DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
BIAYA
No.
URAIAN
KO
DE
HP
KAP.
HARGA
ALAT
KET.
SEWA
ALAT/JAM
(di luar PPN)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
ASPHALT MIXING PLANT
ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100-150 HP
COMPRESSOR 4000-6500 L\M
CONCRETE MIXER 0.3-0.6 M3
CRANE 10-15 TON
DUMP TRUCK 3.5 TON
DUMP TRUCK 10 TON
EXCAVATOR 80-140 HP
FLAT BED TRUCK 3-4 M3
GENERATOR SET
MOTOR GRADER >100 HP
TRACK LOADER 75-100 HP
WHEEL LOADER 1.0-1.6 M3
THREE WHEEL ROLLER 6-8 T
TANDEM ROLLER 6-8 T.
TIRE ROLLER 8-10 T.
VIBRATORY ROLLER 5-8 T.
CONCRETE VIBRATOR
STONE CRUSHER
WATER PUMP 70-100 mm
WATER TANKER 3000-4500 L.
PEDESTRIAN ROLLER
TAMPER
JACK HAMMER
FULVI MIXER
CONCRETE PUMP
TRAILER 20 TON
PILE DRIVER + HAMMER
CRANE ON TRACK 35 TON
WELDING SET
BORE PILE MACHINE
ASPHALT LIQUID MIXER
TRONTON
COLD MILLING
ROCK DRILL BREAKER
COLD RECYCLER
HOT RECYCLER
AGGREGAT (CHIP) SPREADER
ASPHALT DISTRIBUTOR
SLIP FORM PAVER
CONCRETE PAN MIXER
CONCRETE BREAKER
ASPAHLT TANKER
CEMENT TANKER
CONDRETE MIXER (350)
VIBRATING RAMMER
TRUK MIXER (AGITATOR)
BORE PILE MACHINE
CRANE ON TRACK 75-100 TON
BLENDING EQUIPMENT
E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36
E37
E38
E39
E40
E41
E42
E43
E44
E45
E46
E47
E48
E49
E50
E51
E52
294.0
72.4
4.0
155.0 60.0
20.0
138.0
100.0
190.0
133.0
190.0
180.0
135.0
70.0
96.0
55.0
82.0
100.5
82.0
5.5
220.0
6.0 100.0
8.8
4.7
0.0
345.0
100.0
175.0
25.0
125.0
40.0
150.0
5.0
150.0
248.0
3.0 900.0
400.0
115.0
115.0
105.0
134.0
290.0
190.0
190.0
20.0
4.2
220.0
125.0
200.0
50.0
60.0 T/Jam
10.0 Ton
850.0 Liter
5,000.0 CPM/(L/m)
500.0 Liter
15.0 Ton
3.5 Ton
10.0 Ton
0.9 M3
10.0 ton
135.0 KVA
10,800.0 0.8 M3
1.5 M3
8.0 Ton
8.1 Ton
9.0 Ton
7.1 Ton
25.0 60.0 T/Jam
4,000.0 Liter
835.00 Ton
121.00 Ton
1,330.00 2,005.00 8.00 M3
20.00 Ton
2.50 Ton
35.0 Ton
250.0 Amp
2,000.0 Meter
1,000.0 Liter
15.0 Ton
1,000.0 m
2,200.0 M
3.0 M
3.5 M
4,000.0 Liter
2.5 M
600.0 Liter
20.0 m3/jam
4,000.0 liter
4,000.0 liter
350.0 liter
80.0 KG
5.0 M3
60.0 CM
75.0 Ton
30.0 Ton
53
ASPHALT LIQUID MIXER
E34a
40.0
54
55
BAR BENDER
BAR CUTTER
E53
E54
3.0
3.0
56
BREAKER
E55
80.0
57
GROUTING PUMP
E56
100.0
15.0 Ton
58
JACK HIDROLIC
E57
3.0
59
MESIN LAS
E58
60
61
62
PILE DRIVER LEADER, 75 kw
PILE HAMMER
PILE HAMMER, 2,5 Ton
63
64
STRESSING JACK
WELDING MACHINE, 300 A
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-
20,000.0 Liter
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.0 0
0.0 0
3.0 m3/jam
150.0 Ton
3.0
0.2 Ton
E59
E60
E61
70.0
10.0
1.0
75.0 kw
0.0 0
2.5 Ton
E62
E63
89.0
5.0
15.0 Ton
0.0 0
URAIAN ANALISA ALAT
No.
