Canal Design
Canal Design
                       2.     Dr NURU R.M.
                                      CERTIFICATION
The undersigned certifies that they have read and hereby recommend for acceptance by the
Arusha Technical College a project entitled: Design of Lined Irrigation Canal Network at
Cheju Irrigation Scheme in partial fulfillment of the requirements for the award of the Bachelor
Degree in Civil and Irrigation Engineering of the Arusha Technical College.
                                               1
                                      DECLARATION
I, SALUM M. JUMA hereby declare that the contents of this dissertation is a result of my own
efforts in observations, investigations and findings, and to the best level of my knowledge and
experience gained through consultation to different experts/supervisors and various literatures. It
has never been presented and submitted to any other College, higher learning institution or a
similar of any other degree award.
SALUM M. JUMA
                                                2
                                        DEDICATION
This project is dedicated to my beloved parents Mohammad J. Mussa and Asha J. Khamis who
raised me throughout my childhood and their positive and enthusiastic encouragements and for
their mutual and objective cooperation during my studies. Also lovingly dedicated to my true
treasures in life, my lovely fianc Halima Amour for her love, patience, wise words, prayers and
encouragement throughout my studies.
ACKNOWLEDGEMENT
First and foremost, I would like to extend my unshared thanks to Almighty God, for
obvious reasons, but especially for the countless blessings that He has
                                               3
poured     upon      me     in      the   completion    of    the   project    with    strength,
determination and discipline.
A special vote of thanks goes to my supervisors, Dr. Senzia M.A and Dr Nuru R.M for their
patience, guidance, constructive comments, wisdom suggestions, courage, critical comments and
advice throughout my project work; I wish the best successful in all over their life. Also, special
thanks to all teaching staff of Civil Engineering Department for giving me such an enjoyable and
noble education and career.
Special thanks should also be to ATC Materials laboratory technicians namely; Mr. Bakari
Saliungu and Mr. Doto Charles. Additionally my heart thanks to my fellow students in Civil and
Irrigation Engineering for their valuable comments, suggestion, support and encouragements
during my study time.
My cordial thanks spread out to my brothers, sisters and lovely parents Mohammad J. Mussa and
Asha J. Khamis for their love, support and guidance throughout my life and for inculcating in me
the passion for knowledge. Out of the ordinary, I thank my lifelong best friend, companion and
my lovely fianc Halima Amour for her love and patience so exceedingly appreciated during the
period of three years of studies.
My special thanks are due to Ministry of Agriculture and Natural Resources for giving me
permission to attend this course of three years. Additionally, I sincerely appreciate the degree of
thoughtfulness and kindness to all staff of Department of Irrigation Mbweni Zanzibar for their
courage and support especially Chief Irrigation Engineer Juma A. Foum (Eng) together with Eng
Rashid S. Hamad for donating generously the enormous amount of time and providing some
relevant data and information required to carry out this project.
A debt of gratitude is to all people who in one way or another contributed idea directly or
indirectly. Because it would end up into long list to mention all the people I am indebted to, I
gratefully thank all of them collectively.
                                                 4
                                             ABSTRACT
The focus of this project is on designing of lined irrigation canals network at Cheju scheme
located at Cheju village within south eastern part of Zanzibar main Island (Unguja Island). This
design is due to the fact that most of the area of Cheju scheme (about more than 1000ha) is not
developed under irrigation system, only about 90ha has so far been developed for irrigated
agriculture by using tubular wells as a source of water of this scheme.
The scheme area was found to have a total area of 1200ha but this project cover only 75ha which
will be irrigated by using two tubular wells and each tubular well has capacity of 35l/sec which
can cover the area of 38ha, reference being made on yield of the existing boreholes in Cheju
(average of 35 l/s) and crop water requirement.
The topographical survey was conducted in a study area was conducted for the purpose of
obtaining the topographical map of the study area. From that map, farm layout and profile of
main and secondary irrigation canals were produced.
Soil investigation was conducted in the project area by taking soil sample in a several point in a
study area by using augering method. The soil samples are taken in a depth of 0 to 30cm and 30
to 60cm in a several auger holes in a project area. The purpose of taking these soil samples was
for identifying different soil types whose characteristics serve as basis for the design decision
particularly on the type and method of irrigation system to be employed.
The collected samples were submitted to ATC Soil and Bitumen Laboratory laboratories for
grain size distribution (wet sieve analysis), permeability with specific gravity of soil and
Atterberg limits i.e Liquid limit, Plastic limit. The results of this investigation indicate that soil of
sample 1 in Cheju irrigation scheme contains the liquid limit of 46.25% and plastic limit 19.92%
                                                    6
plastic index 26.33% and permeability of 2.71053 10 . Also investigation result indicates
that the soil of sample 21 in Cheju irrigation scheme contains the liquid limit of 71% and plastic
                                                            6
limit 28% plastic index 42% and permeability of 8.66964 10    . These results indicate that
the soil in Cheju scheme is clay soil which indicate high potential swell. Since swell potential
and swell pressure are key properties of expansive soils, so that the designed foundation during
                                                   5
construction should be strong enough to resist the effect of expansion and contraction which can
break the concrete of the canals.
The designed farm layout is comprised with primary farmland, secondary farmland and tertiary
farmland with dimension of 150m x 300m (4.5ha), 100m x 150m (1.5ha) and 100m x 50m
(0.5ha) respectively. The scale of the primary farmland section looks inefficient, but it can be
overcome through the managerial methodology of water supply into the farmland.
Surface irrigation farm layout is also comprised by designed main and secondary canals
as per objectives, while others structures have been proposed from standard drawing. The
proposed canals network comprises of two main canals with length of 610m and 570m and
eight secondary canals of different lengths. SC1=299m, SC2=292m, SC3=323, SC4=282m,
SC5=360m, SC6=272, SC7=343m and SC8=275m and they are located at interval distance of
150m apart.
Finally, in order to make sustainable irrigation scheme, this project recommended that for future
project the more effort should be put forward in a designing of drainage canals which will be
used to drain water from the field and to direct that water to the supplementary water sources and
the drainage water collected within supplementary water sources will be recycled back to the
scheme.
                                                6
                                          Table of Contents
CERTIFICATION..................................................................................................i
DECLARATION...................................................................................................ii
DEDICATION.....................................................................................................iii
ACKNOWLEDGEMENT......................................................................................iv
ABSTRACT........................................................................................................v
LIST OF ABBREVIATIONS..................................................................................xii
CHAPTER ONE...................................................................................................1
  1.0     INTRODUCTION.....................................................................................1
  1.1     GENERAL OVERVIEW.............................................................................1
  1.2     BACKGROUND INFORMATION......................................................................1
  1.3     PROBLEM STATEMENT...........................................................................2
  1.4     PROJECT OBJECTIVES............................................................................2
     1.4.1 Main objectives......................................................................................2
     1.4.2      Specific objectives...............................................................................2
  1.5     SCOPE OF THE PROJECT.........................................................................3
  1.6     SIGNIFICANCE OF THE PROJECT.............................................................3
CHAPTER TWO..................................................................................................4
                                                        7
  2.3.2.1 Pan Evaporation Method........................................................................6
  2.3.2.2 Blaney-Criddle Method.........................................................................6
  2.3.2.3 Penman-Monteith method......................................................................7
2.4    REFERENCE EVAPOTRANSPIRATION.......................................................7
2.5    IRRIGATION REQUIREMENTS..................................................................8
2.6    IRRIGATION CANALS.............................................................................9
  2.6.1     Main canal.........................................................................................9
  2.6.2     Field canals for small irrigation schemes....................................................9
  2.6.3     Secondary canals...............................................................................10
  2.6.4     Tertiary canals...................................................................................10
  2.6.5     Design command area.........................................................................10
2.7    PLANNING OF AN IRRIGATION CANAL SYSTEM.....................................11
  2.7.1     Alignment of irrigation canals...............................................................11
  2.7.2     Curves in canals................................................................................12
  2.7.3     Duty of water....................................................................................13
  2.7.4     Irrigation-canal losses.........................................................................13
2.8    DESIGN OF LINED CANAL.....................................................................14
  2.8.1     General Descriptions..........................................................................14
2.9    HYDRAULIC DESIGN............................................................................14
  2.9.1     Chezys Equation...............................................................................15
  2.9.2     Manning formula...............................................................................15
  2.9.3     Most Efficient Hydraulic Section...........................................................17
  2.9.4     Design discharge of a canal..................................................................18
  2.9.5     Maximum Permissible Velocities...........................................................19
  2.9.6     Minimum Velocity.............................................................................20
  2.9.7     Canal Cross-Section...........................................................................20
  2.9.8     Longitudinal canal sections..................................................................20
  2.9.9     Side Slope........................................................................................21
  2.9.10    Bank Width......................................................................................21
  2.9.11    Bed Width and Depth ratio...................................................................22
                                                    8
     2.9.12    Canal shape......................................................................................22
     2.9.13    Berms.............................................................................................23
     2.9.14    Freeboard........................................................................................23
     2.9.15    Canal Curvature................................................................................24
  2.10    WATER CONTROL AND DIVERSION STRUCTURES...................................24
     2.10.1    Turnouts..........................................................................................24
     2.10.2 Division boxes..............................................................................25
     2.10.3    Check gates......................................................................................25
     2.10.4    Drop Structures.................................................................................25
CHAPTER THREE.............................................................................................27
  3.0     METHODOLOGY..................................................................................27
  3.1     Description of the Study Area.....................................................................27
     3.1.1     Location..........................................................................................27
     3.1.2     Climate...........................................................................................27
     3.1.2.1 Rainfall...........................................................................................27
     3.1.2.2 Evaporation......................................................................................27
     3.1.2.4 Wind..............................................................................................28
     3.1.2.5 Relative humidity..............................................................................28
     3.1.2.6 Soils...............................................................................................28
  3.2     Site Visits..............................................................................................29
  3.3     Consultation...........................................................................................30
  3.4     Design..................................................................................................30
CHAPTER FOUR...............................................................................................31
                                                         9
  4.2     DATA ANALYSIS...................................................................................33
     4.2.1       Crop water requirement analysis............................................................33
     4.2.2       Soil data analysis...............................................................................35
     4.2.3       Topographical map.............................................................................35
     4.2.3.1 Land Consolidation............................................................................36
     4.2.3.1.1     Farmland......................................................................................36
     4.2.3.1.2     Irrigation Canal..............................................................................36
     4.2.4       Canals Hydraulic Design and consideration:.............................................36
     4.2.5       Water Control Structures......................................................................37
CHAPTER FIVE................................................................................................38
APPENDICES...................................................................................................42
Figure 3: The analysis of irrigation requirement of rice for actual project area............................34
Figure 4: Summary crop water analysis of rice crop for actual project area.................................35
                                                              11
                                  LIST OF ABBREVIATIONS
ATC: Arusha Technical College
Ha: Hectare
                                             12
                                           CHAPTER ONE
1.0 INTRODUCTION
  Irrigation canals network are designed and managed to receive water from a source and to
  distribute it among farms in order to meet their water needs. Various design decisions must be
  made in order to rehabilitate or develop irrigation canal network, including those related to
  specification of the characteristics of hydraulic structures used to convey, regulate, or divert
  water. An irrigation system comprises all the physical and organizational facilities and services
  required to convey water for the irrigation of crops from a source of supply to the farmers' fields.
  Systems may vary in size, scope and design from one merely aiming at spreading the flood water
  of a river over adjacent areas, or conveying small flows from a surface or ground water source
  over limited distances and areas to large networks ramifying over the land like the branches of a
  tree (FAO, 1982).
  Before designing a canal network, a topographical survey of the area should be done and a
  topographical map of the area drawn. On this map the layout of the canal system is planned so
  that water delivery will be as efficient as possible (FAO. 1992). The layout of irrigation schemes
  is indicated mainly by topography, types of crop grown, soil type and the irrigation method. In
  surface irrigation, the topography of the land is the critical factor for the selection of canal
  alignment, and shape of the farm unit.
  Agriculture in Zanzibar is therefore weak and suffers from low and unstable production. The
  arable lands of Zanzibar are estimated at 130,000 ha, of which 5,100 ha has been previously
  identified as potential area for irrigation. In order to improve such unstable and low production,
  the government of Zanzibar (GOZ) is establish the department of irrigation to propose an
  irrigated agriculture development and prepared the Zanzibar Irrigation Development Program in
  August 1997 (ZIDP), following the successful launch of the National Irrigation Development
  Plan for the Mainland. The ZIDP concluded that the highest priority should be given to surface
  fed gravity smallholder irrigation schemes in Pemba. In Unguja, this method could be used for
  schemes with high value crops and a few areas where rice is irrigated under gravity.
