1im i wt
tri-61 44.
INSTALLATION RECORD - RCC PILES
THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
TO AND IS ISSUEDTO
SITE FOR USING FROM NOW.
AUTHENTICATED BY
(SR. MANAGER - E & P)
41 ,skto w t40011111111114*..
i4.00.040tege.K.RE441414Wiiiw4441444i4wiliket.46.4.40..*.xmaitvtopt*
11/:
HINDUSTAN PETROLEUM CORP LTD
1111MMIIIIMPIPIr
INSTALLATION RECORD: Bored cast in situ/ Under-reamed RCC Pile.
CONTRACTOR :
P.O.NO
Date
:
Report No :
4
NAME OF WORK :
Location /Co-ordinate:
Pile No :
Pile Dia :
DATE
TIME OF BORING
FROM
Reinforceme Dia
Main Bars
TO
Nos
BORING DEPTH
FROM
Len. th
Bored level from
Ground level:
Bored level from
Cut of Level :
REMARKS ON
Ph
Density
TO
Lap Length
Lap No.
Marsh cone
Viscosity.
Tot Length Total Lap
Rock Level /socketing strata /No of Blows per
unit time etc.
Remarks
Helical
Spacers
Total
Concrete Grade:
Cubes Taken :
Slump:
Nos.
Marks:
Concrete Started :
Concrete Completed:
Quantity of Concrete:
Cement Consumption:
Density of bentonite suspension = 1.12 grms/cc
Marsh cone viscosity : 37 seconds.
Ph value of the bentonite suspension less than 11.5 but not less than 7.
Sand content shall be less than 7 %. ( to control and reuce wear & tear of the pumping equipemt)
Liquid Limit of suspension : more than 300 % and less than 450 ( to be carried out in lab)
Swelling index ( measured after 12 hrs in abundant water ) shall be atleast 2 times its dry volume.
Signed
HPCL Representative
Consultant
Contractor's Site Incharge
BOOK NO. :
Concrete Pour Card
THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
TO AND IS ISSUED TO
SITE FOR USING FROM NOW.
AUTHENTICATED BY
(SR. MANAGER - E & P)
waPw`.'"w wst44 $041*
*****44040144440101611614444ftwAoitoolivilitie*
Hindustan Petroleum Corporation Ltd.
1
CONCRETE POUR CARD
NAME OF PROJECT
PURCHASE ORDER NO. :
CLIENT
: M/s IHNDUSTAN PETROLEUM CORPORATION LIMITED
ARCHITECT
CONTRACTOR
Date :
Time :
S. No.
1
2
3
4
5
6
7
$
Description
9
10
11
Mii used :
HPCLlConsultant
Contractor
Remark
Level
Plumb
Shuttering
Reinforcement
Concrete quantity
Theoratical cement consumption
Availibility of material at site
Cement
Sand
Metal no. 1
Metal no. 2
V) Water
Silt content in sand
% Bulkage in sand
Others
Whether passed for construction Yes/No
Remark if any :
Contractor's Signature
Architect's Signature
HPCL
-a
If' V,,MORIA
TIF Wri FIORIP9WW111411M
BOOK NO. :
Check List for External
Internal Plaster
THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
1 TO 25 AND IS ISSUED TO
SITE FOR USING FROM NOW.
AUTHENTICATED BY
(SR. MANAGER - E & P)
.7
Otikstaaiomi.i.m,au ,wk.,
'1*Aktokilif1at olimo tiet
Hindustan Petroleum Corporation Ltd.
CHECK LIST FOR EXTERNAL/INTERNAL PLASTER
NAME OF PROJECT
PURCHASE ORDER NO. :
CLIENT
ARCHITECT
CONTRACTOR
Date :
Sr. No.
1
,2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17 J
Location:
Time :
Description
Masonary and concrete surface are found clean, free from dust, loose
Material, oil, grease, morter drooping, nails, steel patti, wooden pieces,
wire etc.
Joints in masonary are racked to a depth of 10 mm.
Surface to be plastered is made sufficiently damped.
Unavoidable projections in masonary and concrete is chissled.
Hacking on concrete surface is sufficiently deep and distance between
hacking is not more than 25-40 mm.
Any leakage observed before plastering.
If yes, leakage have rectified
Joint between concrete surface and masonary are properly filled with
cement morter or sealent before applying plaster.
Joints, concealing and repaired area are covered with chicken mesh of
150 mm. wide.
Mark up are made before plaster at interval not more than the size of
the bottom patti to be used.
Grading of sand, silt and dust are within the permissible limit.
Thickness of single coat plaster is not less than 12 mm and not more
than 15 mm.
Door frame are free from cracks, knots, etc.
6 no. Holdfast fixed properly.
Frame are fixed in 'plumb.
Silt content in sand
% Bulkage in sand
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES I NO
YES I NO
YES / NO
All above point checked and permitted to start plaster. Plaster is in line and level. The difference in
plumb is not more than 2mm.
Contractor's Signature
Architect's Signature
HPCL
BOOK NO. :
Measurement Sheet
THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
TO AND IS ISSUED TO
SITE FOR USING FROM NOW.
AUTHENTICATED BY
(SR; MANAGER - F & P)
Hindustan Petroleum Corporation Ltd,
Measurement Sheet
ENGINEERING Et PROJECTS DEPARTMENT
No.
P. O. No.
Item
Name of Work
Ref.
Name of Party
S.No. I
Date
Description of Item
No.
Length
Breadth
Depth
Quantity
Total
CONTRACTOR
ARCHITECT
HPCL REPRESENTATIVE
BOOK NO 
Site Order Book
THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
TO
AND IS ISSUED TO
SITE FOR USING FROM NOW.
AUTHENTICATED BY
(SR. MANAGER - E & P)
Hindustan Petroleum Corporation Limited
SITE ORDER BOOK
NAME OF THE WORK
PO No.
DATE OF COMMENCEMENT :
CONTRACTORS NAME :
PERIOD OF COMPLETION
SI. No.
Remarks of the Inspecting Officer or Contractor
2
Action Taken Er by whom
3
Remarks
4
BOOK NO. :
Cement Register
THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
AND IS ISSUED TO
TO
SITE FOR USING FROM NOW.
AUTHENTICATED BY
(SR. MANAGER - E & P)
Alb
Hindustan Petroleum Corporation Limited
CEMENT REGISTER
Date of
Receipt
Source & Invoice Ref.
__.. . _
QtY.
Received
3
Cumulative
Qty.
Received
4
Date of .
Issue
5
Cumulative
Consumption
Balance
(4-10)
10
11
MI=
1011111
111
!
i
i
!
!
{
1
1
Remarks
k
Periodica Checks
SiteContractor
Sign.
Engineers
EIC
HQO-IC
Sign.
13
14a
12
14b