NO.
Open
Close
72 item
58 item
Pending
total
DESCRIPTION
LOCATION
STATUS
Boiler
Closed
Defect After Shutdown 17 January 2016
Lower Water wall Leakage
Dryer pipe IPB fasa RST not yet
install
IPB
Closed
Wrong address for pulverized
system between local and DCS
(CCB)
Coal Bunker
Closed
Thermocouple abnormal reading
(during turbine running 34 oC,
during turbine stop 22 oC)
Bearing No.2
PENDING
Major
Chlorination still not running
during unit firing ( cooling pipe
rectifier B leakage )
Chlorint Plant
Boiler Leakage Detector No. 27 is
Boiler electronic room
Abnormal
Abnormal function for Valve
Inerting system at Mill ( Display
DCS open but in local still
closed )
Mill
OPEN
Major
PENDING
Major
Closed
CCR
PENDING
Major
6 pcs Temperature gauge at
generator stator cooling water
pipe is abnormal
Generator
PENDING
Major
10
Indication APH A firing Alarm is
active during sinkron
APH A
OPEN
Major
11
Any leakage at pressure indicator
mixed bed entrance pipe
CPP Panel
PENDING
Major
Different reading for Voltage
output GT RST not balance
BFPT A&B
OPEN
Major
Flexible APH A bocor
APH A
Closed
14
Flexible Hot Air Ducting bocor
Mill C
Closed
15
Terminal Motor Sealing Air Fan B
terbakar
Sealing Air Fan B
Closed
16
Silica conten is high during
turbine rolling
Turbine
Info.
12
Any leakage oil at local control
panel in BFPT A&B
13
17
Abnormal feedwater flow
indication hunting from 570 t/h to
487 t/h
CCR
PENDING
Major
18
Abnormal sealing CEP B
CEP
Closed
19
Different reading between local
and DCS at drain valve WCT to
drain Flash tank (CV)
Boiler
PENDING
Major
20
Coal mill sequence start is
operate by manual
Coal mill
OPEN
Major
21
Turning Gear is operate by
manual
Turbine
OPEN
Major
22
coal bunker level different value
between CCR and CHCB
Coal Bunker
Closed
23
BFPT B vibration is high
BFPT B
OPEN
Major
24
EH oil pipe leakage indication and
no PT after repair
Turbine
Closed
25
BCU module related generator
current metering for relay room
relay room
Closed
26
Module dry temperature dry
excitation need to be change
Generator Exciter
Closed
27
ESP heater problem (8 pcs)
ESP heater
PENDING
Major
28
Flow meter at mix bed #3
reading error )
CPP
PENDING
Minor
29
Water flooding on the floor due to
CPP backwash
CPP
Closed
30
Condensor rubber cleaning is not
ready
condenser
Closed
31
CPP online monitoring is not
ready
CPP
OPEN
Major
32
Steam and water sampling rack
on line monitoring not ready
sampling rack
OPEN
Major
33
Stacker reaclaimer function test
is not ready
stacker recalimer
OPEN
Major
34
Dust suppresion is not ready
dust suppresion
Pending
Major
35
Dust collector is not ready
dust collector
PENDING
Major
36
Condenser leakage detector is
not ready
condenser
OPEN
Major
37
Generator metal temperature
detector no.29 & 79 has wrong
indicate
Generator
Pending
Major
38
Insulation and cladding damage
various location
PENDING
Major
39
Stacker reclaimer is not ready
coal yard
Pending
Major
40
Coaly waste water is not ready
during coal firing
coal yard
Closed
CCR
OPEN
Major
Defect After Shutdown 14 Maret 2016
41
Abnormally of platen super
heater temp no.12 and 13
42
Flow indicator for cooling water
BFPT A has leakage
Turbine
Closed
43
Any leakage on MOV OCCW
outlet HE A
Turbine
Closed
44
Generator cooling water has
leakage (generator floor)
Turbine
Closed
45
1 pcs TI and PI for nitrogen filling
line on GSCW has damage
Turbine
OPEN
Major
46
1 pcs PS on Behind of HP turbine
has disconneted.
Turbine
OPEN
Major
47
Laying power cable on dangerous
area with improper condition
(without tray and lake)
Coal Feeder
Closed
48
Cleaning mill area after coal drain
Mill
Info.
49
Flow indication of coal feeder (AF) has been inaccurate
Coal feeder
OPEN
Major
50
Abnormal reading for
Thermocouple Inlet #6 HP Heater
51
Monitor for TDM can't Operate
and any alarm for LAN
(PWR8000)
52
Temperature bearing 2 is high
and the return indicate ambient
temperature
Turbine
Closed
Turbine Electronic
Room
Pending
Major
Turbine
Pending
Major
53
Alarm indication (dishcarge valve
fault) for debris filter B control
panel
Turbine Electronic
Room
OPEN
Major
54
Overflow during flushing
condensate water tank
Condensate water
tank
OPEN
Minor
55
Flexible ducting PA Hot air is
leakage
56
Oil leakage for pressure gauge
10HJF11CP501
57
Mill C
Closed
Boiler fuel oil
burner C
OPEN
Major
High vibration BFPT A & B (72.78
um & 79.77um)
BFPT A
OPEN
Major
58
disconnecting cable for
temperature instrument on
hydraulic oil mill E
Turbine
Closed
59
recycle condensate water system
valve improper work
Turbine
OPEN
Major
60
Vibration Y dan absolut turbine
bearing no. 1 has bad point
Turbine
OPEN
Major
61
broken module coal feeder F
Coal Mill
OPEN
Major
62
leakage on coal pipe no. 5 Mill E
Coal Mill
Closed
63
broken bypass gland seal steam
valve (10MAW03AA101)
Turbine
Closed
64
leakage instrument pipe
CWP
Closed
65
HP heater level 7 & 8 has error
and bad point
66
Turbine
Closed
UAT
OPEN
Major
CTP
OPEN
Minor
Fan UAT #A no.7 dan no.9 can't operate.
67
Leakthrough Make Up LCV
Condensate Strorage Tank from
Demin Tank
68
Capasitor cooling for AVR has
broken
Turbine house
Closed
69
Leakage on fuel oil connection
pipe of PI burner B
Boiler
OPEN
Major
70
burning local control box for
power lube oil pump FDF A.
Boiler
Closed
71
Motor Bearing Temp 2 RTD
(10HFW12CT107) for SAF B is
abnormal
Boiler
OPEN
Major
72
Any Leakage for hydraulic Mill D
Mill
OPEN
Major
73
Alarm indication for Rubber ball B
control panel
Turbine house
OPEN
Major
74
Any Leakage for MOV Deaerator
(10LBG21AA003)
Turbine house
Closed
75
Cable for solenoid supply notyet
connected for air cannon bunker
Mill
Closed
76
Hanger for emergency drain pipe
HP heater 8 to condenser drain
flash tank B is broken
Turbine house
Closed
77
Water leakage in line pressure
gauge (00GBB15CP522)
Desalination
Closed
78
Water leakage at strainer Booster
pump BFPT A
Turbine house
Closed
79
Pressure gauge cover broken on
start up drain water pump B
Boiler
Closed
80
indication fault for Modbus ESP B
ESP
OPEN
Major
81
Generator metal (generator
winding stator) temp no. 6 & 75
is abnormal
Turbine house
Closed
82
Indication fault for MOV
10HHL20AA003
Boiler
OPEN
Major
83
Indication abnormal for Coal flow
- coal feeder B
Mill
Closed
84
Temperature thrust bearing is
abnormal (29 C) during
operation
Turbine house
OPEN
Major
85
Any Leakage in supply sootblower
ke APH
86
Water leakage on joint for spray
pyrite removal system
87
leakthrough shutoff and control
valve(FCV and TCV) of hot air and
cold air. (on CCR indicate any
pressure in mill E air line, outlet
mill, and sealing air)
88
seal cooling water start-up drain
pump boiler has leakage.
89
condenser leakage detector
indicate 680s/cm but at HMI
99s/cm
Boiler
Closed
Mill ACD
Closed
Mill
Closed
Boiler
Closed
Turbine
OPEN
Major
90
leakage on flange orifice outlet
booster pump B
Turbine
Closed
91
Bearing for Booster Pump MBFP
damage
Trubine
OPEN
Major
92
high vibration for Mill A during
operation and leakage on ducting
near hydraulic.
Mill
OPEN
Major
93
Fire figting must be have stand
by pressure and proper function.
whole area
OPEN
Major
94
leakage on hydraulic for ACSR
(air cooled slag conveyor)
Boiler
Closed
95
abnormal indicate for generator
winding no.41, and 15 (101 C
and 0 C)
96
Turbine house
Closed
leakthrough for drain inlet
economizer. (manual valve)
boiler
Closed
97
lamp off for boiler elv 48 up to 60
meters.
