THE
GROUP
FICCI
Lessons Learned for India
Dr. Martin Stickel
The Fichtner Group
Established in 1922 and family-owned ever since
Germanys biggest independent engineering and
consultancy enterprise
More than 1800 employees worldwide
over 500 in our Home Office
Over 500 in India (Chennai, Mumbay, Delhi)
Project experience in 150 countries, over 1200 ongoing projects
650 of these in our Home Office
Total turnover of 196 million in 2009
Capital investment volume now under planning in the home office:
60 billion of which some 12 billion is in renewable energies
2
Worldwide Presence
We are represented in over 50 countries with subsidiaries and affiliates,
branches and project offices
3
Fichtner's Areas of Activity
Energy
Energy economics power plants renewables district heating
energy transmission and distribution I&C and power system technology
oil & gas energy management electric mobility
energy-purchasing portfolio management
Environment
Environmental management environmental technology
environmental information systems waste management
soil and water protection air pollution control
sustainable development emissions trading
Water & Infrastructure
Total water management drinking water supply and sanitation
surface and engineering structures traffic, transportation and civil engineering
mining and mineral economics integrated infrastructure concepts
Consulting & IT
Studies organization and strategy consultancy privatizations
project management financial modeling infrastructure management
IT consultancy and services geo-solutions
Total Turnover of Fichtner Group, 2009
By business sector
Energy
Environment
Water & Infrastructure
Consulting & IT
Total turnover 2009
By region
Germany
Europe and CIS
Africa
Middle East
Latin America
Asia, Australia
Total turnover 2009
5
109.5 m
23.4 m
29.0 m
33.7 m
195.6 m
68.9 m
32.7 m
27.5 m
27.1 m
7.2 m
32.2 m
195.6 m
Renewable Energy Technologies
Photovoltaic
Solarthermal power
Hydropower
Wind power
Geothermal power
Solid biomass
Sewage and landfill gas
Biogas
Biomass to Liquid (BtL)
Fuel Cells
Present PV Highlights
About 20 PV projects ongoing at present, mostly due diligence services on behalf
of financing institutions and investors as well as owners engineering services,
among others:
3 projects in Spain
>10 projects and project pipelines in Italy
1 project pipeline in the Czech Republic
1 project in Qatar (test facility for solar equipment)
4 projects in Bulgaria
1 project pipeline in Canada
2 projects in Peru
1 project in United Kingdom
1 project in Chad
1 project in Ukraine
1 project in Turkey
1 project in Thailand
1 project in India
Technology / reliability studies on behalf of reknown and innovative PV module
producers (thin film and crystalline)
In total above 500MW installed capacity, i.e. CAPEX >>1bn; inter alia Europe
largest PV plants (Rovigo >70WM, Montalto di Castro >80MW in total)
For research related fields long term colaboration with Centre for Solar Energy
and Hydrogen Research (ZSW) in Stuttgart.
PV Due Diligence Services Typical Project Structure
Investor
Lender
Loans
Developer
Insurance
company
Equity
Project
Rights
Policies
Solar Project
Special Purpose
Vehicle (SPV)
Power purchase
agreement
Operation
Contract
Management
O&M Contract
EPC Contract
Utility
Service
Company
EPC contractor(s)
Objectives:
8
Implementation of a long life power plants with high energy yield and availability
Proper and safe operation complying with the relevant requirements
Low cost, high return on investment
Due Diligence Services in PV Projects
Preliminary
DD
Yield
Projection
Full Due
Diligence
Construction
Monitoring
Verification of
Construction
Completion
Prov. & final
Acceptance
Operation
Phase
9
Phase I: Pre-Financial Close Due Diligence - I
1. Preliminary Due Diligence
Suitability of the key plant components (modules, inverters)
Rough verification of the plant key data (size of the site, installed capacity)
2. Yield Projection
Input
Irradiation data to be expected on site based on the best available sources
Site inclination
Project design (e.g. inclination and positioning of the modules, partial shading
Actual characteristics of the plant key components (including temperature behavior
of the modules, part load characteristics of inverters and transformers)
Output
Annual electricity production (MWh/a; kWh/kWp/a)
Probability cases (e.g. P50, P75, P90)
PV Performance Projection - Example
10
PV Performance Projection - Example
11
Due Diligence Services in PV Projects
Preliminary
DD
Yield
Projection
Full Due
Diligence
Construction
Monitoring
Verification of
Construction
Completion
Prov. & final
Acceptance
Operation
Phase
12
Phase I: Pre-Financial Close Due Diligence - II
3. Full Due Diligence
Suitability of site (site visit)
Technical concept
Plant layout
Key components
Grid connection
Civil works / structural verification
Security and surveillance
Project structure and obligations of project parties, project management
Contracts / project agreements (EPC Contract, component supply contracts, O&M
Contract)
Adequacy of the technical warranties and verification procedures e.g.
Guarantees of Contracts / liquidated damages provisions
Performance test, availability, technical characteristics
Project time schedule
Permits and licenses (status, constraints, etc.)
