B01-00-217 A en MANUAL
B01-00-217 A en MANUAL
2014-07-14
Table of Contents
                                        I
                                PCS-521B Twin Engine and Twin Pump Cementing Skid
                                        Operation and Maintenance Manual
                                                B01-00-217_A
                                                 Foreword
This manual basically describe main structures, technical specifications, basic operations, repair
and maintenance of the PCS-521B twin engine and twin pump cementing skid. The operator
should read and understand the operation manual before starting this equipment. The following
safety precautions should be paid attention to:
                                                      1                            http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
                              Safety Symbols
Meanings of safety symbols are as follows:
SJS Ltd. cannot anticipate every possible circumstance that might involve a potential hazard.
Therefore, all warnings in the manual are all inclusive.
                                             2                   http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
                            Safety Precautions
Most of accidents that involve equipment operation, repair and maintenance are caused by failure
to observe basic safety rules or precautions. An accident can often be avoided by recognizing
potential hazardous situations before an accident occurs.
When operating the equipment, please adhere to the following safety precautions:
   For use in a hazardous area, this equipment should be certified with a certificate to permit to
    use in this hazardous area. Before putting into service, all components of the equipment
    should be inspected to ensure all of them are installed correctly and are in good status.
   If the equipment is used in the hazardous area and its safety protection system is under a
    fault status, the equipment is prohibited from starting up.
   For the equipment already acquired with a certificate to use in the hazardous area, its safety
    protection device must be inspected by an authorized organization. Installation persons must
    have the job certificates after training.
   For installation, repair and maintenance persons, they must have the job certificates after
    training.
   The equipment can be operated only after this operation manual is carefully read and
    understood.
   Before operating and repairing and maintaining the equipment, please carefully read and
    understand all warnings, cautions, prohibitions and tags on the equipment.
   When the equipment is in service, removal or dismantlement of protection guard or housing
    on any component is strictly prohibited.
   When the equipment is being operated, do not keep close to or touch the drive shafts, pump
    drives or other mechanical moving parts.
   The high pressure discharge ports of the equipment are only connected with high pressure
    lines. Low pressure lines are prohibited.
   Under emergent conditions, such as fire, engine out of control caused by mechanical
    problems or inflammable gas entering the engine air inlet, use the emergency shutdown
    device to shut the engine. Please test the emergency shutdown system under non-working or
    idle status of the equipment. Test under full engine load status will easily damage the engine.
    After completion of emergency shutdown test and before restarting of the engine, please
    readjust the valve at the air inlet of the emergency shutdown device.
   Without written authorization from SJS Limited, any company or person should not have the
    right to modify the equipment, otherwisely all results arose from the modification will be
    undertook by the responsible party.
                                             3                       http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
Note: Any welding on the control equipment will possibly damage the computer,
monitor screens, transducers and electric elements of the automatic control system in
an a large scale.
                                            4                      http://www.sjs.ServaCorp.com
                         PCS-521B Twin Engine and Twin Pump Cementing Skid
                                 Operation and Maintenance Manual
                                         B01-00-217_A
                                Abbreviations
Abbreviations used in this manual:
                                      5                   http://www.sjs.ServaCorp.com
              PCS-521B Twin Engine and Twin Pump Cementing Skid
                      Operation and Maintenance Manual
                              B01-00-217_A
Conversion Factors
                           6                   http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
                                 Section 1
                              Engine Overview
1.1GENERAL DESCRIPTION
CATERPILLAR provides a series of oilfield engines. We have selected the CAT C15 industrial engine
as the main engine of the power system of our cementing equipment. Photos showing the overall
configuration and accessories are provided as follows:
                                            1-1                     http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
 SN                     Item                                        Parameters
  1     Engine model                              C 15SCAC
  2     Working condition/power rating            D
                                                  Diesel, In-line six cylinder, four stroke
  3     Engine type
                                                  engine
  4     Rated power                               536 HP
  5     Rated speed                               2000 RPM
  6     Engine oil supply                         Electronic injection
  7     Engine cooling                            Water
  8     Bore                                      137 mm (5.4 in)
  9     Stroke                                    171 mm (6.7 in)
  10    Displacement                              15.2 L (928 in3)
                                                  Turbocharged -Inlet and exhaust
  11    Air inlet
                                                  intercooling
  12    Firing order                              1-5-3-6-2-4
  13    Rotation (flywheel end)                   Counterclockwise
  14    Fuel consumption (full power)             107 L/hr
        Coolant volume
  15                                              80 L
        (engine internal + radiator)
  16    Oil consumption                           40L
        Net   dry   weight,     not   including
  17                                              1698 Kg (approximate)
        accessories
  18    Gross weight, including accessories       1792 Kg (approximate)
Working Parameters
                                           1-2                    http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
                                             1-3                       http://www.sjs.ServaCorp.com
                    PCS-521B Twin Engine and Twin Pump Cementing Skid
                            Operation and Maintenance Manual
                                    B01-00-217_A
                                 1-4                http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
The engine mainly consists of fuel system, lubrication system, air inlet system, cooling system,
electronic system and exhaust system.
The fuel system includes the DDEC, the fuel injector, the fuel inlet line (combined with cylinder
head), the fuel pump, the cooling plate for non-automatic engine ECU, the fuel filter and
necessary fuel connecting lines.
The lubrication system includes the lube oil pump, the lube oil cooler, two full-flow lube oil filters,
the bypass valve of the connector of lube oil pump to lube oil filter, and the lube oil pressure
regulator for the vertical oil passage of the cylinder body.
External air is suctioned into the engine thru the air cleaner to the turbine supercharger for
pressurization and then to the Air-to-Air cooler (heat exchanger) for cooling down and then to the
air inlet line and the cylinder for mixing with the fuel atomized by the fuel injector.
To better protect the engine from the damage by dust and pollution generated from other air, the
dry type air cleaner should be repaired when the max. allowed air flow restriction or repair year
limit is reached, whichever happened first.
Sufficient high quality air should be timely supplied to the burning chamber.
The cooling system of the C13 engine adopts a radiating fin type fan for cooling. This system uses
the centrifugal water pump to circulate the cooling fluid inside the engine. Two full-plunger type
thermostats control the flowing direction of the cooling fluid. They are located inside the housing
connected the RH side of the cylinder.
The system includes the starting motor, starting switch, the battery-powered DC generator,
battery and necessary wires.
The hot waste air from the air exhaust manifold to the outlet is used to drive the turbine
supercharger. The burnt waste air is exhausted from the engine freely.
                                               1-5                      http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
                                          1-6                   http://www.sjs.ServaCorp.com
PCS-521B Twin Engine and Twin Pump Cementing Skid
        Operation and Maintenance Manual
                B01-00-217_A
             1-7                http://www.sjs.ServaCorp.com
                                PCS-521B Twin Engine and Twin Pump Cementing Skid
                                        Operation and Maintenance Manual
                                                B01-00-217_A
Inspect the engine for no oil, water leaks, coolant leaks, loose bots and trash buildup.
   Check the engine crankcase oil level. See Fig.1.1. When the engine is stopped, use the oil
    scale ENGINE STOPPED on the oil level gauge to check; when the engine runs at low idle
    speed, use the LOW IDLE on the oil level gauge to check. The engine oil level should be kept
    between the ADD mark and the FULL mark on the oil level gauge.
2 3 4
                           Fig. 1.1 Oil level gauge: ENGIN STOPPED check level (1), LOW
                           IDLE check level (2), ADD mark (3), FULL mark (4).
Notice: The engine oil level check can be done only when the engine is stopped.
Attention: If the engine oil level is found higher than the FULL mark on the oil level gauge, the
crankshaft has been immerged below the oil level. This will cause the engine power derate and air
mixing in the oil, i.e. oil bubbles which affecting the oil lubricating capability and cooling capability
to the piston. In addition, oil injection from the breather on the crankcase and large consumption
of engine oil will be caused.
After the engine is stopped and cooled down, check the coolant level.
                                                         1-8                        http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
   Slowly remove the coolant filler cover to release pressure. (Note: Hot coolant can cause
    serious scald. Wait until the engine is cooled down and then open the filler cover.)
   Maintain the coolant level in the sight glass.
   Check the fuel supply. Drain out the remaining water in the oil/water separator. Open the fuel
    supply valve of the fuel tank. The fuel tank should maintained full with diesel oil to avoid
    condensation of moisture.