Boiler
OPEN
Minor
98
leakage inlet pump booster MBFP
(flange)
Turbine house
Closed
99
leakage on pipe air heater
aeration blower.
ESP
Closed
100
pressure switch control cable not
connected
ESP
Pending
Major
101
Block on ash convey pipe
ESP
closed
102
Seawater filter disc A&B has
leakage
sea water pump
OPEN
Major
103
differen indication of bag filter
bottom ash silo motor at DCS
(unrunning) and at the local
running.
Bottom ash
OPEN
Minor
104
leakage on the flow transmitter
spray water tube of PSH A
Boiler
OPEN
Major
105
broken manual drain valve of
bottom ash silo
Bottom ash
Closed
106
Broken of inlet valve from service
water to mixer conditioning
Fly ash silo
Closed
107
Temperature bearing crusher B
was high. (front motor)
Cruhser house
OPEN
Major
108
outer bafle plank was damaged
on welding koint.
Slag Conveyor
OPEN
Major
109
Expansion Indicator of Boiler
damaged in 4 area, Eco Tube Left
Side
Eco Hopper 1 (most east/left)
Eco Hopper 4
Eco Hopper 5
Boiler
Closed
110
MCB power CPU DCS can't
energized
111
Based on oil analyzer, water
containt in oil to high. Result from
oil testing ISO VG 320, normaly
must be ISO VG1000
112
Leaks Out in Outlet valve
feedwater pump to steam drum
auxiliary boiler
113
MOV dosing chlorine fault
114
Check valve sewage pump t3
broken, sewage pool flooded
Boiler electronic room
Closed
boiler
Pending
Major
Auxiliary Boiler Area
Closed
chlorine
OPEN
Major
sewage pump
Pending
Minor
115
Forced start mill F, A and E
without permissive work.
Boiler
Closed
116
BC 5 Trip, but crusher still running
BC 5
OPEN
Major
117
STRE cannot leaving down
STRE
OPEN
Minor
118
Terjadi kebocoran di tubing
transmitter 10LBG620F101A
Turbine
Closed
119
Power supply phasa T for
lubricating oil PAF A high, into
101 C
Boiler
Closed
120
Leaks out coal pipe mill F
Mill F
Closed
121
Leaks out in line inlet floculation
Basin Unit 2
BOP
Closed
122
Leaks Out in manual valve spray
water BFPT A
BFPTA
OPEN
Major
123
Hydrolik luffing stre leak
STRE
OPEN
Major
124
Filter Scan Air Fan A dirty
Boiler
OPEN
Major
125
Dissolve Oxigen (DO) in outlet
CEP increase in to 425ppb
CEP
Info.
During shutdown
rubber lining for seawater steel
pipe (outlet condenser and outlet
CW pump)
solenoide valve for air drive air
preheater
vibration bearing alarm for
turbine bearing no.9.
check some valve which have
toruble (between IP and
Nanchang)
Hanger and shock damper of
coald reheat pipe has drop down.
Closed
Boiler
Open
Major
Turbine
Open
Major
Boiler and Turbine
Open
Major
Boiler
Open
Major
MONITORING DEFECT DURING S
19 item
130 item
DATE
DECIPLINE
17-Jan-16
17-Jan-16
18-Jan-16
25-Jan-16
I&C
REFERENCE
25-Jan-16
25-Jan-16
26-Jan-16
I&C
I&C
26-Jan-16
ELE
25-Jan-16
I&C
26-Jan-16
I&C
25-Jan-16
I&C
25-Jan-16
26-Jan-16
27-Jan-16
27-Jan-16
I&C
12-Jan-16
I&C
19-Jan-16
21-Jan-16
I&C
26-Jan-16
I&C
27-Jan-16
ELE
26-Jan-16
I&C
26-Jan-16
I&C
14-Jan-16
ELE
ELE
I&C
I&C
I&C
I&C
MEKANIK & IC
MEKANIK & IC
MEKANIK & IC
I&C
I&C
MEKANIK
MEKANIK
I&C
Mek
I&C
I&C
SAFETY
I&C
I&C
4-Mar-16
I&C
4-Mar-16
I&C
4-Mar-16
I&C
5-Mar-16
MEKANIK
26
5-Mar-16
MEKANIK
6-Mar-16
I&C
6-Mar-16
I&C
19-Feb-16
I&C
19-Feb-16
I&C
8-Mar-16
I&C
6-Mar-16
5-Mar-16
MEKANIK
1-Mar-16
I&C
1-Mar-16
I&C
4-Mar-16
I&C
4-Mar-16
ELE
4-Mar-16
MEKANIK
6-Mar-16
ELE
8-Mar-16
I&C
10-Mar-16
ELE
7-Mar-16
I&C
7-Mar-16
MEKANIK
7-Mar-16
MEKANIK
7-Mar-16
MEKANIK
7-Mar-16
I&C
7-Mar-16
MEKANIK
8-Mar-16
I&C
8-Mar-16
MEKANIK
8-Mar-16
MEKANIK
9-Mar-16
ELE
9-Mar-16
I&C
9-Mar-16
I&C
9-Mar-16
I&C
9-Mar-16
I&C
11-Mar-16
MEKANIK
11-Mar-16
MEKANIK
13-Mar-16
MEKANIK & IC
11-Mar-16
MEKANIK
13-Mar-16
I&C
9-Mar-16
I&C
4-Mar-16
I&C
4-Mar-16
I&C
1-Mar-16
SAFETY
4-Mar-16
MEKANIK
13-Mar-16
I&C
13-Mar-16
MEKANIK
9-Mar-16
ELE
11-Mar-16
MEKANIK
MEKANIK
I&C
MEKANIK
I&C
MEKANIK
MEKANIK
MEKANIK
I&C
15-Mar-16
MEKANIK
15-Mar-16
MEKANIK
1 Pebruari 2016
ELE
26/02/16
MEKANIK
05 Maret 2016
MEKANIK
07 Maret 2016
I&C
08 Maret 2016
MEKANIK
09 Maret 2016
COMM
09 Maret 2016
COMM
09 Maret 2016
MEKANIK]
09 Maret 2016
I&C
10 Maret 2016
ELE
10 Maret 2016
MEKANIK
11 Maret 2016
MEKANIK
11 Maret 2016
MEKANIK
12 Maret 2016
MEKANIK
12 Maret 2016
ELE
13 Maret 2016
I&C
MECH
I&C & MECH
I&C
I&C
Mech
MONITORING DEFECT DURING SYNCHRONE
PLANT & ACTION
RECOMMENDATION
closed
closed
closed
CNTIC is requested to submit
manual or data sheet for TC
equipement
CNTIC IMPROVEMENT
CNTIC is requested to running the
chlorine plant B
CNTIC is requested to check the
boiler pipe and answer letter from
PLN regarding problem solving and
root cause analysis.
COMMISIONING
CNTIC IMPROVEMENT
closed
CNTIC should identify and may
repair the PT.
INSPECTION
CNTIC is requested to repair or
replace
CNTIC IMPROVEMENT
CNTIC is requested to repair or
replace
CNTIC IMPROVEMENT
CNTIC is requested to repair or
replace
CNTIC IMPROVEMENT
CNTIC is requested to repair and
CNTIC IMPROVEMENT
closed
closed
closed
CNTIC will follow the procedure
054. PLN will not give permit to
CNTIC if Silica content is still high.
CNTIC IMPROVEMENT
- CNTIC should check or repair. And
conduct loop test.
- CNTIC is requested to fixed this
matters.
CNTIC IMPROVEMENT
closed
CNTIC is requested to repair or
replace.
CNTIC IMPROVEMENT
waiting the confirmation
COMMISIONING
CNTIC should cheack and repair.
And perform the function test.
COMMISIONING
closed
CNTIC is requested to check,
submit RFCA and conduct
inspection with PLN.
COMMISIONING
closed
closed
CNTIC is requested to Check
together
closed
CNTIC should confirm to
commisioning team
COMMISIONING
CNTIC is requested to perform
measure point.
CNTIC IMPROVEMENT
closed
closed
CNTIC is requested to repair or
replace. And put into operation for
next start-up
CNTIC IMPROVEMENT
CNTIC is requested to repair or
replace. And put into operation for
next start-up
CNTIC IMPROVEMENT
CNTIC should perform the test
COMMISIONING
CNTIC should perform the test
COMMISIONING
CNTIC should perform the test
COMMISIONING
CNTIC is requested to repair and
put into operation with proper
fucntion before next running startup
CNTIC IMPROVEMENT
CNTIC need discuss with PLN
CNTIC IMPROVEMENT
CNITC is requested tio finished
remaing work clading .
CNTIC is requeste to perform
slewing and lufing immediately.
CNTIC IMPROVEMENT
COMMISIONING
closed
CNTIC is requested to repair or
replace
CNTIC IMPROVEMENT
CNTIC is requested to repair
DURING RUNNING
closed
closed
CNTIC should replace
CNTIC IMPROVEMENT
CNTIC id requested to measure
point.