Technical input data for the financial model
CAPEX & OPEX / Capital replacement
Electricity yield
Due Diligence Services in PV Projects
Preliminary
DD
Yield
Projection
Full Due
Diligence
Phase II: Construction Monitoring
Construction monitoring (compliance with contract / specifications)
Compliance with project schedule
Review of EPC contractors / owners progress report
Site and workshop inspections
Preparation of monthly or quarterly progress reports and progress certificates
Phase III: Testing and completion (provisional and final acceptance)
Construction
Monitoring
Verification of
Construction
Completion
Review of commissioning and of trial operation
Attendance and monitoring of the performance and reliability tests
Review of performance test results in view of liquidated damages requests
PV plant installation and mounting inspections
Certification of completion
Phase IV: Monitoring during operation
Prov. & final
Acceptance
Operation
Phase
13
Preparation of (semi-) annual operating status reports including
operating performance (availability, power performance, energy yield)
maintenance and extraordinary events
O&M budget verification
Site Assessment
Source: Google Maps
14
Sensitivity of Direct Normal Irradiation
25%
Thin film
20%
Change of LEC
Monocrystalline
15%
Polycrystalline
10%
Parabolic trough
5%
0%
-5%
-10%
1,254
1,463
1,671
1,881
2,089
2,299
DNI [kWh/a]
15
2,508
2,716
2,926
Assessment of Costs
Example: Johannesburg, South Africa
0.25
LEC [/kWh]
/kWh]
0.20
0.15
fixed
1-axis
2-axis
0.10
0.05
0.00
Thin film
16
Poly- crystalline
Monocrystalline
Parabolic
trough
Summary
Industry
No better technology but project specific technology selection
Size, topography, irradiation (global / direct), Accessibility, grid condition
Feed-in tariffs
Relevance of dispatchability / storage
Sound engineering and design required for each project
Thorough project development and due diligence process
Bankable EPC and O&M Contracts
performance and plant acceptance criteria and procedures
liquidated damages and incentive schemes
Reliable Yield Forecasts
Framework
Reliability of framework is key is basis for planning
Tariffs, PPAs
Permitting
Project financing conditions
17
Selected References:
Photovoltaic Power Plants
Photovoltaic Power Plants (1/3)
Expert Appraisal of PV Park Yield, Italy
Independent Engineer for 21.8 MW PV Solar Power Plant, Srem, Bulgaria
Independent Engineer for a 2.5 MW Solar PV Power Plant in Pchelarovo, Bulgaria
Independent Engineer for a 3.8 MW Solar PV Power Plant in Kalipetrovo, Bulgaria
Independent Engineer for a 3.55 MW Solar PV Power Plant in Drachevo, Bulgaria
Technical Due Diligence for Energy 21 Project, Czech Republic
Technical Advisor for 5 PV Plants, Sicily, Italy
Technical Due Diligence for a 24 MW Photovoltaic Power Plant, Italy
Lenders Technical Advisor Services for Montalto Solar PV Power Plant, 9 MW, Italy
Lenders Technical Advisor Services for Montalto Solar PV Power Plant, 53
MW, Italy
Lenders Technical Advisor for 4 projects in Spain
19
Photovoltaic Power Plants (2/3)
Technical Advisor for Pipeline of Photovoltaic in Apulia, Italy
Consultancy Services for the implementation of a Solar Test Facility within the
area of Qatar Science & Technology Park, Qatar
Yield Projection for a Photovoltaic Project, Italy
Pre-feasibility Study for Solar Photovoltaic Power in Florida, USA
Due Diligence on behalf of Institutional Investor in the Czech Republic
Due Diligence for a 20 MW Plant on behalf of Financing Bank, Spain
Feasibility study for Photovoltaic Power Plants, Italy
Technical Advisory Services for a 10 MW Photovoltaic Power Plant, Italy
Due Diligence for a 5 MW Photovoltaic Power Project, Italy
Pre-Feasibility Study for a Photovoltaic Power Plant, Italy
Independent Engineering Services, Italy
Lenders Engineering Services for a 3 MW Photovoltaic Plant, Italy
20
Photovoltaic Power Plants (3/3)
Lenders Engineering Services for two 5 MWp Photovoltaic Power Plants, Italy
Independent Technical Advisor Services, Italy
Technical Advisor Services for 4 Photovoltaic Power Plants, Spain
Pre-Due Diligence Development of 20 MWp photovoltaic project, Spain
Consulting Services for an Investor
Preliminary Due Diligence for a PV Project, Italy
Preliminary Due Diligence for a PV Project, Italy
Independent Lenders Technical Advisor Services, Spain
21
Photovoltaic Power Plants
Expert Appraisal of PV Park Yield, Italy
An EPC Contractor intends to build a PV Plant in
Italy for which Fichtner prepares an expert appraisal
of electricity yield as an input parameter to the EPC
contract. In this context Fichtner:
checked the conceptual design data
verified the Clients assumptions for the yield
simulations (meteorological data, shading)
prepared a yield projections based on PVSYST
(version 5) simulations
including an analysis of uncertainties and the
calculation of probability cases (P50, P75 P90)
over different time periods.
