PREPARED. BY:- CHECKED.
BY:- APPROVED B
HERO
INITIAL PART PRODUCTION TAG DATE:- REASON FO
1) DRAWING SPECIFICATION CHAN
PART NO:- GR. NO. / DATE:- 2) QUALITY IMPROVEMENT.
3) NEW SUPPLIER/ NEW LOCATION
PART NAME:- CH. NO. / DATE:- 4) SUBVENDOR CHANGE/ SUBVEN
5) MATERIAL CHANGE/ ALTERNATE
VENDOR:- ECN NO. / DATE:- 6) MANUFACTURING METHOD CHA
7) MANUFACTURING PROCESS SE
8) MACHINE CHANGE.
MODEL:- QUANTITY:-
9) JIG/ FIXTURE/ TOOL DESIGN CH
MODIFICATION:- 10) DIE/ MOULD CHANGE.
11) INSPECTION METHOD CHANG
12) PACKINGCHANGE (WITH OR W
METHOD CHANGE).
13) RESTART OF SUPPLIERS & PAR
DISCONTINUATION FOR TWELVE M
14) CHANGE IN MANPOWER AT CR
15) OFFLOADING BY TIER 1 AND T
16) SAME LINE/ JIGS/ FIXURES/ DIE
LOCATION.
PREPARED BY:-
APPROVED BY:-
ITEMS FOR INSPECTION DURING FITMENT
DEPARTMENT INSPECTION ITEM
1) PPC ENTER FRAME NO. & ENGINE NO.
2) PRODUCTION WORKABILITY CONFIRMATION & ASSY CONFIRMATION
3) FINAL INSP. JUDGEMENT RESULT & FRAME NO./ENGINE NO. CONFIRMATION.
ISPECTION DATE DATE & TIME OF FEEDING PERSON INCHARGE SECTION HEAD
TO LINE BY PPC IN PLANT / SQA MANUFACTURING
COMMENTS:-
FRAME/ENGINE NO.
COMMENTS:-
COMMENTS:-
CONCLUSION BY B.O.I. / INPLANT:-
APPROVED BY:- SHEET 1/1 DOC. NO.IMDM:QA:BP:FF:04
REV. NO.:- 01
DATE:- 01/04/09
REASON FOR IPPT FLOW
1) DRAWING SPECIFICATION CHANGE.
2) QUALITY IMPROVEMENT.
3) NEW SUPPLIER/ NEW LOCATION/ NEW LINE.
4) SUBVENDOR CHANGE/ SUBVENDOR LOCATION.
5) MATERIAL CHANGE/ ALTERNATE MATERIAL.
6) MANUFACTURING METHOD CHANGE. SUPPLIER
7) MANUFACTURING PROCESS SEQUENCE CHANGE.
8) MACHINE CHANGE.
9) JIG/ FIXTURE/ TOOL DESIGN CHANGE.
10) DIE/ MOULD CHANGE.
11) INSPECTION METHOD CHANGE.
12) PACKINGCHANGE (WITH OR WITHOUT TRANSPORTTATION
METHOD CHANGE).
13) RESTART OF SUPPLIERS & PARTS AFTER RECEIPT STORE/ MATERIALS
DISCONTINUATION FOR TWELVE MONTHS.
14) CHANGE IN MANPOWER AT CRITICAL STAGES.
15) OFFLOADING BY TIER 1 AND TIER 2 SUPPLIERS.
16) SAME LINE/ JIGS/ FIXURES/ DIES/ SHIFTING TO NEW
LOCATION.
QA BOP/ INTERNAL
SUPPLIER
PREPARED BY:-
APPROVED BY:-
PPC
MANUFACTURING
DEPTT.
SECTION HEAD PERSON INCHARGE SECTION HEAD FINAL INSP.
MANUFACTURING PPC
P
R
O
D
U
C
SIGN:- T
I
O
N
&
F
SIGN:- I
N
A
L
I
N
S
SIGN:- P
T:- E
C
T
I
O
N