COMMISIONING
closed
on progress, masih menunggu
filling oil mill
CNTIC is requested to adjust and
repair
CNTIC & PLN MPROVEMENT
CNTIC IMPROVEMENT
CNTIC is requested to replace,
actual condition CNTIC check the
termination
CNITC is requested to replace
closed
CNTIC IMPROVEMENT
CNTIC is requested to investigation
about the root cause and invite PLN CNTIC IMPROVEMENT
together check.
CNTIC should be repair
CNTIC IMPROVEMENT
PLN suggest CNTIC to provide
trench.
CNTIC IMPROVEMENT
CNTIC is requested oOpen the
Cladding, Insepct the ducting, and
check function all damper for PA
Fan supply (hot and cold air) &
sealing air fan.
closed
CNTIC is requested to repair and
CNTIC IMPROVEMENT
test by pneumatic air pressure test.
CNTIC is requested to invite
manufacture come on site to
COMMISIONING
investigate the problem due to
probable any problem with bearing.
CNTIC should confirm
CNTIC change the control valve.
INSPECTION
CNTIC IMPROVEMENT
CNTIC is requested to invite
manufacture come on site to
CNTIC IMPROVEMENT
investigate the problem due to
probable any problem with bearing.
CNTIC should replace for mill feeder
INSPECTION
C
CNTIC is requested to repair and
inspect.
DURING RUNNING
CNTIC is requested to repair and
inspect.
closed
CNTIC is requested to repair and
inspect.
DURING RUNNING
CNTIC need to clarify and repair.
CNTIC is requested to repair and
inspect.
closed
CNTIC IMPROVEMENT
CNTIC should repair.
DURING RUNNING
CNTIC should repair.
closed
CNTIC is requested to repair and
CNTIC IMPROVEMENT
test by pneumatic air pressure test.
CNTIC is requested check the
insulation resistance for cable and
motor
closed
CNTIC should change and check
during running
CNTIC IMPROVEMENT
CNTIC should repair.
CNTIC IMPROVEMENT
CNTIC should be repair
CNTIC IMPROVEMENT
CNTIC should be repair
INSPECTION
CNTIC should connect and put into
CNTIC IMPROVEMENT
use during operation
CNTIC is requested to replace
closed
CNTIC should repair.
closed
CNTIC should repair.
DURING RUNNING
CNTIC should replace
closed
CNTIC should check the function
and repair
CNTIC is requested check the
resistance from RTD.
CNTIC should repair.
CNTIC should adjust and repair.
CNTIC is requested check the
voltage the TE.
CNTIC IMPROVEMENT
closed
CNTIC IMPROVEMENT
Closed
CNTIC IMPROVEMENT
DURING RUNNING
CNTIC should repair.
CNTIC should repair and function
check.
closed
closed
CNTIC should repair and check
during running
CNTIC IMPROVEMENT
CNTIC should repair and running
the motor
CNTIC IMPROVEMENT
CNTIC should repair and function
DURING RUNNING
check.
CNTIC is requested to repair and
conduct inspection after repair.
COMMISIONING
CNTIC should inform and check
together.
COMMISIONING
CNTIC should monitor everytime
INSPECTION
CNTIC should perform tension SCC
to check there is no leak during DURING RUNNING
operation.
CNTIC should repair and function
check.
closed
CNTIC should repair or replace
DURING RUNNING
CNTIC should repair or replace
CNTIC IMPROVEMENT
CNTIC should repair or replace
DURING RUNNING
CNTIC should repair.
DURING RUNNING
CNTIC should connect and check
toether
CNTIC IMPROVEMENT
closed
CNTIC should replace
CNTIC IMPROVEMENT
CNTIC should repair.
COMMISIONING
CNTIC should repair.
CNTIC IMPROVEMENT
CNTIC should repair or replace
CNTIC IMPROVEMENT
CNTIC should repair or replace
closed
CNTIC should repair or replace
COMMISIONING
CNTIC should inspected
CNTIC IMPROVEMENT
CNTIC should repair or replace
CNTIC IMPROVEMENT
CNTIC should repair or replace
CNTIC IMPROVEMENT
CNTIC should change the oil follow
CNTIC IMPROVEMENT
the requierement
CNTIC should repair or replace
closed
CNTIC should repair or replace
CNTIC IMPROVEMENT
CNTIC should repair or replace
CNTIC IMPROVEMENT
need confirm to commisioning
COMMISIONING
CNTIC should adding
COMMISIONING
CNTIC should perform the test
CNTIC IMPROVEMENT
CNTIC should repair or replace
DURING RUNNING
need check together
DURING RUNNING
CNTIC should repair or replace
DURING RUNNING
CNTIC should repair or replace
DURING RUNNING
CNTIC should repair or replace
CNTIC IMPROVEMENT
CNTIC should repair or replace
CNTIC IMPROVEMENT
CNTIC should repair or replace
CNTIC IMPROVEMENT
CNTIC should repair or replace
DURING RUNNING
closed
CNTIC IMPROVEMENT
CNTIC IMPROVEMENT
CNTIC IMPROVEMENT
CNTIC IMPROVEMENT
NE
JMK Suggest.
REMARKS
CNTIC still repair temporary 18 Januari
2016, the spare part has been arrive at site
on 30 January 2016
dilepas pada ssat short circuit test sebelum
1st synchrone, dan tidak dipasang
kembali.no progress
need measure point (no progress)
no confirmation for manual sheet of
CNTIC is requested to submit
temperature, and the bearing temperature
manual or data sheet for TC
for thrust bearing also still abnormal. upto
equipement
now data sheet no submit.
- CNTIC should confirm about readiness of
chlorine generating A (the latest condition
the capacity produce chlorine still not
CNTIC is requested to solve the qualified by commisioning team)
under gradeting capacity of
- CNTIC is requested to follow the
chlorine.
requirement for injection chlorine during
CNTIC is requested to produce unit running.
chlorine follow requierement
- PLN suggest to add manual injection to
for totally content.
meet the requierement.
- CNTIC will contact the manufacture. Result
Friday will confirm.
- CNTIC is requested to operate A&B during
operation.
- refer to monitoring of boiler
leakage detector any
- CNTIC has inform that the setting can be
appointed from channel 20, 21 fixed while the unit running at 80% power
and 28 which proble any
out from Generator
leakage on boiler pipe. CNTIC is - refer to actual condition on 6 May 2016,
requested to give technical Vendor has came for setting. But we found
reason and check the boiler. that any setting value limit not follow
- JMK submit the formal letter manual book.
to CNTIC.
no progress, CNTIC is requested re-strooke
test.
- CNTIC shoul pay more
attention during running
especially for operating the
OLTC and exitation.
- CNTIC inform close, but last agreement
check during the synchrone 4 March 2016.
the result still not same between each
phase.
- upto now during synchron there is no
improvement about the balance the voltage
for each phase.
- the latest information on 4 March 2016
CNTIC inform that alredy on going purhase.
CNTIC is requested to replace 2 But upto now no progress for changing.
pcs other gauge which broken, - as per actual conditon CNTIC already
change by new one. But the condition still
have 2 in damage condition.
- related APH burned , actual on site the
temperature monitoring for APH not uniform
indicate. Have 2 indicator has been much
CNTIC is requested to replace different.
the damage equipments.
- CNTIC inform that the deviation
measurement will confirm to manufacture
(within 3 days). The other for display on
going for purchasing.
- During runnning on march the leakage
became 2 pcs pressure gauge.
CNTIC is requested to replace - CNTIC inform has repair and will check
the pipe and pressure gauge. during running.
- during running at 6 May 2016 still leakage
on both pressure gauge.
- CNTIC inform already repair.
CNTIC is requested to change - Actual on site for BFPT B still wet by oil.
the gland and gasket
But CNTIC insist that have been repaired.
Will check during running
on going repair
on going repair
on going repair, CNTIC is requested change
with the new one.
- CNTIC is reqeusted to monitor
the quality steam and water
follow the requierement and
procedure (054)
- CNTIC should activate online
analyzer during running.
- CNTIC should activate online analyzer
during running.
- during the strat-up CNTIC already meet
the requierement for silica content. But for
the other content (conductivity still higher)
CNTIC should perform loop check.
- CNTIC is requested to fixed
this matters.
- CNTIC should perform loop
check and recalibration.
- CNTIC inform that only change the kks
valve. But actually during function test
abnormally operate for CV kks
(10LCL72AA101). So, CNTIC is requested to
change or repair the positioner due to
Hunting of operation valve.during check on
CNTIC is requested to change
site, the control valve (A&B)has hunting on
the positioner valve.
25%,50%, and 75%.
- CNTIC already replace the broken material
and will conduct the inspection on 12 April
2016.
- on 25 April 2016 PLN has checked and still
hunting for both valve overflow.