                                                   1
        The ZIMP has identified 57 schemes with a total area of 8,521 ha as potential for
        irrigation development in Zanzibar. Unguja has 18 schemes of with an area about
        6,629ha, while Pemba has 39 schemes with an area of 1,892ha. Cheju irrigation schema is one
        among of 18 irrigation scheme of Unguja which has potential area of 1200ha.
        The total potential area of Cheju irrigation scheme is 1200ha, but only about 90ha has so far
        been developed for irrigated agriculture by using tubular wells, this make the agricultural
        activities at Cheju irrigation scheme rely highly on rains and this makes production vulnerable to
        adverse rainfall patterns. Concurrently, rainfall is not promising due to climate change and this
        result to prolonged dry spell, hence crop yield decreases. Thus, this situation obligates the need
        of designing a canal network to locate main canal, secondary canals and tertiary canal at the
        remained area of the scheme by using ground water as a water source of that scheme.
        The main objective of the project is to design lined irrigation canals network at Cheju irrigation
        scheme.
                                                          2
   The scope of this project has limited on drawing topographical map of the scheme, designing
   farm layout and design of main and secondary irrigation canals on 72ha of an area.
   Upon completion of conveyance system design, there will be availability of water at farm levels
   there by contributing in the improvement of food production to farmers, as they can grow several
   crops more than once.
CHAPTER TWO
                                                  3
2.1 INTRODUCTION
  Irrigation is defined as the process of artificially supplying water to soil for growing crops. It is a
  science of planning and designing an efficient, low-cost, economic irrigation system tailored to
  fit natural conditions. It is the engineering of controlling harnessing the various natural sources
  of water, by the construction of dams and reservoirs, canals and head works and finally
  distributing the water to the agricultural fields (Punmia and Pande, 1992).
  According to Theo Meijer, irrigation is the provision of measures that enables users to
  adequately supply their crops with water, which is collected elsewhere. Thus the water is
  collected elsewhere and transported to the plants. The elsewhere can be groundwater that is
  pumped through pipes to the surface and sprinkled on the plants. An activity that can be applied
  by the farmers themselves. Irrigation water can also be collected from a stream, river other open
  water source sources and transported to fields through canals. Water residues are discharged in a
  drain that transports the water away from the field.
  Most irrigation schemes are provided with a complementary irrigation canals network to convey
  and distribute water into the fields evenly, and field drainage network to remove excess water
  from the fields. The canal network of irrigation schemes is dictated mainly by topography, types
  of crop grown and the irrigation Method employed. In surface irrigation, the topography of the
  land is the critical factor for the selection of canal alignment, and shape of the farm unit. The
  design and operation of farm irrigation system is influenced by the quantity and timing of water
  delivery to the farm. Delivery schedules are either demand, rotational, or continuous flow.
  Delivery systems operating under rotation schedules deliver water for a fixed duration of time
  according to a prearranged schedule (James, 1988).
                                                    4
        Crop water requirements are determined by the climatic evaporative potential, plant
        characteristics, and all of the factors that influence growth and development of the crop. For
        purposes of irrigation planning, design, and management, computations are usually made to
        determine reference evapotranspiration (ETo), which is multiplied by a crop coefficient (K c) to
        determine the evapotranspiration of a particular crop at a given growth stage. Irrigation
        requirements tend to be significantly greater than crop water requirements because of the need to
        allow for imperfect application uniformities and efficiencies, and for maintaining a favorable salt
        balance in the crop root zone. Crop water requirements include transpiration of water by the
        plants and evaporation from the soil and from the plants. These combined amounts result in
        evapotranspiration (ET), the major component of which is usually transpiration of water by the
        plants (Hargreaves, et al. 1985).
        Crop ET can also be determined by intensive soil water studies where the soil is fairly uniform
        and the depth to groundwater will not influence soil water within the root zone. Soil water is
        determined by field moisture sampling before and after each irrigation with some measurements
        between irrigations to determine water depletion in the root zone (Hargreaves, et al. 1985).
                                                        5
2.3.2.1 Pan Evaporation Method
      A Class A evaporation pan set in a large irrigated pasture or other irrigated area provides an index
      that has been widely used for estimating crop ET. The principal source of energy for evaporation
      is solar radiation. If the pan reflects five percent of radiation back to the atmosphere and an
      extensive irrigated grass area reflects 25 to 30%, then it seems logical to assume a ratio of ET of
      grass to pan evaporation (Ep) of 0.75 to 0.80. The California Department of Water Resources
      (1986) gives ET/Ep ratios for irrigated pastures and turf grasses ranging from 0.70 for the coldest
      weeks to 0.78 for the warmest months.
K pan E pan
      If no measured data on pan evaporation are available locally, a theoretical method (such as
      Blaney-Criddle method) to calculate the reference crop evapotranspiration ETo has to be used.
      There are a large number of theoretical methods to determine the ETo. Many of them have been
      determined and tested locally. If such local formulae are available they should be used. If such
      local formulae are not available one of the general theoretical methods has to be used. The
      Blaney-Criddle method is simple, using measured data on temperature only. But, however, this
      method is not very accurate, it provides a rough estimate or "order of magnitude" only.
      Especially under "extreme" climatic conditions the Blaney-Criddle method is inaccurate, in
      windy, dry, sunny areas, the ETo is underestimated (up to some 60 percent), while in calm,
      humid, clouded areas, the ETo is overestimated up to some 40 percent(Allen et al., 1986)
      The equation used is;
        ETo=p (0.46 T mean+ 8).
      Where:
      ETo = Reference crop evapotranspiration (mm/day) as an average for a period of 1 month.
        T mean = mean daily temperature (C) and
                                                       6
      From which       ETcrop=Kc  ETo .
      Penman-Monteith method as modified by Allen et al (1986) is the most accurate method used to
      compute ETo arid and humid locations. Because of its accuracy, the Penman-Monteith method is
      recommended when air temperature, relative humidity, wind speed, and solar radiation data are
      available or can be reliably estimated. The method is accurate because it considers all
      climatically data required in crop water requirement and it is integrated in most of computer
      software for computing crop water requirement (Neitsch et al., 2005.).
      Allen et al. (1989) express the Penman Monteith equation as:-
                                  890  U 2 ( e ae d )
              0 . 408  ( R nG ) +
                                      T +273              ...2.4.2
       ETo=
                        +  ( 1+0339 U 2 )
      Reference ET is calculated based on a calibrated equation for a selected reference crop using
      lysimeter measurements. The equation form may be empirically developed, involving only a few
      external environment variables, or it may be derived from the principles of physics, heat transfer,
      and other scientific fields of study. Some of the more complex reference ET equations include
      many variables and can be very precise. However, in practice the complexity of a reference ET
      equation must be justified by the availability of climatological and other data  if an equation is
      very complete from atheoretical standpoint it may be preferred over an empirically derived
      equation, but only if there is sufficient data to support its application. In general, reference ET
      equations can usually be categorized as temperaturebased methods, radiationbased methods,
      and combination methods (Hargreaves, et al. 1985).
      Hargreaves, et al. (1985) and Hargreaves and Samani (1985) propose the use of an equation for
      estimating ETo from air temperature and latitude. It is classified as a temperaturebased method,
      and several previous versions were proposed and subsequently improved upon before the current
      equation form was developed. The equation is:
                                                          7
    ETo=0 .0023 R A ( T +17 . 8 )  T R .2.4.1
  In which ETo and RA are in the same units of equivalent water evaporation (often in mm), R A is
  extraterrestrial solar radiation. T is the mean air temperature in oC or the average of mean
  maximum and mean minimum daily temperatures, and TR is the average daily temperature range
  for the period considered (mean daily maximum minus mean daily minimum). The value of TR
  is influenced by solar radiation, local advective energy, and the frontal temperature differences
  associated with storms and abrupt weather changes. Therefore, Eq. 2.4.1 will not be accurate for
  the days of major weather changes but usually provides very satisfactory results when T and TR
  are averaged over periods of five or more days. Thus, Eq. 2.4.1 is often applied to the calculation
  of weekly ETo.
  Where ETo is in units of mm/day for a grass reference crop;  is the slope of the saturation vapor
  pressure function (kPa/C);  is a psychrometric constant (kPa/C); Rn is net solar radiation
                 U2
  (MJ/m2/day);         is the wind speed (m/s) at 2.0 m height; T is the mean daily air temperature
  (C); eaed represents the vapor pressure deficit of air (kPa); and G is the soil heat flux density
  (MJ/m2/day).
  The irrigation water need is defined as the crop water need minus the effective rainfall. It is
  usually expressed in mm/day. An irrigation water need per day, however, does not mean that has
  to be supplied by irrigation every day. In theory, water could be given daily .But, as this would
  be time consuming and laborious. It is possible to supply water required for 3days for instance at
  a time. Rice can grow well under flooded conditions. Rice consumes more water than any other
  irrigated crop and it requires up to 23 times more water compared to other crops .Rice requires
  700 and 1500 mm of water per growing season (Bhuiyan, 1992).
  For most crops, the reference evapotranspiration at mid-season can be taken as a reasonable
  estimate of the peak water requirement. It is reasonable to assume that 70 per cent of average
  rainfall is available to the crop; the net irrigation requirement (In mm/d) can be estimated as:
                                                    8
          I n=ETo(0 . 70  P) .2.4.3
Where: In (mm/d) is the net irrigation requirement, ETo (mm/d) is the reference
        The field irrigation requirement represents the rate (in mm/d) at which water must be delivered
        to the field to prevent the crop suffering a shortage of water.
        A canal is defined as an artificial channel constructed on the ground to carry water from a river
        or another canal or a reservoir to the fields. Usually, canals have a trapezoidal cross section. An
        irrigation canal carries water from its source to agricultural fields. The slope of an irrigation
        canal is generally less than the ground slope in the head reaches of the canal and, hence, vertical
        falls have often to be constructed.
                                                          9
        Field canals (tertiary canals and sometimes secondary canals) usually run at an average gradient
        of 1:500 (0.0020 or 0.2%) to 1:300 (0.0033 or 0.33%). When the existing land slope exceeds the
        proposed canal gradient, drop structures can be used in order to avoid the canal being suspended
        too much above the ground level, which would require too much fill.
        A Secondary canal consists of several tertiary units, and normally receives water from a division
        structure on the main canal. Boundaries of secondary units are generally distinct topographic
        features such as drainage channels. Secondary canals are often located on a ridge, irrigating areas
        on both sides of the canal, as far as the bordering.
        The farmers receive their water from the tertiary canal in which there grouped in it. The upper
        limit of the length of the tertiary canal is about 1500 to 2000 meters. The area of a tertiary unit is
        normally 50 to 100 ha, but occasionally up to 150 ha, and is subdivided into quaternary units of
        8 - 15 ha each. The tertiary units should be designed prior the design of the other infrastructure of
        the scheme. First a suitable size of the units should be determined and subsequently the tertiary
        units are arranged in the project area. Only when the tertiary units are determined the other
        infrastructure can be mapped out (John V.R, 2004).
        Gross command area is the total area which can be economically irrigated from an irrigation
        system without considering the limitation on the quantity of available water. It includes the area
        which is, otherwise, uncultivable. For example, ponds and residential areas are uncultivable areas
        of gross command area.
                                                         10
        The required canal discharge depends on the field area to be irrigated ('command area'), and the
        water losses from the canal. For a design command area A (m 2), the design discharge required Q
        (l/s) for irrigation hours (H) every day, is given by the field-irrigation requirement multiplied by
        the area, divided by the time (in seconds) (Stern, 1979.).
                If  A
         Q=              +canal losses
              H  60 60
        Planning of an irrigation canal project includes the determination of canal alignment, and the
        water demand. The first step in the planning of an irrigation canal project is to carry out a
        preliminary survey to establish the feasibility or otherwise of a proposal. Once the feasibility of
        the proposal has been established, a detailed survey of the area is carried out and, thereafter, the
        alignment of the canal is fixed. The water demand of the canal is, then, worked out. To determine
        the feasibility of a proposal of extending canal irrigation to a new area, information on all such
        factors which influence irrigation development is collected during the preliminary               (or
        reconnaissance) survey. During this survey all these factors are observed or enquired from the
        local people (Asawa. 2008).
