72 60 00 PDF
72 60 00 PDF
                                                                                        726000
                                                                                                      Page 201
                                                                                                      Sep 15/00
                            Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                 RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                                  726000
                                                                                      Page 202
                                                                                      Sep 15/00
                       Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                        RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                               726000
                                                                                   Page 203
                                                                                   Sep 15/00
                    Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                        RollsRoyce
                 250B17F SERIES OPERATION AND MAINTENANCE
                                                                                         726000
                                                                                               Page 204
                                                                                               Sep 15/00
                              Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                             Rolls--Royce
                   250--B17F SERIES OPERATION AND MAINTENANCE
       (19) Check run the engine after gearbox replacement. (See Check Run, para 1., 72--00--00, Engine
            Adjustment/Test.)
            NOTE:     When the power and accessory gearbox has been replaced, check the system oil
                      level before and after the check run.
  B.   Oil Seals Replacement
       Replace leaking power and accessory gearbox seals as follows:
       NOTE:     Long term use of Aeroshell 555 oil may increase the probability of seal leakage in the
                 accessory gearbox.
       (1) Remove the accessory or drive from the gearbox pad.
       CAUTION:       DO NOT PRY BETWEEN THE SEAL CAVITY IN THE HOUSING AND THE SEAL.
       (2) Use the 6796941 seal replacement kit to remove the seal. Be careful not to contaminate the
           shaft bearing or damage the gear shaft. The seal will be damaged during removal,
           consequently it will not be salvageable.
       CAUTION:       DO NOT USE SILICONE LUBRICANTS EXCEPT WHERE SPECIFIED. USE
                      ONLY THE LUBRICANTS RECOMMENDED IN THE TABLE 301, 72--00--00,
                      ENGINE--SERVICING.
       (3) Apply grease (Shell 6249, Mobil 28, engine oil or equivalent) to the seal lip to aid the
           installation, then carefully drive (or press) the replacement seal in place.
       (4) Reinstall the accessory or drive on the gearbox pad.
  C.   Oil Filter Replacement (See Figure 215)
       Remove, inspect, clean and install the oil filter as follows: (Refer to Gearbox Housing Lubrication
       System Components Disassembly, para 2.D., this section.)
       (1) Place a container beneath the gearbox to catch oil which will drain when the cap is removed.
       (2) Remove two nuts and washers; then using 6798860 puller, remove the oil filter cap. Remove
           the filter element and packing from the housing. Discard the packing.
       (3) Inspect filter element and filter cavity for metal particles.
            (a) A small amount of metallic debris is acceptable after recent overhaul or repair. If
                excessive metal contamination is present, clean filter and perform ground run for 30
                minutes at power.
            (b) Check filter after ground run for new accumulation of particles. If filter is clean, release
                aircraft for flight. If accumulation is present after second ground run, tag engine, noting
                cause for rejection.
       (4) Reinstall the cap while the oil filter element is being cleaned.
       (5) Clean the filter ultrasonically in perchlorethylene. If equipment is not available, clean by
           agitating in mineral spirits.
       (6) If excessive contamination is present the filter must be ultrasonically cleaned. If excessive
           carbon deposits are found, con-- duct the inspection and cleaning of the power turbine support
           pressure oil nozzle in accordance with Cleaning the Power Turbine Support Pressure Oil
           Nozzle, para 6.F.(3), 72--50--00.
       (7) Dry the filter by shaking (air dry), and inspect for any metal particles. If particles are present,
           re--clean filter or replace filter element.
       (8) Remove the cap and replace packing.
       (9) Thoroughly clean the filter cavity of all residual oil and sludge.
       (10) Install the cleaned filter element with new packing. Install filter cap with new packing. Tighten
            nuts to 30--40 lb in. (3.4--4.5 N.m).
                                                                                     72--60--00
                                  .COPYRIGHT 1989, 2008 Rolls--Royce Corporation                      Page 205
                                                                                                      May 1/08
                         Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                               RollsRoyce
                      250B17F SERIES OPERATION AND MAINTENANCE
                                                                                                726000
                                                                                                        Page 206
                                                                                                       Sep 15/00
                                     Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                            RollsRoyce
                  250B17F SERIES OPERATION AND MAINTENANCE
                                                                                        726000
                                                                                                     Page 207
                                                                                                     Sep 15/00
                        Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                  RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                                   726000
                                                                                       Page 208
                                                                                       Sep 15/00
                        Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                          RollsRoyce
                250B17F SERIES OPERATION AND MAINTENANCE
                                                                                    726000
                                                                                                    Page 209
                                                                                                    Sep 15/00
                      Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                   RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                                    726000
                                                                                        Page 210
                                                                                        Sep 15/00
                         Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                        RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                               726000
                                                                                    Page 211
                                                                                   Sep 15/00
                    Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                          RollsRoyce
                  250B17F SERIES OPERATION AND MAINTENANCE
                                                                                           726000
                                                                                                  Page 212
                                                                                                 Sep 15/00
                                Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                        RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                               726000
                                                                                   Page 213
                                                                                   Sep 15/00
                    Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                          RollsRoyce
                 250B17F SERIES OPERATION AND MAINTENANCE
                                                                                           726000
                                                                                                Page 214
                                                                                               Sep 15/00
                                Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                        RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                               726000
                                                                                   Page 215
                                                                                   Sep 15/00
                    Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                            RollsRoyce
                    250B17F SERIES OPERATION AND MAINTENANCE
                                                                                             726000
                                                                                                   Page 216
                                                                                                    May 1/04
                                  Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                            RollsRoyce
                  250B17F SERIES OPERATION AND MAINTENANCE
                                                                                   726000
                                                                                                Page 217
                                                                                                Sep 15/00
                        Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                        RollsRoyce
                250B17F SERIES OPERATION AND MAINTENANCE
                                                                                         726000
                                                                                                      Page 218
                                                                                                     Sep 15/00
                              Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                        RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                               726000
                                                                                   Page 219
                                                                                   Sep 15/00
                    Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                 RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                                          726000
                                                                                                      Page 221
                                                                                                      Sep 15/00
                         Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                   RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                                    726000
                                                                                        Page 222
                                                                                        Sep 15/00
                         Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                             RollsRoyce
                   250B17F SERIES OPERATION AND MAINTENANCE
       (10) Remove the fuel control and oil pump flex shaft coupling.