URAIAN
A.
1.
2.
3.
4.
5
B.
1.
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
Pw
Cp
A
W
B
Kapastas tangki aspal
Ca
850
BIAYA PASTI PER JAM KERJA
Nilai Sisa Alat
= 10 % x B
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
H
H3
0.00
0.00
Rupiah
Rupiah
0.00
Rupiah
Rupiah
0.00
Rupiah
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =
b. Asuransi, dll =
0.002 x B
W
Biaya Pasti per Jam
C.
KODE
(E+F)
ASPHALT SPRAYER
4.0
HP
850.0
Liter
5.0
Tahun
2,000.0
Jam
0
Rupiah
Liter
Rupiah
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
Bahan Bakar Pemanas Aspal
= 1/1000 *Ca*Ms
2.
Pelumas
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B
W
3.
Perawatan dan
perbaikan =
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
0.00
0.00
Rupiah
Rupiah
Biaya Operasi per Jam
0.00
Rupiah
0.00
Rupiah
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter
KET.
E03
URAIAN ANALISA ALAT
No.
URAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
BIAYA PASTI PER JAM KERJA
Nilai Sisa Alat
= 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
SATUAN
COMPRESSOR 4000-6500 L\M
Pw
60.0
HP
Cp
5,000.0 CPM/(L/m)
A
5.0
Tahun
W
2,000.0
Jam
B
0
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
0.002 x B
W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
0.00
Rupiah
2.
Pelumas
0.00
Rupiah
0.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B
W
3.
Perawatan dan
perbaikan =
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
0.00
0.00
Rupiah
Rupiah
Biaya Operasi per Jam
0.00
Rupiah
0.00
Rupiah
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter
KET.
E05
URAIAN ANALISA ALAT
No.
URAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
BIAYA PASTI PER JAM KERJA
Nilai Sisa Alat
= 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
SATUAN
CONCRETE MIXER 0.3-0.6 M3
Pw
20.0
HP
Cp
500.0
Liter
A
2.0
Tahun
W
1,500.0
Jam
B
0
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.57619
(B-C)xD
W
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
0.002 x B
W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
0.00
Rupiah
2.
Pelumas
0.00
Rupiah
Rupiah
0.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B
W
3.
Perawatan dan
perbaikan =
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
0.00
0.00
Rupiah
Rupiah
Biaya Operasi per Jam
0.00
Rupiah
0.00
Rupiah
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter
KET.
E06
URAIAN ANALISA ALAT
No.
URAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
BIAYA PASTI PER JAM KERJA
Nilai Sisa Alat
= 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
SATUAN
DUMP TRUCK 3.5 TON
100.0
HP
3.5
Ton
5.0
Tahun
2,000.0
Jam
0
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
0.002 x B
W
Biaya Pasti per Jam
Pw
Cp
A
W
B
KOEF.
(E+F)
Rupiah
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
0.00
Rupiah
2.
Pelumas
0.00
Rupiah
0.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B
W
3.
Perawatan dan
perbaikan =
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
0.00
0.00
Rupiah
Rupiah
Biaya Operasi per Jam
0.00
Rupiah
0.00
Rupiah
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir / Mekanik
Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter
KET.
E08
URAIAN ANALISA ALAT
No.
URAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
BIAYA PASTI PER JAM KERJA
Nilai Sisa Alat
= 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
SATUAN
FLAT BED TRUCK 3-4 M3
190.0
HP
10.0
M3
5.0
Tahun
2,000.0
Jam
0
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
0.002 x B
W
Biaya Pasti per Jam
Pw
Cp
A
W
B
KOEF.
(E+F)
Rupiah
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
0.00
Rupiah
2.
Pelumas
0.00
Rupiah
Rupiah
0.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B
W
3.
Perawatan dan
perbaikan =
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
0.00
0.00
Rupiah
Rupiah
Biaya Operasi per Jam
0.00
Rupiah
0.00
Rupiah
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter
KET.
E11
URAIAN ANALISA ALAT
No.
URAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
BIAYA PASTI PER JAM KERJA
Nilai Sisa Alat
= 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
SATUAN
MOTOR GRADER >100 HP
135.0
HP
10,800.0
5.0
Tahun
2,000.0
Jam
0
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
0.002 x B
W
Biaya Pasti per Jam
Pw
Cp
A
W
B
KOEF.
(E+F)
Rupiah
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
0.00
Rupiah
2.
Pelumas
0.00
Rupiah
Rupiah
0.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B
W
3.
Perawatan dan
perbaikan =
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
0.00
0.00
Rupiah
Rupiah
Biaya Operasi per Jam
0.00
Rupiah
0.00
Rupiah
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter
KET.
E13
URAIAN ANALISA ALAT
No.
URAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
BIAYA PASTI PER JAM KERJA
Nilai Sisa Alat
= 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
SATUAN
WHEEL LOADER 1.0-1.6 M3
96.0
HP
1.5
M3
5.0
Tahun
2,000.0
Jam
0
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
0.002 x B
W
Biaya Pasti per Jam
Pw
Cp
A
W
B
KOEF.
(E+F)
Rupiah
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
0.00
Rupiah
2.
Pelumas
0.00
Rupiah
Rupiah
0.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B
W
3.
Perawatan dan
perbaikan =
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
0.00
0.00
Rupiah
Rupiah
Biaya Operasi per Jam
0.00
Rupiah
0.00
Rupiah
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter
KET.
E15
URAIAN ANALISA ALAT
No.
URAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
BIAYA PASTI PER JAM KERJA
Nilai Sisa Alat
= 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
SATUAN
THREE WHEEL ROLLER 6-8 T
Pw
55.0
HP
Cp
8.0
Ton
A
5.0
Tahun
W
2,000.0
Jam
B
0
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
0.002 x B
W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
0.00
Rupiah
2.
Pelumas
0.00
Rupiah
Rupiah
0.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B
W
3.
Perawatan dan
perbaikan =
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
0.00
0.00
Rupiah
Rupiah
Biaya Operasi per Jam
0.00
Rupiah
0.00
Rupiah
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter
KET.
E16
URAIAN ANALISA ALAT
No.
URAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
BIAYA PASTI PER JAM KERJA
Nilai Sisa Alat
= 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
SATUAN
TANDEM ROLLER 6-8 T.
82.0
HP
8.1
Ton
5.0
Tahun
2,000.0
Jam
0
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
0.002 x B
W
Biaya Pasti per Jam
Pw
Cp
A
W
B
KOEF.
(E+F)
Rupiah
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
0.00
Rupiah
2.
Pelumas
0.00
Rupiah
Rupiah
0.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B
W
3.
Perawatan dan
perbaikan =
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
0.00
0.00
Rupiah
Rupiah
Biaya Operasi per Jam
0.00
Rupiah
0.00
Rupiah
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter
KET.
E17
URAIAN ANALISA ALAT
No.
URAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
BIAYA PASTI PER JAM KERJA
Nilai Sisa Alat
= 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
SATUAN
VIBRATORY ROLLER 5-8 T.
82.0
HP
7.050
Ton
5.0
Tahun
2,000.0
Jam
0
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
0.002 x B
W
Biaya Pasti per Jam
Pw
Cp
A
W
B
KOEF.
(E+F)
Rupiah
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
0.00
Rupiah
2.
Pelumas
0.00
Rupiah
Rupiah
0.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B
W
3.
Perawatan dan
perbaikan =
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
0.00
0.00
Rupiah
Rupiah
Biaya Operasi per Jam
0.00
Rupiah
0.00
Rupiah
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter
KET.
E19
URAIAN ANALISA ALAT
No.
URAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
BIAYA PASTI PER JAM KERJA
Nilai Sisa Alat
= 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
SATUAN
WATER TANKER 3000-4500 L.
Pw
100.0
HP
Cp
4,000.0
Liter
A
5.0
Tahun
W
2,000.0
Jam
B
0
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
0.002 x B
W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
0.00
Rupiah
2.
Pelumas
0.00
Rupiah
Rupiah
0.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B
W
3.
Perawatan dan
perbaikan =
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
0.00
0.00
Rupiah
Rupiah
Biaya Operasi per Jam
0.00
Rupiah
0.00
Rupiah
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter
KET.
E23