22
Client:
Confidential
Period:
03.2010 05.2010
7489P01
Photovoltaic Power Plants
Independent Engineer for 21.8 MW PV
Solar Power Plant, Srem, Bulgaria
Fichtner prepares a fully-fledged technical due diligence
on behalf of the future lenders. Among others, Fichtner
performed the following tasks, which are reflected in the
technical due diligence report.
A visit of the project sponsors existing plants and
monitoring center in France
A verification of the suitability of the site and the
grid connection
Verification of the Srem plant concept and the
suitability of the plant key components
A verification of the sponsors operation and
maintenance activities
A detailed yield projection (PVSYST v.5)
simulation and comparison of the results with
sponsors own calculations, considering among
others Clients on-site meteorological
measurements
The verification of the main project contracts (EPC
Contract, O&M Contract, Grid Connection
Agreement)
Verification of the project time schedule
23
Client:
Electricit de France (via
Socit Industrielle de
lAntlantique, Bulgaria) on
behalf of IFC International
Finance Corp. Washington,
DC, USA
UniCredit, Munich,
Germany
Period:
03.2010 05.2010
7481S01
Photovoltaic Power Plants
Independent Engineer for a 2.5 MW Solar
PV Power Plant in Pchelarovo, Bulgaria
A private developer, owner and operator of solar power
plants assigned Fichtner with the independent
engineering service to the projects financing bank. The
related scope of work is performed in the following
phases:
1. Irradiation yield analysis
Estimation of irradiation and calculation of
performance ratio
2. Project analysis
Review of technical concept, O&M/EPC contract
and of permitting situation to ascertain whether the
project is bankable
3. Construction works monitoring
Monitoring of construction works in comparison with
the project schedule and of the compliance with key
purchasing agreements
4. Operation phase monitoring
Verification of the technical reporting
(production, availability) to the lenders
24
Client:
Confidential
Period:
03.2010 05.2010
7474S01
Photovoltaic Power Plants
Independent Engineer for a 3.8 MW Solar
PV Power Plant in Kalipetrovo, Bulgaria
A private developer, owner and operator of solar power
plants assigned Fichtner with the independent
engineering service to the projects financing bank. The
related scope of work is performed in the following
phases:
1. Irradiation yield analysis
Estimation of irradiation and calculation of
performance ratio
2. Project analysis
Review of technical concept, O&M/EPC contract
and of permitting situation to ascertain whether the
project is bankable
3. Construction works monitoring
Monitoring of construction works in comparison with
the project schedule and of the compliance with key
purchasing agreements
4. Operation phase monitoring
Verification of the technical reporting
(production, availability) to the lenders
25
Client:
Confidential
Period:
03.2010 05.2010
7474S02
Photovoltaic Power Plants
Independent Engineer for a 3.55 MW Solar
PV Power Plant in Drachevo, Bulgaria
A private developer, owner and operator of solar
power plants assigned Fichtner with the independent
engineering service to the projects financing bank.
The related scope of work is performed in the
following phases:
1. Irradiation yield analysis
Estimation of irradiation and calculation of
performance ratio
2. Project analysis
Review of technical concept, O&M/EPC
contract and of permitting situation to ascertain
whether the project is bankable
26
Client:
Confidential
Period:
01.2010 03.2010
7469P01
Photovoltaic Power Plants
Technical Due Diligence for Energy 21
Project, Czech Republic
An international investor is panning to invest in the solar
technology enterprise Energy 21. To check the
chances and risks of the investment, Fichtner has been
retained to conduct a technical due diligence analysis.
The company possesses an inventory of 15 to 20
photovoltaic plants with a total capacity rating or around
50-60 MW. The technical review focuses on the
services:
Technical evaluation of PV module design and
component selection
Verification of planned project pipeline
Evaluation of yield models
Project time tables and planning
Check of contracts: EPC, component supply and
O&M
Cost analysis
Client:
Confidential
Period:
01.2010 03.2010
Technical standards, environmental impact and
permit procedure
27
7463P01
Photovoltaic Power Plants
Technical Advisor for 5 PV
Plants, Sicily, Italy
A project developer is involved firstly as equity
investor and secondly as financial advisor and
mandated lead arranger in a range of photovoltaic
projects in Sicily of total rating around 33 MW.
Fichtner undertakes a due diligence review of these
as independent technical advisor. Services
cover, among others, evaluation of project
structure, suitability of site, energy yield
assessment, technical concept evaluation, contract
evaluation, adequacy of technical warranties and
verification procedures, permits and licenses, project
insurance, project management, and risk
management with project sensitivity analysis.
28
Client:
Commercial bank
Period:
01.2010 03.2011
6881P04
Photovoltaic Power Plants
Lenders Technical Advisor Services for
Montalto Solar PV Power Plant, 24 MW, Italy
Following financial close and start of
construction, Fichtner assists construction of
the 24 MWp tranche of Montalto Solar Farm
on behalf of the project developer and
financing banks. Through monthly site visits
and reviews of the construction site logs of
the contractors, construction progress is
documented. Upon ending
construction, Fichtner additionally supervises
the concluding functional and performance
trials during commissioning, and compiles the
results in a general report for the construction
phase.