       (11) Remove the eight pump attaching screws and six washers. Remove the oil filter inlet and
            bypass tubes, the transfer tube to the filter housing, and the scavenge oil tube. Discard the
            seven packings. Remove pump. Discard the gasket and packing beneath the pump.
       (12) Remove the two oil transfer tubes and connector beneath the oil pump. Discard two packings
            from each.
       (13) Remove the lockwire and separate the magnetic plug from the gearbox housing. Discard
            packing.
       (14) Remove the low pressure scavenge check valve from the gearbox housing. Discard packing.
       (15) Remove gearbox housing accessory pad seals using 6796941 seal replacement kit only if the
            seals are defective.
  E.   Oil Filter Inlet Tube Assembly Drop Dimension Inspection
       (1) Engines that exhibit low or fluctuating oil pressure may have been assembled with an
           incorrectly manufactured tube assembly, P/N 6876925A. If the gearbox modification log card
           does not show compliance with 250B17F TP CEB 722041, proceed to the next step.
       (2) Remove the Lube Oil Filter Housing Assembly from the gearbox. Refer to para 2.D., this
           section.
       (3) Make sure that all gasket material is removed from the gearbox. Do not let gasket material or
           other foreign material fall into the gearbox.
                                                                                        726000
                                                                                                    Page 223
                                                                                                    Sep 15/00
                         Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                           RollsRoyce
                   250B17F SERIES OPERATION AND MAINTENANCE
        (4) Using a 23 inch depth micrometer, measure the distance from the gearbox/filter housing
            splitline to the top of the oil filter inlet tube assembly, P/N 6876925A (See Figure 216).
        (5) If this dimension exceeds 2.843 in. (72.21 mm), then the oil inlet tube assembly and the oil
            filter housing assembly may not be correctly engaged. Reject the gearbox for compliance of
            250B17F TP CEB 722041 or replace P/N 6876925A, Oil Filter Inlet Tube Assembly with P/N
            6876925B (or later) Oil Filter Inlet Tube Assembly.
   F.   Oil Pump Disassembly, Inspection and Assembly
        Disassemble and inspect the oil pump when it is the suspected cause of oil pressure and/or oil
        scavenging discrepancies. Remove pump in accordance with the Gearbox Housing Lubrication
        System Components Disassembly para 2.D., this section. Install pump in accordance with the
        Gearbox Housing Assembly and Check, para 2.I., this section.
        CAUTION:      BE CAREFUL NOT TO PRY ON, OR DAMAGE, ANY LAPPED SURFACES.
        (1) Disassemble the oil pump as follows: (See Figure 217)
            (a) Remove two screws and separate the pressure oil pump body from the balance of the
                pump.
            (b) Remove the oil pump idler spur gear. Remove and discard the packing in the pump body.
                Do not remove the pinned bushing cage or flanged bushings unless replacement is
                required.
            (c) Remove the oil pump and gas producer tachometer spur gearshaft. Do not remove the
                oil seal plug unless it is loose. If replacement is necessary, press out the plug using
                1/4in. (6 mm) OD drift.
            (d) Remove the pressure and scavenge oil pump separator body using a prying tool. Do not
                pry on lapped surfaces. Remove the oil pump drive spur gear and three oil pump idler
                spur gears. Discard five packings.
            (e) Remove the scavenge oil pump cover from the scavenge oil pump body using a prying
                tool. Do not pry on lapped surfaces. Remove the oil pump drive spur gear and three oil
                pump idler spur gears. Discard three packings.
            (f)   Do not remove the four dowel pins from the pump body unless replacement is necessary.
                  Do not remove the three pinned oil pump gearshafts or the pinned bushing from the
                  scavenge oil pump cover unless replacement is necessary.
        (2) Inspect the components of the oil pump in accordance with Table 201.
        (3) Replace or secure loose oil pump gearshafts as follows:
            (a) Immediately prior to installing gearshafts, clean the bores and the gearshaft using
                cleaning agent recommended by Loctite Corporation. Apply Loctite 290, in accordance
                with Loctite Corporation recommendations, to the mating surfaces of the gearshaft OD
                only.
            (b) Install gearshaft with the slot aligned with the antirotation pin and ensure that it bottoms
                in the cover assembly bore.
            (c) Immediately after gearshaft installation, clean off any Loctite on the shaft OD and cover
                assembly.
