2G Swap/3G/4G Installation Quality Control
Check List V1.0
Site ID 0084
By: Syed Khurram Iqbal
2G Swap/3G/4G INSTALLATION QUALITY CONTROL
CHECK LIST
DESIGN PARAMETERS
Vendor Representative Signatures & Date
CMPak Representative(s) Signatures & Date
2G Swap/3G/4G Installation Quality Control
Check List V1.0
Site ID 0084
Site ID
0084
OMO Name
Region
RT(Outdoor)
OPS
Sindh
Morphology
HSPA/ HSPA+
4G
Site Type
TXN Vendor
Huawei
67.0038
Latitude
Transmitter
Transmission Subnet IP Address
Height (m)
Transmission VLAN IDs
Azimuth ()
IUB throughput Mbps
Mechanical
DownTilt ()
Additional Electrical DownTilt ()
Configuration
URA
RNC Name/
BSC Name
RNC ID/ BSC ID
2G/3G/4G Cell ID
TAL/RAC
IBS
Cluster No.
Province
Longitude
Share
Plot No. L-S 30, Sector No. 13-D Orangi Town, Karachi
Karachi
City
Site Type
OMO ID
South
Address
By: Syed Khurram Iqbal
4G
24.95072
TAC/LAC
PCI/SAC
Note that above mentioned parameters should be completely filled before Site visit.
Zong 2G Swap/3G/4G Installation Quality Control Check List V1.0
CMPak HQ Team Visit
Vendor Representative Signatures & Date
CMPak Representative(s) Signatures & Date
2G Swap/3G/4G Installation Quality Control
Check List V1.0
Site ID 0084
Check date
No.
Checker
name
By: Syed Khurram Iqbal
Remarks
Installation Quality Check Criteria
Installation Environment.
1.01
The door, feeder window of shelter and cable-through
holes are sealed reliably.
1.02
Neatness and sundries including in the cabinet
(no dust on the cabinet felt by hand, no sundries).
2.01
Installation of BBU,RRU,LBBP
The brackets of RRUs on the tower mounted reliably
and fully with flat washer spring washer and twin nuts
orderly according to engineering design drawing.
Vendor Representative Signatures & Date
CMPak Representative(s) Signatures & Date
1. [Critical]: defects may cause security risks, short circuit/fire
hazard, falling objects, inclined equipment or building theft. The
equipment cannot be use normally, which leads to
dissatisfaction.[Major]: defects affect stable running, service life,
maintenance, specifications and appearance of the equipment..
[Minor]: Other small defects that affect. [QDR]: Quality Defect
Rate, calculated per site, region, vendor, etc.
Pass
Fail
N/A
Defect
Severity
Level
Critical,
Major,
Minor.
Remarks
2G Swap/3G/4G Installation Quality Control
Check List V1.0
Site ID 0084
2.02
Both end of jumper connected to RRU and antenna or
arrestor should be wrapped tightly with insulating tape
and waterproof adhesive tape as per related
engineering specification.
Cabling Test Cases
Vendor Representative Signatures & Date
CMPak Representative(s) Signatures & Date
By: Syed Khurram Iqbal
2G Swap/3G/4G Installation Quality Control
Check List V1.0
Site ID 0084
3.01
Check all OF/ RF cable physical connections correctly
from RRU to Antenna & BBU to RRU respectively.
3.02
The jumper keeps more than 300mm straight from the
joint between the jumper and antenna or RRU
firstly, then the jumper can be bended and tied.
Vendor Representative Signatures & Date
CMPak Representative(s) Signatures & Date
By: Syed Khurram Iqbal
2G Swap/3G/4G Installation Quality Control
Check List V1.0
Site ID 0084
3.03
The optical fiber/RF and DC cable on the ladder shall
be tied with clamps evenly and reliably in the same
direction. CPRI should be coiled properly.
Vendor Representative Signatures & Date
CMPak Representative(s) Signatures & Date
By: Syed Khurram Iqbal
2G Swap/3G/4G Installation Quality Control
Check List V1.0
Site ID 0084
3.04
Power cables for RRU connections are as per
standards and termination are on separate DC
breakersof proper rating. The rating of power cable
must be of proper rating as per design.
Grounding Test Cases
Vendor Representative Signatures & Date
CMPak Representative(s) Signatures & Date
By: Syed Khurram Iqbal
2G Swap/3G/4G Installation Quality Control
Check List V1.0
Site ID 0084
4.01
Each rack of equipment (BTS, Power, Battery, etc.)
must be connected reliably to grounding bar with
proper grounding cable.
Antenna Installation, Cabling, Grounding and weatherproofing.
Vendor Representative Signatures & Date
CMPak Representative(s) Signatures & Date
By: Syed Khurram Iqbal
2G Swap/3G/4G Installation Quality Control
Check List V1.0
Site ID 0084
5.01
Antenna type is as per the sites band plan. (Dual
band, Tri band, Tetra band)
5.02
Check the brackets of antenna on the tower should be
mounted reliably and fully with
flat washer, spring washer and twin nuts orderly
according to engineering design drawing.
Vendor Representative Signatures & Date
CMPak Representative(s) Signatures & Date
By: Syed Khurram Iqbal
2G Swap/3G/4G Installation Quality Control
Check List V1.0
Site ID 0084
5.03
6
6.01
7
7.01
7.02
By: Syed Khurram Iqbal
Check antenna Electrical & Mechanical tilts, Azimuth,
height are as per RNP design.
4G Board Installation Test Cases
Check the installation of E Node B/ Node B/ 2G site
boards meets the engineering LLD.
Labels and Assembly.
Power cables, grounding cables, OF, Patch Cords,
Feeders & Jumpers should be labeled at both ends.
These labels are pasted and marked neatly in the
same position closely to 20mm away from the cable
end.
The monitor equipment (the temperature and humidity
sensors, the smoke sensor, the infra-red sensor,
socket) and PVC channel is fixed firmly.
Vendor Representative Signatures & Date
CMPak Representative(s) Signatures & Date
NA
Not in scope of this
project