0% found this document useful (0 votes)
137 views10 pages

2G Swap/3G/4G Installation Quality Control Check List

This document is a quality control checklist for a 2G swap, 3G, and 4G installation at site ID 0084. It contains sections to check the installation environment, equipment mounting, cabling, grounding, antenna installation, and labeling. Installers and CMPak representatives would use this checklist to ensure the installation meets specifications and identify any issues in different areas like cabling, grounding, or equipment mounting. Upon completion, vendor and CMPak representatives would sign off to confirm the quality control checks were performed.

Uploaded by

ursalibaba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
137 views10 pages

2G Swap/3G/4G Installation Quality Control Check List

This document is a quality control checklist for a 2G swap, 3G, and 4G installation at site ID 0084. It contains sections to check the installation environment, equipment mounting, cabling, grounding, antenna installation, and labeling. Installers and CMPak representatives would use this checklist to ensure the installation meets specifications and identify any issues in different areas like cabling, grounding, or equipment mounting. Upon completion, vendor and CMPak representatives would sign off to confirm the quality control checks were performed.

Uploaded by

ursalibaba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

2G Swap/3G/4G Installation Quality Control

Check List V1.0


Site ID 0084

By: Syed Khurram Iqbal

2G Swap/3G/4G INSTALLATION QUALITY CONTROL


CHECK LIST

DESIGN PARAMETERS
Vendor Representative Signatures & Date
CMPak Representative(s) Signatures & Date

2G Swap/3G/4G Installation Quality Control


Check List V1.0
Site ID 0084

Site ID

0084

OMO Name

Region

RT(Outdoor)

OPS

Sindh

Morphology

HSPA/ HSPA+

4G

Site Type

TXN Vendor

Huawei

67.0038

Latitude

Transmitter

Transmission Subnet IP Address

Height (m)

Transmission VLAN IDs

Azimuth ()

IUB throughput Mbps

Mechanical
DownTilt ()

Additional Electrical DownTilt ()

Configuration

URA

RNC Name/
BSC Name

RNC ID/ BSC ID

2G/3G/4G Cell ID

TAL/RAC

IBS

Cluster No.

Province

Longitude

Share

Plot No. L-S 30, Sector No. 13-D Orangi Town, Karachi

Karachi

City

Site Type

OMO ID

South

Address

By: Syed Khurram Iqbal

4G

24.95072

TAC/LAC

PCI/SAC

Note that above mentioned parameters should be completely filled before Site visit.

Zong 2G Swap/3G/4G Installation Quality Control Check List V1.0


CMPak HQ Team Visit
Vendor Representative Signatures & Date
CMPak Representative(s) Signatures & Date

2G Swap/3G/4G Installation Quality Control


Check List V1.0
Site ID 0084

Check date

No.

Checker
name

By: Syed Khurram Iqbal

Remarks

Installation Quality Check Criteria


Installation Environment.

1.01

The door, feeder window of shelter and cable-through


holes are sealed reliably.

1.02

Neatness and sundries including in the cabinet


(no dust on the cabinet felt by hand, no sundries).

2.01

Installation of BBU,RRU,LBBP

The brackets of RRUs on the tower mounted reliably


and fully with flat washer spring washer and twin nuts
orderly according to engineering design drawing.

Vendor Representative Signatures & Date


CMPak Representative(s) Signatures & Date

1. [Critical]: defects may cause security risks, short circuit/fire


hazard, falling objects, inclined equipment or building theft. The
equipment cannot be use normally, which leads to
dissatisfaction.[Major]: defects affect stable running, service life,
maintenance, specifications and appearance of the equipment..
[Minor]: Other small defects that affect. [QDR]: Quality Defect
Rate, calculated per site, region, vendor, etc.

Pass

Fail

N/A

Defect
Severity
Level
Critical,
Major,
Minor.

Remarks

2G Swap/3G/4G Installation Quality Control


Check List V1.0
Site ID 0084

2.02

Both end of jumper connected to RRU and antenna or


arrestor should be wrapped tightly with insulating tape
and waterproof adhesive tape as per related
engineering specification.

Cabling Test Cases

Vendor Representative Signatures & Date


CMPak Representative(s) Signatures & Date

By: Syed Khurram Iqbal

2G Swap/3G/4G Installation Quality Control


Check List V1.0
Site ID 0084

3.01

Check all OF/ RF cable physical connections correctly


from RRU to Antenna & BBU to RRU respectively.

3.02

The jumper keeps more than 300mm straight from the


joint between the jumper and antenna or RRU
firstly, then the jumper can be bended and tied.

Vendor Representative Signatures & Date


CMPak Representative(s) Signatures & Date

By: Syed Khurram Iqbal

2G Swap/3G/4G Installation Quality Control


Check List V1.0
Site ID 0084

3.03

The optical fiber/RF and DC cable on the ladder shall


be tied with clamps evenly and reliably in the same
direction. CPRI should be coiled properly.

Vendor Representative Signatures & Date


CMPak Representative(s) Signatures & Date

By: Syed Khurram Iqbal

2G Swap/3G/4G Installation Quality Control


Check List V1.0
Site ID 0084

3.04

Power cables for RRU connections are as per


standards and termination are on separate DC
breakersof proper rating. The rating of power cable
must be of proper rating as per design.

Grounding Test Cases

Vendor Representative Signatures & Date


CMPak Representative(s) Signatures & Date

By: Syed Khurram Iqbal

2G Swap/3G/4G Installation Quality Control


Check List V1.0
Site ID 0084

4.01

Each rack of equipment (BTS, Power, Battery, etc.)


must be connected reliably to grounding bar with
proper grounding cable.

Antenna Installation, Cabling, Grounding and weatherproofing.

Vendor Representative Signatures & Date


CMPak Representative(s) Signatures & Date

By: Syed Khurram Iqbal

2G Swap/3G/4G Installation Quality Control


Check List V1.0
Site ID 0084

5.01

Antenna type is as per the sites band plan. (Dual


band, Tri band, Tetra band)

5.02

Check the brackets of antenna on the tower should be


mounted reliably and fully with
flat washer, spring washer and twin nuts orderly
according to engineering design drawing.

Vendor Representative Signatures & Date


CMPak Representative(s) Signatures & Date

By: Syed Khurram Iqbal

2G Swap/3G/4G Installation Quality Control


Check List V1.0
Site ID 0084

5.03

6
6.01

7
7.01

7.02

By: Syed Khurram Iqbal

Check antenna Electrical & Mechanical tilts, Azimuth,


height are as per RNP design.

4G Board Installation Test Cases


Check the installation of E Node B/ Node B/ 2G site
boards meets the engineering LLD.
Labels and Assembly.
Power cables, grounding cables, OF, Patch Cords,
Feeders & Jumpers should be labeled at both ends.
These labels are pasted and marked neatly in the
same position closely to 20mm away from the cable
end.
The monitor equipment (the temperature and humidity
sensors, the smoke sensor, the infra-red sensor,
socket) and PVC channel is fixed firmly.

Vendor Representative Signatures & Date


CMPak Representative(s) Signatures & Date

NA

Not in scope of this


project

You might also like