                                                                                            726000
                                                                                                   Page 224
                                                                                                   Sep 15/00
                                 Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                         RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                                        726000
                                                                                                Page 226
                                                                                                Sep 15/00
                             Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                             RollsRoyce
                     250B17F SERIES OPERATION AND MAINTENANCE
Table 201
                                                                                          726000
                                                                                                       Page 227
                                                                                                       Sep 15/00
                         Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                               RollsRoyce
                      250B17F SERIES OPERATION AND MAINTENANCE
Oil Pump and Gas Producer Tachometer Spur Gearshaft (fig. 217)
         (4) Assemble the lube oil pump as follows: (See Figure 217)
             CAUTION:        USE SPECIFIED LUBRICANTS DURING PUMP ASSEMBLY; DO NOT USE
                             SILICONE LUBRICANTS.
             (a) Lubricate and install the three packings in the scavenge body assembly. Install the oil
                 pump drive gear and three oil pump idler gears.
                  1      Measure the gear end clearance in the pressure and scavenge elements between
                         the splitline and gear end with a dial indicator. The gear end clearance must be
                         0.0005 0.0015 in. (0.0130.038 mm).
                  2      If the end clearance limit is exceeded, select gears or lap scavenge oil pump body,
                         pressure and scavenge oil pump separator body or pressure oil pump body as
                         necessary to obtain required gear end clearance. Make sure that lapping is done on
                         a flat lap surface and that the whole face of the item being lapped is smooth and
                         square. Surface finish after lapping must be 32 microinches (0.80 micrometers) or
                         better.
             (b) Place cover assembly on the scavenge body assembly. Install oil pump drive gear with
                 lubricated packings and oil pump idler gears. Lubricate and install four packings in the
                 separator body. Place separator body on the scavenge body assembly.
             (c) Install oil seal plug in oil pump and gas producer tachometer spur gearshaft if it has been
                 removed. Install oil pump idler spur gear and oil pump and gas producer tachometer spur
                 gearshaft on the separator body.
                                                                                               726000
                                                                                                          Page 228
                                                                                                         Sep 15/00
                                    Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                             RollsRoyce
                    250B17F SERIES OPERATION AND MAINTENANCE
           (d) Lubricate and install packing in pressure oil pump body. Place pressure oil pump body on
               scavenge body assembly. Install two screws; tighten to 1822 lb in. (2.02.5 N.m).
                NOTE:      The pump must turn freely by hand after assembly.
  G.   Gearbox Assembly and Test
       Assemble the gearbox as follows:
       (1) Lube Oil Filter Housing Assembly and Test (See Figure 215).
           (a) Assemble and test the lube oil filter housing as follows:
                CAUTION:         INSPECT THE RETAINING RING BEFORE INSTALLATION TO BE SURE
                                 IT HAS NO DEFECTS AND AFTER INSTALLATION TO BE SURE IT IS
                                 PROPERLY SEATED.
                1    Install the poppet, spring, lubricated packing, and guide in the filter housing. Retain
                     with an internal retaining ring. Use 6798807 compressor to aid in installation of
                     retaining ring.
                2    Lubricate and install the packing on the pressure regulator guide. Insert poppet,
                     spring, and guide into the filter housing. Make an approximate adjustment of the
                     regulator by bottoming the adjusting screw and backing out 51/2 turns.
                3    Test the lube oil filter housing as follows:
                     a     Plug the standpipe and install the cap on the filter housing.
                     b     Connect a supply of calibration fluid at 2429C (7585F) or engine oil at
                           2738C (80100F) to the filter housing inlet port.
                     c     Slowly apply increasing pressure until the bypass valve opens. Pressure must
                           be 80130 psig (552896 kPag).
                     d     Decrease pressure to 30 psig (207 kPag). Leakage through the bypass valve
                           must not exceed 63 cc per minute.
                     e     Connect the fluid supply to the outlet port and plug the inlet port.
                     f     Adjust the fluid supply to obtain a flow of 720 pph (327 kg/hr) across the filter.
                     g     Adjust the guide assembly until 130  5 psig (896  34.5 kPag) is obtained with
                           720 pph (327 kg/hr) flow.
                     h     Decrease flow to 15 pph (6.8 kg/hr). Pressure must not be less than 125 psig
                           (862 kPag). If pressure is not within limits, repeat steps f and g, adjusting the
                           guide assembly for a higher pressure within the 130  5 psig (896  34.5 kPag)
                           range. If pressure is less than 125 psig (862 kPag) at 15 pph (6.8 kg/hr)
                           replace the pressure regulating poppet valve and repeat the entire test.
                     i     Remove the cap and remove the plug from the stand pipe. Remove the plug
                           from the inlet port.
                4    Install the filter assembly with new lubricated packing in the filter housing. Install cap
                     with lubricated packing in the filter housing. Secure the cap with two nuts and
                     washers. Tighten nuts to 3540 lb in. (3.94.5 N.m).
  H.   Gearbox Housing Assembly and Check (Refer to Figure 212)
       Assemble and check gearbox housing as follows:
       (1) Install gearbox housing seals as necessary at the following locations using 6796941 seal
           installation kit with details 16 or 19 (See Figures 218 and 219). Apply grease to the seal lip
           to aid in installation.
           (a) Power turbine tachometer generator pad (use detail 16).
           (b) Gas producer tachometer generator pad (use detail 16).
