1.13 Tender Section A

The document appears to be an installation record for RCC piles containing details of boring, reinforcement, and concrete pouring activities. It includes information on the contractor, pile dimensions, dates and depths of boring and concrete pouring. It also lists requirements for bentonite suspension and concrete mixes. The record is meant to document the installation of RCC piles at a site for Hindustan Petroleum Corporation Ltd.

Uploaded by

ErMelvinDias
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views12 pages

1.13 Tender Section A

The document appears to be an installation record for RCC piles containing details of boring, reinforcement, and concrete pouring activities. It includes information on the contractor, pile dimensions, dates and depths of boring and concrete pouring. It also lists requirements for bentonite suspension and concrete mixes. The record is meant to document the installation of RCC piles at a site for Hindustan Petroleum Corporation Ltd.

Uploaded by

ErMelvinDias
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

.

1im i wt

tri-61 44.

INSTALLATION RECORD - RCC PILES


THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
TO AND IS ISSUEDTO
SITE FOR USING FROM NOW.

AUTHENTICATED BY
(SR. MANAGER - E & P)

41 ,skto w t40011111111114*..

i4.00.040tege.K.RE441414Wiiiw4441444i4wiliket.46.4.40..*.xmaitvtopt*

11/:

HINDUSTAN PETROLEUM CORP LTD

1111MMIIIIMPIPIr

INSTALLATION RECORD: Bored cast in situ/ Under-reamed RCC Pile.


CONTRACTOR :

P.O.NO
Date
:
Report No :

4
NAME OF WORK :
Location /Co-ordinate:
Pile No :
Pile Dia :
DATE

TIME OF BORING
FROM

Reinforceme Dia
Main Bars

TO

Nos

BORING DEPTH
FROM

Len. th

Bored level from


Ground level:
Bored level from
Cut of Level :
REMARKS ON
Ph
Density

TO

Lap Length

Lap No.

Marsh cone
Viscosity.

Tot Length Total Lap

Rock Level /socketing strata /No of Blows per


unit time etc.

Remarks

Helical
Spacers
Total
Concrete Grade:
Cubes Taken :

Slump:
Nos.

Marks:

Concrete Started :

Concrete Completed:

Quantity of Concrete:

Cement Consumption:

Density of bentonite suspension = 1.12 grms/cc


Marsh cone viscosity : 37 seconds.
Ph value of the bentonite suspension less than 11.5 but not less than 7.
Sand content shall be less than 7 %. ( to control and reuce wear & tear of the pumping equipemt)
Liquid Limit of suspension : more than 300 % and less than 450 ( to be carried out in lab)
Swelling index ( measured after 12 hrs in abundant water ) shall be atleast 2 times its dry volume.

Signed
HPCL Representative

Consultant

Contractor's Site Incharge

BOOK NO. :

Concrete Pour Card


THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
TO AND IS ISSUED TO
SITE FOR USING FROM NOW.

AUTHENTICATED BY
(SR. MANAGER - E & P)

waPw`.'"w wst44 $041*

*****44040144440101611614444ftwAoitoolivilitie*

Hindustan Petroleum Corporation Ltd.


1
CONCRETE POUR CARD
NAME OF PROJECT
PURCHASE ORDER NO. :
CLIENT
: M/s IHNDUSTAN PETROLEUM CORPORATION LIMITED
ARCHITECT
CONTRACTOR
Date :

Time :

S. No.
1
2
3
4
5
6
7
$

Description

9
10
11

Mii used :

HPCLlConsultant

Contractor

Remark

Level
Plumb
Shuttering
Reinforcement
Concrete quantity
Theoratical cement consumption
Availibility of material at site
Cement
Sand
Metal no. 1
Metal no. 2
V) Water
Silt content in sand
% Bulkage in sand
Others

Whether passed for construction Yes/No


Remark if any :

Contractor's Signature

Architect's Signature

HPCL

-a

If' V,,MORIA

TIF Wri FIORIP9WW111411M

BOOK NO. :

Check List for External


Internal Plaster
THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
1 TO 25 AND IS ISSUED TO
SITE FOR USING FROM NOW.