        The information on the following features of the area, are to be collected:
                  i.   Type of soil,
                 ii.   Topography of the area,
                iii.   Crops of the area,
                 iv.   Rainfall in the area,
                 v.    Water table elevations in the area,
                vi.    Existing irrigation facilities, and
                vii.   General outlook of the cultivators with respect to cultivation and irrigation.
                                                         11
        Desirable locations for irrigation canals on any gravity project, their cross-sectional designs and
        construction costs are governed mainly by topographic and geologic conditions along different
        routes of the cultivable lands. Main canals must convey water to the higher elevations of the
        cultivable area. Branch canals and distributaries convey water to different parts of the irrigable
        areas. On projects where land slopes are relatively flat and uniform, it is advantageous to align
        channels on the watershed of the areas to be irrigated. Aligning a canal (main, branch as well as
        distributary) on the watershed ensures gravity irrigation on both sides of the canal. Besides, the
        drainage flows away from the watershed and, hence, no drainage can cross a canal aligned on the
        watershed. Thus, a canal aligned on the watershed saves the cost of construction of cross-
        drainage structures (Asawa. 2008).
        Because of economic and other considerations, the canal alignment does not remain straight all
        through the length of the canal, and curves or bends have to be provided. The curves cause
        disturbed flow conditions resulting in eddies or cross currents which increase the losses. In a
        curved channel portion, the water surface is not level in the transverse direction.
        There is a slight drop in the water surface at the inner edge of the curve and a slight rise at the
        outer edge of the curve. This results in slight increase in the velocity at the inner edge and slight
        decrease in the velocity at the outer edge. As a result of this, the low-velocity fluid particles near
        the bed move to the inner bank and the high-velocity fluid particles near the surface gradually
        cross to the outer bank. The changes in the velocity on account of cross currents depend on the
        approach flow condition and the characteristics of the curve. When separate curves follow in
        close succession, either in the same direction or in the reversed direction, the velocity changes
        become still more complicated (Asawa. 2008).
        Therefore, wherever possible, curves in channels excavated through loose soil should be
        avoided. If it is unavoidable, the curves should have a long radius of curvature. The permissible
        minimum radius of curvature for a channel curve depends on the type of channel, dimensions of
        cross-section, velocities during full-capacity operations, earth formation along channel alignment
        and dangers of erosion along the paths of curved channel. In general, the permissible minimum
        radius of curvature is shorter for flumes or lined canals than earth canals, shorter for small cross-
                                                         12
        sections than for large cross-sections, shorter for low velocities than for high velocities, and
        shorter for tight soils than for loose soils (Asawa. 2008).
        Table 2.1. Values of minimum radii of channel curves for different channel capacities
        Channel capacity (m3/s)                                Minimum radius of curvature (metres)
        Less than 0.3                                                             100
        0.3 to 3.0                                                                150
        0.3 to 15                                                                 300
        15.0 to 30                                                                600
        30.0 to 85.0                                                              900
        More than 85                                                             1500
        Source: (Asawa .2008)
        For proper planning of a canal system, the designer has to first decide the duty of water in the
        locality under consideration. Duty is defined as the area irrigated by a unit discharge of water
        flowing continuously for the duration of the base period of a crop. The base period of a crop is
        the time duration between the first watering at the time of sowing and the last watering before
        harvesting the crop. Obviously, the base period of a crop is smaller than the crop period. Duty is
        measured in hectares/m3/s. The duty of a canal depends on the crop, type of soil, irrigation and
        cultivation methods, climatic factors, and the channel condition (Asawa. 2008).
        Well irrigation has higher duty than canal irrigation due to the fact that water is used
        economically according to the needs. Open wells do not supply a fixed discharge and, hence, the
        average area irrigated from an open well is termed its duty. Between the head of the main canal
        and the outlet in the distributary, there are losses due to evaporation and percolation. As such,
        duty is different at different points of the canal system.
        When water comes in contact with an earthen surface, whether artificial or natural, the surface
        absorbs water. This absorbed water percolates deep into the ground and is the main cause of the
        loss of water carried by canal. In addition, some canals water is also lost due to evaporation. The
        loss due to evaporation is about 10% of the quantity lost due to seepage. The seepage loss varies
                                                          13
        with the types of the materials through which the canal runs. Obviously, the loss is greater in
        coarse sand and gravel, less in loam, and still less in clay soil. If the canal carries silt-laden water,
        the pose of the soil are sealed in course of time and the canal seepage reduces with time (Asawa.
        2008).
        In almost all cases, the seepage loss constitutes an important factor which must be accounted for
        in determining the water requirements of a canal. For the purpose of estimating the water
        requirements of canal, the total loss due to evaporation and seepage, also known as conveyance
        loss, is expressed as m3/s per million square meters of either wetted perimeter or the exposed
        water surface area. Conveyance loss can be calculated using the values given in Table 2.2. The
        total loss (due to seepage and evaporation) per million square meters of water surface varies
        from 2.5m3/s for ordinary clay loam to 5.0m3/s for sandy loam (Asawa. 2008).
        Canal lining is considered for the reasons of prevention of seepage losses, prevention of scour
        and erosion, prevention of damage by livestock or people, to allow for increase curvature,
        reduction of land acquisition and many others. Lining of canals is an important feature of
        irrigation projects as it minimizes generally the loss of water due to seepage. The water thus
        saved can be usefully employed for the extension and improvement of irrigation facilities.
                                                          14
   2.9 HYDRAULIC DESIGN
        The design of a channel involves the selection of channel alignment, shapes, size, and bottom
        slope and whether the channel should be lined to reduce seepage and/or to prevent, the erosion of
        channel sides and bottom. Since a lined channel offers less resistance to flow than an unlined
        channel. Procedures are not presently available for selecting optimum channel parameters
        directly. Typically, the design of a channel is done by trial and error. Channel parameters are
        selected and an analysis is done to verify that the operational requirements are met with these
        parameters. A number of alternatives are considered, and their costs are compared. Then, the
        most economical alternative that gives satisfactory performance is selected.
        The design of canal generally assumes that steady and uniform flow exists in the canal. In
        addition to that assumption and also depending on the design concept, sediment content in the
        irrigation water and the soil characteristics of the field are taken into account. The hydraulic
        design of unlined canal and earthen lining canal can be carried out using various methods. The
        most common methods are Chezys Formula and Manning Equation.
        According to M.H Ali, the earliest formula for open channel design was proposed by Chezy
        (in 1775). The Chezys equation is expressed as
V =C RS
C = Chezys constant, which varies with surface roughness and flow rates
        Later on, difference scientists and engineers worked on this formula. After conducting a series of
        experiment, Kutter, Basin and Manning proposed a method for determining C in Chezys
        formula. But due to simplicity, Mannings formula is widely used.
                                                       15
The Manning formula is widely used for canal design. However its flow factor n depends on
several factors, including the canal slope, depth of flow and bed slope. These factors are more
dominant in rough and shallow canals with low water levels, common in smallholders irrigation
schemes (John V.R., 2004). The canal dimensions and longitudinal slope, whether for irrigation
or drainage, can be calculated through trial and error with the Manning formula. This formula is
derived from the continuity equation and the equation for unsteady flow. These equations have
been simplified by assuming steady uniform flow in the canal (this assumes long canals with
constant cross-section and slope) (Andreas &Karen, 2002).
Where: Q = Discharge (m3/sec) A = Wetted cross-sectional area (m2) V = Water velocity (m/sec)
                                 1
                     1     6
Manning suggested C= n  R               in Chezys formula. Manning equation expressed as
         2   1
    1
 V = R 3 S2          ..2.9.2
    n
                 2    1
                                                    2     1
     AR3S2
 Q=                        or       Q=k m  A  R 3  S 2        2.9.3
       n
Where:
Q = Discharge (m3/sec)
                                                              1
 km                                                     km=
      and n = Manning roughness coefficient:                  n
                                                    16
        Table 2.3: Manning roughness coefficient values
         Surface                                          Km                     n
         lined irrigation canals
          Well finished                                  70                     0.014
          Average finished                               65                     0.015
          Poor finish                                    60                     0.017
                                                          60                     0.017
         Soil cement
         Bricks                                           55                     0.018
         Correction for curved reaches                    -5                     +0.001
         Correction for small depth (y<0.5 m)             -5                     +0.001
         Earth Irrigation Canals:
          Straight minor weed growth Q>10 m3/s           40-50                  0.02-0.025
          Straight short grass, Q<10 m3/s                36                     0.028
          Straight short grass Q<0.2 m3/s                24                     0.042
          Correction for curved reaches                  -5                     +0.001
         Drains, Earth
         Bush & weed clearance 2 or 3 times per year     24                    0.0417
         Less well maintained                            10-20                 0.1-0.05
         Source: T.K.E. Meijer: Design of Smallholders Irrigation Systems, 1993, WAU
        Madan Das and Mimi Das (2009), suggest that for a given discharge Q, Manning n and bed slope
        S, wetted perimeter P is minimum when A is minimum. For minimum P and A, cost of
        excavation and lining used to prevent seepage and erosion will be minimum. Thus in the design
        of canal considering P to be minimum is termed as method of economic section.
                                                        17
   i.   Maximum discharge for a given cross sectional area
  ii.   Minimum excavation and lining i.e. least expenditure for the design amount of discharge
 iii.   Least wetted perimeter or its equivalent so that there is minimum resistance of flow and
        consequently there is optimum discharge.
The Table below gives the geometric attributes of three best hydraulic sections.
Where y is the depth of the channel, R is the hydraulic depth, S is the slope of channel and n is
mannings coefficient for the channel lining.
For a concrete lined channel n = 0.015. For a rectangular channel, designing for the best
hydraulic section we have: B = 2d; P = 4d; and A = 2d2. Where B, d, P, A are the bottom width,
depth, wetted perimeter and Area of channel respectively.
                                                  18
                                                          T
                                         zy               B              zy
                                                                y              1V
                                                                          zH
                                                         B
                                              Figure 1 Trapezoidal section
        For the trapezoidal channel, the half of top width is equal to the length of one slanting side,
        which is the condition for economic section.
( B+22 zy )= y 1+ z 2
Also the trapezoidal channel section is economical when hydraulic radius R is half of the depth (
               y
          R=
               2 ). Also where a trapezoid channel is used the best hydraulic section will have side slope
             3
        of     3    horizontal to 1 vertical. For trapezoidal channel, designing for the best hydraulic
                        2y
                   B=      , P=2  3 y           A=  3 y 2 .
        section,        3                and
        The capacity of a canal at any given point is the amount of water which will pass that point under
        normal condition. In preparation plans for construction or enlargement it is necessary to know
        the agricultural area which the canal is to serve and the duty of water for which provision must
        be made during the period of greatest irrigation requirement (Frederick & Daniel 1913).
                                                           19
        Irrigation canals should be able to transport peak flows. The design capacity depends on the
        rotation schedule. Under continuous flow arrangements the design capacity equals the
        requirements of the total area under demand. The design capacity of on-demand or rotation
        systems depends on the duration that it carries water. A canal that only carries water for 50% or
        25% of the time requires respectively double and four times higher capacities. If farmers can take
        water without prior notice, the canals need very large capacities. It is recommended to increase
        the flexibility of the scheme to react to water needs and increase the design capacity of the canals
        with 10% to 40%, at respectively the intake to the end of the secondary canals (John V.R, 2004).
        According to (MAFC,1999), it is advisable to design the tertiary canals for continuous flow for
        economic reasons, and to design the quaternary canals on a rotation basis, since most farmers do
        not irrigate more than 8 - 10 hrs a day.
        In this case the tertiary canals should be designed for continuous flow and the capacity of the
        field distribution system will be increased to Q x 24/t, when Q is the design capacity for
        continuous flow and (t) is the irrigation period in hours.
        In the absence of accurate data, the distribution system is usually designed for 1 litre/s/ha
        continuous flow and proportionally increased with the irrigation by rotation.
        The design capacity of a tertiary canal between two Quaternary division box is given by:
Q=( A 1+ A 2+ An)q
        Where: Q1 = tertiary canal upstream for continuous flow q =Irrigation model l/s/Ha and
        A =Quaternary area irrigated.
        According to R.K Sharma and T.K Sharma (2002), the Permissible Velocity is defined as the
        highest velocity at which water may be carried safely in a channel. Maximum permissible
        Velocity is specified so that the discharge is passed within the smallest section without causing
        erosion. Maximum Permissible Velocities recommended for various types of soil are shown in
        Table 2.5.