   Before starting engine, ensure that no man is standing in the hazardous zone of the engine.
                                               1-9                   http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
1.4.2 STARTING THE ENGINE BY AIR STARTING (NEGLECT THE STEP 1 AND 2 IF
ELECTRICAL STARTING.)
    1: Starter button
    2: Oil pot
    3: Time-delay valve
                                                                      Fig.1.2   control air valve  1  and
    The engine startup at no load requires the air                 oil/water seperator2
    pressure of 100PSI and startup under load requires a higher air pressure.
    Press the starter button 1. the compressed air enters the green pilot line from the inlet port
    to push out the the pinion of the motor to mess the flywheel gear ring.
    After pushing out the pinion, the compressed air open the passage to enter the blue air line
    and then enter the time-delay valve to push down the valve core. The compressed air at the
    inlet port enter the motor thru the time-delay valve to drive and turn the vanes and the
    pinion to start the engine.
    The electrical starting system is designed to use small current to control big current. After the
    pinion is pushed out, the motor begins to turn. This is the same principle in the air starting
    system.
    After releasing the starter button, the pilot air pressure is zero and the pinion retracts back
    by spring and the motor stops running.
   See Fig. 1.3.Check the oil/water separator level. The oil level should be maintained at half
    position. The remaining water should be drained out. If the fuel system is found with the
    condensed water, the fuel primary filter element should be immediately replaced to avoid
    rough performance of the engine and damage to the electronic injection system.
Check the emergency shutdown device is positioned at the opening position or not.
   Check the fuel inlet and return valves are opened or not. If the engine is stopped for long time,
    the fuel system should have air exhausted, i.e. manual pumping oil.
                                            1-10                       http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
   Check the fan belt is normal or not. a) Check the engine drive belt every 3 months. If it is
    found worn or damaged, replace the belt. b) To check the tension of the belt, you can apply
    an 110N acting force to the belt in the center position between two pulleys. Normally the belt
    will have an offset of 5~15mm.
If the engine is placed in a closed compartment, the air blower or windows should be opened.
Next, press the starter button to start the engine. While the engine is started, release the starting
button. The starting motor should not run continuously for over 15 seconds. Each starting time
interval should be less than 10 seconds. Do not engage the starting motor when the engine
flywheel is turning. If the engine fails to start within 30 seconds, release the starter button and
wait for two minutes to allow the starting motor to cool before attempting to start the engine
again.
   15 seconds after starting the engine, the lube oil pressure begins to show indication. Do not
    increase the engine speed and increase the engine load before the oil pressure is normal. If
    within 15 seconds, the lube oil pressure has no indication, stop the engine to check for
    reasons.
   Usually from 0 to 60C, the warm-up time is about 3 minutes. More time may be necessary
    when the temperature is below 0C.
   To warm-up the engine, move the throttle and shifter lever individually to run the engine at
    low idle for three to five minutes until the jacket water temperature starts to rise.
   Check all of the gauges during the warm-up period. The required time for engine prewarming
    is as follows:
    a. When the atmospheric temperature is above 0, 5 minutes is required.
    b. When the atmospheric temperature is below 0, 15 minutes is required.
    c.   When the atmospheric temperature is below -18, more time is required.
   Perform another walk-around inspection. Check the engine for fluid leaks and air leaks. Check
    the engine crankcase oil level. (Refer to  check before starting the engine item2 for detailed
    information.
Increase the rpm to the half rated rpm. Check for fluid leaks and air leaks.
   All of the gauges should be ensured normal when the engine rpm is at the half rated. If the
    driven equipment is driven but no load applied, gauge reading for any device should be
    ensured normal.
Increase the rpm to the rated rpm. Check the engine for fluid leaks and air leaks. The engine
                                             1-11                      http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
    may be operated at full rated rpm and at full load when the engine oil temperature reaches
    60.
   Loading. Run the engine at low gear firstly. Check the gauges and the equipment for proper
    operation. When the oil pressure reaches the normal pressure and the temperature begins to
    move, the engine can be then run at full load.
   For normal engine stopping, remove the load firstly, i.e. the clutch is engaged at NEUTRAL.
    Reduce the engine speed (rpm) to low idle.
   Increase the engine speed (rpm) to no more than one-half of the rated rpm. Perform this
    procedure for three to five minutes in order to cool the engine. Reduce the engine speed (rpm)
    to low idle.
                Note:
                Please immediately stop the engine when the working load is found to cause
                heat to the engine and acceleration of wear to the engine parts. Prohibition of
                warm shutdown can prolong the service life of the cylinder sleeve.
                The emergency shutdown control is only used for emergent situation. It is
                prohibited to the emergency shutdown for common parking control.
Use whichever of the following that occurs first in order to determine the maintenance intervals:
fuel consumption, service hours, and calendar time.
Before each consecutive interval is performed, all maintenance from the previous intervals must
be performed.
When required
   Battery - Replace
   Battery or battery cable - Disconnect
   Engine oil cleaner element  Clean/Replace
   Engine storage procedure - Check
   Fuel system  Oil pumping
Daily
       Cooling system coolant level - Check
       Engine air cleaner service indicator - Inspect
       Engine air precleaner  Check/Clean
       Engine oil level - Check
       Fuel system primary filter/water separator - Drain
       Fuel tank water and sediment - Drain
       Walk-around inspection
                                           1-12                     http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
Every year
    Cooling system coolant sample  Obtain
                                          1-13                    http://www.sjs.ServaCorp.com
                              PCS-521B Twin Engine and Twin Pump Cementing Skid
                                      Operation and Maintenance Manual
                                              B01-00-217_A
Overhaul considerations
Overhaul
   Fan drive bearing - Replace
Attachment I:
   
                      Engine Oil Change Interval
   
                                   C13 Engine Oil Change Interval
       Multigrade Oils         Normal Job    Heavy Load Job       Severe Job Condition
                                Condition       Condition         Sulfur      Altitude is
                                   (2)            (Fuel        content is    over 1830m
                                              consumption       0.3% 
                                               more than        0.5% (4)
                                               34L/h) (3)
   Cat DEO (Preferred)            500h             500h            500h        250h(7)
         API CH-4                 500h             500h            500h        250h(7)
   (Total alkalinity is no
       less than 11)
         API CH-4                 500h              500h             250h(6)         250h(7)
  (Total alkalinity is less
          than 11)
         API CG-4                 250h             250h(6)           250h(6)         250h(7)
         API CF-4                 250h(6)          250h(7)           250h(7)         250h(7)
   
1.6 DIAGNOSTICS OF PROBLEMS AND TROUBLE SHOOTING
                                            1-14                      http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
                                         1-15                  http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
              Note:
               According to the requirements in the engine operation manual, the
                 coolant is anticorrosive. Otherwisely the engine cooling system and
                 related parts will be seriously damaged.
               Overtime use of the starting motor and fuel system precharging
                 pump will cause damage to the starting motor, fuel pump and
                 injector.
               If the engine is started under a closed status of air inlet, the
                 supercharger will be seriously damaged. Please confirm the air inlet
                 emergency cut-off valve is opened before starting the engine.
               If the engine fails to start within 15 seconds, release the starter
                 switch and wait for 15 seconds to allow the starter to cool before
                 attempting to start the engine again. If the engine fails to start after
                                          1-16                     http://www.sjs.ServaCorp.com
                         PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                             B01-00-217_A
                 4 times, overhaul the engine to confirm causes.
               When possible, avoid useless idle. The common concept that engine
                 run at idle will not cause damage to the engine is wrong. Idling will
                 cause sulfuric acid to decompose the lube oil and erode the bearing,
                 piston ring, valve stem and engine surface. When the transmission is
                 shifted to NEUTRAL and the engine runs at idle for long time, the
                 engine coolant temperature will drop below the normal working
                 range. In the cold engine, the incomplete burned fuel will cause
                 dilution of the crankcase lube oil, glue film or gummy precipitation to
                 the air valve, piston and piston ring to produce rapid sediment as oil
                 sludge in the engine. When required for long-time idling, the engine
                 rpm should be maintained at 850 rpm in spring/summer time and at
                 1200 rpm in fall and winter time.