                                                                                      726000
                                                                                                    Page 229
                                                                                                    Sep 15/00
                         Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                          RollsRoyce
                  250B17F SERIES OPERATION AND MAINTENANCE
      (2) Lubricate and install the packings on the two oil transfer tubes and the connector which go
          beneath the oil pump. Install the transfer tubes and connector in the gearbox housing (See
          Figure 220).
      (3) Lubricate and install the two packings on oil transfer tube and insert tube in the pump (See
          Figure 215).
      (4) Lubricate and install the packing on the underside of the lube pump (See Figure 215). Position
          the pump mounting gasket and install the pump in the gearbox housing using 6796941 seal
          guide with detail 13 (See Figure 221). Install the filter inlet and filter bypass tubes with
          lubricated packings.
      (5) Insert eight pump attaching screws and six washers. Washers are used at positions 1, 3, 4, 5,
          6, and 7 counting clockwise with 1 at the point nearest the filter housing. The five 1032 X 2
          in. screws go at positions 1, 2, 3, 7, and 8; the two 1032 X 2.750 in. screws go at positions 4
          and 6; the 1032 X 2.375 in. screw goes at position 5. Do not tighten screws at positions 2
          and 8 at this time, tighten others finger tight.
      (6) Lubricate packing and install it on the scavenge oil tube. Install the scavenge oil tube in the oil
          pump. Retain the scavenge oil tube with a screw at the oil pressure tube and with a screw at
          the oil delivery tube.
      (7) Lubricate and install the two packings on the check valve; install the valve in the gearbox
          housing (See Figure 222).
      (8) Position the gasket and install the filter housing assembly in the gearbox housing (See Figure
          215). Mate the filter inlet and filter bypass transfer tubes and check valve to the filter housing
          during the assembly (See Figure 222).
      (9) Retain the housing with eight nuts and washers. Tighten nuts to 3540 lb in. (3.94.5 N.m).
          Align the two tubes; then tighten the pump attaching screws to 3540 lb in. (3.94.5 N.m).
          Loosen and retorque to 2226 lb in. (2.52.9 N.m). Secure with lockwire.
      (10) Lubricate and install two packings on each of the three oil scavenge transfer tubes; install the
           two short tubes in the pump and the long tube in the gearbox housing.
      (11) Lubricate and install two packings on the oil delivery tube and one packing on the oil pressure
           tube. Install the oil pressure tube (nozzle) and the oil delivery tube with screen in the gearbox
           housing. Retain each with a screw; tighten screws to 2226 lb in. (2.52.9 N.m) and secure
           with lockwire.
(12) Make a static leak check of the oil filter housing and lube oil pump assembly.
           (a) Equipment. A six foot length of oneinch (25.4 mm) ID copper tubing having a length of
               hose with a shutoff valve near the outlet end; a four foot (1.2 m) head of oil in the
               standpipe; and a fitting for connecting the hose to the oilin port of the gearbox.
           (b) Attach the fitting to the gearbox and the standpipe hose to the fitting. Keep the hose
               coupling loose until the system can be bled. Open the shutoff valve and bleed the air
               from the system, then tighten the hose coupling nut.
(c) Place the gearbox housing in a vertical position with the oil pump at the top.
(d) Visually check the partial assembly for ten minutes for oil leakage.
                NOTE:     Leakage will be evident if a problem exists. Slight moistness or seepage should
                          not be interpreted as leakage.
           (e) Correct the condition causing leakage before proceeding with the assembly of the
               gearbox.
                                                                                           726000
                                                                                                   Page 230
                                                                                                  Sep 15/00
                                Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                        RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                               726000
                                                                                   Page 231
                                                                                   Sep 15/00
                    Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                                 726000
                                                                                     Page 232
                                                                                     Sep 15/00
                      Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                            RollsRoyce
                 250B17F SERIES OPERATION AND MAINTENANCE
                                                                                   726000
                                                                                                Page 233
                                                                                                Sep 15/00
                        Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                             RollsRoyce
                    250B17F SERIES OPERATION AND MAINTENANCE
        (22) Apply lubricant lightly to the splines then install the tachometer and governor spur gearshaft in
             the gearbox housing using 6796941 seal guide with detail 13.
        (23) Lubricate and install the bearings on the fuel control and oil pump spur gearshaft using
             6796930 plate, location H and 6796946 drift. The small ball bearing that was pulled by the
             outer race must be replaced with a new bearing at this step if there is any apparent indication
             of raceway brinelling. Install the gearshaft in the oil pump bearing cage.
        (24) Apply lubricant lightly to the splines then install the fuel control and oil pump flex shaft coupling
             on the oil pump drive shaft (See Figure 215).
        (25) Lubricate packing and install with magnetic plug in the gearbox housing. Tighten plug to 6080
             lb in. (6.89.0 N.m) and secure with lockwire.
        (26) Lubricate packing and install with low pressure scavenge oil check valve on outside of gearbox
             housing. Install check valve with arrow pointing away from gearbox housing.
   I.   Gearbox Cover Assembly (See Figure 202)
        Assemble the gearbox cover as follows:
        (1) Install gearbox cover seals as necessary at the following locations using 6796941 seal
            installation kit with details 16, 17, and 20 (See Figures 219 and 224). Apply grease to the
            seal lip to aid in installation.
             (a) Accessory drive pad (use detail 17).
             (b) Gas producer fuel control pad (use detail 17).
