CATALOGUES
Page.: 131
REFERENCE DRAWINGS
Page.: 132
SL. NO. DRAWING NAME DRAWING NO.
PDE/BT/P1
1 FRONT VIEW OF PLC CUM SYNCHRONIZING PANEL
(SHEET NO-1)
PDE/BT/P1
2 LEGEND DETAILS OF PLC CUM SYNCHRONIZING PANEL
(SHEET NO-2)
3 MIMIC VIEW PDE/BT/P2
4 GA OF RIO PANEL-1 AT C1 SUBSTATION PDE/BT/P3
5 GA OF RIO PANEL-2 AT C0 SUBSTATION PDE/BT/P4
6 GA OF RIO PANEL-3 AT C2 SUBSTATION PDE/BT/P5
7 GA OF RIO PANEL-4 AT BANBURY SECTION PDE/BT/P6
8 MAIN MENU PDE/BT/P7
9 EXISTING OVERALL POWER FLOW SLD PDE/BT/P8
10 REVISED OVERALL POWER FLOW SLD PDE/BT/P9
11 DISPLAY OF OVERALL POWER FLOW SLD PDE/BT/P10
12 DISPLAY OF 132KV SWITCHYARD SLD PDE/BT/P11
13 132KV SWITCHYARD BREAKER STATUS PDE/BT/P12
14 DISPLAY OF 6.6KV TG POWER HOUSE SLD PDE/BT/P13
15 6.6KV TG POWER HOUSE BREAKER STATUS PDE/BT/P14
16 DISPLAY OF 6.6KV DG POWER HOUSE SLD PDE/BT/P15
17 6.6KV DG POWER HOUSE BREAKER STATUS PDE/BT/P16
18 DISPLAY OF 6.6KV NEW TG PANEL AT C0 SUBSTATION SLD PDE/BT/P17
19 6.6KV NEW TG PANEL BREAKER STATUS AT C0 SUBSTATION PDE/BT/P18
20 DISPLAY OF 6.6KV NEW GRID PANEL AT C0 SUBSTATION SLD PDE/BT/P19
6.6KV NEW GRID PANEL BREAKER STATUS AT C0
21 PDE/BT/P20
SUBSTATION
Page.: 133
SL. NO. DRAWING NAME DRAWING NO.
22 DISPLAY OF 6.6KV NEW DG PANEL AT C0 SUBSTATION SLD PDE/BT/P21
6.6KV NEW DG PANEL BREAKER STATUS AT C0
23 PDE/BT/P22
SUBSTATION
DISPLAY OF 6.6KV DOUBLE BUS BAR AT C0 SUBSTATION
24 PDE/BT/P23
SLD
PDE/BT/P24
6.6KV DOUBLE BUS BAR BREAKER STATUS AT C0
25
SUBSTATION
(SHEET NO 1&2)
DISPLAY OF 6.6KV DOUBLE BUS BAR PANEL AT C1
26 PDE/BT/P25
SUBSTATION SLD
PDE/BT/P26
6.6KV DOUBLE BUS BAR BREAKER STATUS AT C1
27
SUBSTATION
(SHEET NO 1&2)
28 DISPLAY OF 415V PCC PANELS AT C1 SUBSTATION SLD PDE/BT/P27
29 415V PCC PANELS BREAKER STATUS AT C1 SUBSTATION PDE/BT/P28
30 DISPLAY OF 415V PCC PANELS AT C2 SUBSTATION SLD PDE/BT/P29
31 415V PCC PANELS BREAKER STATUS AT C2 SUBSTATION PDE/BT/P30
32 APFC PANEL AT C1 & C2 SUBSTATION PDE/BT/P31
33 MANUAL POWER FACTOR CONTROL PDE/BT/P32
34 LOAD SHARING SCHEME-MANUAL PDE/BT/P33
35 LOAD SHARING SCHEME-AUTO PDE/BT/P34
36 LOAD SHEDDING SCHEME-MANUAL PDE/BT/P35
37 LOAD SHEDDING SCHEME-AUTO PDE/BT/P36
38 MD LOAD SHEDDING SCHEME-MANUAL PDE/BT/P37
39 MD LOAD SHEDDING SCHEME-AUTO PDE/BT/P38
40 UNDER FREQUENCY LOAD SHEDDING PDE/BT/P39
41 UNDER PRESSURE LOAD SHEDDING PDE/BT/P40
42 GRID LOAD CONTROL SCHEME PDE/BT/P41
43 TG LOAD CONTROL SCHEME-MANUAL PDE/BT/P42
Page.: 134
SL. NO. DRAWING NAME DRAWING NO.