               Under normal working conditions, stop the engine as follows: Reduce
                 the engine speed to low idle and set all gear shifts to no load. Note:
                 Stopping of the engine equipped with turbine supercharger without
                 allowing the engine to cool completely after high speed running will
                 cause damage to the turbine supercharger for the reason that it is
                 continuously rotating without lube oil supply to the bearing.
              Warning:
               When work is performed around an engine that is operating, do not
                 wear loose clothing or jewelry that can snag on controls or on other
                 parts of the engine. Also your long hair should be tightened or
                 covered to avoid seizing by moving parts of the engine.
               Wear a hard hat, protective glasses protective devices for ears and
                 other protective equipment as required when operating the engine or
                 working around the engine.
               Wear protective gloves and working clothes to avoid direct skin
                 contact to the used engine oil containing contaminant,
               Conduct an immediate cleaning of the spilled fluid to avoid injury by
                 falling down from foot slip.
               Do not stand around the engine drive belt and engine rotating parts.
               Do not smoke or light near the operating engine.
               Diesel engine exhaust and some of its unknown constituents are to
                 cause cancer, birth defects and other reproductive harm. Start and
                 operate engine in an area with good ventilation. If operating an
                 engine in a closed environment, the exhaust should be towards the
                 outside. It is prohibited to modify or lessen the air exhaust system or
                 emission control system.
Record of detailed engine basic information can help maintenance and purchase of accessories:
                                         1-17                      http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
       Engine Model
       Serial Number
       Arrangement Number
Tips
For details of engine parts list and operation and maintenance instructions, please refer to the
provided CAT C15Engine Parts Manual and CAT C15 Engine Operation and Maintenance
Manual.
                                          1-18                     http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                Operation and Maintenance Manual
                                        B01-00-217_A
                             Section 2
                       Transmission Overview
2.1 TRANSMISSION PARAMETERS
Performance Parameters
2nd - 3.51
3rd - 1.91
4th - 1.43
5th - 1.00
Reverse is prohibited.
Working Parameters
                              Measurement                 Temperature
                           Conditions                     Range
        Oil temperature    Normal                         71-104
                           Sump                           Max.104
        Oil pressure       Idle, neutral                  220-299psi
                           Idle, forward                  180-260psi
                           High speed, neutral            262-298psi
                           High speed, forward (locked)   157-198psi
        Oil brand          -32 above                     MIL-PRF-46167
        Oil capacity       Normal (approximate)           43L
                                                 1
2.2 Introduction to transmission
1) Profile pictures
                                   2
                       PCS-521B Twin Engine and Twin Pump Cementing Skid
                             Operation and Maintenance Manual
                                     B01-00-217_A
                                       3
In the figure: 1. Engine flywheel housing                    2. Flywheel
               3. Flexible disc bolts (12 ea M8 or 6 ea M10) 4. Flexible disc Assy. (1 ea)
               5. Flexible disc (3 ea)                       6. Spacer (1 ea)
               7. Hex. head bolt (2)                         8. Flexible disc connecting ring
               9. Flexible disc connecting ring bolt (10 ea) 10. Transmission Assy.
               11. 10 Gasket (12 ea)                       12. Transmission connecting bolt (12 ea)
               13. Crankshaft connecting hub                14. Crankshaft bolt
3Introduction to components
The transmission includes electronic control system, torque converter, planetary gears, clutches,
cooler circuit, retarder, etc.
Periodic inspections
Careful attention to the fluid level and connections for the electronic and hydraulic circuits is very
important.
For easier inspection, the transmission should be kept clean. Make regular periodic inspections and
check:
                                                  4
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
   The condition of the electrical harnesses.
   The engine cooling system for presence of transmission fluid and check the transmission fluid
    for presence of coolant, which would indicate a faulty oil cooler.
   Check the breather to make sure it is clean and free for dirt or debris.
Help Allison 4th Generation Controls oversee the operation of the transmission. Minor problems can
be kept from becoming major problems if an Allison Transmission distributer or dealer is noticed
when one of these conditions occurs:
   When choosing the optimum viscosity grade of fluid, duty cycle, preheat capabilities, and/or
    geographical location must be taken into consideration. The Transmission Fluid Operating
    Temperature Requirements table lists the minimum fluid temperatures at which the
    transmission may be safely operated without reheating. Preheat with auxiliary heating
    equipment or by running the equipment with the transmission in neutral for a minimum of 20
    minutes before attempting range operation.
           SAEOW20 or TranSyndTM                      30                 22
                                                5
           DEXRON III                                             25                 13
           SAE 10W                                                  20                 4
           SAE 15W40                                               15                  5
           SAE 30W                                                   0                  32
           SAE 40W                                                   10                 50
           * SAE W designation indicates winter weight based on cold temperature properties.
                    CAUTION: Containers or fillers that have been used for antifreeze solution or
                    engine coolant must NEVER be used for transmission fluid. Antifreeze and
                    coolant solutions contain ethylene glycol which, if put into the transmission,
                    can cause the clutch plates and some seals to fail.
It is absolutely necessary that transmission fluid be clean. The fluid must be handled in
clean containers to prevent foreign material from entering the transmission.
NOTE: Severe and General Vocations  Local conditions, severity of operation, or duty cycle
may require more or less frequent fluid change intervals that differ from the published
recommended fluid change intervals of Allison Transmission. Transmission protection and fluid
change intervals can be optimized by using fluid analysis. Filter must be changed at or before
recommended intervals. Change fluid/filter after recommended mileage, months, or hours
have elapsed, whichever comes first.
               SEVERE VOCATION*                                            GENERAL VOCATION**
                                                        6
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
6 Months     6       Overhaul      6 Months          12         12       Overhaul   12 Months
           Months                                  Months     Months
  500                              500 Hours                                        1000 Hours
 Hours
            500                                     1000      1000
           Hours                                    Hours     Hours
4 Inch Control Module (3.5 Inch Approximately) Requires Filter Kit P/N 29540494
*** Recommendations in Schedules 2 and 3 are based on the transmission containing 100
percent TranSynd fluid and Allison Transmission Gold Series filters.
Refill Transmission. The amount of refill fluid is less than the amount used for the initial fill.
Fluid remains in the external circuits and transmission cavities after draining the transmission.
After refill, check the fluid level.
                    NOTE: Quantities list are approximations and do not include external lines
                    and cooler hose.
The fluid level dipstick is an important device used to measure the fluid volume in the transmission.
Of course, Allison has provided other means to measure the fluid volume. Therefore, it is
necessary to understand the fluid level dipstick.
Fig. 6-1 indicates the fluid level scale on the dipstick. This dipstick has the HOT band and the
COLD band. In each band there are upper and lower level limits. Therefore, the fluid filling
procedure of the automatic transmission is quite different from that of the manual transmission.
The auto transmission requires re-measurement under the hot condition after fluid filling and
checking under the cold condition in order to make the fluid volume to meet both requirements of
                                                   7
the fluid volume under hot and cold conditions.
For initial fill of fluid to the 4700 series transmission itself and external circuits, please
see the following table.
Transmission 27 L
Cooler 2.5 L
Accumulator 0.9 L
Please note that all data in the table are only for reference, for a) the transmission will have a
certain amount of fluid remained inside after test at factory; b) length of each oil line is different.
3) Cold check
                    WARNING: Fluid level check requires the engine startup. Therefore you
                    have to complete all of the following procedures:
                    Put the transmission in N (Neutral).
                    Be sure the engine is at low idle.
                                                   8
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
4) Hot check
   1.   Shift the transmission to D (drive) and keep running after normal operating temperature
        is reached:
         Sump temperature is 7193 (160200).
         The torque converter outlet temperature is 82104 (180220).
         If the transmission is not equipped with a temperature gauge, hot check can be
             performed after the engine water temperature gauge reading is stable and the
             transmission runs under load for minimum of 1 hour.
   2.   Park the vehicle on a level surface and shift to N (Neutral) to allow the engine to idle (500
        800 rpm/minute).
   3.   With the engine running, remove the dipstick and wipe it clean.
   4.   Insert the dipstick into the fill tube, pushing down until it stops. Remove the dipstick and
        observe the fluid level. Repeat this step to verify the level.
   5.   Add or drain fluid as necessary to bring the level within the middle band of the HOT
        FULL and the HOT ADD. See Fig. 6-1.
                   NEVER use the container or oiler that has contained antifreeze or engine
                   coolant to add. The antifreeze and coolant have ethylene and glycol. If
                   entered the transmission, clutched plates will be damaged.