             (c) Fuel pump pad (use detail 17).
             (d) Starter generator pad (use detail 18).
             (e) Gas producer idler spur gearshaft (internal installation held by a retaining ring) (use detail
                 20).
        (2) Lubricate and install packings on two of the three idler gear support shafts. Install the three
            idler gear support shafts in the gearbox cover using 6795614 pusher and puller (See Figure
            211).
        (3) Lubricate and install the bearings in the three gas producer gear train idler spur gears; retain
            with internal retaining rings (See Figure 210).
        (4) Install one idler spur gear and bearing on the idler shaft adjacent to the accessory drive spur
            gearshaft. Retain gear assembly with keyway washer, key washer, and bolt which has been
            lightly coated with Loctite No. 242. Tighten the bolt to 3540 lb in. (3.94.5 N.m) and bend
            locktab of the key washer.
        (5) Install one idler spur gear and bearing on the idler shaft adjacent to the fuel pump drive spur
            gearshaft. Retain gear assembly with through bolt, lubricated packing, keyway washer, and
            external washer and locknut. Tighten locknut to 3540 lb in. (3.94.5 N.m).
        (6) Lubricate and install the ball bearings on the gas producer gear train idler spur gearshaft using
            6796946 drift and 6796930 plate, locations F and H.
        (7) Install the remaining idler spur gear, keyway washer, lubricated packing, through bolt, external
            washer and locknut at the same time the gas producer gear train idler spur gearshaft is
            installed. Tighten the locknut that retains the idler gear to 3540 lb in. (3.94.5 N.m).
        (8) Install the internal retaining ring; then lubricate and install the two ball bearings, one at a time,
            and the bearing sleeve spacer on the accessory drive spur gearshaft using 6796949 drift and
            6796930 plate, location C. A 0.0000.0007 in. (0.0000.018 mm) T fit between the inner race
            ID and the shaft OD must be maintained.
        (9) Install the bearing retainer and secure it with an external retaining ring.
        (10) Apply lubricant to the splines of the gearshaft and using 6796941 seal guide with detail 14,
             install the gearshaft in the gearbox cover. Secure with an internal retaining ring using 6796966
             pliers.
                                                                                              726000
                                                                                                       Page 234
                                                                                                       Sep 15/00
                                   Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                        RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                               726000
                                                                                   Page 235
                                                                                   Sep 15/00
                    Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                           RollsRoyce
                  250B17F SERIES OPERATION AND MAINTENANCE
      (11) Install the fuel pump drive spur gearshaft in the same manner that the accessory drive spur
           gearshaft was installed [steps (8) through (10)].
      (12) Lubricate packing and install it on the startergenerator spur gearshaft. Assemble the
           startergenerator spur gearshaft in the same manner that the accessory drive spur gearshaft
           was installed [steps (8) through (10)].
      (13) Lubricate packing and install with the plug at the top of the gearbox cover. Tighten plug to
           6080 lb in. (6.89.0 N.m) and secure with lockwire.
      (14) Lubricate packing and install it on the fuel control spur gearshaft. Assemble the fuel control
           spur gearshaft in the same manner that the accessory drive spur gearshaft was installed
           [steps (8) through (10)] (See Figure 202).
      CAUTION:       FAILURE TO INSTALL THE INTERNAL RETAINING RING IN THE HELICAL
                     POWER TRAIN DRIVE GEAR CAN ALLOW DISENGAGEMENT OF THE TURBINE
                     SHAFTTOPINION GEAR COUPLING CAUSING POWER TURBINE
                     OVERSPEED.
      (15) Install the roller bearing in the helical power train drive gear. Secure with internal retaining
           ring.
      (16) Install the two ball bearings on the drive gear using 6796948 drift and 6796930 plate, location
           A. The bearings shall be selected to obtain an internal clearance of not less than 0.0003 in.
           (0.008 mm) after assembly on the gear. Check clearance using 6872165 gage. Chill the gear,
           60C (76F) max., and heat the bearings, 121C (250F) max., to aid the installation. When
           bearings have cooled, lubricate bearings and install the gear in the gearbox cover.
      (17) Lubricate and install the ball bearing on the helical power takeoff gearshaft using 6796948
           drift and 6796930 plate, location A (See Figure 225).
      (18) Uniformly heat to 177204C (350400F), and install the roller bearing inner race on the
           gearshaft using 6796948 drift and 6796930 plate, location B. Hold the heated bearing race in
           position against the gear shoulder until heat distribution has normalized. Install the retaining
           ring.
      (19) Apply lubricant to the splines of the gearshaft and using 6796941 seal guide with detail 15,
           install the gearshaft in the gearbox cover.
      (20) Lubricate and install the packing in the groove at the torquemeter shaft opening of the gearbox
           cover. Lubricate and position the thrust washer and bearing end plate in the gearbox cover.
      (21) Use petrolatum to retain the bearing outer race and rollers of the torquemeter bearing in the
           torquemeter gearshaft. Install the damper ring in the retaining groove of the helical
           torquemeter gearshaft.
      (22) Place the gearshaft in position in the cover, meshing the gear teeth with the teeth of the helical
           power train drive gear and the helical power takeoff gearshaft.
      (23) Lubricate and install the roller bearing inner race on the torquemeter shaft support using
           6796930 plate, location E and 6796947 drift.
      (24) Install the headed pin in the shaft support.