29
Client:
SunRay Management
Ltd., London, United
Kingdom
Period:
10.2009 03.2010
7422P03
Photovoltaic Power Plants
Lenders Technical Advisor Services for
Montalto Solar PV Power Plant, 9 MW, Italy
The Client is developing a 9 MW single-tracked
photovoltaic solar park located at Lazio, Italy. Fichtner
was appointed as Independent Lenders Technical
Advisor (TA) for the services of:
Pre-Financial Close
Technical and environmental due diligence
investigation
Revision of technical aspects of the
construction, operations and maintenance of the
project including
Solar power production simulation
Review of the construction schedule and
identification of possible constraints
Review of and comments on project budget
Client:
Confidential
Period:
10.2009 07.2010
Review and provision of sensitivity analysis
30
7422P02
Photovoltaic Power Plants
Lenders Technical Advisor Services for
Montalto Solar PV Power Plant, 53 MW, Italy
The Client is developing a 53 MW single-tracked
photovoltaic solar park located at Lazio, Italy. Fichtner
was appointed as Independent Lenders Technical
Advisor (TA) for the services of:
Pre-Financial Close
Technical and environmental due diligence
investigation
Revision of technical aspects of the
construction, operations and maintenance of the
project including
Solar power production simulation
Review of the construction schedule and
identification of possible constraints
Review of and comments on project budget
Client:
Confidential
Period:
10.2009 05.2010
Review and provision of sensitivity analysis
31
7422P03
Photovoltaic Power Plants
Lenders Technical Advisor for 4 projects in
Spain
On behalf of the financing bank, Fichtner has been
involved in the pre-financial close as well as
construction phase of four photovoltaic solar power
plants on Mallorca/Spain, with fix installed PV power
plant with a total installed capacity of 8.3 MW.
Pre-financial close services
Technical and environmental due diligence
Review of technical opportunities and
risks
Investigation and description of planned
operating regime and costs
Construction monitoring on behalf of financing
bank
Client:
Commercial bank
Period:
2008 ongoing
Verification of operational data in first years of
commercial operation
32
7421A01
Photovoltaic Power Plants
Technical Advisor for Pipeline of
Photovoltaic in Apulia, Italy
The Client is interested in the development and
investment of a portfolio of PV projects with two
different Project Developers at Puglia, Italy with a
maximum installed capacity of around 7 MW.
Fichtner was appointed as Owners Technical
Advisor (TA) for the services of:
Technical and environmental due diligence
investigation
Site assessment for suitability for the PV plants
and identification of any constraints
Revision of technical aspects of the
construction, operations and maintenance of
the project including
Solar Production Due Diligence review
Revision of input and assumptions of the
financial model
Client:
Confidential
Period:
10.2009 11.2009
Assist the Client in technical matters
33
7423A01
Photovoltaic Power Plants
Consultancy Services for the implementation of a
Solar Test Facility within the area of Qatar Science
& Technology Park, Qatar
Qatar Science & Technology Park (QSTP), located in
Qatar Foundations Education City. Alongside campuses
of several leading universities it is planned to build within
the area of the QSTP a demonstration and test facility
for solar technology in Qatar. The area will have approx.
4 hectares. Green Gulf as the representative of this
project engages Fichtner as the technical advisor of this
project covering:
Performance of shading analysis for several
different sites within QSTP and elaboration of site
assessment report
Detail comparison of different solar technologies in
photovoltaics, low temperature solar thermal
sector
Elaboration of the test facility master plan
including conceptual layout, infrastructure
planning, definition of media and energy supply
requirements
Development of project implementation plan
34
Client:
Green Gulf, Qatar
Period:
09.2009 05.2010
7421A01
Photovoltaic Power Plants
Yield Projection for a Photovoltaic
Project, Italy
In Apulia, DEE is developing the Torre Santa
Susanna Photovoltaic Project. Based on the
conceptual design Fichtner
checked the conceptual design data
verified the Clients assumptions for the yield
simulations (predominantly meteorological
data)
prepared a yield projection based on PVSYST
(version 5) simulations
including an analysis of uncertainties and the
calculation of probability cases
(P50, P75, P90) over different time periods
35
Client:
DEE Deutsche
Erneuerbare Energien
GmbH, Dsseldorf,
Germany
Period:
09.2009 10.2009
7420S01
Photovoltaic Power Plants
Pre-feasibility Study for Solar Photovoltaic
Power in Florida, USA
Fichtner provided assistance in selecting the
technology for generating electricity from solar
energy. In this connection, various candidate
locations in the State of Florida, USA, are
investigated and a pre-feasibility study is
prepared, which covers among others:
Verification of site suitability
Technological and commercial evaluation of
different plant concepts, such as:
- poly-, mono-crystalline, thin film modules
Client:
Confidential
Period:
08.2009 11.2009
- tracked systems vs. fix installation
Preparation of cash-flow model and calculation
of key financial parameters
36
7404P01
Photovoltaic Power Plants
Due Diligence on behalf of Institutional
Investor in the Czech Republic
Fichtner has been appointed to perform technical
due diligence services on several existing PV power
plants (350 kW 1 MW, fix module installation) and
to assess future projects of a leading Czech project
developer on behalf of a potential institutional
investor. The services include:
Assessment of plant concepts
Site visits and assessment of plant realization
Verification of yield projections and
performance of PVSYS simulations
Client:
Confidential
Elaboration of recommendations for
improvements for future plants
Period:
since 03.2009
Verification of insurance policies
37
F. Solar
Photovoltaic Power Plants
Due Diligence for a 20 MW Plant on
behalf of Financing Bank, Spain
Fichtner has been appointed to conduct technical
due diligence investigations for a 20 MW
photovoltaic power plant (dual-axis tracking) project
in Spain.