CNTIC is requested to follow need confirmation by commisioning team
manufacture spesification for - CNTIC will inform and invite manufacture
provide automatic sequence. to analyze.
CNTIC should check, repair,
perform the function test for
automatic rigid.
- need confirmation by commisioning team.
During shutdown 14 March 2016, the
turning gear can't operate by automatic.
- CNTIC is requested to perform automatic
operate during start-up. CNTIC will conduct
the test automatic operation turning gear
during shutdown turbine.
- the latest shutdown unit on 9 May 2016,
still can't automatic.
need measure point (no progress)
CNTIC inform that manufacture
give the result investigation is
due to the low efficiency.
CNTIC is requested to submit
the Root cause analyze by
official letter.
Based on the our obsercation
on site the higher vibration has
been conduct many times, so
CNTIC is requested to check
the bearing condition and
repair the problm.
CNTIC will keep monitor
vibration.
- need confirmation by commisioning team
(still higher on 78 us/cm alarm 1)
- CNTIC inform that manufacture give the
result investigation is due to the low
efficiency.
- CNTIC is requested to submit the Root
cause analyze by official letter.
- CNTIC will keep monitor vibration.
- based on latest running on may, the
higher vibration still indicate but there is no
improvement, and there is no engineer from
manufacture doing for identification.
CNTIC is requested to conduct NDT &
Pressure Test.
(Module / display temperature phase S dry
transformer ) need confirmation by
commisioning team
- CNTIC is requested to change
the damage part.
acual on site still have 3 damage (A : 3, 16,
- Conduct inspection to ensure B: 2). CNTIC is requested to repair before
the heater are working
unit running.
properly.
- perform the measure point
(during running mix bed #3 flow indication
notice on mix bed #1)
- CNTI C inform that CPP proper system still
on going to finished the system for DCS.
need confirmation by commisioning team,
waiting strainer gate motor.
- CNTIC should activate online
analyzer during running.
- CNTIC is requested to finished
the reamining calibration for
conductivity and Natrium
analyzer.
CNTIC should activate online analyzer
during running.
'- CNTIC inform will fixed the probelem
during strat-up.
- CNTIC is requested to put into use all the
online analyzer in proper condition for
monitor in local and DCS before steam
admission to turbine.
- CNTIC should activate online
analyzer during running.
CNTIC should activate online analyzer
- CNTIC is requested to finished
during running. Still have 3 equipment
the reamining calibration for
mismatch indication.
conductivity and Natrium
analyzer.
need confirmation by commisioning team
- CNTIC is requested to fixed
and put into use proper dust
suprresion before start-up.
- CNTIC is requested to fixed
and put into use proper dust
suprresion before start-up.
need confirmation by commisioning team ,
dust suppresion remain BC 5
- CNTIC inform that remain of dust
suppression only on BC-6 due to still have
problem on the spray.
- CNTIC is requested to fixed and put into
use proper dust suprresion before start-up.
- need confirmation by commisioning
team .dust collector remain for BC4, BC5,
and BC6
- CNTIC inform that remain of dust
suppression only on BC-6 due to still have
problem on the spray.
- CNTIC is requested to fixed and put into
use proper dust suprresion before start-up.
- CNTIC should activate online analyzer
during running. Upto now only modify the
sampling pipe. But still not yet follow
requirement.
- CNTIC already finish the installation follow
CNTIC is requested to adjust the condensor manufacture.
the limit value follow the
- CNTIC is requested to consider following
design and made uniform on the manufacture of leakage detector for
DCS and local.
proper function of equipment. CNTIC will
perform the function test on 13 April 2016
- refer to our observation on stite the setting
of upper and lower limit conductivity
transmitter has different between design,
local and DCS.
this issue for commercial
aspect
'- CNTIC is requested to consider about
protecion for rise temperature and will
discuss later.
- CNTIC state will provide spare parts
- CNTIC inform that has been correct
measure. CNTIC is requested to check the
output resistance.
- still error for no.29
this issue should finished
before COD and conduct joint
inspection.
CNTIC is requested to finished the
remaining clading before COD
- need confirmation by commisioning team
CNTIC is requested to
- CNTIC is requested to complete no load
immediatelly finish the
test (slewing and luffing) before filling
remaining commisioning work bunker. (may perform on 13 April 2016)
need confirmation by commisioning team
- during operation still inaccurate (MAJOR)
- During running the temperature can't rich
CNTIC is requested to replace more tha 250 degree.
with new one.
- CNTIC is requested to replace and will
monitoring during strat-up.
- still can't rise-up.
still leakage (MAJOR)
no leakage
already repair
already repair
still damage
CNTIC is requested to replace
with new one.
- The connection still disconnect. PLN inform
that it equipment (MAJOR)
- CNTIC inform that still connected the
broken one. The new one will arrived two
Perform the commisioning for
weeks later. ( will check and confirm by
AST and OPC protection.
commisioning)
- already perform measure point, but CNTIC
is requested to perform the protection with
commisioning team
IP and CNTIC will together
incharge.
IP operator will incharge.
During runnning the consummation signal
has unnormally. (MAJOR)
CNTIC is requested to replace.
- during latest unit runing on may, still
hunting the measuring flow.
already normal on 43.5
CNTIC is erquested to replace
power adapter and invite
manufacture to recovery the
soft ware for monitoring TDM.
CNTIC is requested to submit
official letter for confirmation
modification and root cause
failure analyze from shanghai
turbine.
CNTIC is requested to sumit
RFCA and repair.
- No Power, the power adapter for Hub link
may damage. (MAJOR)
'- CNTIC inform that the communication and
power has trouble, will confirm to
manufacture to check and will replace the
broken part.CNTIC is requested put into use
before RR.
CNTIC should check the oil circulation. May
any blocking in this system (MAJOR)
- Alarm can't be reset, Now the condition
shutoff power.(MAJOR)
- CNTIC inform already repair.
- CNTIC is requested before start-up
PLN suggest to CNTIC during flushing should
consider about the environment due
contamination mix of water and coal.
(MAJOR)
CNTIC is requested to provide
the trench for drainage.
based on actual site on 21 March 2016, the
cladding already reinstalled but there is no
inspection and no function test.(MAJOR)
CNTIC is requested to repair
and test by pneumatic air
pressure test.
- still have leak (MAJOR)
'- Actual on site still wet by oil.
- CNTIC is requested to repair before unit
start-up for safety purpose.
- CNTIC is requested to submit
the Root cause analyze by
official letter.
there is no improvement (MAJOR)
- CNTIC is requested to keep
monitor the vibration and solve
the problem if the vibration
already pass the first alarm
should consider to repair or
treatment.
still disconnected (MAJOR)
- CNITC is requested to replace
the positioner regulating
hunting on 50% and 75%, (MAJOR)
control valve.
CNTIC is requested to replace
viibration sensor bearing no.3
and no.9
CNTIC is requested to perform
trial running and setting of
claibration coal feeder.
- CNTIC inform that already replaced. CNTIC is requested to check and measure
the output for bearing vibration no.1,2 and
3 on 12 April 2016.
- CNTIC is requested to repair the vibration
sensor bearing no.3 and 9. - - CNTIC
purpose to check during start-up.
CNTIC inform already repair (but the
repairing are moving devices from feeder
C).
- during latest unit running this feeder never
use.
the leakage on flange pipe no.5,
before unit start-up CNTIC inform this
equipment has broken and waiting spare
part & arrival manufacture.
still leak
now already normal indicate on HMI, but
when compare with level indication on local
still much deviation.
CTIC is requested to replace
the fans.
upto now the fan not running yet.
- CNTIC inform that still purchase and will
arrive end of April.
during filling until fully level but on local
-CNTIC is requested to change
operator open the venting still have much
the valve.
flow carried out.
already change
CNTIC is requested to repair
and test by pneumatic air
pressure test.
still have leak (MAJOR)
Check insulation resistance motor
CNTIC is reqeiested to replace. Measure 67 (bad point), trip 70
after repair CNTIC should
perform trial running.
Leakage on the handle
still on going repair.
CNTIC is requested to sumit
RFCA and repair.
Alarm can't be reset, Now the condition
shutoff power.(MAJOR)
the greas has carried out from the stamp
valve MOV
this solenoide for drainage.
still broken
still leak
already change the packing, check during
running
the case has poor by corrosive and broken
cover glass.
CNTIC is requested to ceck,
submit RFCA and replace the
communication connector.
check and function check
- the latest unit running the fault became
for modbus A and B
check the resistance from RTD.
CNTIC is requested to repair or
replace. And perform restill fault
function check.
CNTIC inform that already repair. But upto
now the condition in force. Need to check
during running
CNTIC is requested to replace.
check or measure output signal from TE
still leakage
When mill E not running but any indication
pressure and high temperature.
still ongoing repair for start-up drain A
already change the pump
during operation this leakage detector not
put into use (motor sampling never running)
still same.