44 TG LOAD CONTROL SCHEME-AUTO PDE/BT/P43
45 GIP RELAY STATUS PDE/BT/P44
46 TG RELAY STATUS PDE/BT/P45
47 NGR CONTROL PDE/BT/P46
48 POWER MONITOR POP-UP SCREEN PDE/BT/P47
49 BREAKER POP-UP SCREEN DISPLAY PDE/BT/P48
50 PARAMETERS(SOURCES) PDE/BT/P49
PDE/BT/P50
51 PARAMETER SELECTION OF METERS FOR RECORDING
(SHEET NO1,2&3)
PDE/BT/P51
52 PARAMETERS SELECTION OF METERS FOR TRENDING
(SHEET NO1,2&3)
PDE/BT/P52
53 ENERGY CONSUMPTION
(SHEET NO1,2,3&4)
54 DETAILS FOR TRENDING PDE/BT/P53
55 PRODUCTION V/S. ENERGY CONSUMPTION PDE/BT/P54
56 TARGETED MD V/S. ACTUAL MD PDE/BT/P55
57 ELECTRICAL LOG SHEET FOR 6.25MW TG-1 PDE/BT/P56
58 ELECTRICAL LOG SHEET FOR 6.25MW TG-2 PDE/BT/P57
59 ELECTRICAL LOG SHEET FOR 7.5MW TG-3 PDE/BT/P58
60 ELECTRICAL LOG SHEET FOR GRID PDE/BT/P59
61 SYSTEM CONFIGURATION PDE/BT/P60
62 CONTROL DESK PDE/BT/P61
Page.: 135
SL. NO. DRAWING NAME DRAWING NO.
FEEDER LIST OF 132KV INCOMER,6.6KV NEW GRID,DG,TG PDE/BT/P62
63
PANELS,DOUBLE BUS BAR PANEL AT C0 SUBSTATION (SHEET NO 1)
FEEDER LIST OF DOUBLE BUS BAR PANEL AT C1 PDE/BT/P62
64
SUBSTATION (SHEET NO 2)
FEEDER LIST OF 415V PCC-4, PCC-5, PCC-6 PANELS AT C1 PDE/BT/P62
65
SUBSTATION (SHEET NO 3)
FEEDER LIST OF 415V PCC-7, PCC-8, PCC-9, PCC-12 PANELS PDE/BT/P62
66
AT C1 SUBSTATION (SHEET NO 4)
FEEDER LIST OF 415V PCC-1, PCC-2, PCC-3, PCC-10 PANELS PDE/BT/P62
67
AT C2 SUBSTATION (SHEET NO 5)
FEEDER LIST OF 415V PCC-11, PCC-13, PCC-14 PANELS AT C2 PDE/BT/P62
68
SUBSTATION (SHEET NO 6)
FEEDER LIST OF 415V BANBURY DB -1, DB -2, DB -3, DB -4 PDE/BT/P62
69
PANELS (SHEET NO 7)
FEEDER LIST OF 415V BANBURY DB -5, DB -6, DB -7, DB -8 PDE/BT/P62
70
PANELS (SHEET NO 8)
PDE/BT/P62
71 FEEDER LIST OF 415V DUAL EXTRUDER DB#2
(SHEET NO 9)
REVISED LAYOUT OF C0 SUBSTATION WITH ADDITIONAL
72 PDE/BT/P63
TIE BREAKER & LT BUSCOUPLER
REVISED LAYOUT OF C1 SUBSTATION WITH ADDITIONAL
73 PDE/BT/P64
TIE BREAKER & LT BUSCOUPLER
REVISED LAYOUT OF C2 SUBSTATION WITH ADDITIONAL
74 PDE/BT/P65
BUSCOUPLER
Page.: 136