The following services are carried out:
Assessment of plant concept
provided
Verification
of permitting
situation
The
services
included:
Assessment
Verification of of
yield
projections
potential
project sites
regarding
technical
suitability
a PV
Site
visit and
verification
of plantfor
realization
power plant
Assessment of mover structure
Verification of O&M concept and costs
Verification of insurance risk coverage
Client:
Confidential
Period:
since 02.2009
Verification of security and surveillance
concept
38
F. Solar
Photovoltaic Power Plants
Feasibility study for Photovoltaic Power
Plants, Italy
Fichtner was appointed to conduct initial
technical and financial due diligence
investigations as well as a prefeasibility study for
PV-projects in Southern Italy.
The provided services included:
Assessment of potential project sites
regarding technical suitability for a PV
power plant
Comparison of PV technologies and
sensitivity study of the electricity production
costs
Preparation of a summary of administrative
framework and required formal steps for
receiving the construction and operation
permits and licenses in Italy
Preparation of a flexible financial model
39
Client:
Confidential
Period:
06.2008 09.2008
5442P09
Photovoltaic Power Plant
Technical Advisory Services for a
10 MW Photovoltaic Power Plant, Italy
The Customer, a private investor, is in
process to acquire the property of two sets of
PV Plants each composed of 1 MWp units.
The current developer will be appointed as
EPC contractor as well as O&M contractor to
build and operate the plants.
The Customer, in agreement with the MLA,
appointed Fichtner as Technical Advisor for all
project phases:
Pre-financial closing
Construction
Operation
40
Client:
Confidential
Period:
since 04.2008
Fichtner Italia 093
Photovoltaic Power Plant
Due Diligence for a 5 MW Photovoltaic
Power Project, Italy
The client, an Investment Fund, is willing to
acquire PV Projects in the southern part of
Italy. The Projects are realized by the
Developer who will remain involved in the
Project as EPC Contractor.
Fichtner has been appointed to perform a
full Due Diligence of the Project to assess
the technical, contractual and authorizing
aspects prior to the completion of the
transaction.
41
Client:
Confidential
Period:
since 04.2008
Fichtner Italia 094
Photovoltaic Power Plant
Tracking modes
Pre-Feasibility Study for a Photovoltaic
Power Plant, Italy
Fixed orientation
Biaxial tracking
Photon 7/2004
The Customer owns two pieces of land
located in an industrial area for a total
available surface of 100 hectares.
Fichtner has been appointed to perform a
pre-feasibility study for a PV project
focusing on the plant concept, the preselection of the most suitable technologies
and configurations, the plant layout, the
production estimate, the authorization
processes and the preliminary business
model.
42
Single axis
tracking
- vertical -
- tilted -
Client:
Confidential
Period:
since 04.2008
- horizontal -
Fichtner Italia 092
Photovoltaic Power Plant
Independent Engineering Services, Italy
The client intends to act as major equity
investor for photovoltaic projects in Italy
and in other European Countries and is
in the process of defining the term
sheets for EPC and O&M framework
agreements with international suppliers.
Fichtner has been appointed with the
following services:
Provision of technical and
contractual support in the finalization
of a framework agreement
43
Client:
Confidential
Period:
since 01.2008
Fichtner Italia 086
Photovoltaic Power Plant
Lenders Engineering Services for a
3 MW Photovoltaic Plant, Italy
The client, the Italian subsidiary of an
international bank, is going to finance on a
non recourse basis a PV plant currently
being developed by a private investor.
Fichtner was awarded with the following
services:
pre-financial closing technical advisor
services
technical and contractual due
diligence including an independent
production estimate
monitoring of the construction and the
first two years of operation
44
Client:
Confidential
Period:
since 01.2008
Fichtner Italia 085
Photovoltaic Plant
Lenders Engineering Services for two
5 MWp Photovoltaic Power Plants, Italy
The Client, the Italian subsidiary of an
International Bank, is going to finance on a
non recourse basis a PV plant currently being
developed by a private investor.
Fichtner was awarded to perform the following
technical advisory services:
pre-financial close support
technical and contractual Due Diligence,
including an independent production
forecast
monitoring of the construction as well as
of the first year of operation.
45
Client:
Confidential
Period:
since 01.2008
Fichtner Italia 089
Photovoltaic Power Plant
Independent Technical Advisor
Services, Italy
Assessment of the PV modules supplier
and EPC contractor
An international bank is expected to act as
major equity investor in two photovoltaic
project portfolios (respective total output 40
and 20 MWp) currently under development
in Southern Italy. In view of the full
technical and environmental due diligence
of the 40 MWp project to be undertaken at
a later stage, Fichtner was awarded to
independently assess the bankability of the
proposed PV technology, panel suppliers
and EPC contractor.