CNTIC inform that reading of analyzer no
problem. PLN still insist any problem about
CNTIC is requested to repair or the conductivity analyzer.
replace. And perform reCNTIC is requested to fixed before unit
function check.
start-up.
- the detector setting upper and lower limit
not follow design on DCS and local
instrument.
- display local for conductiity analyzer B still
damage and error.
the latest condition CNTIC has dismantle
cover bearing and disconnect the coupling
between motor and pump. Already repair
but need to individual running to confirm
the vibration after dismantle coupling.
based on actual site we found that any
additional screw
some areas still have any valve not opened
yet
already repair
CNTIC is requested to replace
the lamp.
check iluminnation
check during running
alredy repair and the isolated.
CNTIC is requested to connect
the cable.
still disconnect cable
CNTIC is requested to repair.
still leak A side
there is no improvement
CNTIC is requested to perform
inspection for NDT or submit
the report if already done by
internally.
already repair, but without NDT test
CNTIC is requested to revise
the protection .
there is no improvement
CNTIC is requested to perform
inspection for NDT or submit
the report if already done by
internally.
already repair but without inspection
Need Wiring diagram to make easier when
normalized
PLN need oil report by third
party.
CNTIC inform already replace
Need to Repaire
CNTIC should repair or replace
CNTIC is requested to replace
the valve.
Need to Repaire
only can operate by local
still leakthrough
Need to check PA Flow minimum related to
the mill Load. Sequence start stop mill must
be added, FSSS not working
CNTIC should confirm to JASER
for logic of protection and
Need to adding interlock
perform the sequence check
individual.
Need to Repaire
already repaired, but need to check during
running
Still High, need to check
Temporary repair by operator
Need to Repair
CNTIC should repair or replace already repair but waiting for checking
CNTIC should repair or replace
already repair, but need check during
running.
CNTIC is remind to provide the
Need mandatory spare part for filter
spare parts
decrese into 50 ppb, but still high limit
untuk outlet condenser B sudah selesai
repair tapi belum di inspeksi, outlet A dalam
progress, untuk CW pipe dalam progress
CNTIC diminta untuk
menyelesaikan koneksi kabel
solenoide valve.
untuk APH A sudah terpasang (koneksi
kabel belum selesai), remain APH B belum
blas
CNTIC is requested to replace
vibration sensor no.9
adanya alarm badpoint selama unit
shutdown
CNTIC is requested to repair or beberapa valve malfunction dan tidak
replace.
normal
CNTIC is requested to adjust
beberapa hanger di adjusting dan
and submit technical reason for
ditambahkan dudukan plate untuk beberapa
condition of hanger and pipe
beam.
cold reheat.
Update : 25 April 2016
PHOTO
Progress per 11 April 2016
closed
closed
N/A
closed
upto now data sheet no submit.
CNTIC will contact the
manufacture. Result Friday will
confirm.
CNTIC is requested to operate
A&B during operation.
closed
closed
CNTIC inform close, but last
agreement check during the
synchrone 4 March 2016. the
result still not same between
each phase.
some Ti was replaced , but there
are 1 TI is broken (20 MEI 2016)
CNTIC will check. CNTIC is
reqeusted to replace.
no progress
CNTIC inform already repair. But
not checked due to the box has
lock.
closed
closed
closed
during the strat-up CNTIC
already meet the requierement
for silica content. But for the
other content (conductivity still
higher)
CNTIC inform closed, but during
running still have hunting
indicate on history tren d.
closed
CNTIC already replace the broken
material and will conduct the
inspection on 12 April 2016.
CNTIC inform closed. PLN will
confirm by commisioning team
CNTIC inform closed. PLN will
confirm by commisioning team
closed
CNTIC inform that manufacture
give the result investigation is
due to the low efficiency. CNTIC is
requested to submit the Root
cause analyze by official letter.
CNTIC will keep monitor
vibration.
Last operation BFT vibration is 75
(20 may 2016)
closed
closed
closed
CNTIC inform that already repair.
But no inspcetion.
on progress
closed
closed
CNTIC inform that online monitor
has ready to use. PLN inform that
on 11 April 2016 the condition all
analyzer still bad point. CNTIC is
requested to use the online
monitor with proper condition
before unit start up.
CNTIC inform that online monitor
has ready to use. PLN inform that
on 11 April 2016 the condition all
analyzer still bad point. CNTIC is
requested to use the online
monitor with proper condition
before unit start up.
CNTIC inform that load test of
stacker reclamier on going.
CNTIC is requested to finish the
test during reclaiming STRE.
CNTIC inform that remain of dust
suppression only on BC-6 due to
still have problem on the spray.
CNTIC is requested to fixed and
put into use proper dust
suprresion before start-up.
CNTIC inform that dust collector
finished. CNTIC is requested to
ensure the readiness and put into
use proper dust suprresion before
and during start-up.
PLN ask about the installation of
sampling pipe. CNTIC inform that
the letter has been prepared and
submit 11 April 2016.
CNTIC inform that has been
correct measure. CNTIC is
requested to check the output
resistance. still no.29 has error.
CNTIC inform that ready to use.
(check during commisioning)
closed
CNTIC inform that check during
operation.
N/A
closed
N/A
closed
N/A
closed
no progress
CNTIC inform that still connected
the broken one. The new one will
arrived two weeks later. ( will
check and confirm by
commisioning)
closed
N/A
CNTIC inform that on 12 April
2016 has ready to use.
CNTIC inform that can conduct
the inspection together with IP.
CNTIC inform that already
repaired and can use. Will check
during running
perbaikan SOP
CNTIC already repair.
CNTIC inform that already
repaired. Will check during
running.
CNTIC inform that manufacture
give the result investigation is
due to the low efficiency. CNTIC is
requested to submit the Root
cause analyze by official letter.
CNTIC will keep monitor
vibration.
Last operation BFTA & B vibration
is 75 (20 may 2016)
closed
CNTIC will check and repair on 12
April 2016.
CNTIC inform that already
replaced. CNTIC is requested to
check and measure the output
for bearing vibration no.1,2 and 3
on 12 April 2016.
CNTIC inform that for all coal
feeder modules are in good
condition. But PLN have found
that coal feeder C has
disconnected. CNTIC is requested
to fixed the problem on Coal
feeder C before unit start-up.
(trial running no load)
already repair but will check
during running
CNTIC inform that already repair.
already repair, (closed)
CNTIC inform that still purchase
and will arrive end of April.
CNTIC will check.
closed
CNTIC inform that already
repaired. Will check during
running.
CNTIC already replace and will
perform the insulation resistance
check
CNTIC plan to replace during FYI.
But PLN request to fixed before
start-up due to related protection
purpose.
CNTIC already repair will check
during running.
CNTIC inform that already repair
but now still power off. Will check
during running
CNTIC inform already repair but
need to check
no progress
CNTIC inform already repair and
tightened.
no progress
CNTIC already repair, but need to
check during unit start-up
on progress
CNTIC inform that already repair.
Need check during running
CNTIC inform that already finish.
Will check together with IP on 12
April 2016.
CNTIC will replace on 12 April
2016 after that function test.
CNTIC inform that already repair.
But upto now the condition in
force.
CNTIC inform that already finish.
Will check together with IP on 12
April 2016.
Already repair
no progress
already check together on 23
March 2016 (closed)
CNTIC inform that waiting spare
part.
CNTIC inform that reading of
analyzer no problem. PLN still
insist any problem about the
conductivity analyzer. CNTIC is
requested to fixed before unit
start-up.
CNTIC already repair, but need to
check during unit start-up
CNTIC inform that to check
vibration before start-up. (during
filling water boiler)
CNTIC inform that during
operation check the vibration.
CNTIC are guarantee about the
readiness of fire fighting. But PLN
still found that some problem
regarding readiness of fire
fighting and inform by official
letter. CNTIC will answer.
CNTIC inform that already
rapired. But CNTIC should
perform tension test during
running.
CNTIC inform that already finish.
Will check together with IP on 12
April 2016.
CNTIC inform that already repair.
Check during running.
CNTIC inform on going. CNTIC will
prepare at least for considering
related safety purpose and will
check before unit start-up.
already repair but need to check
during running
already repaired check during
running
CNTIC will check.
Based on CNTIC maintenance
"Pressure switch is not used"
closed
CNTIC inform manufacture check
and on going repair. 15 April
2016 will finished
no progress from CNTIC
CNTIC already perform NDT
internal.
no progress from CNTIC
no progress from CNTIC
CNTIC already repair.
CNTIC already perform NDT
internal
CNTIC will check after repair wil
check together before tightness
test.
CNTIC inform waiting the spare
part.
CNTIC inform already replace the
oil. PLN need oil report by third
party.
akready repair
CNTIC inform will check.
no progress from CNTIC
CNTIC is requested to complies
the correct permissive start and
stop.