      (25) Install the shaft support in the cover through the gear using 6795969 holder (See Figure 226).
           Secure the support with a cup washer and spanner nut lightly coated with antiseize
           compound. Tighten spanner nut to 390400 lb in. (4445 N.m) using 6795597 wrench (See
           Figure 203). Crimp cup washer securely into locknut slot.
      (26) Apply antiseize compound to the oil nozzle mounting studs; in stall oil nozzle with lubricated
           packing. Secure with two washers and nuts. Tighten nuts to 3540 lb in. (3.94.5 N.m).
                                                                                            726000
                                                                                                     Page 236
                                                                                                    Sep 15/00
                                 Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                             Rolls--Royce
                   250--B17F SERIES OPERATION AND MAINTENANCE
       (7) Check the operation of the power and control gear trains to make sure no binding is present
           between the meshing teeth.
           (a) Turn the power train counterclockwise through the power turbine fuel governor pad (See
               Figure 224). Use 6799790 engine turning adapter. No binding is acceptable.
           (b) Turn the control gear train counterclockwise through the gas producer fuel control pad
               (See Figure 224). Use 6799790 engine turning adapter. No binding is acceptable.
       (8) Remove the 6886201 power takeoff roller bearing guide from the helical power takeoff
           gearshaft. Install the gearbox housing seal in the power output pad (use detail --19). Lubricate
           the seal with engine oil prior to installation.
       (1) Disassemble, clean, inspect and assemble the check valve as follows: (See Figure 230)
           NOTE:      Check Valve P/N 23074872 and subsequent part numbers are not applicable to this
                      inspection (these valves are considered ON CONDITION.)
           (a) Remove the fitting from the check valve housing.
           (b) Separate the packing, spring and poppet from the housing. Discard packing.
           (c) Wash parts in mineral spirits.
           (d) Inspect valve parts in accordance with Table 202.
           (e) Insert poppet and spring into valve housing.
           (f)   Install fitting with new packing on housing.
                                                                                    72--60--00
                                  .COPYRIGHT 1989, 2009 Rolls--Royce Corporation                  Page 237
                                                                                                  May 1/09
                         Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                 RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                               726000
                                                                                   Page 239
                                                                                   Sep 15/00
                    Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                                 726000
                                                                                     Page 240
                                                                                     Sep 15/00
                      Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                             RollsRoyce
                   250B17F SERIES OPERATION AND MAINTENANCE
Table 202
                                                                                            726000
                                                                                                         Page 241
                                                                                                         Sep 15/00
                         Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                              Rolls--Royce
                       250--B17F SERIES OPERATION AND MAINTENANCE
              CAUTION:       BE SURE THE CHECK VALVE IS INSTALLED WITH THE ARROW POINTING
                             TOWARD THE REAR OF THE ENGINE.
              (g) Inspect check valve for external leakage at first engine operation after valve installation on
                  the engine. No leakage permitted.
     L.   Test the Turbine Pressure Oil System Check Valves. (See Figure 230)
          NOTE:    Valves with part numbers 23074872 and subsequent are not field repairable.
          WARNING:      DO NOT BREATHE THE FUMES FROM SYNTHETIC LUBRICATING OIL. IT CAN
                        CONTAIN TRICRESYL PHOSPHATE. USE IN AN AREA WITH CONTINUOUS
                        AIRFLOW. KEEP AWAY FROM HEAT, SPARKS, AND OPEN FLAMES. DO NOT
                        GET IT ON YOUR SKIN OR IN YOUR EYES. WEAR GOGGLES,
                        CHEMICAL--RESISTANT GLOVES, AND SAFETY CLOTHING. IF YOU GET IT ON
                        YOUR SKIN, CLEAN WITH SOAP AND WATER. IF YOU GET IT IN YOUR EYES,
                        FLUSH WITH WATER. GET MEDICAL AID.
          (1) Test the check valve using engine oil (MIL--L--23699 Series at 225F (107C) or MIL--L--7808
              Series at 180F (82C)) as follows:
              (a) Install the valve on the test stand with the large end down.
              (b) Apply the test pressure to the small end of the valve.
              (c) Cycle the valve open and closed at least once before taking pressure readings.
              (d) Slowly increase the pressure and observe the opening pressure. Opening pressure must
                  not exceed 5.0 psig (34.5 kPag).
              (e) As the test pressure is reduced, the valve must be fully closed (with no leaks) at 3.0 psig
                  (20.7 kPag).
3.   Adjustment/Test
     A.   Oil Pressure Regulating Valve (See Figure 215)
          CAUTION:      EXCEPT FOR INITIAL ADJUSTMENTS ON NEWLY INSTALLED ENGINES, DO
                        NOT ADJUST THE PRESSURE REGULATING VALVE TO CORRECT FOR HIGH
                        OIL PRESSURE. DO NOT MAKE A PRESSURE REGULATING VALVE
                        ADJUSTMENT TO CORRECT FOR A SUDDEN INCREASE OR RAPID CHANGE
                        IN OIL PRESSURE. THESE CONDITIONS ARE CAUSE TO SUSPECT OTHER
                        OIL SYSTEM PROBLEMS HAVE DEVELOPED.
          (1) Make necessary changes in the engine oil pressure by adjusting the pressure regulating valve.
              (Refer to Gearbox Housing Lubrication System Components Disassembly, para 2.D., this section.)