46
Client:
Confidential
Period:
12.2007
Fichtner Italia 083
Photovoltaic Power Plant
Technical Advisor Services for
4 Photovoltaic Power Plants, Spain
Deutsche Bank AG is planning the
erection of four photovoltaic power
plants at four different sites in Spain.
Fichtners pre-financial close Lenders
Engineering services for the financing
bank include:
technical and environmental due
diligence
47
review of the technical concept and
risks
Client:
Deutsche Bank AG,
Franfurt, Germany
review of the plant project costs
with a special focus on O&M costs
Period:
08.2007 11.2007
6881S04
Photovoltaic Power Plant
Pre-Due Diligence Development of
20 MWp photovoltaic project, Spain
An international bank is interested in purchasing
a 20 MWp photovoltaic project in Spain. To
ensure an appropriate degree of security for this
purchase, an analysis with calculation of figures
is necessary with respect to:
check of location in view of the plants
technical requirements
check of technical concept for feasibility,
compliance with state of the art and
reasonableness of requirements
check of grid infeed conditions
evaluation of project risks under the
aspects of location, technical concept and
procurement, as well as the significance of
the recent royal decree 661/2007
48
Client:
Confidential
Period:
08.2007 09.2007
7077P02
Photovoltaic Power Plant
Consulting Services for an Investor
Fichtner consults an Investor with regard
to the readiness for the marketing of
concentrator photovoltaic technology.
49
Client:
Confidential
Period:
07.2007
6881S02
Photovoltaic Power Plant
Preliminary Due Diligence for a PV
Project, Italy
A major Italian group operating in the
energy sector is considering the acquisition
of shareholding interests in a photovoltaic
project being developed in a EU country. In
order to assess the feasibility of the
acquisition, the client has appointed
Fichtner to perform a preliminary analysis
of the project, including in particular the
assessment of the site layout and of its
expected production, of the different
technology options, of CAPEX and OPEX
estimates and of the potential risks.
50
Client:
Confidential
Period:
01.2007 02.2007
Fichtner Italia 068
Photovoltaic Power Plant
Preliminary Due Diligence for a PV
Project, Italy
The project developer, Aliwin Plus S.L., based in
Madrid/Spain, plans to erect a solar photovoltaic
power plant in Extremadura Province, SouthWestern Spain. The plant will have an electrical
generation capacity of 20 MW. The Lender's
Engineering services for the financing Deutsche
Bank AG, London, include the following for the
Pre-Financial Close phase:
technical and environmental due diligence
Client:
Aliwin Plus S.L., Spain
on behalf of
Deutsche Bank AG,
London, Great Britain
Period:
01.2007 10.2007
solar power simulation review
review of technical conditions and risks,
including time scheduling
check of and comment on project budget
51
6881A01
Photovoltaic Solar Energy
Independent Lenders Technical Advisor
Services, Spain
Erection of two Photovoltaic Power Plants on two
sites in Albacete-Province in South Eastern
Spain, of 15 MW and 5 MW. The lenders
engineering services include the following:
Phase I
technical and environmental due diligence
solar power output simulation review
review of technical conditions and risks,
including time scheduling
check of and comments on project budget
Phase II
tracking and monitoring construction
activities
tracking plant commissioning
reports on status of construction
certification of draw downs
Client:
Abastecimientos
Energeticos SL Madrid,
Spain
on behalf of
Deutsche Bank AG,
London, United Kingdom
Period:
05.2006 12.2008
52
7105S01
Standby Slides
Design Review
30 MWe Fresnel Solar Power Plant,
Puerto Errado II, Spain
The plant will have an installed capacity of 30 MWe.
A turnkey contractor has been appointed for detail
engineering, procurement, construction and
commissioning of the power plant. A design review
is conducted for all parts of the plant in order to
ensure a reliable and easily maintainable design.
Fichtner supports EBL during the design review in
the following areas:
Solar steam generation
Water-steam cycle including steam turbine
and generator
Client:
EBL, Liestal, Switzerland
Electrical equipment
Period:
05.2010 - 12.2010
Instrumentation and control
Project Data:
30 MWe Fresnel trough power
plant
Grid connection
Civil works.
54
7505A01
Feasibility Study
Jaisalmer 50 MWe Solar Power Plant,
India
In close collaboration with Fichtner India Pvt
Ltd, Fichtner Germany supported the
elaboration of a Feasibility study for a
50 MWe parabolic trough power plant to be
located in Jaisalmer, India.