                                                         20
        Table 2.5: Maximum Permissible Velocities
        Soil type                                velocities (m/s)         CBIP Practice velocities (m/s)
        Ordinary soil                            0.6  1.0                0.6  0.9
        Very light loose sand to average sand    3  0.6                  0.3  0.6
        Sandy loam, black cotton and similar     0.5  1.0                0.6  0.8
        Murum, hard                              0.75  1.25              0.9  1.0
        Gravel                                   1.25                     1.25
        Rock                                     1.25  2.0               1.5
        Source: R.K Sharma and T.K Sharma (2002).
        minimum non- silting and non- weed velocity is considered as 0.3 to 0.5 m/sec. objection to the
        slack velocity are (i) It tends to encourage weed growth, (ii) It increases transmission losses
        through the canal, and (iii) It results in increased cross section area and hence uneconomical
        section (R.K Sharma &T.K Sharma, 2002).
        The selection of a cross section for canal is one involving economy of construction and
        maintenance as well as security against failures which prove disastrous to an irrigation system. It
        requires the consideration of the theory of flow of water in channel and the exercise of
        engineering judgment. From the standpoint of theory alone it would appear the section which
        will carry the necessary amount of water, conserve grade so as to cover the greatest possible area
        and require the least amount of excavation in its construction, is the one which should be
        selected. For a canal of given slope and fixed area of cross section, the greatest velocity will be
        attained by selection the section with maximum hydraulic radius (Frederick & Daniel 1913).
                                                        21
        Andreas and Karen (2002) suggest that, the best way to present canal design data for
        construction is to draw a longitudinal profile of the canal route and to tabulate the data needed
        for construction. The longitudinal profile shows the chainage or distance along the canal at the
        horizontal or x-axis and the elevations of the natural ground, the ground after leveling and the
        canal bed at the vertical or y-axis. The data are tabulated under the graph, showing the elevation
        of ground and canal bed in figures at each given distance. Water depths could also be shown. The
        chainage starts from a reference point, which is usually the beginning of the canal. Where
        possible the survey results of the topographic survey are used. If these are not sufficient a
        detailed survey of the proposed alignments should be made.
        To limit excavation and expropriation cost, canal side slopes are designed as steep as possible.
        Soil material, depth of the canal and occurrence of seepage will determine the maximum
        steepness for a stable side slope. Side slopes can be steeper for lined canals compared to unlined
        canals. For small canals (where h<0.40 m) side slopes of lined canal can be vertical. For larger
        canals the side slope values in Table 2.6 are recommended. Particularly for the larger canals
        stability of the lined side slope has to be checked against sliding and overturning. Water pressure
        from behind the lining is an important factor in this balance (DID MANUAL 2009).
        The side slope depends on the material which is used for constructing the canal, and canals
        constructed with heavy clay can have steeper side slopes than those built with sandier material.
        Lined canals which are constructed from bricks or concrete can even have vertical side slopes
        (FAO. 1992).
                                                        22
      Canal banks hold water within the water section of a channel. The width of the banks may vary
      according to the importance and capacity of the canal. In case of distributaries, service road
      should be provided on one bank for inspection and maintenance purpose. However, in case of
      main and branch canals service road should be provided on both the banks. Bank widths at all
      elevations must provide stability against water pressure at the sides of the channel section. They
      should also keep percolating water below ground level outside the banks and prevent piping of
      bank materials (Asawa G.L, 2008). For considerations of operation, maintenance and inspection,
      minimum bank width along the canals required are as given in Table 2.7.
Y= 0.5 B ,
                                                     23
2.9.12 Canal shape
       Canals with the same cross-sectional area, longitudinal slope and roughness, but with different
       shapes, will carry different discharges because of different wetted perimeters and hydraulic
       radius. The most efficient geometry is when the wetted perimeter is minimal for a given
       discharge.
       Under these circumstances, the cross sectional area for a given discharge will also be minimal.
       The optimum canal shape, hydraulically, also tends to be the cheapest to construct as the amount
       of surface lining material required will be minimized (FAO-Andreas et al, 2002).
2.9.13 Berms
       A berm is a narrow horizontal strip of land between the inner toe of the bank and the top edge of
       cutting. Berms between water section and inner bank slopes are required along the channels
       where bank materials are susceptible to sloughing. Berms slope towards water section to
       facilitate drainage.
2.9.14 Freeboard
       Freeboard is the vertical distance from the water surface at full supply level to the top of bank.
       Freeboard provides the margin of safety against overtopping of the banks due to sudden rise in
       the water surface of a channel on account of improper operation of gates at the head regulator,
       accidents in operation, wave action, landslides, and inflow during heavy rainfall.
       Design of channels should specify adequate freeboards to prevent overtopping of the banks
       during sudden rises in water surface. Adequate freeboard would depend on dimensions of the
       flow section, flow condition, bank material, method of construction of bank, and resulting
       damage due to failure of bank (Asawa 2008).
       The freeboard can be calculated using the following equation
       F = C  h
       Where: C = 0.8 for discharges of up to 0.5 m 3/sec up to 1.35 for discharges in excess of
       80 m3/sec and h = Water depth (m)
       For lined canals, F ranges from 0.40 m for discharges less than 0.5m 3/s up to 1.20m for
       discharges of 50m3/s or more. For very small lined canals, with discharges of less than 0.5 m 3/s,
                                                       24
      the freeboard depths could be reduced to between 0.05-0.30 m. The Central Water Commission
      of India (CWC) has recommended the value of freeboard as given in Table 2.9.
      The minimum radius for earth canals constructed in less erosive soils should not be less than 5 to
      8 times the water width in the canal. The following range is suggested: canals conveying 5 to 15
      m3/s, 6 times the water width: 15 to 50m 3/s, 7 times the water width: over 50 ml/s, 8 times the
      water width. If the canal is concrete lined or if a flume is used, a minimum radius of curvature of
      3 times the water width should be used to avoid bend losses. If the canal is lined with brick,
      masonry, rip-rap, stone pitching or other hard material resistant to erosion it should also have a
      minimum radius of 3 times the water width (Labye Y. et al, 1988).
      In general, the minimum radius of curvature is usually taken as three times the water surface
      width for concrete-lined canals, and three to seven times the surface water width and for erodible
      canals (MAFC. 1999).
      Water control and diversion structures are necessary to gives easy and effective control of
      irrigation water on the farm. Good control will reduce the labour required to irrigation and check
                                                      25
      erosion and water loss. The structures include drops, check gates, portable check dam, diversion
      boxes, turnout boxes, siphons and pipe turnouts.
2.10.1 Turnouts
      When water is to be taken from a lateral channel into field distribution channel or from a channel
      into a field, a turnout is used. Kraatz and Mahajan (1982) define an outlet or farm turnout as a
      structure at the head of a watercourse, farm irrigation canals, or a farm or field lateral, which
      connects it with a supply canal. They are needed to provide a quick and easy means of taking
      water from the head ditch to field ditches or border dikes.
      Turnouts may be portable or built in. They are sometime equipped with gates to control the flow
      of water. The most common turnouts are box turnouts, spiles and siphon tubes (Michael A.M.,
      2008).
      A division box or a division structure is a structure put along a canal at a point where two or
      more canals meet. It is used to divide and control the flow from one canal to several other canals
      or fields. The structure consists of two or more controllable openings provided with metal or
      wooden slide gates or stop planks. The flow from one canal is divided between two or more
      canals or fields by partially or completely opening or closing the appropriate gates.
      The division box is constructed at the junction point where an irrigation sub lateral branches into
      two or three farm ditches. The division box is not used to divide water carried in by the sub
      lateral between farm ditches. It used to turn the whole flow of water alternatively into one of the
      ditches according to preset irrigation schedule (Kraatz & Mahajan 2008)
      Checks are placed in an irrigation channel to form and adjustable dam to control the elevation of
      the water surface upstream. To apply water from channels to a field it is often necessary to raise
      the water level. The water level in the channel should be at least about 8 to 12cm above the
      ground surface in order that siphon tubes or pipe turnout may be used efficiently. Checks gates
                                                      26
        placed at intervals along the channel keep a satisfactory water level for applying water to the
        field (Michael A.M., 2008).
        A drop (or fall) structure is a regulating structure which lowers the water level along its course.
        The slope of a canal is usually milder than the terrain slope as a result of which the canal in a
        cutting at its headworks will soon outstrip the ground surface. In order to avoid excessive
        infilling the bed level of the downstream canal is lowered, the two reaches being connected by a
        suitable drop structure (Novak et al, 2007).
        The drop is located so that the fillings and cuttings of the canal are equalized as much as
        possible. Wherever possible, the drop structure may also be combined with a regulator or a
        bridge. The location of an offtake from the canal also influences the fall site, with offtakes
        located upstream of the fall structure (Novak et al, 2007).
        Drops are usually provided with a low crest wall and are subdivided into the following types:
(i)     The vertical drop,
(ii)    The inclined drop and
(iii)   The piped drop.
                                                        27
                                               CHAPTER THREE
3.0 METHODOLOGY
        The project is a problem solving by designing irrigation canals network at Cheju irrigation
        scheme. In order to come up with proper design, various approaches have been used. This project
        report had considered all the possible economical and easy methods used in design of irrigation
        structures adopted in Tanzania. To be familiar with the methodology which were used in this
        project, one have to understand a number of processes to be done in order to accomplish the
        whole design work of irrigation canals network.
        Cheju Scheme is located at Cheju village within south eastern part of Zanzibar main Island
        (Unguja Island), about 30 km, south east of Zanzibar town. The Scheme has a total potential area
        of 1200ha only about 90ha has so far been developed for Irrigated agriculture by using four
        tubular wells as a source of water.
3.1.2 Climate
3.1.2.1 Rainfall
        The mean annual rainfall of the project area site is 1554.64mm. Although the rains are distributed
        throughout the year, there are two prominent rainy seasons. The main rainy season or Masika
        extends from the end of March to May and is responsible for about half of the total rainfall. The
        short rains or Vuli fall in the months of October to December. Little more than half of
        remaining rainfall is received during this season.
                                                        28
3.1.2.2 Evaporation
3.1.2.3 Temperature
        The mean monthly maximum temperature ranges from 28.5 during the coldest month (July)
       to 32.0oC during the hottest month (February) and the mean monthly minimum temperature
       range from 19.1oC during the month of September to 23.4oC during the hottest month of April.
3.1.2.4 Wind
       There are two dominant prevailing winds. South monsoon winds prevail during the months of
       June to December while North monsoon winds prevail during the months of January to May.
       Wind speed is lowest in March (144.3 km/day). From April it starts increase and attains the
       highest value during the months of June to September (197.1 km/day).
3.1.2.6 Soils
       According to the geological map of Zanzibar, the soil of Cheju, and Zanzibar in general, have
       been divided into three main groups .these are: sandy, calcareous red soils, and clay soils
       (Therma, 1981). But in general the soil type of Cheju scheme heavy clay soil.
                                                     29
                  Figure 2: Map of Cheju village showing location of Cheju irrigation scheme
   A number of reference books, manuals, journals and design reports will be consulted so as the
   skills gained can be used during designing of the project as literature review provide a theoretical
   background to the study area concerned and experiencing different approach used by others to
   tackle the same problem.
   Data were collected involve primary (include soil data, topographical survey data wells discharge
   data), and secondary data (include Water sources, population, Climatic data, Crop and Cropping
   pattern). Field visit will be done as to prepare an inventory of land use, topography, water source,
   agricultural activity including soils i.e. texture, structure,to asses and observe existing situation
   of project area in consultation with different stakeholders.Some of the Secondary data will be
   collected from local authorities and survey office while primary data will be collected at site.
                                                     30
3.3 Consultation
   Through consultation, gathering information and data collection concerning the study area
   becomes possible. Moreover, Experts and technical people are the key sources of information on
   technical issues and knowledge.
3.4 Design
   During data analysis and computations, the design process was involving manual work through
   the use of empirical formula and design soft ware. Different design softwares to be used are.
   This was used to filter and arrange the topographical data of study area (Cheju scheme) in order
   to be imported in AutoCAD civil3D program to draw topographical map.
   To determine crop water requirements (CWR or ETcrop) ,Cropwat 8.0 in combination with
   Climwat 2.0 were used for analysis of meteorological data i.e determining parameters such as
   reference evapotranspiration (ETo), determination of effective rainfall from the monthly average
   total rainfall for different years of the collected data, determination of net irrigation requirements
   and determination of irrigation scheduling.
   AutoCAD Civil 3D was used to prepare a contour map which provided a clear picture on the
   topography of the project area. This software is capable of providing the direction of flow of
   water, watersheds, and existing ground profiles from a drawn contour map.
