E-05
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
STAGE III LOSSES
Creep Loss
12 Aug 16
BY
CHKD
PRA
ASK
60d to 90d
During this period deck will be present throughout.
Stress level in cable
MIDSPAN :
=
P/As
=
=
9664.05
2516
Kn/m2
Pe / Zs
Md/Zs
11618.29
4470.21
Pe / Zs
Md/Zs
SUPPORT
=
=
=
P/As
7416.59 -
525.42 +
11017
Kn/m2
6767
Creep co- efficient
Kn/m2
Ave Stress=
where
4126.24
Considering a factor of 0.98 for losses during period
cc ( t )
ci ( t )
cc ( t )
Creep strain at time t > t0
ci ( t )
initial strain at loading
RH
=
=
Relative humidity expressed as percentage
50
%
100
%
Rho
h0
278.75
668.16
age of concrete in days at time considered =
t0
age of concrete in days at time of loading =
<
1500
25550
days
90
days
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
t- t0
25460
( 25550 , 90 )
0.9923
(25550 , 90 )
2.00
(90 , 60 ) =
1.98
initial strain
II
2.29E+00
5.89E-05
1.98 ) *
Ca
cd
CS
Total shrinkage strain
cd
Drying shrinkage strain
Ca
Autogenous shrinkage strain
Ca
75.0
Ca
cd
Kh
=
=
=
7.50E-05
cd ,
0.771
1.00E-06
kh
cd , = depending on grade and relative Humidity
fck
25
50
75
95
cd , =
cd , =
cd
650
Relative humidity ( %)
535
420
330
260
1.00E-06
0.771
6.50E-04
6.50E-04
CHKD
PRA
ASK
days
Shrinkage Strain =
CS
BY
0.000193
creep strain loss = (
=
12 Aug 16
0.0002
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
=
12 Aug 16
BY
CHKD
PRA
ASK
5.01E-04
Development of autogenous shrinkage with time can be taken as
Ca
( t )
Ca( 7 )
Ca( 28 )
Ca ( 60 )
Ca( 90 )
as (t) x
ca
4.10E-01
7.50E-05
6.52E-01
7.50E-05
7.87E-01
7.50E-05
8.49E-01
7.50E-05
3.07E-05
4.89E-05
5.90E-05
6.37E-05
Development of drying Shrinkage
age of concrete in days at time of considered ie 60th
ts
Age of concrete in days at beginning of drying shrinkage . Ie 14th day .
ds
( 60, 0 ) =
cd (60) =
(60.0 -
14.0)
(60.0 -
14.0) +
1.98E-01
1.98E-01
cd (60) = =
4.08E-05
age of concrete in days at time of considered ie 90th
ds ( 90, 0 )
2.90E-01
cd (90) =
2.90E-01
cd (90) =
5.97E-05
Shrinkage strain loss
Total strain loss
day
7.00E-01
cd
Ca
CS
60
90
4.08E-05
3.07E-05
5.97E-05
4.89E-05
7.15E-05
1.09E-04
1.09E-04
3.70E-05
0.000096
90
Days
60
0.04* sqrt (ho3)
7.00E-01
day
7.15E-05
2.94E-04
days
2.94E-04
14
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
Loss Creep+Shrinkage =
STAGE IV LOSSES
Creep Loss
BY
CHKD
PRA
ASK
79 kn
=
TOTAL LOSSES STAGE III
12 Aug 16
79 kn
90d to
During this period sidl will be present throughout.
Stress level in cable
MIDSPAN :
P/As
=
=
9664.05 -
SUPPORT
=
=
=
Ave Stress=
2516
Pe / Zs
11618.29 +
Pe / Zs
7416.59 -
Kn/m2
6767
Kn/m2
cc ( t )
ci ( t )
(25550 ,90 )
1.98
0.000193
4811.21
Md/Zs
+
4126.24 +
1.98E+00
0) *
0.0003836
Shrinkage Strain =
Ca
Ml/Zc
75.0
Ml/Zc
4251.64
Considering a factor of 0.94 for losses during period
creep strain loss =
Creep co- efficient
4470.21 +
525.42 +
11017
creep strain loss = (
Md/Zs
Kn/m2
P/As
initial strain
II
1.00E-06
0.0002
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
Ca
cd
Kh
12 Aug 16
BY
CHKD
PRA
ASK
7.50E-05
cd ,
kh
0.771
cd , = depending on grade and relative Humidity
fck
25
50
75
95
cd , =
535
420
330
260
420
cd , =
cd
Relative humidity ( %)
1.00E-06
0.771
4.20E-04
4.20E-04
3.24E-04
Development of autogenous shrinkage with time can be taken as
Ca
( t )
Ca( 7 )
Ca( 28 )
Ca ( 60 )
Ca( 90 )
as (t) x
ca
4.10E-01
7.50E-05
6.52E-01
7.50E-05
7.87E-01
7.50E-05
8.49E-01
7.50E-05
3.07E-05
4.89E-05
5.90E-05
6.37E-05
Development of drying Shrinkage
ds
age of concrete in days at time of considered ie 90th
ts
Age of concrete in days at beginning of drying shrinkage . Ie oth day .
( 90, 0 )
=
=
cd (90) = =
(90.0 -
14.0)
(90.0 -
14.0) +
day
90
0.04* sqrt (ho3)
2.90E-01
cd (90) =
2.90E-01
7.00E-01
5.97E-05
Days
cd
Ca
CS
90
5.97E-05
3.07E-05
9.04E-05
2.94E-04
14
898/S
R
0
DATE
SHEET
NOTE No.
PROJECT:
SUBJECT:
Metrolink Express for Gandhinagar and Ahmedabad (MEGA)
East west Corridor (reach 2)
Preliminary Design note for elevated Metro rail station structures
=
Total strain loss =
9.04E-05
0.00009
0.000474
Loss Creep+Shrinkage =
III
12 Aug 16
BY
CHKD
PRA
ASK
0.00E+00
388 kn
Total Relaxation Loss =
2.415 * 3%
Relaxation loss values shall be taken 3 times the 1000hour value .
for girder stage I+II
TOTAL LOSSES STAGE III
TOTAL LOSSES
=
TOTAL APPLIED PRESTRESS =
% LOSS
=
420 kn
808 kn
1577
5859
26.9
KN