CNTIC need to check. Before
filling coal bunker before running.
no progress from CNTIC
already repaired, but need to
check during running
CNTIC is requested to continue
monitor.
already repaired, but need to
check during running
CNTIC already repaired. Will
check during running.
already repair but waiting for
checking
already repair, but need check
during running.
no progress from CNTIC
CNTIC will monitor.
CNTIC inform ongoing and will
finished on 12 April 2016. CNTIC
is requested inspect the adhesion
test, spark test and hardness
test.
already installed the solenoide
valve. And still waiting
manufacture for commisining.
End of May 2016.
CNTIC inform that already
replaced. CNTIC is requested to
check and measure the output
for bearing vibration no.1,2 and 3
on 12 April 2016.
PLN inform that 18 valves has
malfunction. CNTIC is requested
to repaired and conduct function
test.
beberapa hanger di adjusting
dan ditambahkan dudukan plate
untuk beberapa beam.
BAHAN RAPAT
Pending
REMARK
Major
CNTIC has inform that the setting
can be fixed while the unit running
at 80% power out from Generator
Pending
CNTIC inform close, but last
agreement check during the
synchrone 4 March 2016. the
result still not same between each
phase.
Pending
Pending
as per actual conditon CNTIC
already change by new one. But
the condition still have 2 in
damage condition.
Major
CNTIC inform that the deviation
measurement will confirm to
manufacture (within 3 days). The
other for display on going for
purchasing. CNTIC is requested to
replace the damage equipments.
Pending
Will check during running.
Pending
actual on site for BFPT B still wet
by oil. But CNTIC insist that have
been repaired. Will check during
running
pending
CNTIC is reqeusted to monitor the
quality steam and water follow the
requierement and procedure (054)
pending
CNTIC is requested to fixed this
matters.
pending
- CNTIC ask to check by IP and
PLN. But the condition of boiler
already filling by water and no
possible check by IP.
- CNTIC is requested to perform
function test .
Major
CNTIC is requested to follow
manufacture spesification for
provide automatic sequence.
CNTIC is requested to perform
automatic operate during start-up.
CNTIC will conduct the test
automatic operation turning gear
during shutdown turbine.
Major
Major
CNTIC is requested to submit the
Root cause analyze by official
letter. CNTIC is requested to keep
monitor the vibration and solve
the problem if the vibration
already pass the first alarm should
consider to repair or treatment.
pending
acual on site still have 3 damage
(A : 3, 16, B: 2). CNTIC is
requested to repair before unit
running.
Pending
Major
- CNTIC inform will fixed the
probelem during strat-up.
- CNTIC is requested to put into
use all the online analyzer in
proper condition for monitor in
local and DCS before steam
admission to turbine.
Major
- CNTIC inform will fixed the
probelem during strat-up.
- CNTIC is requested to put into
use all the online analyzer in
proper condition for monitor in
local and DCS before steam
admission to turbine.
Major
CNTIC is requested to complete no
load test (slewing and luffing)
before filling bunker. (may perform
on 13 April 2016)
Major
CNTIC is requested to put into use
the dust suppresion during startup and considering for safety
purpose.
Major
CNTIC inform dust collector ready
to use. CNTIC is requested to put
into use the dust collector during
start-up and considering for safety
purpose. PLN remind about delay
time need to repair on BC 5 before
unloading coal bunker.
Major
- CNTIC already finish the
installation follow the condensor
manufacture.
- CNTIC is requested to consider
following the manufacture of
leakage detector for proper
function of equipment. CNTIC will
perform the function test on 13
April 2016.
Major
- CNTIC is requested to consider
about protecion for rise
temperature and will discuss later.
- CNTIC state will provide spare
parts.
minor
CNTIC is requested to finished the
remaining clading before COD
Major
CNTIC is requested to complete no
load test (slewing and luffing)
before filling bunker. (may perform
on 13 April 2016)
Major
- During running the temperature
can't rich more tha 250 degree.
- CNTIC is requested to replace
and will monitoring during stratup.
pending
CNTIC is requested to replace with
new one.
major
already perform measure point,
but CNTIC is requested to perform
the protection with commisioning
team
pending
close
Major
CNTIC inform that the
communication and power has
trouble, will confirm to
manufacture to check and will
replace the broken part.CNTIC is
requested put into use before RR.
Major
CNTIC is requested to submit
official letter for confirmation
modification and root cause failure
analyze from shanghai turbine.
Major
CNTIC inform already repair. CNTIC
is requested before start-up
Pending
CNTIC is requested to provide the
trench for drainage.
major
- Actual on site still wet by oil.
- CNTIC is requested to repair
before unit start-up for safety
purpose.
Major
- CNTIC is requested to submit the
Root cause analyze by official
letter.
- CNTIC is requested to keep
monitor the vibration and solve
the problem if the vibration
already pass the first alarm should
consider to repair or treatment.
Major
Major
CNTIC is requested to repair before
unit start-up
Major
CNTIC is requested to repair the
vibration sensor bearing no.3 and
9. CNTIC purpose to check during
start-up.
Major
CNTIC inform that already change
by new one.
- CNTIC is requested to perform
trial running and calibration after
replacement.
Pending
Major
Major
major
Major
- Actual on site still wet by oil.
- CNTIC is requested to repair
before unit start-up for safety
purpose.
Major
Major
CNTIC is requested to replace the
equipment before start-up due to
relate protection and safety
purpose to the seal air fan.
Major
Pending
Pending
CNTIC is requested to perform
function test to know the latest
condition after filling griss.
Pending
CNTIC is requested to finish
connection cable and perform
function check.
major
CNTIC inform already repair and
tightened.
close
CNTIC is requested to replace the
valve during running.
pending
major
major
already check normal
Major
CNTIC will replace on 12 April 2016
after that function test.
pending
major
CNTIC is requested to submit
official letter for confirmation
modification and root cause failure
analyze from shanghai turbine.
pending
Minor
CNTIC is requested to repair before
RR.
Major
CNTIC inform that waiting spare
part.
CNTIC is requested to repair the
pump before RR.
closed
CNTIC inform that reading of
analyzer no problem. PLN still
insist any problem about the
conductivity analyzer.
CNTIC is requested to fixed before
unit start-up.
pending
CNTIC inform that to check
vibration before start-up. (during
filling water boiler)
major
major
CNTIC inform that during operation
check the vibration.
major
CNTIC are guarantee about the
readiness of fire fighting. But PLN
still found that some problem
regarding readiness of fire fighting
and inform by official letter. CNTIC
will answer.
Major
CNTIC inform that already rapired.
But CNTIC should perform tension
test during running.
Major
CNTIC inform that already repair.
Check during running.
Major
CNTIC inform on going. CNTIC will
prepare at least for considering
related safety purpose and will
check before unit start-up.
pending
major
already repaired check during
running
major
CNTIC will check.
CNTIC is requested to finish
connection as soon as possible.
major
CNTIC inform manufacture check
and on going repair. 15 April 2016
will finished
pending
Major
CNTIC already perform NDT
internal.
CNTIC is requested to submit the
NDT report..
pending
pending
CNTIC is requested to replace the
valve before RR.
Major
CNTIC already repair.
Major
CNTIC already perform NDT
internal.
CNTIC is requested to submit the
NDT report..
Major
CNTIC will check after repair wil
check together before tightness
test.
Major
CNTIC inform waiting the spare
part.
Major
CNTIC inform already replace the
oil. PLN need oil report by third
party.
Major
CNTIC inform will check.
minor
CNTIC is requested to replace.
Major
CNTIC is requested to complies the
correct permissive start and stop
and perform the simulation test
before start-up
Major
CNTIC need to check. Before filling
coal bunker before running.
pending
pending
pending
CNTIC is requested to continue
monitor.
pending
major
CNTIC already repaired. Will check
during running.
pending
Pending
pending
CNTIC is requested to provide
spare part for the filter due to the
scan air fan air important to
continues running for RR.
pending
CNTIC will monitor.
Major
CNTIC inform ongoing and will
finished on 12 April 2016. CNTIC is
requested inspect the adhesion
test, spark test and hardness test.
pending
already installed the solenoide
valve. And still waiting
manufacture for commisining. End
of May 2016.
Major
CNTIC is requested to repair the
vibration sensor bearing no.3 and
9. CNTIC purpose to check during
start-up.
Major
PLN inform that 18 valves has
malfunction. CNTIC is requested to
repaired and conduct function test.
Major
foto
foto
foto
CNTIC ask to check by IP and PLN. But the
condition of boiler already filling by water and
no possible check by IP.
still have 3 damage (A : 3, 16, B: 2)
ready to use remind no load test.
has normal on CCR.
already check normal
NO.
DESCRIPTION
Defect During shutdown
First Week I
LOCATION
SYSTEM
Oil gearbox for motor gantry no.4
Ship Unloader
SU A has leakage
Coal handling
Tube connector of Lubrication
pneumatic valve economizer
Boiler
Hooper no,2,3 and 6 has leakage.