              NOTE:     During the initial check run of a newly installed engine the pressure regulating valve
                        may be adjusted to increase or decrease oil pressure as per specified limits. A direct
                        reading gage is to be utilized anytime an adjustment to the pressure regulating valve
                        is required.
              (a) Remove the lockwire.
              (b) Using a wrench, turn the regulating valve clockwise to increase and counterclockwise to
                  decrease the oil pressure. An approximate adjustment may be made by bottoming the
                  valve and then backing it out 5--1/2 turns. One turn of the adjustment will change the oil
                  pressure approximately 13 psig (90 kPag). Oil pressure is 120--130 psig (827--896 kPag)
                  at 82C (180F) oil temperature.
4.   Inspection/Check/Repair
     A.   Oil Leakage Inspection
          Inspect the power and accessory gearbox for oil leaks. Replace the seal assembly if excessive oil
          leakage is detected at the accessory pad locations (See Figure 231).
     B.   Magnetic Plug Inspection (Refer to para 11.I., 72--00--00, Engine--Servicing for inspection procedure.)
          (1) Operational Check.
                                                                                               72--60--00
                                        .COPYRIGHT 1989, 2009 Rolls--Royce Corporation
                                                                                                     Page 242
                                                                                                     May 1/09
                                    Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                             Rolls--Royce
                   250--B17F SERIES OPERATION AND MAINTENANCE
                      FRONT                                                         REAR
             1. Power Turbine Tachometer--                           5.   Starter Generator Pad
                Generator Pad                                        6.   Power Takeoff Pad
             2. Power Output Pad                                     7.   Fuel Pump Pad
             3. Gas Producer Tachometer--                            8.   Vacuum--Hydraulic Pad
                Generator Pad                                        9.   Power Turbine Fuel Governor Pad
             4. Torquemeter Spanner Nut                             10.   Gas Producer Fuel Control Pad
            (a) If magnetic plugs are removed for scheduled maintenance, perform an operational check
                prior to reinstallation. Connect harness lead and bridge plug with a suitable conductor.
                Check each plug separately for proper cockpit indication.
            (b) Reinstall magnetic plug, tighten to 60--80 lb in. (6--8--9.0 N.m).
  C.   Starter--generator Gearshaft Female Spline Inspection
       (1) Remove the starter--generator.
       (2) Clean the female splines of the starter--generator gearshaft and the male splines of the
            starter--generator driveshaft with mineral spirits and a soft brush.
       (3) Using a bright light, inspect the splines in accordance with the criteria depicted in Figure 232.
            NOTE: A sharp pointed scribe, 0.020 in. (0.51 mm) radius, should be used to detect a wear
                       step. A 0.010 in. (0.25 mm) feeler gage can be helpful in visually comparing the
                       depth of the wear step.
       (4) Lubricate acceptable splines with engine oil.
       (5) Before reinstallation of the starter--generator, make sure the torsional damper members of the
            driveshaft in the starter--generator are in hard contact with each other.
  D.   Opened Gearbox Inspection
       Whenever the gearbox is opened for any reason, and at an Authorized Maintenance Facility make
       a general inspection of the assembly, paying particular attention to the following:
       (1) Check condition of accessory gearshaft drive splines. If excessive wear is believed present,
            replace the gearshaft.
       (2) Check condition of gears. Replace gears having spalled or chipped teeth.
       (3) Check mounting and attachment security of all internal parts including tab lockwashers and
            safety wire. Secure as required.
       (4) Check integrity of oil pump attaching screws and oil tube packings.
                                                                                           72--60--00
                                  .COPYRIGHT 1989, 2009 Rolls--Royce Corporation                            Page 243
                                                                                                            May 1/09
                         Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                            Rolls--Royce
                    250--B17F SERIES OPERATION AND MAINTENANCE
        (5) Check condition of the accessory pad seal for the gas producer gear train idler spur gearshaft
             (inside the gearbox cover). Replace seal if it shows apparent damage or if the engine is prone
             to blow oil out the gearbox vent.
        (6) Check the filter housing for excessive wear at the opening for the filter inlet and filter bypass
             tubes. Replace packings on the filter inlet and bypass tubes at each disassembly. Replace
             the filter housing if necessary to prevent air/oil leakage.
        (7) If the records indicate that more than 3500 hours have elapsed since the gears were new or
             were last magnafluxed at overhaul or repair, all gears are to be magnetically inspected. (Refer
             to the Engine Overhaul Manual, publication No. GTP 5243--3, for inspection criteria.)
             NOTE: If any doubt exists concerning the serviceability of any part, repair or replace the part
                         before closing the gearbox.
   E.   Insert Inspection
        Any time the compressor is removed or when insert looseness is known or suspected, check for
        space between each of the five inserts and the gearbox housing. If a piece of 0.0015 in. (0.038
        mm) shim stock can be inserted anywhere under the insert, it must be reworked.
   F.   Repair of Compressor Mounting Inserts
        CAUTION:         THE GEARBOX HOUSING MUST HAVE AT LEAST THREE GOOD
                         COMPRESSOR MOUNTING INSERTS BEFORE REWORK CAN BE
                         ACCOMPLISHED ON A LOOSE INSERT.
        Repair loose compressor mounting inserts in the gearbox housing as follows:
        NOTE: The rework shall be made with the engine removed from the air--frame and with the
                    turbine and compressor assembly removed from the gearbox. (Refer to Compressor
                    Assembly Replacement, para 1., 72--30--00.)