                                                 9
5) Importance of proper fluid level
It is important that the proper fluid level be maintained at all times because the
transmission fluid cool, lubricates and transmits hydraulic power. If the fluid level is too
low, the converter and clutches do not receive an adequate supply of fluid. If fluid level is
too high, the fluid can aerate. Aerated fluid can cause the transmission to shift erratically
or overheat.
Fluid level check using pushbutton or handle shift selector to obtain the level, the
transmission should be equipped with oil level sensor.
   Correct Fluid Level  o L is displayed (o L represents Fluid (Oil) Level Check Mode),
    followed by o K. The o K display indicates the fluid is within the correct fluid level zone.
    The sensor display and the transmission dipstick may not agree exactly because the oil level
    sensor compensates for fluid temperature.
   Low Fluid Level  o L is displayed (o L represents Fluid (Oil) Level Check Mode),
    followed by L oL o represents Low Oil Leveland the number of quarts the
    transmission fluid is low.
   o L L o 0 2  Where 2 indicates that 2 additional quarts of fluid will bring the fluid level
    within the middle of the o K zone.
   High Fluid Level  o L is displayed (o L represents Fluid (Oil) Level Check Mode),
    followed by H I (H I represents High Oil Level) and the number of quarts the
    transmission is overfilled.
    Example: o L H I 0 1
    Where 1 indicates 1 quart of fluid above the full transmission level.
   Invalid for Display  o L is displayed (o L represents Fluid (Oil) Level Check Mode),
    followed by and a numerical display. The numerical display is a fault code and indicates
    conditions are not proper to receive the fluid level information, or there is a system
    malfunction. The fault codes that may be encountered are shown in the Fluid Level Fault
    Codes table.
                                                  10
                    PCS-521B Twin Engine and Twin Pump Cementing Skid
                          Operation and Maintenance Manual
                                  B01-00-217_A
            NOTE: To exit the fluid level display mode, press any range button on
            the pushbutton shift selector, or press the display mode (diagnostic)
            button twice on the lever shift selector.
                                        11
2.6 INTRODUCTION TO ELECTRONIC CONTROL
                                   12
                              PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
HOLD OVERRIDE Button. The level shift selector has three locked positions to prevent
accidentally selecting R (Reverse), N (Neutral, or D (Drive, including 1st, 2nd, 3rd, 4th, 5th). Select N
(Neutral, or D (Drive) by pressing the HOLD OVERRIDE button and moving the level to the
                                                   13
desired position. Once D (Drive) is selected, lower forward range positions may be selected
without pressing the HOLD OVERRIDE button.
In normal operation conditions, each time the engine is started, the CHECK TRANS light will
illuminate, then turn off after a few seconds. This momentary lighting is to show that the status
light circuits are working properly.
At the same time, the digital display will show NN with the first N to indicate the current selected
shift and the second N to indicate the current actual shift.
If the CHECK TRANS light does not illuminate during ignition, or if the light remains on after
ignition, the system should be checked immediately.
After ignition, If the double digit display shows blank for 10 seconds and then show          , this
means the shift selector cannot communicate with the TCM or has an internal problem.
Continued illumination of the CHECK TRANS light during operation indicates that the TCM has
signaled a diagnostic code. Illumination of the CHECK TRANS light is accompanied by a flashing
display from the shift selector. The shift selector display will show the actual range attained and
the transmission will not respond to shift selector request.
When the CHECK TRANS light comes on and the ignition switch id turned off, the transmission will
remain in N (Neutral) until the condition causing the CHECK TRANS light is corrected.
Generally, while the CHECK TRANS light is on, up shifts and downshifts will be restricted and
direction changes will not occur. Lever and pushbutton shift selectors do not respond to any
operator shift request while the CHECK TRANS light is illuminated.
                                                   14
PCS-521B Twin Engine and Twin Pump Cementing Skid
      Operation and Maintenance Manual
              B01-00-217_A
                15
2.8 FAULT CODE
                                              WHETHER
                                              FAULT LIGHT
 FAUL     DESCRIPTION                         ILLUMINATES OPERATING INSTRUCTIONS
 CODE                                         OR NOT
  P0614 Mismatching Torque control data      YES         Some shifting operations are
        ECM/TCM                                           suppressed.
          TCM internal temperature is too high YES        DNSno shiftingsolenoid
  P0634                                                   valve is closed default
                                                          hydraulic state
  P063E Throttle position signal cannot be    YES         Use the set throttle position
        detected                                          data
  P063F Engine coolant temperature signal     NO          Use default data
        cannot be detected.
  P0658 Low HSD1 input voltage#1 high-       YES         DNSno shiftingsolenoid
        end drive                                        valve is closed default
  P0659 high HSD1 input voltage#1 high-      YES         DNSno shiftingsolenoid
        end drive                                        valve is closed default
                                                          h d    l       
  P0701 Abnormal transmission control         NO
        system.
  P0702 Transmission ID cannot be detected YES
        by transmission electronic control
                                                          Garbage truck with automatic
                                                          neutral cannot shift to drive
  P0703 Vehicle brake signal Line fault.      NO
                                                          from neutral
  P0708 Abnormal transmission bar shift       YES         To neglect the defective shift
        selector output.                                  selector output
                                              16
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                 Operation and Maintenance Manual
                                         B01-00-217_A
P0711 Abnormal transmission oil              YES       To use the set oil sump
      temperature sensor circuit.                      temperature
P0712 Low transmission oil temperature       YES       To use the set oil sump
      sensor circuit reading.                          temperature
P0713 High transmission oil temperature      YES       To use the set oil sump
      sensor circuit reading.                          temperature
P0716 Abnormal turbine speed sensor          YES       DNSno shiftinglocked at
      circuit.                                         the current shift
P0717 With no turbine speed sensor circuit   YES       DNSno shiftinglocked at
      signal.                                          the current shift
P0719 Abnormal ABS output signal.            NO        TCM assuming that ABS is
      Abnormal RELS output signal.           YES       To suppress RELS working
      reduce engine loading function
P071A when parking                                    reduce engine loading
                                                       function when parking
P071D Abnormal TCM general input signal. YES
P0721 Abnormal output speed sensor circuit YES         DNSno shiftinglocked at
                                                       the current shift
                                             17
P0796 PCS3 is at Off                    YES     DNSno shiftingRPR
                                                  return to previous shift
                                          18
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
                                              WHETHER
FAULT                                         FAULT LIGHT
                                                                OPERATING INSTUCTIONS
CODE     DESCRIPTION                          ILLUMINATES
                                              OR NOT
 P1891 Too low throttle position sensor   NO                To use the set throttle data
       PWM input signal.
 P1892 Too high throttle position sensor  NO                To use the set throttle data
       PWM input signal.
 P2184 Too low engine coolant temperature NO                To use the set engine coolant data
       sensor circuit signal.
 P2185 Too high engine coolant            NO                To use the set engine coolant data
       temperature sensor circuit signal.
         Abnormal torque control feedback     YES           To suppress SEMshift energy control
         signal.
 P2637
         SEM shift energy control
         Abnormal torque control feedback     YES           To suppress LRTPlow shift torque
         signal.
 P2641                                                      protection
         LRT Plow shift torque protection
P2742 Too low retarder oil temperature    NO     To use the set retarder oil temperature
      sensor output signal.                      data.
P2743 Too high retarder oil temperature   NO     To use the set retarder oil temperature
      sensor output signal.                      data.
P2761 Lockup clutch PCS control open      YES    To suppress lockup clutch
      circuit
P2763 Lockup clutch PCS control circuit   YES    To suppress lockup clutch
      high-end ground.
P2764 Lockup clutch PCS control circuit   YES    Cab be at 2nd shift to 6th shiftNR
      ground.                                    to suppress lockup clutch
P278A Kickdown device input signal normal NO     To suppress kickdown
      open.
P2793 Abnormal selector direction shift   YES
      signal circuit.
