Construction Program

This project plan outlines the design and construction stages of a building project over 33 months. The design stage is scheduled to last 25 weeks and includes tasks such as developing concept designs, obtaining client feedback and legal approvals. The construction stage is scheduled to last 1 year and includes tasks such as site preparation, building the structure floor-by-floor, installing services and finishes, and completing landscaping and commissioning. The project involves building the structure up to 5 floors and a roof with tasks dependency and durations shown for each.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
286 views9 pages

Construction Program

This project plan outlines the design and construction stages of a building project over 33 months. The design stage is scheduled to last 25 weeks and includes tasks such as developing concept designs, obtaining client feedback and legal approvals. The construction stage is scheduled to last 1 year and includes tasks such as site preparation, building the structure floor-by-floor, installing services and finishes, and completing landscaping and commissioning. The project involves building the structure up to 5 floors and a roof with tasks dependency and durations shown for each.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

ID

WBS

Task Name

Duration

Start

Finish

Predecessors

2015
Qtr 1

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13

Design stage (approx 25 weeks)


Identifying client brief and strategic brief
Establishing client requirements
concept design and preparation of legal documents
Client review and feedback
developed design
Client review and feedback
Technical design
Client review and feedback and getting building
approvals
from
Invitation to
bid legal authorities
Tender closing date
Tender Evaluation
Negotiations
Issue of LOA

170 days
14 days
2 days
28 days
7 days
35 days
7 days
49 days
14 days
14 days
0 days
7 days
7 days
0 days

Mon 8/3/15
Mon 8/3/15
Fri 8/21/15
Tue 8/25/15
Fri 10/2/15
Fri 10/2/15
Fri 11/20/15
Fri 11/20/15
Fri 2/5/16
Thu 2/25/16
Tue 3/15/16
Wed 3/16/16
Fri 3/25/16
Mon 4/4/16

2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17

Construction Stage (to be ended in approx one year)


Mobilisation to site
setting out
site clearing
putting up temporary contractor and consultant
offices with of
preliminary
excavation
topsoil to services
reduce levels
compactng of soil and ABC Fill
laying reinforcement for columns and raft foundation
including
the basement
walls
and plant room
laying services
pipes and
conduits
Concreting of Raft Foundation including basement
walls,
room andfor
curing
21 days including lift
laying plant
reinforcement
both for
staircases
core
in
basement
Fixing of the temporary tower crane
laying of ground floor precast hollow core slab
laying of services pipes through hollow core slab
Concreting of both staircases including lift core to
ground
Ceiling, floor
Wall and Ground Finishes to client
specifications
in basement
Erecting of walls
and partitions including the gym
over
the
plant
room
for ground
floor over ground
laying of services
pipes
and conduits
floor walls

239 days
1 day
2 days
3 days
5 days
14 days
4 days
16 days
6 days
22 days
4 days
6 days
2 days
3 days
2 days
16 days
7 days
3 days

Wed 4/20/16
Wed 4/20/16
Thu 4/21/16
Mon 4/25/16
Thu 4/28/16
Thu 5/5/16
Thu 5/26/16
Wed 6/1/16
Thu 6/23/16
Fri 7/1/16
Tue 8/2/16
Mon 8/8/16
Tue 8/16/16
Thu 8/18/16
Mon 8/8/16
Wed 8/10/16
Wed 8/10/16
Fri 8/19/16

Project: PP2
Date: Thu 5/5/16

Mon 4/4/16
Thu 8/20/15
Mon 8/24/15 2
Thu 10/1/15 3
Mon 10/12/15 4
Thu 11/19/15 4
Mon 11/30/15 6
Thu 2/4/16 6
Wed 2/24/16 8
Tue 3/15/16 9
Tue 3/15/16 10
Thu 3/24/16 11
Mon 4/4/16 12
Mon 4/4/16 13
Tue 3/28/17
Wed 4/20/16 14FS+7 days
Fri 4/22/16 17
Wed 4/27/16 18
Wed 5/4/16 19
Wed 5/25/16 20
Tue 5/31/16 21
Wed 6/22/16 22
Thu 6/30/16 23
Mon 8/1/16 24
Fri 8/5/16 25
Mon 8/15/16 26
Wed 8/17/16 27,25
Mon 8/22/16 28
Tue 8/9/16 26
Wed 8/31/16 30
Thu 8/18/16 30
Tue 8/23/16 32