Fichtners support included:
Solar resource assessment
Preliminary solar field and HTF system
design, including layout
Preliminary plant performance analysis
(annual electricity production)
Costs estimated of solar field together
with the heat transfer fluid system
Client:
Fichtner Consulting Engineers
India Private Limited, India
Period:
04.2010 06.2010
Project Data:
50 MWe parabolic trough
Recommendations for follow-up actions
55
5376A09
Conceptual Design, Tendering and Bid Evaluation
140 MWe ISCC Power Plant, Mathania,
India
The project is to be implemented by an EPC
Contractor who has to operate the plant for
an initial five year period. The Fichtner
services include:
Prepare the conceptual design
Validation of CO2 abatement
Request for pre-qualification
Request for proposal
Evaluation of EPC cum O&M bids
Client:
KfW, Frankfurt, Germany
Period:
11.1997 05.1998
Project data:
220,000 m parabolic collectors
field
140 MWe
56
4899S13
Feasibility Study
Solar Thermal Parabolic Through Power
Plant, Mathania, India
Fichtner prepared a feasibility study for the
first large scale solar power plant to be
erected in in the 140 MWe range:
Assessment of local constraints and
conditions
Comparison of power plant concepts
Optimization of solar plant and
Integrated Solar Combined Cycle (ISCC)
Client:
Rajasthan Energy
Development Agency, India
Drawing up heat balances
Period:
09.1995 03.1996
Estimate of capital costs
Project data:
140 MWe ISCC
Analysis of operating economics
220,000 m solar collector area
57
4899P11
Feasibility Study
Solar Thermal Power Plant (SOLIN-1), India
Fichtner prepared a feasibility study for the first large
scale solar power plant to be erected in India in the
30 - 80 MWe range.
This study covered
Investigation of the Indian power scenario
Evaluation of various potential sites
Selection of the most suited solar energy
technology
Optimization of plant parameters
Performance evaluation
Investigation of potential suppliers
Client:
Ministry of Energy New Dehli,
India
Period:
08.1989 11.1990
Project Data:
30 80 MWe
Cost estimate
Determination of ecological benefits
Determination of organizational concepts
Devising a strategy to introduce solar energy
on a large scale into the Indian power scenario
58
4899P03
Selected References:
Solar Thermal Power Plants
(India)
Solar Technologies - Overview
Solar Power
Plants
Solar Thermal
NonConcentrating
SolarChimney
Linear-focusing
(single axis)
Linear
Fresnel
Parabolic
Trough
Photovoltaic
(PV)
Point-focusing (dual
axias)
Central
Receiver
Dish
Concentrating
(CPV)
NonConcentr.
Concentration ratio and Temperature increasing
Thermal Energy Storage
Rankine Cycle (ST)
Wind
Turbine
Integrated Solar Combined Cycle
DC-AC Inverter
Brayton Cycle
Stirling
Engine
60
Electric Power
Solar Irradiation
Direct
on
no
rm
al
pl a
ne
Diffuse
Direct
Direct
Global = Diffuse + Direct
on horizontal plane
Different technologies use different type of irradiation.
61
Organisation Geschftsbereich G3
G3
Geschftsbereich
Erneuerbare Energien &
Umwelt
Roland Prger
G3
Geschftsbereich
G3 Geschftsbereich
Project Consultants
Sekretariat
Link
Seregly
Somdalen
G31
Projektbereich
G32
Projektbereich
Energiewirtschaft
Heinrich P.
(Dr. Stuible)
Umwelt- und Klimaschutz
Turek
Bohlmann
Fey
Finker
Gomez Mejia
Jahraus
Kohberg
Plasa
Rehrl
Schlegel
Schller
Ulrichs
Wlbeck
Basteck
Benz
Eckert
Fricke
Dr. Langni
llbrunner
Preu
Stumpp
Ullrich
Wssner
Fichtner MEI Oil & Gas GmbH
62
G3
Controlling
Janetzko, Bauer-Bidell,
Becker, Kauderer,
Rada, Striffler, Tipling,
G33
Projektbereich
G34
Studien
konomie
Linder
(Dr. Hnig)
Planung und
Ausfhrung
Bauteil
Planung und
Ausfhrung
Elektromechanik
Dr. Palt
(Dr. Schfer)
Siemer
(Dr. Trifkovic)
Hegetschweiler
(von Bueren)
Dr. Ayros
Dr. Gurmessa
Haug
Heider
Dr. Hildebrand
Dr. Kammerer
Dr. Peissner
Pfizenmaier
Dr. Rosier
Shresta
Thapa
Thvenaz
Vuckovic
Blling
Brggemann
Croissant
Fahrenbach
Dr. Hnisch
Osan
Schtz
Stangl
Tedla
Fr. Vuckovic
Brunner U.
Gantenbein
Guimond
Mancal
Yungi
Bro Lima
Borel
Heimel
Kantsperger,
Girmendonk, Harder, Selei
Projektbereich
Wasserkraft
konomie
Linder
Becker
Dr. Belova
Clausen
Dr. Horn
Horstmann
Dr. Hnig
Johnson
Dr. Korn
Mahler
Dr. Pintz
Rischawy
Dr. Unger
Geschftsbereich
Project
Assessment
Dr. Butler
Abfallwirtschaft
Bickel
Mettler
sterle
Dr. Obid
Vancini
Fuchs
G35
Projektbereich
Photovoltaik /
Solar Technologies
Dr. Stickel
Baumgartner
Capdevila
Becerra Cruz
Gudat
John
Kuhn
Lecoufle
Lemaitre
Meyer, T.