                                            20
                         PCS-521B Twin Engine and Twin Pump Cementing Skid
                               Operation and Maintenance Manual
                                       B01-00-217_A
FAULT                                      WHERTHER
                                           FAULTLIGHT      OPERATING INSTRUCTIONS
CODE        DESCRIPTION                    ILLUMINATES
                                           OR NOT
P2808 PCS6 is at Off                     YES         DNSno shiftingRPRreturn
                                                       to previous shift
                                           2  21
2.9 TRANSMISSION SPARE PARTS
                                           2  22
                                                                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                                                                Operation and Maintenance Manual
                                                                                        B01-00-217_A
l :2 lME
        
      00 H  ER Ho.JJG                                                                                                                                               r FllTER ASSEMBLES
      mtw FA    a:                                                                                                                                                   5EE :::(T :2
                                                                                                                             A'H-'q X 55 LmlO
                                                                                                                                 o 5:2-61 N m (38-4..': -F 
                                                                                                                              DR aU E              
                    ENSUJ
.-   -- - -0  ENSI4             
                                                                                           UJ G:R   iCS
                  Um
                    
                    M
                           -DmA-
                              
                     VAL AN  INSTALLATICtJ CLEARANCE
           1E
PAR1/ASSEN 8LY
                                                 m Et
                                                 
                                                                                          DESCRJPl J
                                                                                                           " 
                                                                             ..E AR..vE R'E QUIREO IELOW CCfIT l OO.J _E
                                                                             FFU[ MlD COVEI!00.'.1
"" P f:SSI.f!ET N'S                                                        CAlA
                                                                                 iINCERE '  fO fROM CON1Rot MOOULE
                                                                             F I'lUO [)jO\'AL
'"""
SPEEO S NSCR
                                                                             U  ARAtJ<:E '" o IELOWCJ  a._ (J(}LL[
                                                                             FOI! PlUC R"
                                                                                           VAL
ca .r.!ECTIR'!                                                              ClE NI  a          
                                                                                                         f:I'I1RrlG
                                                                             MR  fl':oo sp rn 3"MSOIrS
                                                              
                        u  PUT SHAFT
                        C[NTERLlNE               \                                                            CO  ER RE  Rf'J LOC A       J
ISOMElRlC VIEW
                                                                       V1EW _A_
                                                                      SC^lE '/"                                                        FOR MAJtJ ELECTRIC
                                                                                                                                       Ca-l'E C  OR D IENTATlml
                                                        5M ^RD REMOTE COOl..ER  OVIS1crJ                                           SEE D 
                                                                                                                                       FOR c:otmECTOR
                                                                                                                                       LA Ya.J T INF
                                                                                                                                                         "
                                                                                                                                                   NG AS67-431
                                                                                                                                                   '  AT1CtJ
                                                                                                                                                   
                  BREATHER - 11410   'j_   L5-6g                                                                                       sE  00.    NG Asa7-405
[ SPEEO SENSOR
                                                                                                                                     JTPUT SP D SENSOR
                                                                                                                                                                                      I FllruSE OUNTtJG BRAC 
                                                                                                                                                                                      LOCA TlC  S DRA't'ING AS6 7-4BO
                                                                                                                                                       NMEPLA E
UJ G:R   iCS
                                                                                                                                                                         TVBE MOm. n  H DlE
                                                                                                               PQWER TAKE -OFf NOUtf'JG PAD                             I TIJOC AND OIPST
                                                     INPIJ T SPEEO SriSOR                                                                                         R EWRE S SE  RIIW1rG IIS 57- 
                                                                                                               .2 PlACES
                                                                                                               FDR EI' NE DR IVEN F'O  R  AKE-                  60
                                                                                                               OFF
                                                                                                               DATA 5EE DRArW ASB7- 48
                                                                                                                                                                                                                 219_0
                                                                                                                                                                                                                 [8.62   J
                                                                                                                                                                                                           (RE _Mt(JNC
                                                                                                                                                                                                              PAD F A.CE l
                                                                                                                                                                                                                   7
                                     S[CTION   C-C
                                                                                                                                                                         HR U Fl.Al'JGE 2_ H O [S
                                                                                                                                                                         FOR MNJ AC nJRING
                                                                                                                                                                         PURPOSES ONLY
                                                                                                                                                                        12_a                                                             AS" Y P ADS BOn1 SIDESUSE FOR
                                                                                                                                                                                                                                          MAtjUFACURING-MA 8E USo D UFr THE
                                                                                                                                                                       [47      J                                                         TR 'JSvtSS!J
                                                                                                                                                                                                                                          (!FJK
                                                                                                                                                                     U flWX 2 HOLES
                                                                                                                                                                    FD L1A1'AFACTIJ  "0
                                                                                                                                                                    P  POSES ON Y
                                                                                                                                                                                                                                                                             S
                                                        12_D2 - 12.37       
                                                                                               FOR EI'.lQNE AOAP TATIDN REQ.J REMEtJ T'S
                                                                                               SEE DRAIM fJG AS67-Q2Q
                                                                                                                                                                                                                                            '" DOWN
                                                                                                                                                                                                                                            FORE -AF 
                                                                                                                                                                                                                                                          T!lo
                                                                                                                                                                                                                                                          '"
                                                         [.473   7     J                                                                                                                                                                AU X Ll A RY E  T;9R A CK Er DESj N
                                                                                                                                                                                                                                          MU5  E ECKo FOR N A T\.R A. FRE
                                                                                                                                                                                                                                          )[NCY VBR A.TION lOADS AND PDW[RP A.  
                                                                                                                                                                                                                                          VBRA T LOAOS     V[
                                                                                                                                                                                                                                                               RIFY THAT HE
                                                                                                                                                                                                                                          A8 0VE \1UES AAE rm E:KCHO
SDCIETY OF AU TOt.j DT\! IE                                                                                                                                                                                                               A 1.j r.lMUM OF :3 MOUNnNG PN  5 '5
ENGHERS NU1.j  ER'                                                                                                                                                                                                                      REOOMEI'.       F 0  TlrG X UI'. Y
FLY IHE[L HOUSj ri                                                                                                                                                                                                                   ]   EOUIPIfEN   E T'RAI'.'5
MOUJl1rJ C FACE
                    5       22
                       [.o   '75J
                    
                     RCE
                    EFE  ENCE
                                                                                                            MMJ PRESSURE.AP  c
                                                                                                                       
                                                          FOR F   MOUNT R ENO
                                                                             
                                                          E COOLER PROvtS!ctJ
                                                          R ECUIREMEN SH<J 4
                                                                                                              4J7S-20 UH F  IN CH SERtES _1HREAIL..
                                                                                                             TO =      1Q-1J N      " m /  lU LIj 
                                                          SEE DRAWlNG AS6 7-474                              J
                                                          SDCIEOF AUTDMQT !  Ef
                                                                                   ':NEERS                                                                                           FOR CL ARANCE REQUIR ED  o R ENO L F!LTER
                                                                                                                                                                                       AND COV[RSEE  MO'AL A.NO INS-ALLATKl'l
                                                          1.3125 SRAIG?  EAD
                                                          NG CCmEcnc INCH SER E:S  HREAD                                                             GaJ3 J                       U AR  CE CHAR  C EET 1
                                                                                                                                                                                                            S  'rra!'lI'.fI'B
                                                                                                                                                                                                                             -FTJ
                                                                                                                                                                                                                                                                                     h
                                                                                                           7-SPEED MODEL mLy
SCALE: 1/5
                                                      Q----;;
                                 SECTIJ   S-S                                                            \c'i" llIl  ' GE-
DIMEN.SlotJ
                                                      19
                                                                127_ 4 (5_02
                                                              196.9         
                                                       20242+0 [7  6B-8Q.31
                                                                     r.
                                                        11.16-11.21 4J9.44'
                                                           HH 1!i r 7. 2 O) REF
                                                          1.27 152 (050-.0 60
                                                                 1 5 (.413
DIMErJSl otJ Y RE                                                34_3 ['_35
                                                                          k
                                                                     m (S4- 77 lB FT
flMJCE             AP ClTY                              4    N   ' m[25Jt L8FT
-QROU( M AY BE     LlMITE YBTED   ..aNT o cO' PANIDI'J FLANGE OR 8Y   Qn-ER DRI\i lINE CO'
                                                                                                   NS
                                                                                                                                                                               UJ G:R   iCS
                                                                                                                                                                               UJ   R   iCS
                   PCS-521B Twin Engine and Twin Pump Cementing Skid
                           Operation and Maintenance Manual
                                   B01-00-217_A
              Section 3
TPH400 Triplex Plunger Pump Overview
                         TPH400 Pump Parameters
Working Parameters
                                       3-1                    http://www.sjs.ServaCorp.com
                                        PCS-521B Twin Engine and Twin Pump Cementing Skid
                                                Operation and Maintenance Manual
                                                        B01-00-217_A
  4          1.31          41.8   14,000      90.8        10,190      166.9         5,545     222.9        4,152     318.8    2,903
(101.6)      (4.94)        (158)   (96.5)     (344)        (70.2)      (632)         (38.2)    (844)        (28.6)   (1207)    (20.0)
 4 1/2       1.65          52.9   11,200     115.0        8,051       211.3         4,381     282.2        3,280     403.5    2,284
(114.3)      (6.25)        (200)   (77.2)     (435)        (55.5)      (800)         (30.2)   (1068)        (22.6)   (1527)    (15.8)
                                                               3-2                            http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
Introduction to Maintenance
Necessary daily maintenance on the TPH400 can enhance the pump service life. Some simple
repair and maintenance can be done by the user at the site or at the base. However, overhaul on
the TPH400 pump must be done at the related SJS department.