Task

Inactive Milestone

Finish-only

Split

Inactive Summary

External Tasks

Milestone

Manual Task

External Milestone

Summary

Duration-only

Progress

Project Summary

Manual Summary Rollup

Deadline

External Tasks

Manual Summary

External Milestone

Start-only
Page 1

Qtr 2

ID

WBS

Task Name

Duration

Start

Finish

Predecessors

2015
Qtr 1

34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66

2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50

Project: PP2
Date: Thu 5/5/16

laying of first floor precast hollow core slab including


for gym.
laying
of services pipes and conduits through first
floor hollow
core slab.for ground floor in both
laying
Reinforcement
staircases including
lift core including lift core to first
concreting
of both staircases
floor
erecting walls and partitions including the gym for
first
floorwall and ground finishes including services
Ceiling,
fittings
in services
ground floor
clientconduits
specifications
laying of
pipestoamd
over first floor
walls
laying Reinforcement for first floor both staircases
including
liftofcore
Concreting
both stiarcases including lift core to
second
floor
laying of second floor precast hollow core slab
including
for gym. pipes and conduits through second
laying of services
floor
hollow
slab. finishes including services
ceiling, wall core
and ground
fittings
in
first
floor
to partitions
client specifications.
erecting of walls and
for second floor.
laying of services pipes and conduits for second floor
walls.
Installation of 40Kva Generator and the water pumps
in pump
room for rain
harvesting
system
laying
reinforcement
forwater
second
floor both
staircases
including liftofcore
Concreting
both staricases including lift core to
third floor.
laying
of third floor hollow core precast slab.
laying of services pipes and conduits through third
floor hollow
slab finishes including services
ceiling,
wall core
and ground
fittings inthird
second
toand
client
specifications.
erecting
floorfloor
walls
partitions.
laying services pipes and conduits in third floor walls
laying of fourth floor hollow precast slab.
ceiling, wall and ground finishes including services
fittings
in services
third floorpipes
to client
laying of
and specifications.
conduits in fourth floor
hollow
core
precast
slab.
erecting of walls and partitions in fourth floor
laying services pipes and conduits in fourth floor
walls
laying reinforcement for both staircases including lift
core
for third
fourth floor
Concreting
offloor
bothand
staricases
including lift core to
fourth
and
fifth
floor.
laying of fifth floor hollow core precast slab.
laying of services pipes and conduits through fifth
floor
hollow
slab. finishes including services
ceiling,
wall core
and ground
fittings
to
client
specifications
in fourth floor.
erecting fifth floor walls.

2 days
3 days
4 days
2 days
7 days
16 days
3 days
4 days
2 days
2 days
3 days
16 days
6 days
3 days
14 days
4 days
2 days
2 days
3 days
16 days
6 days
3 days
2 days
16 days
3 days
6 days
3 days
8 days
5 days
2 days
3 days
16 days
6 days

Fri 8/19/16
Mon 8/22/16 32
Tue 8/23/16
Thu 8/25/16 34
Fri 8/26/16
Wed 8/31/16 35
Thu 9/1/16
Fri 9/2/16 36
Mon 9/5/16
Tue 9/13/16 37
Mon 9/5/16
Mon 9/26/16 37
Wed 9/14/16
Fri 9/16/16 38
Mon 9/19/16
Thu 9/22/16 40
Fri 9/23/16
Mon 9/26/16 41
Tue 9/27/16
Wed 9/28/16 42
Thu 9/29/16
Mon 10/3/16 43
Tue 9/27/16 Tue 10/18/16 42
Tue 10/4/16 Tue 10/11/16 44
Wed 10/12/16
Fri 10/14/16 46
Mon 10/17/16
Thu 11/3/16 47
Mon 10/17/16 Thu 10/20/16 47
Fri 10/21/16 Mon 10/24/16 49
Tue 10/25/16 Wed 10/26/16 50
Thu 10/27/16 Mon 10/31/16 51
Tue 11/1/16 Tue 11/22/16 52
Tue 11/1/16
Tue 11/8/16 52
Wed 11/9/16
Fri 11/11/16 54
Mon 11/14/16 Tue 11/15/16 55
Wed 11/16/16
Wed 12/7/16 56
Wed 11/16/16
Fri 11/18/16 56
Mon 11/21/16 Mon 11/28/16 58
Tue 11/29/16
Thu 12/1/16 59
Fri 12/2/16 Tue 12/13/16 60
Wed 12/14/16 Tue 12/20/16 61
Wed 12/21/16 Thu 12/22/16 62
Fri 12/23/16
Tue 1/3/17 63
Wed 1/4/17
Wed 1/25/17 64
Wed 1/4/17
Wed 1/11/17 64

Task

Inactive Milestone

Finish-only

Split

Inactive Summary

External Tasks

Milestone

Manual Task

External Milestone

Summary

Duration-only

Progress

Project Summary

Manual Summary Rollup

Deadline

External Tasks

Manual Summary

External Milestone

Start-only
Page 2

Qtr 2

ID

WBS

Task Name

Duration

Start

Finish

Predecessors

2015
Qtr 1

67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59
2.60
2.61
2.62
2.63
2.64
2.65
2.66