                                                    31
                                                CHAPTER FOUR
        Frequent site visits were carried out so as to ascertain information observed from the studies, as
        well as to collect farmers ideas and interests that could be incorporated in the design according
        to the nature of their environment. Data collection involved: Topographical field survey data,
        Water sources, Soil data and Meteorological data.
        A plan for scope and methods of topographical survey was established by stages. The control
        point and temporary benchmark are installed in/nearby the project area in order to correctly mark
        the location of various facilities such as irrigation canals, drainage canals, and roads
        In this project, topographical survey was conducted by team of surveyors and technicians from
        engineering section of department of irrigation Zanzibar in collaboration with other experts from
        Korea Rural Community Corporation. A total of about 259 survey points were used to draw the
        topographical map of study area. The lists of topographical data are attached on appendix 1
        The scheme is planned to be provided with irrigation water by using tubular wells. In order to
        meet crop water requirement for 75ha of project area at Cheju irrigation scheme, there are 2
        tubular wells which used to irrigate this area. Each tubular is expected cover the 38ha, reference
        being made on yield of the existing boreholes in Cheju (average of 35 l/s) and crop water
        requirement.
        In this project, meteorological data were collected to the meteorological station which is closer to
        the project site. The detailed information about climatic condition of 10 years was collected
        through metrological data from Zanzibar Meteorological Station. The collected meteorological
        parameters include maximum and minimum temperatures, humidity, rainfall, and average
        minutes of daily sunshine as they appear in the tables below.
                                                         32
        Table 4.1: Average meteorological data from 2004 to 2013
                                                         RELATIVE     TOTAL
                          MAX.TEMP        MIN.TEMP                                    WIND RUN         SUN SHINE
           MONTH                                         HUMIDITY    RAIN FALL
                            (C)            (C)                                      (Km/Day)          (Av. Mins)
                                                            (%)        (mm)
        JANUARY              32.69           24.55           77.8       81.43             493              8.61
        FEBRUARY             32.84            24.4           77.3       50.33             424              8.54
        MARCH                32.37           24.62           81.6       213.8             333              7.67
        APRIL                30.65           24.59           84.7       360.11            379              6.22
        MAY                  29.87            23.9           82.5       198.79            426              6.99
        JUNE                 29.32           22.95           78.9       60.12             466              8.11
        JULY                 29.25           22.21           76         13.46             504              8.08
        AUGUST               29.58           21.24           76.1       32.03             471               8.3
        SEPTEMBER            30.67           21.32           76.7       41.45             478              8.62
        OCTOBER              31.24           22.35           79         93.57             437              9.02
        NOVEMBER               31            23.29           84.2       233.8             333              8.18
        DECEMBER             31.73           24.18           82.1       175.75            377              8.65
        Source: Tanzania Meteorological agency, Zanzibar office
4.1.4   Soil data
        Soil survey was conducted in the project area by taking soil sample in a several point in a study
        area by using augering method. The soil samples are taken in a depth of 0 to 30cm and 30 to
        60cm in a several auger holes in a project area. The purpose of taking these soil samples was for
        identifying different soil types whose characteristics serve as basis for the design decision
        particularly on the type and method of irrigation system to be employed.
             Photo 3.1: Salum taking soil samples at Cheju          Photo 3.2: collected soil samples at Cheju from
                                                                                    different depth
                                                             33
4.1.5   Laboratory Soil Test
        Soil samples which collected at the project area were tested at ATC Soil and Bitumen Laboratory
        (photo 3.3  3.4). The soil parameters were tested includes: grain size distribution (wet sieve
        analysis), permeability with specific gravity of soil and Atterberg limits i.e Liquid limit, Plastic
        limit. Soil laboratory tests were done to measure the engineering properties of the soils where the
        canals are to be constructed. The results of these tests are attached on appendices 3a- 3g
Photo 3.3: Sieve analysis test at ATC laboratory Photo 3.4: Atterberg analysis test at ATC laboratory
        Estimating the crop water requirements (CWR) and irrigation requirements (IR) for a proposed
        cropping pattern is an essential part of the planning and design of capacity of canals. To estimate
        the crop water requirements and irrigation requirements of project area, there are some
        essentially data needed. The data obtained from meteorological station, soil data, coverage area
        of the project and the type of crop grown at project area (rice) were used to analyze the crop
        water requirement and irrigation requirements of rice crop by using the CROPWAT version 8
        program. The analyses of irrigation requirement of rice for actual project area are shown in a
        figure below.
                                                           34
 Figure 3: The analysis of irrigation requirement of rice for actual project area.
As stated before (at 4.1.2 water source) that the project area is planned to be provided with
irrigation water by using two tubular wells and cover the area of 72h, but each tubular well
From the above analysis the maximum irrigation requirement for rice crop is 0.69/ s/ha at
month of March which was used to design the canal discharge for the project area for each
month. For 36h the discharge of canal will be 225 l / sec ( 0.69 l/s /h 3 6 h ). But because
the tubular well has discharge of 35 l/sec , which is greater than 25/sec, than for safely
designing of irrigation canal network at 36haof an area, the discharge of 35 l/sec should be
                                                35
         Figure 4: Summary crop water analysis of rice crop for actual project area.
After conducting soil laboratory test the obtained results are summarized in a table below
        By using the values of proportion of material passing 0.425m sieve, liquid limit and plastic
        index, according to AASHTO method of classification, the soils (sample 1 and 2) are classified
        as clayey soils which fall on A-7, A-7-5a, and A-7-6.
        The AutoCAD Civil 3D computer program was used to prepare topographical map of project
        area by using the topographical survey data of project area. The topographical map of the area
        was produced to a 1:1,000 scale with contour interval of 0.5m for the entire area. The map as a
        result of survey data has been used in design of farm lay out and longitudinal profile. The detail
        information about the farm layout has been presented in appendix 07
                                                       36
4.2.3.1 Land Consolidation
The purposes of the land consolidation are as following; a) improvement of irrigation, drainage
and soil, b) alignment of farm road, c) collectivization of farmland, d) preparation of farming
mechanization, e) improvement of productivity and work efficiency, f) improvement of water
resource management.
4.2.3.1.1 Farmland
The dimensions of primary farmland, secondary farmland and tertiary farmland will be 150m x
300m (4.5ha), 100m x 150m (1.5ha) and 100m x 50m (0.5ha) respectively. The scale of the
primary farmland section looks inefficient, but it can be overcome through the managerial
methodology of water supply into the farmland.
Irrigation canal was designed as follows; (a) primary irrigation canal (PIC) main irrigation canal
(MIC) which provides water into the secondary irrigation canal (SIC), (b) SIC which provides
water into the Tertiary irrigation canal (TIC) and (c) Tertiary irrigation canal (TIC) which
provides water into the farmlands.
Primary irrigation canal (PIC) will be arrayed along the primary farmland section which can be
given the irrigation water by gravity, while The secondary irrigation canal (SIC) will be provided
with water by the PIC and supply this water to secondary farmland section. The slope for both
PIC and SIC is the 1/2,000 and drop structure will be placed accordingly to regulate flow
velocity and dissipate hydraulic energy. Both PIC and SIC will be trapezoidal shaped concrete
lined canals. The detail information about the profile of main and secondary canal has been
presented in hydraulic sheet in appendix 8 and 9 respectively
Mannings equation of flow was used to calculate dimensions of the canals. Through the use of
hydraulic sheet calculation Mannings coefficient value has been taken into account with respect
to the type of lining material for small irrigation canals.
                                                  37
During hydraulic design in a spread sheet, the dimensions of canal for both the PIC and SIC
were probably set as a guide in accordance to irrigation manual as fellows; (a) bed width 0.25m,
(b) cross-sectional slope of canal 1:1, freeboard of 0.15m and manning roughness coefficient of
0.03 for small irrigation canal were used. So by using the following Mannings equation under
condition of most economic section of trapezoidal canal.
( B+22 zy )= y 1+ z 2
B+ 2 zy =2 y 1+ z 2
0.25+2 y=2 y 2
2 y 22 y=0.25
2 y ( 21 ) =0.25
2 y=0.60
y=0.3 m
Then the depth of canal water level will be 0.3m, and total height of canal will be 0.45m. Both
PIC and SIC dimensions of this scheme look smaller than others because it is planned to provide
water resource from the tubular well by farmland section. The detail information about the
designed parameter has been presented in hydraulic sheet in appendix 04 and 5
                                               38
   standard drawing that is recommended to be used for irrigation development to control flow
   of water in the canal and to divert water from a main canal to secondary canal and from
   secondary canal to the tertiary canals.
CHAPTER FIVE
5.2 CONCLUSION
   The objective of this project was to design main and secondary lined irrigation canal network by
   using ground water as a source of irrigation water. at Cheju Scheme which is located at Cheju
   village within south eastern part of Zanzibar main Island (Unguja Island), about 30 km, south
   east of Zanzibar town. The total project area is 72ha which is planned to be provided with
irrigation water by using 2 tubular wells capacity of 35 l/s to meet crop water requirement for
72ha of project area. And each tubular is expected cover the 32ha, reference being made on yield
of the existing boreholes in Cheju (average of 35 l/s ) and crop water requirement.
   The proposed canals network comprises of two main canals with length of 610m and 570m
   and      eight secondary canals of different lengths. SC1=299m, SC2=292m, SC3=323,
   SC4=282m, SC5=360m, SC6=272, SC7=343m and SC8=275m and they are located at a distance
   of 150m apart. The dimensions of designed main canals and secondary canal s were looked
   smaller because it planned to be irrigated by using tubular wells and according to this design, the
   discharge of 35l/s for each tubular well ( 2 tubular wells) will be enough to irrigate the area of
   72ha.
5.3 RECOMMENDATION
     Because Cheju irrigation scheme is planned to be irrigated by using tubular wells, the farm
         operation management should strictly follow the proposed water distribution schedule. The
         proper proposed irrigation application in this scheme is to irrigate by shift and not for whole
         scheme this is die to small discharge of boreholes.
    The effort in this project has been directed to the designing of irrigation canals network only
         at Cheju scheme, but in order to get effective irrigation scheme, adequate drainage systems in
                                                     39
   this scheme should be designed as a future project in this scheme. The recommendations
   have been put forward in a designing of drainage canals which used to drain water from the
   field and to direct that water to the supplementary water sources and the drainage water
   collected within supplementary water sources will be recycled back to the scheme.
 Supplementary water sources should be placed adjacent to the scheme. So that all primary
   drainage canals (PDC) will be directed towards this supplementary water sources and the
   drainage water collected within supplementary water sources will be recycled back to the
   scheme. These supplementary sources will be devised with detention method if the
   geological condition cannot allow storing water. In order to re-utilize the water from the
   Supplementary water sources, it is necessary to install the pump station or pump machine.
                                              40
REFERENCES:
Allen, R.G., M.E. Jensen, J.L. Wright and R.D. Burman. 1989. Operational Estimates of
Reference Evapotranspiration. Agronomy Journal, 81(4):650662.
Asawa, G.L. (2008). Irrigation and Water Resources Engineering..New Delhi: New Age
International(P) Limited.
Andress P. Savva, Karen Frenken, FAO 2002. Planning, Development, Monitoring and
evaluation of irrigated agriculture with farmers participation; Volume II, Harare Zimbabwe.
Bhuiyan, S. I. 1992. Water Management in Relation to Crop Production: Case study on rice.
Outlook Agric. 21(4):293299.
California Department of Water Resources, 1986, Crop Water Use in California. Sacramento.
Department of Irrigation and Drainage manual (DID MANUAL), 2009 Irrigation and
Agricultural Drainage. Malaysia
Dr B.C. Panmia and Dr Pande B.B Lal, 1992. Irrigation and Water Power Engineering. New
Delhi India
Fredrick H.N and Daniel W.M., 1913. Principle of irrigation engineering New York and London
Garg S.K. (1999).Irrigation Engineering and Hydraulic Structures.14th ed. Khanna Publishers,
Delhi India
Hargreaves, G.H. and Samani, Z.A., 1985. Reference Crop Evapotranspiration from
Temperature, Applied Engineering in Agriculture, Trans. ASCE 1(2):9699.
                                              41
Hargreaves, G.L., Hargreaves, G.H., and Riley, J.P., 1985, Irrigation Water Requirements for
Senegal River Basin. J. of Irrigation and Drainage Engineering, ASCE 111(3) 265275.
Irrigation Design Manual Volume 1, (1999), Ministry of Agriculture food security and
cooperatives, Dar es salaam, Tanzania.