Preventive maintenance means maintenance should be performed before the job, in the job and
after the job on some concerned problems. Some maintenance after the job allows the user to
perform a certain repair on the pump such as replacement of parts for the fluid end. This repair
can provide related data for overhaul the pump. Daily maintenance is a continuous process.
The related forms of the procedure are attached for the operator to fill up. The main contents of
the maintenance requirements are as follows:
1) Loosen and open the oil filling cover to check the power end lube oil is sufficient or not. There
is an oil level gauge with scale. If the oil is not sufficient, refill is required. Attention: same type
of oil should be used. Do not mix with different brands of lube oil.
Check the lube oil type is suitable or not. The power end lube oil pour point must be 12.2  below
the working environmental temperature to ensure its flow performance. At the same time, its
individual characteristics should be considered. Lube oil that partially meeting this requirement
should not be appropriately used under a temperature. For selection of lube oil, please refer to
the Table 7 in the Section 5 of this manual.
From the pointer zones on the filter, you can check the blockage degree of the filter. The yellow
zone indicates cleaning is required. When for cleaning, you should firstly remove the filter from
the lube line. Loosen the clamping spring at the pointer. Slightly remove off the pointer case. Do
not damage the O ring and the pointer. Loosen 4 bolts at the top. Remove the filter body (usually
with oil inside). Pour out the remaining oil. Remove the filter strainer. Use cleanser to fully clean
and air blow dry the strainer. Vice verse, the filter can be installed back according to these steps.
Check the packing lube system. Check the lube oil tank level height, open the separate switch,
adjust the air pressure between 0.27~0.4MPa, loosen the packing adapter to see whether oil is
injected out or not. To gain the packing lube oil flow, you should adjust the flow rate regulator
valve. The flow should be regarded suitable when the lube oil flows between the linear status and
the dripping status.
Check the lube oil temperature of the triplex plunger pumps power end and fluid end. The triplex
plunger pump can not properly work before the lube oil temperature is over 40 . The pump
should first run at low speed with no load and then run at high speed with load while the
temperature is increased. Low temperature will thicken the lube oil to flow and make it difficult to
form oil film or to produce poor lubrication. Service life of the bearing and worm can be decreased
and the equipment can be damaged when the lubrication problem is serious.
In the job
2) Observe the lube oil pressure gauge all the time. According to the design requirements of the
lube oil pump, the oil pressure should not be less than 20PSI when the worm speed is 190rpm. To
guarantee service life of the plunger pump, the recommended min. displacement of the lube oil
at working should be 135L/minute at pressure of 80~100PSI.
Adjustment of working pressure of the discharge flange. Max. pressure should be 20000PSI
(137.9MPa) for 3.375 TPH400 pump; and max. pressure should be 14000PSI (77.2MPa) for 4
                                                 3-3                     http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
TPH400 pump. Warning: When this working pressure is excelled, the triplex plunger pump would
be overpressurized. This will cause damage to the equipment and personal injury or death.
Check the packing for oil leakage every 10 minutes. Observe the packing for apparent abnormal
conditions such as smoking, etc. If the packing is found leakage, you should use the packing
spanner (P40-09-009) to tighten the packing. If still leaked, new replacement of packing is
required.
3) Close the packing lubrication system. Open the suction and discharge valves to drain the
remaining water or other medium in the pump head and blow dry using dry air. If the pump is
used for acidizing, the pump head should be fully cleaned with clean water and blown dry. Check
oil volume of the power end. Check oil volume of the packing lube oil. Refill if necessary. Check
the power end lube oil. If found milky bubbles, that means water is mixed in the lube oil. New
replacement of lube oil is required. Please record every replacement of lube oil for reference of
the next job. Check the blockage indication of the filter. Fill up the Daily Record of Work.
Every accumulative 10hrs or every 5 times of operations: Check valve parts of the fluid end.
Every accumulative 100hrs or every 3 months: Remove the side cover plate of the worm gear box
to check the worm gear surface conditions. If found distinctive wear or crack, the triplex plunger
pump should be dismantled to replace the gear and worm. If found darkening on the worm gear,
this indicates the worm gear has depressed area by centralized compression stress. We strongly
recommend replacing with new worm gear and worm.
               Note: When crack is found on the worm surfaces or 50% pitting found
               on the tooth surface, the pump cannot be further used. Continuous
               operation of the pump will cause serious damage to the equipment and
               personal injury.
Every accumulative 200hrs or every 6 months: Replace the power end lube oil. Open the power
end and the teat exchanger and use diesel to clean them.
               Note: If synthetic lube oil such as Mobil SHC-634 is used, the cleaning
               time of the power end can be extended to 2 years or 1000hrs.
4) The filter should be cleaned after each change of the power end lube oil or every 6 months,
even though there is no indication in the yellow zone. Better establish maintenance schedules for
cleaning of the filter in the time of spring and fall to avoid abnormity to the device caused by
tremendous changes of the environmental temperature.
When delivered from the factory, the plunger pump should not have any oil inside during
transportation. Therefore, the plunger pump must be refilled with lube oil before starting the
operation.
When delivered from the factory, the plunger pump should be painted according to the
customers requirements. If no special requirements, the pump is usually painted with prime
coating.
                                              3-4                    http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
The plunger pump is usually applied with anti-rust oil on the metal surfaces. For sea freight,
measures should be taken to prevent soaking and corrosion from sea water.
Packaging for new pump is not for long-time storage. The pump should be put into operation as
soon as possible. If not, the fluid end of the pump should be fully cleaned and applied with
anti-rust oil. The discharge flange outlet and the suction inlet should be blocked. The oil in the
power end should be drained out and fully cleaned with anti-rust oil. The power end lube line
should be flushed to prevent blockage from rusting. Remove the breather valve (oil filling port) on
the power end. Tighten plugs onto the oil filling port and lube oil inlet to guarantee full sealing of
the power end. The metal surfaces exposed to air such as the input flanges, etc. should be applied
with strong anti-rust oil. The pump should be stored in a warm and dry environment.
After storage of 2 weeks or more, when the pump is restored to operation, it must be applied lube
oil or the dry rubber seals will more easily get damage on the surfaces.
Packing
Cause 5:         The plunger has eccentric wear and damaged the packing.
Solution:        Remove and replace the packing according to the drawing.
Cause 1:         The fluid end is not installed with full packing or the plunger is not aligned with
                 the packing. Some deformation causes the eccentric wear of the metal ring by
                 the plunger.
Solution:        Remove and replace the packing. Confirm the pump head is fully filled with fluid.
                 Confirm the valve is working normally. Slowly start the plunger pump and make
                 it self adjusted to the normal working.
Cause 2:         Internal bore size of the packing metal ring is out of tolerance and causes friction
                 and heat of the plunger.
Solution:        Measure sizes of the packing seat ring and the guide ring, and replace the
                 packing.
               Note: The TPH400 plunger pump adopts SPS packings. Do not mix with
               other brands of packings.
                                                3-5                     http://www.sjs.ServaCorp.com
                       PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                           B01-00-217_A
The packing got hot rapidly after the pressure is reached.
Cause 2:      Damaged discharge valve or poor seal will cause the packing under high
              pressure for long time and make lube oil difficult to fully reach to the plunger
              surface. Both of them can happen at operation of the pump.
Solution:     Replace the valve.
Cause 3:      The packing is too loose to cause the fluid end high pressure fluid to enter the
              packing.