Ash handling
Drop voltage for battery EDG A1
and A2
EDG room
Essential power
Air conditiorer on essential MCC
wasn't function (only forced air)
EDG room
HVAC
oil leakage on bearing electric cup
CWP house
CWP motor #A
CWP
hardness of rack out breaker CB
for unloading pump B on MCC
Fuel Oil pump
house
Fuel oil
Temperature Indication was
damage on outlet header lube oil
cooler BFPT B
BFPT B
CCCW
scraped and ripped belt conveyor
on STRE (till 30 cm) (west side and STRE
boom)
Coal handling
cable for pneumatic valve bottom
Bottom ash silo
ash silo was damage
Slag handling
2nd Week II
10
leakage of sealing bearing and
drain motor on chlorin booster
pump.
11
Leakthrough on handle drain valve
Ship Unloader A
ship unloader tnak water spray
Coal handling
12
Lamp off on behind and front STRE STRE
Coal handling
13
exhaust fan of local control panel
motor conveyot BC 1 A was
damage. (can't function)
Coal handling
14
limit switch of cable rool SU B has
Ship unloader
malfunction
Coal handling
15
Navigation lamp on breakwater
was damage
Safety
3rd week III
Chlorine house
BC 1 A
Break water
Chlorination
16
different reading between DCS
and local of Pressure transmitter
bearing oil BFPT #A
BFPT A
lube oil
17
different reading between DCS
and local of Pressure transmitter
bearing oi BFPT #B
BFPT B
lube oil
18
Recirculation pump oil bearing
motor was low level.
RECYLING PUMP
BOP
19
Leaktrought MOV Condensor A
Condesor
Seawater cooling
20
malfunction of MCB solenoide dust
BC 1 & BC 2
suppresion BC 1 & BC 2
Coal handling
21
thermocouple header has leakage
CCCW header
on CCCW system
Cooling system
22
indication of voltage cathodic
protection was inaccurate
(travelling screen #2 and #3)
CWP house
Seawater cooling
23
Combined dryer #A & #B air
compressor can't operate from
DCS
Compressor
Dryer
4th week (IV)
24
Solenoide valve spray coal shied
coal yard
no.8 and 12 abnormal (can't close)
Coal handling
25
solenoide valve for dust
suppresion BC2A can't close
Coal handling
26
Tube condenser leak detector was
Turbine house
leakage (A)
Condeser
27
reading temperature oil UAT
inaaccurate
UAT A
20kv system
28
disconnecting cable of TIS
(temperature indicator switch) of
coal feeder C
coal feeder
pulvurized system
BC #2
May first week
29
improper operating of demin
pump # B.
Water treatment
plant
Demineralized
30
leakage for lube oil bearing demin Water treatment
pump # A
plant
Demineralized
STATUS
DATE
DECIPLINE
PLANT & ACTION
Open
3/4/2016
Mechanical
CNTIC is requested to repair
and re-filling the oil
Open
3/4/2016
I&C
CNTIC is requested to repair
Open
3/4/2016
Electrical
CNTIC is requested to
change the battery.
Open
4/4/2016
Electrical
CNTIC is requested to repair
Open
5/4/2016
Electrical &
Mechanical
CNTIC is requested to repair
Open
5/4/2016
Electrical
CNTIC is requested to
analyze and repair
Open
5/4/2016
I&C
CNTIC is requested to repair
or replace
Open
5/4/2016
Mechanical
CNTIC is requested to repair
or replace
Open
5/4/2016
I&C
CNTIC is requested to repair
or replace
Mechanical
CNTIC is requested to repair
and re-filling the oil
Open
11/4/2016 Mechanical
CNTIC is requested to repair
or replace
Open
11/4/2016 Electrical
CNTIC is requested to repair
or replace
Open
12/4/2016 I&C
CNTIC is requested to repair
or replace
Open
12/4/2016 I&C
CNTIC is requested to repair
or replace
Open
12/4/2016 Electrical
CNTIC is requested to repair
or replace
Open
08/04/2016
Open
18/04/2016
I&C
CNTIC is requested to repair
(re-calibration) and perform
loop check
Open
18/04/2016
I&C
CNTIC is requested to repair
(re-calibration) and perform
loop check
Open
19/04/2016
Mechanical
CNTIC is reqeusted to re
filling oil lubricating
Open
19/04/2016
Mechanical
CNTIC is requested to repair
and tightened the disc
valve
Open
19/04/2016
Electrical
CNTIC is requested to
replace the MCB
Open
20/04/2016
I&C
CNTIC is requested to repair
and analyze due to many
times leak on the same
place
Open
21/04/2016
Electrical
CNTIC is requested to repair
or replace
Open
21/04/2016
Electrical
CNTIC is requested to repair
or replace
Open
22/04/2016
I&C
CNTIC is requested to repair
or replace
Open
23/04/2016
I&C
CNTIC is requested to repair
or replace
Open
24/04/2016
I&C
CNTIC is requested to repair
Open
26/04/2016
I&C
CNTIC is reqeusted to recalibrated.
Open
27/04/2016
I&C
CNTIC is requested to
repair.
Open
30/4/2016
Mechanical
CNTIC is requested to check
the impeler pump and
repair
Open
5/2/2016
Mechanical
CNTIC is requested to check
the leakage point and
repair.
REMARKS
potensial for
influence the
unloading
potensial for
influence unit
running.
potensial for
influence unit RR
PHOTO
has influence the
reclaiming work and
stacking on the night
probable overheat of
electric equipment
and dangerous due
to many dust coal
inside of panel
(explosive effect)
influence unloading
coal (for moving)
batch of coal arriving
need for navigation
and safety sign.
dangerous for safety
(slippery)
the tube use for
continues monitor
the water quality of
hot well. For B has
continue running.
the switch are
protection for
temperature of UAT
A (safety
consideration)
the switch are
protection for
temperature of coal
feeder (safety
consideration)
NO.
DESCRIPTION
LOCATION
STATUS
DATE
DECIPLINE
GCB trip due to exitation fail.
Exitation
Open
Major
30-Apr-16
Electrical
Generator metal temp no. 35, 60,
1 is abnormal
Generator
Open
Major
6-May-16
I&C
thermocouple for
10HHE10CT909,
10HHE10CT920 is abnormal
Superheater
Open
Major
6-May-16
I&C
short circuit indication for ESP no.
4
ESP
Open
Major
6-May-16
ELEC
Vibration is High in BFPT A&B
( >76 mm )
BFPT A&B
Open
Major
6-May-16
I&C & MECH
Temperature High turbine no. 2
TURBINE
Open
Major
6-May-16
MECH
Flow meter is abnormal on STRE
cabin shut off.
STRE
Open
Major
6-May-16
I&C
Flow meter is abnormal on BC 2B
BC 2B
Open
Major
6-May-16
I&C
Flow meter is abnormal on BC 5
BC 5
Open
Major
6-May-16
I&C
10
Any oil leakage in Pressure
switch lube oil PA Fan A (2 pcs) &
B (2 pcs)
PAF A&B
Open
Major
4-May-16
I&C
11
Three way valve is broken for
hydraulic mill D
Mill D
6-May-16
Mech
12
Cover belt conveyor broken at BC
5
BC 5
Open
Major
6-May-16
Mech
13
leakage on flange of relief valve
at condensate polishing
CPP
Open
Major
6-May-16
MECH
14
CTP A has dismantling
Condensate make-up
Open
Major
4-May-16
MECH
15
BFPT A Trip caused flow low
BFPT A
Open
Major
6-May-16
I&C
16
Recycle by pass pipe condenser
is leakage
Turbine house
Open
Major
6-May-16
MECH
17
indication of boiler leakage
detector has detected alarm in
higher probabilty leak on boiler.
Boiler electronic room
Open
Major
8-May-16
I&C
18
sootblower line has leakage
Boiler
Open
Major
8-May-16
MECH
19
ESP modbus for A&B has error
20
hanger for hot reheat has wrong
expand.
21
2 units PS has wrong setting, it
was trip the BFPT during
synchronize.
ESP building
Open
Major
8-May-16
I&C and Elec
Boiler
Open
Major
8-May-16
MECH
Turbine
Open
Major
6-May-16
I&C
21
mill #F have any indication heavy
material on the pulvurized
system (by the high noise)
Mill F
Open
Major
7-May-16
MECH
22
any leakage on pipe outlet resin
trap of condensate polishing
treatment plant.
CPP
Open
Major
8-May-16
MECH
23
any leakage on elbow of lube oil
pipe mill E
Mill E
Open
Major
8-May-16
MECH
24
improper indication of pressure
gauge of main steam
Boiler
Open
Major
10-May-16
I&C
25
Mill #D motor HOP high
temperature
coal mill D
Open
Major
8-May-16
Elec
26
Leakage on pipe coal inlet burner
A5
coal mill A
Open
Major
8-May-16
MECH
27
leakage on flange of booster
pump BFPT A
Turbine
Open
Major
10-May-16
MECH
28
Service Air Compressor #B has
fault but can't be reset
Boiler
Open
Major
8-May-16
Elec
29
Manual Drain bypass HPH 7 has
leakthrough
Turbine
Open
Major
8-May-16
MECH
30
leakage on connection relief
valve of MBFP booster outlet.