AUTHENTICATED BY
(SR. MANAGER - E & P)

.7

Otikstaaiomi.i.m,au ,wk.,

'1*Aktokilif1at olimo tiet

Hindustan Petroleum Corporation Ltd.

CHECK LIST FOR EXTERNAL/INTERNAL PLASTER


NAME OF PROJECT
PURCHASE ORDER NO. :

CLIENT
ARCHITECT
CONTRACTOR
Date :
Sr. No.
1

,2
3
4
5
6

7
8
9

10
11
12
13
14
15
16
17 J

Location:
Time :
Description
Masonary and concrete surface are found clean, free from dust, loose
Material, oil, grease, morter drooping, nails, steel patti, wooden pieces,
wire etc.
Joints in masonary are racked to a depth of 10 mm.
Surface to be plastered is made sufficiently damped.
Unavoidable projections in masonary and concrete is chissled.
Hacking on concrete surface is sufficiently deep and distance between
hacking is not more than 25-40 mm.
Any leakage observed before plastering.
If yes, leakage have rectified
Joint between concrete surface and masonary are properly filled with
cement morter or sealent before applying plaster.
Joints, concealing and repaired area are covered with chicken mesh of
150 mm. wide.
Mark up are made before plaster at interval not more than the size of
the bottom patti to be used.
Grading of sand, silt and dust are within the permissible limit.
Thickness of single coat plaster is not less than 12 mm and not more
than 15 mm.
Door frame are free from cracks, knots, etc.
6 no. Holdfast fixed properly.
Frame are fixed in 'plumb.
Silt content in sand
% Bulkage in sand

YES / NO

YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
YES I NO
YES I NO
YES / NO

All above point checked and permitted to start plaster. Plaster is in line and level. The difference in
plumb is not more than 2mm.

Contractor's Signature

Architect's Signature

HPCL

BOOK NO. :

Measurement Sheet
THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
TO AND IS ISSUED TO
SITE FOR USING FROM NOW.

AUTHENTICATED BY
(SR; MANAGER - F & P)

Hindustan Petroleum Corporation Ltd,

Measurement Sheet

ENGINEERING Et PROJECTS DEPARTMENT

No.

P. O. No.

Item
Name of Work

Ref.

Name of Party
S.No. I

Date
Description of Item

No.

Length

Breadth

Depth

Quantity

Total

CONTRACTOR

ARCHITECT

HPCL REPRESENTATIVE

BOOK NO

Site Order Book


THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
TO
AND IS ISSUED TO
SITE FOR USING FROM NOW.

AUTHENTICATED BY
(SR. MANAGER - E & P)

Hindustan Petroleum Corporation Limited


SITE ORDER BOOK
NAME OF THE WORK

PO No.

DATE OF COMMENCEMENT :

CONTRACTORS NAME :

PERIOD OF COMPLETION
SI. No.

Remarks of the Inspecting Officer or Contractor


2

Action Taken Er by whom


3

Remarks
4

BOOK NO. :

Cement Register
THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
AND IS ISSUED TO
TO
SITE FOR USING FROM NOW.

AUTHENTICATED BY
(SR. MANAGER - E & P)

Alb

Hindustan Petroleum Corporation Limited


CEMENT REGISTER

Date of
Receipt

Source & Invoice Ref.

__.. . _

QtY.
Received
3

Cumulative
Qty.
Received
4

Date of .
Issue
5

Cumulative
Consumption

Balance
(4-10)

10

11

MI=
1011111
111
!

i
i

!
!

{
1
1

Remarks
k
Periodica Checks
SiteContractor
Sign.
Engineers
EIC
HQO-IC
Sign.
13
14a
12
14b