James, L.G. 1988.Principles of Farm Irrigation System Design. Washington State University,
Kraatz D.B and Mahajan I.K small hydraulic structure- FAO, 1982. irrigation and drainage
paper 26
Madan M.D and Mimi D. S., 2009 Irrigation and Water Power Engineering. New Delhi, India.
Mays, L.W. (2005), Water Resources Engineering, John Wiley & Sons Inc., U.S.A.
Michael, A. M. 2008. Irrigation Theory and Practice; 2nd edition: Vicas Publishing House PVT
LTD.
M.H. Ali. 2011. Practices of Irrigation and On Farm Water Management. Volume 2. New York
Neitsch, S.L., J.G. Arnold, J.R. Kliniry, J.R. Wolliams. 2005. Soil and Water Assessment, Tool
Theoretical Document.
P. Novak, A.I.B. Moffat, C. Nalluri and R. Narayanan., 2007. Hydraulic Structures 4th Edition.
New York and London
Sharma R.K. and Sharma T.K., 2002. Irrigation Engineering (Including Hydrology) S.Chand and
Co Ltd. New Delhi
Therma, B.P.,(1981) Detail soil survey of Bumbi-Sudi,Cheju, Chechele, Machigini and Kisima
Mchanga Rice irrigation Project areas - Zanzibar and Soil study of some rice growing valleys of
Pemba In: Development of rice cultivation and Extension in Vegetable Production Zanzibar.
                                               42
T.K.E. Meijer 1993. Design of Smallholders Irrigation Systems, Wageningen Agricultural
University
Y. Labye, M.A. Olson, A. Galand and N. Tsiourtis FAO 1988, Design and Optimization of
Irrigation Distribution Network. Irrigation and drainage Paper 44 FAO, Rome
                                    APPENDICES
Appendix 1: Topographical survey data of project area at Cheju Irrigation Scheme
    P               N                  E                    Z                   D
     1          9314996.89         540853.761            22.943                HT
     2         9314805.887         541746.013            20.236               TREE
     3         9314885.959         541365.473            20.231               TREE
     4          9314917.99         541832.751            21.314               AY42
     5         9314905.343         541852.001            21.119               AY43
     6         9315037.034         541246.936            20.928                SH
     7         9314909.639         541844.668             21.24                SH
     8         9314909.595         541844.744            21.235                SH
     9         9314952.744         541870.005            20.936                SH
    10         9314866.469         541819.442            20.937                SH
    11         9314892.511         541780.418            21.064                SH
    12         9314976.136         541835.252            21.064                SH
    13         9314934.328         541807.827            21.365                SH
    14         9314887.498         541879.242             20.87                SH
    15         9314845.674         541851.842             20.57                SH
    16         9314929.312         541906.645            20.567                SH
    17         9314887.494         541879.238            20.568                SH
    18         9314893.716         541852.496            21.848               TREE
    19         9314862.373         541917.533            20.723                SH
    20         9314904.227         541944.963            20.323                SH
    21         9314820.561         541890.16             20.323                SH
    22         9314798.873         541923.524            20.266                SH
    23         9314882.541         541978.233            20.267                SH
    24         9314840.732         541950.898            20.666                SH
    25         9314819.922         541982.849            19.866                SH
    26         9314861.788         542010.182            19.566                SH
    27         9314778.048         541955.522            19.468                SH
    28         9314750.361         541997.701            19.744                SH
    29          9314834.04         542052.454            20.445                SH
    30         9314792.148         542025.161            20.146                SH
    31         9314769.149         542060.345            19.393                SH
                                             43
32   9314825.178   542123.762   17.013   SH
33   9314810.999   542087.699   18.993   SH
34     9314727.3   542032.977   18.993   SH
35   9315052.102   541628.456   20.708   SH
36   9315061.835   541671.241   20.421   SH
37   9315052.102   541628.456   20.708   SH
38   9315061.835   541671.241   20.421   SH
39   9315039.637   541708.349   20.629   SH
40    9315014.25   541620.63    20.981   SH
41   9315021.232   541626.269   21.187   SH
42    9315028.94   541663.76    20.579   SH
43   9315011.152   541639.098   21.013   SH
44   9315006.315   541647.139   20.969   SH
45    9315008.51   541694.865   20.904   SH
46   9314838.497   541825.164   20.176   SH
47   9314887.498   541879.242    20.87   SH
48    9314712.58   542146.28    20.504   3L
49   9315579.803   541021.968   20.588   SH
50   9315481.146   541005.633   19.588   SH
51   9315530.482   541013.761   20.188   SH
52   9315523.468   541056.211   20.064   SH
53   9315474.133   541048.083   19.563   SH
54   9315572.791   541064.409   19.363   SH
55   9315562.767   541125.094   19.251   SH
56   9315464.102   541108.806    19.45   SH
57   9315513.438   541116.943    19.95   SH
58   9315507.097   541155.449   19.923   SH
59    9315457.76   541147.338   19.226   SH
60   9315556.425   541163.616   19.426   SH
61   9315547.241   541219.235   19.391   SH
62   9315448.577   541202.947   20.293   SH
63   9315497.905    541211.13   19.893   SH
64   9315491.325   541251.102   19.865   SH
65   9315441.978   541242.952   20.364   SH
66   9315540.636   541259.23    19.863   SH
67   9315538.166   541274.028   19.799   SH
68   9315532.926   541306.157   19.326   SH
69   9315434.262   541289.875   20.326   SH
70   9315483.598   541298.002   19.825   SH
71   9315477.149   541337.259   20.189   SH
72   9315427.817   541329.112   20.791   SH
73   9315526.485   541345.377   19.591   SH
74   9315468.996   541386.035    20.54   SH
                           44
 75   9315419.664   541377.88    21.139    SH
 76   9315464.717   541413.997    20.46    SH
 77   9315415.378   541405.878    20.96    SH
 78    9315514.05   541422.123    19.86    SH
 79   9315507.674   541460.981   19.941    SH
 80   9315408.993   541444.767   20.947    SH
 81   9315458.334   541452.877   20.549    SH
 82   9315464.755   541414.003   20.512   C2L1
 83    9315452.87   541487.036   20.857   C2L2
 84   9315453.009   541486.025   20.711    SH
 85   9315403.673   541477.892   21.299    SH
 86   9315502.348   541494.117   19.999    SH
 87   9315452.374   541488.799   20.922   C2L3
 88   9315452.365   541488.797   20.922    SH
 89   9315464.756   541413.997   20.488    SH
 90   9315441.744   541553.149   20.983    SH
 91   9315491.075    541561.3    20.583    SH
 92   9315392.406   541545.005   20.383    SH
 93   9315385.926   541584.242   20.162    SH
 94   9315484.586   541600.556   20.261    SH
 95   9315435.257   541592.396    20.76    SH
 96   9315427.771   541637.524    20.37    SH
 97   9315477.096   541645.715    19.97    SH
 98   9315378.434   541629.405    20.87    SH
 99   9315418.867   541691.634   19.549    SH
100   9315369.531   541683.494   19.149    SH
101   9315468.194   541699.79    18.849    SH
102    9315462.64   541733.989   18.303    SH
103    9315363.97   541717.728   19.402    SH
104   9315413.318   541725.808   19.004    SH
105   9315428.133   541637.253   20.431   C2L4
106   9315423.457   541745.884   20.004   C2L5
107   9315423.457   541745.879   20.006    SH
108   9315427.578   541637.087   20.434   CL26
109   9315427.678   541637.134   20.402    SH
110   9315427.579   541637.051   20.402    SH
111   9315405.464   541835.537   17.812   C2L7
112   9315405.473   541835.478   17.812    SH
113   9315423.458   541745.879   19.962    SH
114   9315414.541   541777.221   19.548    SH
115   9315473.811   541786.487   18.545    SH
116   9315429.345   541779.572   19.344    SH
117   9315365.882   541764.663   20.027    SH
                            45
118   9315405.066   541837.613   17.687   SH
119   9315442.853   541846.395    18.69   SH
120   9315398.156   541871.589   15.744   SH
121   9315436.022   541876.962   17.486   SH
122    9315346.37   541847.692    17.25   SH
123   9315384.323   541839.407   18.344   SH
124   9315387.777   541870.24    17.698   SH
125   9315333.204   541847.868   17.815   SH
126   9315374.462   541884.492   17.932   SH
127   9315355.427   541888.411   17.698   SH
128   9315300.474   541849.715   18.793   SH
129   9315339.895   541897.607   17.719   SH
130   9315239.249   541853.291    18.27   SH
131   9315296.709   541907.579   18.157   SH
132   9315247.365   541897.208   18.821   SH
133   9315246.281   541930.325   17.995   SH
134    9315263.76   541957.773   17.058   SH
135   9315245.205   541949.597   17.302   SH
136   9315284.477   541955.244    17.88   SH
137    9315331.62   541950.26    17.111   SH
138   9315348.775   541960.405   18.905   SH
139   9315367.282   541949.344   18.589   SH
140   9315377.814   541973.427   19.734   SH
141   9315328.796   541963.563   18.535   SH
142   9315335.472   541930.311   19.705   SH
143   9315384.496   541940.148   19.908   SH
144   9315377.851   541973.382   19.723   SH
145   9315361.656   541967.657   19.239   SH
146   9315409.126   541983.365    18.24   SH
147   9315384.419   542052.212    19.53   SH
148   9315289.773   542019.966   18.332   SH
149   9315242.433   542003.757   17.731   SH
150   9315337.098   542036.046   17.733   SH
151   9315337.096   542036.044   18.934   SH
152   9315326.282   542074.837   18.339   SH
153    9315231.35   542043.431   18.939   SH
154    9315278.81   542059.162   18.536   SH
155   9315373.751   542090.567   18.938   SH
156   9315316.585   542104.051   19.362   SH
157   9315363.982   542119.758   18.762   SH
158   9315387.635   541003.778   21.437   SH
159   9315477.824   541032.926   20.274   SH
160   9315443.251   541021.065   20.937   SH
                            46
161   9315449.059   541030.899   20.452     TREE
162   9315418.671   541058.515    20.72       SH
163   9315447.834   541065.127   20.332       SH
164   9315399.744   541053.685   20.693       SH
165   9315430.551   541100.802   20.133       SH
166    9315398.71   541089.356   20.418       SH
167   9315403.052   541101.299   20.491       SH
168   9315426.223   541130.546   20.263       SH
169   9315419.062   541149.884    20.46       SH
170   9315377.132   541122.639   20.164       SH
171   9315355.952   541154.993   20.365       SH
172   9315386.628   541084.932   20.473     TREE
173   9315356.037   541155.036   20.367       SH
174    9315333.05   541190.554   20.641       SH
175   9315318.234   541148.414    20.51       SH
176   9315365.344   541201.953   20.043       SH
177   9315314.287   541219.24    20.344       SH
178   9315277.524   541198.154   20.533       SH
179   9315288.077   541272.508     20.3      AY11
180   9315266.231   541301.118   20.707      AY12
181   9315267.502   541301.015   20.712     TREE
182   9315301.258   541220.777   21.302     TREE
183   9315375.208   541155.639   20.291   MBUYUTREE
184   9315303.813   541147.908   20.839       SH
185   9315243.731   541196.024   20.716       SH
186   9315229.734   541162.693    20.43       SH
187   9315293.944   541079.76    21.315       SH
188   9315086.535   541033.576   21.588       SH
189    9315153.08   541159.769   21.647       SH
190    9315163.85   541210.336   20.854     TREE
191   9315127.394   541073.582     20.8       SH
192   9315113.628   541205.873   20.153       SH
193   9315150.584    541199.82   20.896       SH
194   9315092.927   541236.981   20.236       SH
195   9315132.718   541236.174     21.1       SH
196   9315236.486   541218.653   21.154       SH
197   9315122.463   541107.191   21.081       SH
198   9315106.629   541258.481   21.317       SH
199   9315090.945   541149.398   21.274       SH
200   9315083.618   541297.993   21.162       SH
201   9315054.982   541470.176   21.301       SH
202   9315071.077   541263.913   21.105       SH
203   9315093.517   541356.712   20.332       SH
                            47
204   9315112.311   541338.015   21.204    SH
205    9315063.79   541292.814   20.952    SH
206   9315073.618   541352.762   21.098    SH
207   9315017.509   541280.417   19.963   TREE
208   9315293.125   541252.064    20.18    SH
209   9315251.631   541242.547   20.041    SH
210   9315334.486   541228.682   20.178    SH
211   9315319.487   541260.693    20.07    SH
212   9315235.257   541277.614    20.09    SH
213   9315095.341   541467.207   20.103    SH
214   9315270.596   541287.027   20.092    SH
215   9315311.711   541289.982   19.926    SH
216   9315249.715   541319.325   20.107    SH
217   9315209.408   541316.591   20.284    SH
218   9315198.086   541344.697   20.006    SH
219   9315297.783   541339.275   20.048    SH
220   9315227.622   541353.613   20.196    SH
221   9315284.189   541375.424   20.542   TREE
222   9315279.847   541374.39    19.969    SH
223    9315206.95   541385.726   20.151    SH
224   9315169.831   541387.903   20.086    SH
225    9315251.79   541405.283   19.999    SH
226   9315148.598   541413.002   20.127    SH
227   9315185.994   541418.19    20.117    SH
228   9315228.125   541438.983   20.031    SH
229   9315165.069   541450.696   20.089    SH
230   9315205.211   541446.718   20.548   TREE
231   9315204.606   541464.011   20.384    SH
232   9315124.108   541447.815   20.121    SH
233   9315134.216   541498.82    20.074    SH
234    9315180.05   541491.484   19.994    SH
235   9315142.128   541486.219   20.045    SH
236   9315162.034   541530.603   20.058    SH
237   9315110.529   541500.523   20.234   TREE
238   9315120.427   541520.134   20.234    SH
239   9315080.852   541514.654   20.457    SH
240   9315132.302   541556.449    21.02   TREE
241   9315131.248   541568.475   20.266    SH
242   9315065.114   541540.437   20.479    SH
243   9315097.235   541556.322   20.238    SH
244   9315070.248   541606.664   20.418    SH
245   9315105.979   541603.678   20.371    SH
246   9315073.159   541593.778   20.351    SH
                            48
   247       9315070.458       541598.268                20.935               TREE
   248       9315085.876       541647.638                20.575                SH
   249       9315052.102       541628.456                20.708                SH
   250       9315061.835       541671.241                20.421                SH
   251       9315004.144       541620.642                21.201                SH
   252        9315028.94       541663.76                 20.579                SH
   253        9315014.25       541620.63                 20.981                SH
   254       9315021.232       541626.269                21.187                SH
   255       9315011.152       541639.098                21.013                SH
   256       9315006.315       541647.139                20.969                SH
   257        9315008.51       541694.865                20.904                SH
   258       9315039.637       541708.349                20.629                SH
   259       9314976.706       541689.789                21.048                SH
                                         49
   2004     165    257.6   204.9   549.2    31.6      53      22.8    22.3     20.8       177.3       238.6     190.7       1933.8
   2005     63.6    5.4    216.6   633.1    339.1    33.2      37     48.5      8          4.1        133.1     92.4        1614.1
            184.