Solution:     Check the packing is assembled according to the drawing or not. Reinstall it.
Cause 5:      Air pocket is produced in the pump head for not fully filled with fluid.
Solution:     Confirm the pump runs in the normal pressurized system. Meanwhile, working
              medium with high viscosity or pumping fluid at high speed will also cause
              temperature increase.
Cause:        The pumped fluid enters the packing and frictions with the packing.
Solution:     Replace with a high performance packing to increase the booster valve pressure
              of the packing lubrication system.
Cause 3:      Pump cavitation caused low pressure or insufficient fluid in the suction manifold
              when the pumping fluid source is changed.
Solution:     Pumping plan should be well arranged. When such change is required, the
              change time should be quick.
Cause 4:      Scratches on the plunger surface caused by wrong fused metal material or
              insufficient thickness of the fused metal material corresponding to the job fluid.
Solution:     Contact SJS Engineering Dept. to select an appropriate fused metal material
              with right thickness.
Cause 5:      The plunger surface has pitting to increase friction and heat.
Solution:     Replace the plunger.
                                            3-6                       http://www.sjs.ServaCorp.com
                       PCS-521B Twin Engine and Twin Pump Cementing Skid
                                 Operation and Maintenance Manual
                                           B01-00-217_A
Solution:    Replace the packing lube oil.
Plunger
Cause 1:     The guide ring gap is too big to cause eccentric wear to the packing by the
             plunger and also cause damage to the fused metal material on the plunger
             surface.
Solution:    Remove the guide ring and reject it immediately. Replace with a new guide ring
             with correct size.
Cause 5:     The plunger deforms by weight and clamps the packing due to the fact that the
             plunger pump is stored for a very long time.
Solution:    Replace the plunger and packing components.
Cause 2:     The pumped fluid contains high arene and aniline solvent to cause the valve
             rubber to swell.
Solution:    Replace with a high performance packing or contact SJS Engineering Dept.
Cause 3:     The conical surface of the valve seat is damaged by the facts that the valve seat
             is not completely removed for burrs and residues at its installation; the conical
             surface is damaged; the sealing is not guaranteed and pressure cannot be
             increased.
Solution:    Before installation of the valve seat, the benchman should remove all burrs and
             clean the surface. Otherwisely damage will occur to the conical surface in a large
             scale. If damaged, please contact SJS Engineering Dept. to confirm whether it
             can be repaired or not.
Cause 4:     The valve movement is in connection with the spring. Improper installation of
             the valve and spring will affect the guiding angle of the valve.
Solution:    Use the proper valve and valve seat. Properly install the spring according to the
             SJS spring requirements.
Cause 5:     Improper spring and installation method will cause no reset of the valve.
Solution:    Select a proper spring according to the drawing or contact SJS Engineering Dept.
             for technical support.
Cause 6:     The valve seat is not cleaned or applied with lube oil before installation. The
             valve seat jumps out in the operation.
Solution:    After cleaning the conical surface of the valve seat, the valve seat must be
             installed under a dry condition. Use a 10 pound hammer to hit the valve seat into
                                           3-7                     http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
                 the valve body.
Cause 7:         Temperature of the pumped fluid is too high to damage the valve rubber.
Solution:        The standard valve rubber is polyurethane with temperature resistance of 180F.
                 If this temperature is excelled over, please contact SJS Engineering Dept.
             Symptom                                               Cause
                                     1. Use of lube oil with high viscosity in the extreme cold
                                        working environment.
  Abnormal low oil pressure at       2. The filter is blocked.
 the suction inlet of the lube oil   3. The suction oil line is broken and leaked.
             pump.                   4. The oil filling port is blocked completely and air cannot
                                        enter.
                                     5. The pressure gauge reading is wrong.
                                     1. No oil in the oil tank of the triplex plunger pump.
  Abnormal low oil pressure at       2. The lube oil pump is worn or damaged.
    the outlet of the lube oil       3. The oil inlet line is not connected correctly.
             pump.                   4. The pressure relief valve is out of operation or damaged.
                                     5. The oil temperature is too high and viscosity is too low.
                                     1. The environmental temperature is too high and the lube
  Abnormal high temperature             oil viscosity grade is insufficient.
       of the lube oil.              2. Running time under high load excels the rating.
                                     3. The cooling system is not working normally.
                                     4. The lube oil is polluted by other fluids.
                                     5. The power end is damaged inside.
                                     6. Existence of other high temperature objects to cause heat
                                        to the triplex plunger pump.
                                     1. The lube oil is polluted by water or other foreign objects.
                                     2. The locking nut is loose.
 Lube oil leakage of the power
                                     3. Too much lube oil inside the power frame.
              end.
                                     4. The oil pressure inside the power frame is too high.
                                     5. The oil seal is damaged.
                                     1. The O seal ring is damaged.
                                     2. The oil seal is installed wrong.
  Lube oil leakage of the fluid
                                     3. The oil seal is not cleaned.
              end.
                                     4. The oil seal size is not correct or not tightened.
                                     5. The oil seal life is expired.
                                     1. The packing is not tightened.
                                     2. The packing is not cleaned before installation.
     Lube oil leakage of the         3. The packing rings are not properly installed or other
            packing.                    brands of packings are used.
                                     4. The packing lube system is working abnormally.
                                     5. The packing life is expired or damaged.
                                     1. Air inside due to the loose, worn or damaged adapter.
                                     2. Air inside the pressure booster system caused by the
                                        charging pump.
                                     3. Gas and steam mixed in the original liquid.
                                     4. Insufficient flow rate and pressure of the pressure booster
 Liquid impact or hammering.
                                        system.
                                     5. The opening spring of the valve is damaged or the valve is
                                        stopped.
                                     6. The valve, valve rubber and valve seat are worn or
                                        damaged.
                                                 3-8                    http://www.sjs.ServaCorp.com
                         PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                             B01-00-217_A
                              7. The shock absorber is not properly air charged and
                                 working in a poor efficiency.
                              1. The valve assembly is worn or damaged.
                              2. Insufficient flow rate and pressure of the pressure booster
Low pressure at the discharge
                                 system.
    of the triplex plunger
                              3. The liquid inside the pump is mixed with gas and steam.
pump/unstable running of the
                              4. The shock absorber is not properly air charged and
   triplex plunger pump.
                                 working in a      poor efficiency.
                              5. The same one shock absorber provides service to two
                                 pumps and not in synchronism.
                                           3-9                   http://www.sjs.ServaCorp.com
                                PCS-521B Twin Engine and Twin Pump Cementing Skid
                                        Operation and Maintenance Manual
                                                B01-00-217_A
Attachment 1:
Repair Record:
     1. For example, the packing is replaced on xxx day xxx month xxx year.
     2.
     3.
     4.
          Check the triplex plunger pumps power end and the packing lube oil is sufficient or not.
          Check the packing lube oil outlet has oil or not.
          Check the support, the power frame and the pump head have cracks or not/miss parts or not.
          Check all places for leakage of lube oil or looseness of parts/components.
          Check all gauges are working properly or not.
          Check the magnetic filter is clean or not.
          Check all lines are connected correctly or not.
          Check all bolts for looseness.
          After all the above-mentioned items are working normally, wait until the oil temperature is normal
            (12 higher than the pour points of all oils) and perform pressure test to the max. working
            pressure.
          Check all sealing parts for leakage and check all connections for looseness.
          Record oil pressure and oil temperature.
          Record the triplex plunger pumps discharge pressure. Do not excel the max. pressure.
          Use clean water to flush the internal parts of the fluid end.
          If the environmental temperature is less than 0, the internal parts of the pump head must be blown
            dry with dry air.
          Check the lube oil level height of the fluid end. The level height should be minimally maintained
            above the half. If not sufficient, add oil to the FULL marking.
          Add lube oil for the power end to the scale of FULL.
          Check the suction and discharge sealing plugs, valve bodies and springs. If replacement is required,
            replace the seal rings, valve rubbers and springs.
          If the packing is found leaking in the job, replace the packing components.
          Fill up the daily record of work.
                                                     3-10                       http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
Attachment II:
                                                3-11        http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
                      Section 4
         PCS-521B Twin Engine and Twin Pump
              Cementing Skid Parameters
Model PCS-521B twin engine and twin pump cementing skid is a new generation of cementing
equipment developed by SJS based on the TPH400 oilfield special-purpose plunger pump, the
high energy recirculating mixing system and the ACM-IV.1 automatic density control patent
technologies. It is designed for cementing, acidizing, pressure test and other fluid pumping jobs.