Turbine
Open
Major
10-May-16
MECH
31
GSCW pump #A still high
vibration.
Turbine
Open
Major
5-May-16
MECH
32
any leakage on tube of pressure
switch at BFPT #B
Turbine
Open
Major
8-May-16
I&C
33
any leakage oil on LP MSV of
BFPT #A
Turbine
Open
Major
8-May-16
MECH
34
Leakage oil on connection valve
pressure switch AST
Turbine
Open
Major
8-May-16
MECH
35
furnace CCTV nno.1 has trouble.
Boiler
Open
Major
8-May-16
I&C
36
leakage on air supply pipe of
pneumatic valve outlet mill A
mill A
Open
Major
8-May-16
I&C
37
Seawater Boster Pump # B
vibrasi tinggi
Chlorine
Open
Major
10-May-16
MECH
38
Penunjukan Beban kWh meter
Bruto belum sesuai (terlalu kecil)
Di DCS menunjukkan 147 MW
sedangkan di kWh meter
menujukkan 6.5340 W
Turbine house
Open
Major
10-May-16
ELEC
39
Penunjukan Beban kWh meter PS
- UAT # B, belum sesuai ( terlalu
kecil jika di bandingkan dengan
pemakain aktual alat bantu unit )
Turbine house
Open
Major
10-May-16
ELEC
40
Penunjukan Beban kWh meter PS
- Exciter, belum sesuai ( terlalu
kecil jika di bandingkan dengan
pemakain aktual alat bantu unit )
Turbine house
Open
Major
11-May-16
ELEC
41
Penunjukan Beban kWh meter PS
- UAT # A, belum sesuai ( terlalu
kecil jika di bandingkan dengan
pemakain aktual alat bantu unit )
Turbine house
Open
Major
11-May-16
ELEC
42
Counter Supply HSD Main Boiler
Menunjukkan angka yang
Abnormal dan tidak sesuai
dengan flow yang mengalir
Boiler
Open
Major
11-May-16
I&C
43
leakage boiler tube on
economizer, roof tube and
furnace spriral water wall tube.
Boiler
Open
Major
13-May-16
MECH
MONITORING DEFECT DURING SYNCHRONE
REFERENCE
PLANT & ACTION
CNTIC is requested to analyze and repair the module converter of rectfier.
CNTIC is requested to repair
CNTIC is requested to repair or replace.
CNTIC is requested to repair and re-test.
CNTIC is requested to submit the cause analysis.
CNTIC is requested to clarify and check the bearing condition.
CNTIC is requested to analyze and replace the temperature device.
CNTIC is requested to repair
CNTIC is requested to repair and recalibrated.
CNTIC is requested to repair and recalibrated.
CNTIC is requested to repair
CNTIC is requested to repair or replace.
CNTIC is requested to replace.
CNTIC is requested to repair
CNTIC is requested to repair or replace.
CNTIC is requested root cause analysis
CNTIC is requested to repair
CNTIC is requested to check the boiler leakage detector on position 21 and 20 which
probable leakage on boiler tube.
CNTIC also requested to confirm of setting alarm for each sensor due to the indication
of sensor no.20 has more than upper limit setting oin accordance manual.
CNTIC is requested to repair
CNTIC is requested to repair
CNTIC is requested to adjusting the hanger.
CNTIC is requested to check the setting of pressure switch and need to be
recalibrated.
CNTIC is requested to check and repair the damage point if any.
CNITC is requested to repair
CNITC is requested to replace the elbow.
CNTIC is requested to repair and recalibrated.
CNTIC is requested to check the winding and measure the insulation resistance.
CNTIC is requested to repair with proper procedure
CNTIC is requested to repair or replace the packing seal.
CNTIC is requested to check and repair or replace the module.
CNTIC is requested to repair or replace the valve.
CNTIC is requsted to repair the leakage point with proper procedure.
CNTIC is requested to repair or replace the pump to solve high vibration.
CNTIC is requesteed to tightened the connection or change the gasket.
CNTIC is requested to repair or replace
CNTIC is requested to repair with proper procedure
CNTIC is requested to check and replace the camera which posibble broken on lens.
CNTIC is requested to repair with proper procedure
CNTIC is requested to check and repair
CNTIC is requested to re-set and check the loop signal.
CNTIC is requested to re-set and check the loop signal.
CNTIC is requested to re-set and check the loop signal.
CNTIC is requested to re-set and check the loop signal.
CNTIC is requested to re-calibrated.
CNTIC is requested to repair water wall tube with proper procedure.
CNTIC is requested to submit procedure repair and identify by manufacture.
HRONE
During Synchronize dated o
JMK suggestion
REMARKS (update 11 may 2016)
on May 1st, 2016 CNTIC has change several
part of module converter. But still didn't
CNTIC is requested to replace part has failed and
any confirmation which panel has changed
submit RFCA. (module converter, and display
and the latest information CNTIC requested
control AVR)
to borrow display AVR control from suralaya
plant.
CNTIC is requested to repair if no posibble
discuss for commmercial issue.
CNTIC is requested to replace.
upto now the condition of generator
winding temperature has normal.
Upto now the conditon of temperature on
superheater still unnormally.
CNTIC is requested to check and measure the
isnulation resistance.
- CNTIC is requested to submit the Root cause
analyze by official letter.
- CNTIC is requested to keep monitor the
vibration and solve the problem if the vibration
already pass the first alarm should consider to
repair or treatment.
there is no action
same as previous CNTIC still didn't give any
official letter related technical reasonable
by manufacture. Which has inform during
running manufacture stand by monitor the
vibration.
upto now there is no statement from CNTIC
CNTIC is requested to investigation and submit
related higher temperature for lube oil
clarification by manufacture.
temperature bearing no.2
CNTIC is requested to repair and invite for joint inspection.
there is no action
CNTIC is requested to repair and re-calibrated.
there is no action
- actually speed sensor has broken.
CNTIC is requested to repair and re-calibrated. there is no action
CNTIC should repair
CNTIC has repair the leakage point.
CNTIC is requested to replace.
CNTIC has repair by change the flange and
CNTIC is requested to perform hyraulic system. threeway valve of hydraulic
CNTIC is requested to repair or replace.
there is no action
CNTIC is requested to repair.
there is no action
CNTIC is requested to repair or replace.
there is no action
CNTIC is requested to submit RFCA
there is no action
CNTIC is requested to repair
CNTIC is requested to check the condition of
leakage on boiler pipe and tube.
CNTIC is requested to submit the identification
procedure and repair procedure from
manufacture.
CNTIC is requested to check boiler pipe which
covering by leakage detector channel no.28
which indicate probable leakage on the boiler
pipe.
on goin repair.
upto now only open the clading and
insulation. The point leakge on the body
valve.
upto now CNTIC still waiting monitor the
temperature and will check inside of boiler
which probable leakage. (refer to weekly
information on 10 may 2016)
- based on observation on site, that there
are found 9 point leakage on economizer,
and 14 point leakage on spiral water wall.
CNTIC inform that on going repair
CNTIC is requested to repair or repalce
CNTIC is requested to adjust
there is no action
CNTIC inform that on going monitor and try
to adjusting.
CNTIC is requested to re-calibrated or replace. there is no action
CNTIC is requested to repair the scraper.
will check inside of pulvurized (on 11 may
2016)
- on 11 May 2016 any scarper has
disappear.
- CNTIC will installed the new scraper till
the temperature below 50 celcius.
CNTIC is requested to repair with proper
procedure.
CNTIC was repaired by built up welding. In
accordance standard built up welding only
use for temporary.
CNTIC is requested to repair.
CNTIC was repaired by built up welding. In
accordance standard built up welding only
use for temporary.
CNTIC is requested to repair or replace.
there is no action
CNTIC is requested to running and check the
insulation resistance before running.
there is no action
CNTIC is requested to repair
there is no action
CNTIC is requested to repair
on progress
CNTIC is requested to repair
there is no action
CNTIC is requested to repair
there is no action
CNTIC is requested to repair
on progress repair
CNTIC is requested to repair or replace the
pump.
there is no action
CNTIC is requested to repair
on progress tightened but still leak
CNTIC is requested to repair
there is no action
CNTIC is requested to repair
there is no action
CNTIC is requested to repair or repalce
there is no action
CNTIC is requested to repair
CNTIC need to check
CNTIC need to calibrate
CNTIC need to calibrate
CNTIC need to calibrate
there is no action
CNTIC need to calibrate
CNTIC need to calibrate
already send official letter.
During Synchronize dated on 30 April, 2016
PHOTO