   2006            28.1    243.3   343.2    185      195.5    32.5    29.8     60.4       96.2        259.1     362.6       2020.3
              6
   2007      41    25.2    387.6   271.5    527.4    31.6     11.7    47.9     38.9       113.1       213.7     527.4        2237
   2008     74.8    8.2    124.5    584     115.7    64.6     12.3    51.2     13.2       90.2        242.6     63.6        1444.9
            106.
   2009            126.9   154.1   201.7    111.8    95.4      9.3    24.2     2.1        61.8        194.9     140.2       1228.6
             2
   2010     46.6   21.1    223.3   252.7    193.8    48.1      0.3     20      43.4       86.6        169.1     102.4       1207.4
                                                                               147.
   2011     48.8    1.7    51.9    463.4    262.8    38.3      0.7    30.2                218         393.2     92.1        1748.5
                                                                                4
   2012     22.3    29     150.5   178.4    121      15.2      2.3    28.5     68.1        8.6        269.4     137         1030.3
   2013     61.4    0.1    381.3   123.9     99.7    26.3      5.7    17.7     12.2       79.8        224.3     49.1        1081.5
            81.4                            198.7                              41.4
 Average     3
                   50.33   213.8   360.11
                                              9
                                                     60.12    13.46   32.03
                                                                                5
                                                                                          93.57       233.8    175.75       1554.64
                                                    50
 Temperature     Year    Jan     Feb      Mar       Apr        May     Jun      July     Aug     Sep      Oct       Nov      Dec
                 2004    32.6     31.1     31.9     30.1    30.5        29.3     29     29.6    30.3      30.6      30.6      31.3
 Mean Max.       2005    32.7     32.4     32.7     30.9    29.4        29.3    28.9    28.7    30.3      31.5      30.8      32.2
 Temperature     2006    32.8     33.4     31.5     30.5    29.4        28.3    28.6    29.1     30       30.5      30.1      31.1
                 2007    32.6     33.8     32.6     30.7     29         29.2    29.3    29.5     31        31       30.8      29.5
                 2008    32.4     32.3     32.5     29.1    29.6        28.5    28.8    29.2    30.4      31.7      31.1      32.2
                 2009    33.2      32      32.2     31.1    30.3        29.8    29.1    30.1    31.3      31.7      32.1       32
                 2010     32      32.3     33.3      31     30.6        29.9    29.9     30     30.4      31.6      31.1      32.1
                 2011    33.1     33.9     33.2     31.1    30.2        29.8    29.8    29.9    31.6      31.1      30.6      32.4
                 2012     33      33.2     32.1     30.9    29.7        29.5    29.7    30.1    30.7      31.5      31.7      32.2
                 2013    32.5      34      31.7     31.1     30         29.6    29.4    29.6    30.7      31.2      31.1      32.3
       Average           32.69   32.84    32.37     30.65   29.87      29.32   29.25    29.58   30.67     31.24      31      31.73
                 2004    24.8    23.9     24.4      24.2       24.3     23     21.7     20.2    20.7      22.6     23.5      23.9
                 2005    24.1    24.3     24.9       25         24     22.7    22.3     20.2    20.5      21.4     22.6       24
  Mean Min.      2006    24.4    24.4     24.7      24.6       23.5    22.8    21.8      21     21.9      22.5     23.8      24.2
 Temperature     2007    25.1    24.7     24.7       24         24     22.8    22.2     21.7    21.6       22      22.5       24
                 2008    24.4    23.9     24.5       24        23.3    22.1     22      21.5    20.8      22.4     23.3       24
                 2009    24.2    24.3     23.9      24.6       24.1    22.9    22.1     21.2    20.9      22.5     23.4      24.1
                 2010    24.1    24.4     25.1      24.9       24.6    23.9    22.5      22     21.4      21.8     23.1      23.8
                 2011    24.3    24.6     24.4      24.6       23.9    23.2    22.7     21.8    22.5      22.8     23.5      24.5
                 2012     25     24.2     24.3      24.7        23     22.9    22.4     21.6    21.3      22.7     23.6      24.5
                 2013    25.1    25.3     25.3      25.3       24.3    23.2    22.4     21.2    21.6      22.8     23.6      24.8
     Average             24.55    24.4    24.62     24.59       23.9   22.95   22.21    21.24   21.32     22.35    23.29     24.18
Source: Tanzania Meteorological agency, Zanzibar office
Appendix 2d Monthly Evaporation(mm) (2004~2013)
   Year         JAN      FEB     MAR        APR       MAY          JUN        JUL       AUG      SEP      OCT        NOV        DEC
   2004        148.6    123.5    138.4      129       139.1       138.5       133      141.2    139.3    144.5      123.4      131.6
   2005        165.6    144.4    126.9     124.7       107         111.7      125      113.5     139     159.1       111.7     158.9
   2006        151.6    136.1    119.8     104.2      104.5       104.5       116      121.8    142.4    140.2       98.6      115.4
   2007        187.5    170.7    132.4     105.5      106.2       128.1      151.7     141.9    176.9    163.2      131.4      144.7
   2008        160.3    163.2     157       87.2      124.7       129.1      132.3     141.7    141.7    159.6      114.6       97.2
   2009        199.4    128.5    132.6     133.3      123.9       131.4      153.8     172.7    190.6    189.8      154.3       115
   2010        165.6    171.6    150.8     111.4      115.1       127.1      169.8     167.5    156.9    167.1      113.1      163.1
   2011        188.3    180.2    162.9      107        118        134.3      171.2     179.2     184     158.6      120.2      157.1
   2012        214.8     199     137.3     128.2      116.5       150.2      175.8      174     173.6    181.1        124      139.5
   2013        164.8    158.9     147      121.9      134.2       151.3      152.7     147.3    167.6    167.9      109.5      157.6
 Average       174.65   157.61   140.51    115.24     118.92      130.62     148.13    150.08   161.2    163.11     120.08     138.01
Source: Tanzania Meteorological agency, Zanzibar office
                                                          51
                                                                       Sp
          Dir   Spd    Dir   Spd    Dir    Spd      Dir   Spd    Dir         Dir   Spd    Dir   Spd   Dir   Spd
                                                                        d
                                                                                          20
 2004     50    10     090   14     010    06       060   08     360   06    100   09           06    150   09
                                                                                           0
                                                                                          19
          350   12     030   15     360    10       020   15     190   08    180   10           06    130   12
 2005                                                                                      0
                                                                                          18
          360   08     050   10     360    06       040   10     330   06    150   07           06    150   10
 2006                                                                                      0
                                                                                          21
          330   10     030   15     340    10       020   15     350   06    150   10           08    150   12
 2007                                                                                      0
                                                                                          21
          330   09     360   11     340    08       020   10     180   05    120   10           06    150   09
 2008                                                                                      0
                                                                                          21
          360   09     020   10     360    05       060   09     350   04    030   09           07    130   10
 2009                                                                                      0
                                                                                          21
          360   10     20    12     360    09       030   09     350   06    210   10           07    120   10
 2010                                                                                      0
                                                                                          21
          360   08     030   10     360    07       330   10     180   06    130   07           06    150   09
  2011                                                                                     0
                                                                                          21
          360   13     030   14     360    11       030   11     360   07    270   07           09    180   11
 2012                                                                                      0
                                                                                          21
          030   09     030   12     360    09       060   12     220   06    160   10           07    160   10
 2013                                                                                      0
                                                                                          20
Average   289    9.8  69    12.3    321    8.1  67 10.9          287    6   150 8.9        4    6.8 147 10.2
                   MAY                      JUNE                         JULY                   AUGUST
  Year    09 00 am    03 00 pm      09 00 am    03 00 pm         09 00 am    03 00 pm     09 00 am   03 00 pm
                                                                                                 Sp
          Dir   Spd    Dir   Spd    Dir    Spd      Dir   Spd    Dir   Spd   Dir   Spd    Dir        Dir Spd
                                                                                                  d
 2004     210    7     130   11     200     9       150   15     190    9    120   15     210     6  120 12
 2005     210   10     150   12     210    10       150   15     210    8    120   15     180     8  120 12
 2006     180    7     150   11     180     9       150   11     210    6    120   13     210     5  130 12
 2007     180    8     150   15     210     8       150   12     180   10    120   13     220     8  120 14
 2008     180    6     150   10     210     5       140    8     210    8    130   12     180     8  120 14
 2009     210    7     150   11     210     7       120   13     180    8    140   15     180     7  130 15
 2010     210    8     140   11     200     8       140   13     200    8    130   15     210    10 120 15
 2011     210    7     150   11     180     7       120   12     180    9    120   14     210     8  130 15
 2012     210    7     180   12     210     8       150   14     240    8    120   16     210     7  120 14
 2013     210    8     170   12     210     9       150   16     210    8    120   16     210     7  150 14
Average   201    7.5   152   11.6    202        8   142   12.9   201   8.2   124   14.4   202   7.4   126   13.7
               SEPTEMBER                  OCTOBER                     NOVEMBER                 DECEMBER
  Year    09 00 am   03 00 pm       09 00 am   03 00 pm          09 00 am  03 00 pm       09 00 am  03 00 pm
                                                                                                 Sp
          Dir   Spd    Dir   Spd    Dir    Spd      Dir   Spd    Dir   Spd   Dir   Spd    Dir       Dir Spd
                                                                                                  d
                                                                                           35
 2004
          190    6     120   13     180     7       150   10     140    7    130    9       0     8 30      9
                                                                                           36
 2005
          210    8     120   14     140    10       120   15     60     5    250    10      0    12 50     12
                                                                                           35
 2006
          210    9     130   15     180     8       160   12     210    6    90     7       0     7 30      8
                                                                                           33
 2007
          180    8     120   14     210     8       120   12     30     6    160    8       0     9 30     10
 2008     180    7      90   12     160     7       150   10     30     6    150    8      36     8 30     10
                                                    52
                                                                                            0
 2009      180   7     130   14     130   8     130   13     30   6      120         7     80    6    120   7
                                                                                           36
 2010
           180   8     120   14     210   7     120   10     90    6      90     7          0    7    60    9
 2011      180   9     150   14     150   8     150   11     90   10     150     11        30    8    60    9
 2012      240   7     120   13     150   8     150   12     90    6     130     8         10    6    90    7
                                                                                           35
 2013
           150   8     140   14     160   8     140   12     30   7      120         9      0    8    60    9
                                                                                           25
Average
           190   7.7   124   13.7   167   7.9   139   11.7   80   6.5    139     8.4        8   7.9   56    9
Source: Tanzania Meteorological agency, Zanzibar office NOTE
   a. All times quoted are local times
   b. Wind direction in degrees from True North and speeds quoted in knots (kt)
   c. 1 knot = 1.86 kilometer per hour
                                                53
Appendix 3a Particle size determination wet sieving (Sample 1)
                     TECHNICAL COLLEGE ARUSHA
                     SOILS & BITUMEN LABORATORY
                        SIEVE ANALYSIS OF SOIL
                                              54
 30        0.600            21.25             2.12         97.88
 40        0.425            26.93             2.69         97.31
 50        0.300            35.31             3.53         96.47
 70        0.212            48.36             4.83         95.17
100        0.150            88.42             8.84         91.16
200        0.075            187.36            18.73        81.27
GM
GC
                                         55
                                 Particle Size Distribution Curve
100
90
80
70
60
                      50
%Passing (F%Finer)
40
30
20
10
                      0
                           0.0              0.1              1.0         10.0   100.0
                                                        56
Appendix 3bParticle size determination wet sieving (sample 2)
                                   TECHNICAL COLLEGE ARUSHA