Fichtner Carbon Management
GmbH
Organisation Geschftsbereich G3
G3 Geschftsbereich
Erneuerbare Energien,
Umwelt
G3 Geschftsbereich
Project Consultants
G31
G32
Projektbereich
Energiesysteme
Energiemrkte
Frderung, Regulierung
Integrierte
Infrastrukturkonzept
Biomasse
Geothermie
Photovoltaik
Solarthermie
Windkraft
Fichtner MEI Oil & Gas GmbH
63
Projektbereich
G33
Umwelt- und Klimaschutz
Energiewirtschaft
Energiewirtschaft
Umwelt- und Klimaschutz
Nachhaltige Entwicklung
Genehmigungsmanagement
Umweltmanagement
Umweltvertrglichkeitsstudien
Emissionshandel, CDM, JI
CO2-Speicherung
Standorte, Trassen
Immissionsberechnungen
Raumplanung
Geoinformatik
Fichtner Carbon Management
GmbH
Projektbereich
Wasserkraft
Studien
Laufwasserkraftwerke
Speicherkraftwerke
Pumpspeicherkraftwerke
Hochdruckanlagen
Rehabiltierung, Modernisier
ung
Dmme, Talsperren
G3 Geschftsbereich
G3 Geschftsbereich
Sekretariat
Controlling
G34
Projektbereich
konomie
konomie
Tarife, Preismodelle
Restrukturierung/
Unbundling
Institutional Strengthening
Financial Modelling
Privatisierung, PPP
Abfallwirtschaft
Kommunalwirtschaft
Projektsteuerung
Risk Management
Projekt- und
Unternehmensbewertung,
Due Diligence
M&A
G35
Projektbereich
Photovoltaik /
Solar Technologies
Photovoltaik-Anlagen
PV-Zellen und PV-Modul
Technologien (kristallin,
Dnnschicht)
Freiflchen- / Aufdach- /
Gebudeintegrierte
Anlagen
Niedertemperatur
Solarthermie (Solares
Heizen und Khlen)
Due Diligence
Anlagenspezifikation / ausschreibung
Anlagenplanung
Ertragsprognosen
Anlagenabnahme (inkl.
Kennlinienmessung /
Verifizierung
Anlagenperformance)
Projektmanagement
Studien
Photovoltaic Power - Module Types
Mono-crystalline silicon: Most efficient technology (efficiencies of
around 18% (commercial) to 28% (research)
Multi-crystalline silicon: Cheaper than mono-crystalline silicon but also
less efficient. Research cells approach 24% efficiency, and commercial
modules approach around 16% efficiency.
Thin film:
Cheaper than crystalline silicon but less efficient.
Various materials (amorphous silicon, Cadmium Telluride, Copper
Indium Diselluride (CIS))
Selection of the technology depending on: site, irradiation, temperature, costs vs.
efficiency etc.
64
5994
PV: Crystalline vs. Thin-film Production Capacity
6500
5000
4500
4000
2536
3500
3000
1815
2500
152
20
202
27
288
29.4
390
37.6
1998
1999
2000
2001
720
127
18.8
1997
179
89
11.45
1996
100
79
13.3
1995
50
69
15.6
1994
750
60
16.9
1993
30
58
15.6
1992
42.2
55
18.3
1991
500
47
15.6
1000
560
1500
430
1256
2000
Data: Global Solar Cell Production:
1983-2000: Rumer, PSE
2001-2002: Strategies Unlimited (PV Systems Inc.)
2003-2007: Photon 3/2008
2008:
EuPD Research, 2009
2008
2007
2006
2005
2004
2003
2002
Source: ZSW Centre for Solar
Eneregy and Hydrogen Research
Baden-Wrttemberg
65
4297
global solar cell
production
thin-film technology
5500
1990
Global Solar Cell Production per year, Capacity, MWp
6000
Data: Thin-Film Technologie:
1990-2002: DLR, 2005
2003-2005: EPIA
2006-2007: Navigant Consultant Inc.
2008:
EuPD Research, 2009
PV: Projection of Module Production Capacity
35000
Recession
30000
Conservative
Accelerated
25000
MWp
20000
15000
10000
5000
66
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
Recession
675.3
1049.8
1407.7
1984.6
3073
5455.8
5214.1
5425.4
6207.7
11611
15569.5
Conservative
675.3
1049.8
1407.7
1984.6
3073
5455.8
5990.2
6808.1
8770.3
11731.9
15732.7
Accelerated
675.3
1049.8
1407.7
1984.6
3073
5455.8
6555.2
8507.2
12202.2
18718.2
28795.6
Source: Paula Mints, Navigant Consulting, Inc., 2009
Photovoltaic Power - Module Tracking
Fix, optimum tilt angle
Horizontal N-S axis
30 tilt axis
Vertical axis, module tilt 50
Biaxial tracking
67
Mean annual radiation gain in
Central Europe
0%
Mean annual radiation gain in
Southern Europe
0%
11.5%
17.4%
22.9%
29.8%
23.1%
29.6%
27.2%
34%
PV Grid Parity in Germany
68
Bundesverband Solarwirtschaft
Site impressions
69
70
71
72
73
74
75
For further information, please contact
Dr. Martin Stickel
Senior Manager
Photovoltaic / Solar Technologies
martin.stickel@fichtner.de
Tel.: +49-711-8995-684
Fichtner GmbH & Co. KG
www.fichtner.de