Project: PP2
Date: Thu 5/5/16

laying of services pipes and conduits through fifth


floor walls.
laying
of hollow core precast roof slab.
laying of services pipes and conduits through precast
hollow of
core
roof slab. for both staircases including
laying
reinforcement
lift
core in fifth
floor.stiarcases including lift core to roof
concreting
of both
floor.
ceiling, wall and ground finishes including services
fittings
in fifth floor.
waterproofing
in roof.
laying of solar panels system in roof and fixing to
grid.
fixing of air condtioning units and exhaust fans for
toilets
in building
laying of
reinforcement for overhead tank in roof.
concreting of overhead tank.
reinforcement for water sump including filter tank
near
basement
for rainwater
concreting
of watersump
andcollection
filter tank and filteration.
Landscaping and external works.
Testing and Commisioning of building
handover to client

3 days
2 days
3 days
4 days
2 days
16 days
3 days
5 days
15 days
4 days
1 day
4 days
2 days
20 days
8 days
0 days

Thu 1/12/17
Tue 1/17/17
Thu 1/19/17
Tue 1/24/17
Mon 1/30/17
Wed 2/1/17
Wed 2/1/17
Mon 2/6/17
Mon 2/13/17
Mon 2/13/17
Fri 2/17/17
Mon 2/13/17
Mon 2/20/17
Fri 2/17/17
Fri 3/17/17
Tue 3/28/17

Mon 1/16/17 66
Wed 1/18/17 67
Mon 1/23/17 68
Fri 1/27/17 69
Tue 1/31/17 70
Wed 2/22/17 71
Fri 2/3/17 71
Fri 2/10/17 73
Fri 3/3/17 74
Thu 2/16/17 74
Fri 2/17/17 76
Thu 2/16/17 74
Tue 2/21/17 77
Thu 3/16/17 78
Tue 3/28/17 80
Tue 3/28/17 81

Task

Inactive Milestone

Finish-only

Split

Inactive Summary

External Tasks

Milestone

Manual Task

External Milestone

Summary

Duration-only

Progress

Project Summary

Manual Summary Rollup

Deadline

External Tasks

Manual Summary

External Milestone

Start-only
Page 3

Qtr 2

2015

2016
Qtr 3

Qtr 4

Qtr 1

Qtr 2

20
Qtr 3

Qtr 4

Qtr 1

3/15

4/4

Project: PP2
Date: Thu 5/5/16

Task

Inactive Milestone

Finish-only

Split

Inactive Summary

External Tasks

Milestone

Manual Task

External Milestone

Summary

Duration-only

Progress

Project Summary

Manual Summary Rollup

Deadline

External Tasks

Manual Summary

External Milestone

Start-only
Page 4

Qtr 2

2015

2016
Qtr 3

Project: PP2
Date: Thu 5/5/16

Qtr 4

Qtr 1

Qtr 2

20
Qtr 3

Qtr 4

Qtr 1

Task

Inactive Milestone

Finish-only

Split

Inactive Summary

External Tasks

Milestone

Manual Task

External Milestone

Summary

Duration-only

Progress

Project Summary

Manual Summary Rollup

Deadline

External Tasks

Manual Summary

External Milestone

Start-only
Page 5

Qtr 2

2015

2016
Qtr 3

Qtr 4

Qtr 1

Qtr 2

20
Qtr 3

Qtr 4

Qtr 1

Qtr 2

3/28

Project: PP2
Date: Thu 5/5/16

Task

Inactive Milestone

Finish-only

Split

Inactive Summary

External Tasks

Milestone

Manual Task

External Milestone

Summary

Duration-only

Progress

Project Summary

Manual Summary Rollup

Deadline

External Tasks

Manual Summary

External Milestone

Start-only
Page 6

2017
Qtr 2

Project: PP2
Date: Thu 5/5/16

2018
Qtr 3

Qtr 4

Qtr 1

Qtr 2

Qtr 3

Qtr 4

Task

Inactive Milestone

Finish-only

Split

Inactive Summary

External Tasks

Milestone

Manual Task

External Milestone

Summary

Duration-only

Progress

Project Summary

Manual Summary Rollup

Deadline

External Tasks

Manual Summary

External Milestone

Start-only
Page 7

Qtr 1

2017
Qtr 2

Project: PP2
Date: Thu 5/5/16

2018
Qtr 3

Qtr 4

Qtr 1

Qtr 2

Qtr 3

Qtr 4

Task

Inactive Milestone

Finish-only

Split

Inactive Summary

External Tasks

Milestone

Manual Task

External Milestone

Summary

Duration-only

Progress

Project Summary

Manual Summary Rollup

Deadline

External Tasks

Manual Summary

External Milestone

Start-only
Page 8

Qtr 1

2017
Qtr 2

2018
Qtr 3

Qtr 4

Qtr 1

Qtr 2

Qtr 3

Qtr 4

3/28

Project: PP2
Date: Thu 5/5/16

Task

Inactive Milestone

Finish-only

Split

Inactive Summary

External Tasks

Milestone

Manual Task

External Milestone

Summary

Duration-only

Progress

Project Summary

Manual Summary Rollup

Deadline

External Tasks

Manual Summary

External Milestone

Start-only
Page 9