        (1) Clean the area of the loose insert on the gearbox housing with methylethylketone.
        (2) If the insert is pinned, use a No. 53 drill to drill out the insert locking pin. Remove the insert
             using wrench 6872881 (EX 97154) or 6872927 as applicable.
        (3) File off the burrs and clean the threads and surrounding area of the housing using a brush and
             methylethylketone.
        (4) Check the threads of the gearbox housing for wear by reinstalling the removed insert in the
             threaded opening of the housing. The threads should be snug when the bottom side of the
             insert flange is 1/8--in. (3 mm) above the surface of the gearbox. If any side movement or
             wobble is present, use an oversized insert for the replacement. Select the oversized insert to
             obtain the best fit.
        (5) Install the selected insert. Tighten to 125--150 lb in. (14--17 N.m) plus running torque. Do not
             exceed 180 lb in. (20 N.m).
        (6) Install checking fixture 6872880 (EX 92634) over the five compressor mounting inserts (See
             Figure 233). Be sure the fixture does not touch any of the four bosses around the insert at the
             one oclock position. Determine the one oclock position by viewing the gearbox from the front
             (compressor) side.
        (7) Use shim stock to feel for clearance between each insert flange and the bottom of the fixture.
             Rework insert flange using spotfacing kit 6872879 (EX 97156) until there is no clearance at
             any of the five locations (See Figure 232).
             NOTE: When properly installed and reworked, the five compressor mounting inserts are the
                         same height. In this condition the checking fixture rests on all five points and each
                         insert--to--fixture fit will be closed to the passage of the shim stock feeler gage.
        (8) Mark the gearbox boss at the location of the insert pin slot. Remove the insert using wrench
             6872881 (EX 97154) or 6872927 as applicable. Clean the threads of the insert and the
             gearbox using methylethylketone.
        (9) Apply Resiweld FE 186, or equivalent, sealer to the threads of the replacement insert. Thread
             the insert into the gearbox. The insert will apply sealer to the threads in the gearbox. Repeat
             the application of sealer to the insert as necessary to cover all threads of both parts. Also, at
             the one oclock insert position, do not install the packing; however, be sure the packing groove
             is filled with sealer.
                                                                                             72--60--00
                                      .COPYRIGHT 1989, 2009 Rolls--Royce Corporation
                                                                                                   Page 244
                                                                                                    May 1/09
                                  Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                        RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                               726000
                                                                                   Page 245
                                                                                   Sep 15/00
                    Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                             RollsRoyce
                    250B17F SERIES OPERATION AND MAINTENANCE
        CAUTION:       WIPE EXCESS SEALER FROM THE END OF THE INSERT TO MAKE SURE
                       THAT NONE OF THE SEALER ENTERS THE GEARBOX AT THE ONE OCLOCK
                       INSERT POSITION THROUGHHOLE. ON BOTTOM HOLED INSERT
                       LOCATIONS, MAKE SURE THE HOLE DOES NOT ACCUMULATE EXCESS
                       SEALER WHICH CAN PUSH UP THROUGH THE INSIDE THREAD OF THE
                       INSERT. CLEAN SEALER FROM INSERT INSIDE THREADS BEFORE IT
                       HARDENS USING METHYLETHYLKETONE AND A 1/428 BOLT. RETAP (1/428)
                       THE INSIDE THREAD IF HARDENED SEALER IS ENCOUNTERED.
        (10) Install the new insert. Tighten to 125150 lb in. (1417 N.m) plus running torque to a position
             where the pin slot aligns with the mark on the gearbox boss. (See step (8).) Do not exceed
             180 lb in. (20 N.m).
        (11) Wipe any excess sealer from the insert or gearbox. Recheck insert height. (See steps (6) and
             (7).) Cure sealer for 2535 minutes at 177C (350F), or as an option, at 149C (300F) for
             two hours (to combine cure cycle with paint bake cycle).
        (12) Install compressor and turbine assemblies on the gearbox. (Refer to Replacing the
             Compressor Assembly, para 1.B., 723000.)
        (13) Return the engine to service. Inspect the insert at the one oclock position for any sign of oil
             leakage after the Check Run. Repair the insert if any leakage is detected.
   G.   Power Train Pinion Helical Gear Spline Inspection
        Inspect the power train pinion helical gear spline whenever the engine has been subjected to a
        sudden stoppage as defined in para 1.C.(4)., 720000, EngineInspection/Check. Replace the
        gear (See Figure 202) if any of the following conditions exist:
        (1) Chipped, damaged, pitted or worn spline teeth.
             NOTE:     Use a sharp pointed scribe, 0.020 in. (0.51 mm) radius, to detect a wear step.
        (2) Evidence of spline deformation or twisting.
                                                                                              726000
                                                                                                     Page 246
                                                                                                     Sep 15/00
                                   Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                        RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                               726000
                                                                                   Page 247
                                                                                   Sep 15/00
                    Rolls-Royce Proprietary Data  Uncontrolled Printed Copy
EXPORT CONTROLLED                RollsRoyce
              250B17F SERIES OPERATION AND MAINTENANCE
                                                                                 726000
                                                                                     Page 248
                                                                                     Sep 15/00
                      Rolls-Royce Proprietary Data  Uncontrolled Printed Copy