SITE TEST REPORT Date : JAN 2016
Contractors name: ABB Customer: SEC
Name of substation: AL-BAHA 20MVA Mobile SS SEC EOA Contract No. :
IR TEST FOR SURGE ARRESTOR Page 1 of 2
Mechanical Checks and Visual Inspections:
Item Description Checked
1 Inspect for physical damage or defects. OK
2 Check nameplate information for correctness. OK
3 Check tightness of all bolted connections. OK
4 Check that all grounding cables are securely connected. OK
5 Check mechanical clearance and proper operation of all isolation device OK
DATE :
TESTING ENGINEER SEC- Engineer
Signature: ________________ Signature: ________________
Name : AFAQ AHMAD Name : MOHD ABDUL FATTAH
SITE TEST REPORT Date : JAN 2016
Contractors name: ABB Customer: SEC
Name of substation: AL-BAHA 20MVA Mobile SS SEC EOA Contract No. :
IR TEST FOR SURGE ARRESTOR Page 2 of 2
INSULATION RESISTANCE BY APPLYING 5KV
1. PHASE TO GROUND
R-G Y-G B-G
477 G 459 G 449 G
2. PHASE TO PHASE
R-Y Y-B B-R
1.08 T 1.03 T 1.08 T
DATE :
TESTING ENGINEER SEC- Engineer
Signature: ________________ Signature: ________________
Name : AFAQ AHMAD Name : MOHD ABDUL FATTAH