                                   SOILS & BITUMEN LABORATORY
                                      SIEVE ANALYSIS OF SOIL
                                                   57
 30            0.600                121.86             12.19      87.81
 40            0.425                128.48             12.85      87.15
 50            0.300                134.80             13.48      86.52
 70            0.212                142.37             14.24      85.76
 100           0.150                160.47             16.05      83.95
 200           0.075                197.94             19.79      80.21
 GM
 GC
                                         58
                                 Particle Size Distribution Curve
100
90
80
70
60
                      50
%Passing (F%Finer)
40
30
20
10
                      0
                           0.0            0.1               1.0          10.0   100.0
                                                    59
Appendix 3b Atterberg limits determination (Sample 1)
                                  TECHNICAL COLLEGE ARUSHA
                                  SOILS & BITUMEN LABORATORY
                                ATTERBERG LIMITS DETERMINATION
                         (CASSAGRANDE METHOD - ASTM D.420 / AASHTO T. 86 )
TEST METHOD: ASTM D.420 / AASHTO T. 86 / CML 2000 1.3 & 1.4
Determination of Liquid limit & Plastic limit
Type of test                                      LIQUID LIMIT                                  PLASTIC LIMIT
Test No                                1         2        3            4         1       2                      Averag
Number of Blows                       33         26       22           19
Moisture Can No                        1         B1      44B           55        4       18
Mass of can +Wet soil                26.19      25.90    26.37        24.37     16.55   17.56
Mass of can + dry soil               21.40      21.12    21.42        20.05     15.57   16.42
Mass of can (gms)                    10.82      10.77    10.81        10.83     10.69   10.65
Mass of Water (gms)                  4.79       4.78     4.95         4.32      0.98    1.14
Mass of dry soil (gms)               10.58      10.35    10.61        9.22      4.88    5.77
water content(%)                     45.27      46.18    46.65        46.85     20.08   19.76                    19.92
                                                                60
                    DETERMINATIO N O F LIQ UID
24
22
20
                           18
       Water Content (%)
16
14
                           12
                                1            10          100
Number of Blows
T
E
DO
 A
 IN
  M
  R
  D
  U
  Q
  L
  F
  T
  IM
(S
A
C E
  D
  N
  R
  G
  )
  O
  H
  T
  M
n
o
rc
 te
  a
  W
  )
  (%
ro
 e
 b
 m
 u
 N
 s
 lw
  fB
                                                               Sample Preparation
                                                               (a) As received         V
                                                               (b) Air Dried           C
                                                               (c) Washed on
                                                               0.425mm
                                                                                       0
                                                               (iii) Oven dried            C
                                                               (iv) Unknown
                                                        61
                      Initail           Length of
                    length of           Oven dry     Change                     % Passing
                    specimen            Specimen    in length     % Linear      0.425mm
  Mould No            (mm)                (mm)        (mm)        shrinkage       Sieve          Shrinkage product
      1                  140              120          20          14.29            97.31             1390.1
Appendix 3c Atterberg limits determination (Sample 2)
                                        TECHNICAL COLLEGE ARUSHA
                                        SOILS & BITUMEN LABORATORY
                                      ATTERBERG LIMITS DETERMINATION
                               (CASSAGRANDE METHOD - ASTM D.420 / AASHTO T. 86 )
TEST METHOD: ASTM D.420 / AASHTO T. 86 / CML 2000 1.3 & 1.4
Determination of Liquid limit & Plastic limit
Type of test                                             LIQUID LIMIT                                                            PLASTIC LIMIT
Test No                                         1       2             3               4                  1            2                          Averag
Number of Blows                              33         28            24              18
Moisture Can No                               K        Y2            Y3              544                 13           60
Mass of can +Wet soil                       19.55     18.48         19.17           25.31              14.17         13.97
Mass of can + dry soil                      15.96     15.29         15.64           19.19              13.42         13.23
Mass of can (gms)                           10.74     10.73         10.72           10.78              10.70         10.63
Mass of Water (gms)                         3.59       3.19          3.53            6.12               0.75         0.74
Mass of dry soil (gms)                      5.22       4.56          4.92            8.41               2.72         2.60
water content(%)                            68.77     69.96         71.75           72.77              27.57         28.46   28.02
24
22
20
                               18
    Water Content (%)
16
14
                               12
                                    1                  10                     100
Number of Blows
                                                                           62
 D
 T
 EO
  A
  IN
   M
   R
   D
   U
   Q
   L
   F
   T
   IM
 A
 (CE
   D
   N
   R
   G
   S
   )
   O
   H
   T
   M
 n
 o
 rc
  te
   a
   W
   )
   (%
 ro
  e
  b
  m
  u
  N
  s
  lw
   fB
                                                                               Sample Preparation
                                                                               (a) As received         V
                                                                               (b) Air Dried           C
                                                                               (c) Washed on
                                                                               0.425mm
                                                                                                       0
                                                                               (iii) Oven dried            C
                                                                               (iv) Unknown
                                                             63
Test No                                                                 1          2        3
Pycnometer No                                                           5         10        12
Volume of Pycnometer at 25C                                           50          50       50
Mass of empty Pycnometer (gm)                                         29.02      26.70    26.30
Method of air removal                                                        Vaccum pump
Mass of Pycnometer + water (gm)                                        79.03     76.73    76.37
Temperature C                                                           22       22        22
Mass of Pycnometer + water + soil (gm)                                 85.07     82.73    82.45
Evaporating dish No                                                      21        21       21
Mass of evaporating dish (gm)                                          10.62     10.62    10.62
Mass of evaporating dish + dry soil (gm)                               20.62     20.62    20.62
Mass of oven dry soil (gm)                                             10.00     10.00    10.00
Mass of water equal to the volume of soil solids(gm)                   3.960     4.000    3.920
Temperature correction factor                                         1.0007    1.0007   1.0007
Specific gravity of Soil solids                                        2.527     2.502    2.553
                                                  64
Test No                                                                 1         2        3
Pycnometer No                                                           7         85      46
Volume of Pycnometer at 25C                                           25         25      25
Mass of empty Pycnometer (gm)                                         19.73     20.09   19.64
Method of air removal                                                       Vaccum pump
Mass of Pycnometer + water (gm)                                      44.68      44.89   44.44
Temperature C                                                         22         22      22
Mass of Pycnometer + water + soil (gm)                               47.94      47.79   47.50
Evaporating dish No                                                    22         22      22
Mass of evaporating dish (gm)                                        10.62      10.62   10.62
Mass of evaporating dish + dry soil (gm)                             15.62      15.62   15.62
Mass of oven dry soil (gm)                                            5.00      5.00     5.00
Mass of water wqual to the volume of soil solids(gm)                 1.740      2.100   1.940
Temperature correction factor                                        1.0007    1.0007   1.0007
Specific gravity of Soil solids                                      2.876      2.383   2.579
Basic Data
A: Diameter of Stand Pipe (mm)                                         9.00
                                                  65
B: Cross Section area of Stand Pipe (mm2)                                 63.6700
C: Diameter of Permeameter Cell (mm)                                      70.1000
D: Cross section area of Permeameter (mm2)                               3859.4500
E: Length of Sample (mm)                                                  45.1000
F: Volume of Permeameter Cell (cc)                                        174.0600
G: Average test temperature (C)                                            22
H: Specific gravity of Soil Solids                                         2.572
Determination of Moisture Content at the end of the test
I. Test No                                                                   1
J. Moisture Can No                                                          C-2
K. Mass of can +Wet soil                                                  181.94
L. Mass of can + dry soil                                                 156.06
M. Mass of can (gms)                                                       54.06
N. Mass of Water (gms)                                                     25.88
O. Mass of dry soil (gms)                                                 102.00
P. Water content (%)                                                       25.37
       Determination of Density of the test soil sample
Q: Test No                                                                   1
R: Mass of Cell +Wet soil + Filter paper (gm)                             490.72
S: Mass of Cell (gm)                                                      168.73
T: Mass of filter paper (gm)                                                0.8
U: Mass of wet soil (gms)                                                 321.19
V: Bulk density (gm/cc)                                                    1.845
W: Dry density of soil (gm/cm)                                             1.472
Porosity and Void ratio of the soil sample
X: Void ratio of the soil Sample = (H-W)/W                                 0.747
Y: Porosity of Soil Sample = X/(1+X)                                       0.428
Coefficient of Permeability
1: Test No                                                                   1            Date
2: Initial Head of water in stand pipe(cm) h1                               35.5        13/4/2015
3: Final Head of water in stand pipe(cm) h2                                 34.4       14/04/2015
4: Starting time                                                           17:25        13/4/2015
5: Finishing time                                                          17:25       14/04/2015
6: Test duration t (sec)                                                   86400            -
7: Coefficient of permeability =[(B*E)/(D*t)]*ln[h1/h2](mm/sec)        0.00000271053
Coefficient of permeability (mm/sec)                                   0.00000271053
Appendix 3g Permeability Test (Sample 2)
                                      SOILS & BITUMEN LABORATORY
                                           PERMEABILITY TEST
                                          (FALLING HEAD PERMEAMETER)
                                                           66
D: Cross section area of Permeameater (mm2)                          3859.4500
E: Length of Sample (mm)                                               45.1000
F: Volume of Permeameter Cell (cc)                                    174.0600
G: Average test temperature (C)                                          22
H: Specific gravity of Soil Solids                                      2.612
Determination of Moisture Content at the end of the test
I. Test No                                                               1
J. Moisture Can No                                                      C-2
K. Mass of can +Wet soil                                              256.67
L. Mass of can + dry soil                                             218.28
M. Mass of can (gms)                                                   54.06
N. Mass of Water (gms)                                                 38.39
O. Mass of dry soil (gms)                                             164.22
P. Water content(%)                                                    23.38
       Determination of Density of the test soil sample
Q: Test No                                                               1
R: Mass of Cell +Wet soil + Filter paper (gm)                         494.94
S: Mass of Cell (gm)                                                  168.73
T: Mass of filter paper (gm)                                            0.82
U: Mass of wet soil (gms)                                             325.39
V: Bulk density (gm/cc)                                                1.869
W: Dry density of soil (gm/cm)                                         1.515
Porosity and Void ratio of the soil sample
X: Void ratio of the soil Sample = (H-W)/W                             0.724
Y: Porosity of Soil Sample = X/(1+X)                                   0.420
Coefficient of Permeability
1: Test No                                                               1          Date
2: Initial Head of water in stand pipe(cm) h1                           35.5        14/4/2015
3: Final Head of water in stand pipe(cm) h2                             32.1       15/04/2015
4: Starting time                                                       18:50        14/4/2015
5: Finishing time                                                      18:50       15/04/2015
6: Test duration (sec)                                                 86400         -
7: Coefficient of permeability = [(B*E)/(D*t)]*ln[h1/h2](mm/sec)   0.00000866964
                                                     67
68