The TPH400 triplex plunger pump is an oilfield special-purpose single acting plunger pump
suitable for pumping various kinds of oil well treatment fluids except for low temperature fluid.
The high energy recirculating mixing system is driven by a closed hydraulic system powered by
the hydraulic engine. Its characteristics are high mixing energy and uniform slurry density. The
core part is the ACM-IV.1 automatic density control  one of computerized automatic control
systems featuring the most advanced in design and most precision in slurry density control in the
world as well as the best mixing technology featuring the most successful in application and most
popular in operation for offshore and onshore oilfields in China. It can automatically mix and
pump cementing slurry according to the set slurry density and displacement.
The design and manufacture of this cementing unit can meet the requirements of possible
less-repair/maintenance in a cold temperature environment. The overall layout of complete unit
ensures operators can conveniently and clearly monitor and control working conditions of all
switches, instruments and each system of complete unit. The high automation feature enable
1~2 operator to complete all operations.
Drainage port: two 4" clamp grooves (displacement tank) ; one 5" steel pipe (mixing tank)
4.4.1 Temperature
4.4.2 Humidity
When the system is close to the stable running status, the densitometers reading, under auto
control mode, is displayed as 0.01--0.02 g/ cm (0.083--0.167lb/gal) on the premise of stable
cement transfer system.
                                              4-2                  http://www.sjs.ServaCorp.com
                                   PCS-521B Twin Engine and Twin Pump Cementing Skid
                                           Operation and Maintenance Manual
                                                   B01-00-217_A
                                        Section 5
                                  Lubricating Procedure
The following tables are for recommended oil. Different brands of oil are used for different
working environments. Mobil and Shell are recommended for the equipment used in foreign
countries. On the premise of meeting operational requirements, other brands of oil can also be
selected.
Table 1: Caterpillar recommends 50/50% glycol cooling mixed fluid to achieve the optimum
performance. (The following table can be also used for reference.)
                                                                5-1                            http://www.sjs.ServaCorp.com
                             PCS-521B Twin Engine and Twin Pump Cementing Skid
                                     Operation and Maintenance Manual
                                             B01-00-217_A
Table 3:
Table 7:
                                                            Mobil               Shell
                      Synthetic Gear Lubricating      Mobilube SHC          Spirax s
                                  Oil                   75W-90               75W-90
        TPH400
                                        Spring
       Power End        Seasonal                      Mobilube hd           Spirax hd
                                          and
       Lubrication   Non-synthetic                     80W-90                80W-90
                                       Autumn
                     Lubricating Oil
                                       Summer          Mobilube hd          Spirax hd
                                              5-2                     http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
                                                   85W-140        85W-140
Note: Oil filling steps should be accomplished as per requirements. First add 2/3 and run at low
speed for 2 minutes to allow the pipeline to be fully filled. Refill to the specified scale. After oil
filling, please conduct check according to the following contents.
                                                            Lubrication
                                                                             Working        Lube
 SN            Component               Qty    Frequency      Location
                                                                             Contents       Type
                                                               No.
   1       Engine Lube Oil Level        2      Each time         1             Check         ATF
   2         Engine Fuel Level          2      Each time         1             Check         ATF
           Transmission Lube Oil
   3                                    2      Each time          1            Check         ATF
                   Level
   4      Propeller Shaft Grease        2      Each time          6             Add         Grease
         Plunger Pump Power End
   5                                    2      Each time          1            Check         ATF
                  Lube Oil
         Closed Hyd. Oil Tank Oil
   6                                    1      Each time          1            Check         ATF
                   Level
   7       Injector Grease Point        1      Each time          3             Add         Grease
   8    Cement Valve Grease Point       1      Each time          1             Add         Grease
        Oil/Water Separator Liquid
   9                                    1      Each time          1            Check         ATF
                   Level
          Plunger Pump Packing
  10                                    2      Each time          1            Check         ATF
               Lube Oil level
  11    1 Plug Valve Grease Points     2      Each time          1             Add         Grease
  12    2 Plug Valve Grease Points     5      Each time          1             Add         Grease
          4x3 Centrifugal Pump
  13                                    2      Each time          1            Check        Grease
               Grease Point
          5x6 Centrifugal Pump
  14                                    2      Each time          2            Check        Grease
           Bearing Lube Points
         5x6 Centrifugal Pump Oil
  15                                    2      Each time          2            Check         ATF
             Seal Lube Points
         Variable pump mounting
  16                                    4      Each time          4             Add         Grease
               base grease
                                                 5-3                      http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
                                             Lube Oil
                                              Level
                                              Marker
                                             Lube Oil
                                            Filling Port
Note: The filling ports of the LH engine and RH engine should be symmetrically configured.
                                             RH Lube
                                            Oil Marker
                                             & Filling
                                                Port
                                             LH Lube
                                            Oil Marker
                                             & Filling
                                                Port
                                             5-4                  http://www.sjs.ServaCorp.com
    PCS-521B Twin Engine and Twin Pump Cementing Skid
            Operation and Maintenance Manual
                    B01-00-217_A
                                                   Plunger Pump
                                                  Packing Lube Oil
                                                 Level Marker and
                                                        Filling Port
                       Fuel level
                       and filling
                         port
                          Fuel level
                           marker
                         5-5                   http://www.sjs.ServaCorp.com
    PCS-521B Twin Engine and Twin Pump Cementing Skid
            Operation and Maintenance Manual
                    B01-00-217_A
                       Grease
                       fitting
                     Grease
                     fitting
Grease Fitting
                        5-6                    http://www.sjs.ServaCorp.com
                  PCS-521B Twin Engine and Twin Pump Cementing Skid
                          Operation and Maintenance Manual
                                  B01-00-217_A
Grease Fitting
Each time add grease to the injector and the cement valve.
                                      5-7                 http://www.sjs.ServaCorp.com
                             PCS-521B Twin Engine and Twin Pump Cementing Skid
                                     Operation and Maintenance Manual
                                             B01-00-217_A
                                                              Change         Working
  SN                    Component                     Qty                                 Part No.
                                                               Time          Contents
                                                                 3
   1              Engine Oil Filter Element             2                     Change    X04-06-554
                                                              months
                                                                 3
   2       Engine Fuel Coarse Filter Element            2                     Change    X04-04-280
                                                              months
                                                                 3
   3        Engine Fuel Fine Filter Element             2                     Change    X04-01-027
                                                              months
                                                                 3
   4         Transmission Oil Filter Element            2                     Change    X04-04-306
                                                              months
                                                                 3
   5       Hydraulic Oil Return Filter Element          1                     Change    X04-11-388
                                                              months
                                                                 3
   6      Hydraulic Oil Suction Filter Element          1                     Change    X04-00-030
                                                              months
                                                                 3
   7            Hydraulic Pump Filter Element           4                     Change    X04-00-587
                                                               months
                                                                 3
   8             Engine Air Cleaner Element             2                     Change    X04-07-176
                                                               months
                                                                 3
   9     Plunger Pump Lube Oil Filter Element           6                     Change    X04-09-155
                                                               months
                                                                      3.
                                                                 X04-01-027
           1.                                 2.
       X04-04-276                     X04-06-554
                                               5-8                         http://www.sjs.ServaCorp.com
              PCS-521B Twin Engine and Twin Pump Cementing Skid
                      Operation and Maintenance Manual
                              B01-00-217_A
                                                 6.
                                          X04-00-030
    4.                  5.
X04-04-306          X04-11-388
     7.                 8.                  9.
 X04-00-587         X04-07-176          X04-09-155
                                 5-9             http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
                               Section 6
                          Operating Procedures
Equipment operations include normal operations and cleaning operations.
The operator should be aware of the task for using the equipment this time (pressure test/pump
prepad fluid/pumping slurry volume and pre-calculated engine speed/transmission shift).
2. Connect lines (including clear water, dry bulk cement and air).
2.3 Connect the external air source and open the air inlet valve on the air reservoir tank.
                                                6-1                  http://www.sjs.ServaCorp.com
                         PCS-521B Twin Engine and Twin Pump Cementing Skid
                                 Operation and Maintenance Manual
                                         B01-00-217_A
                                                                   Air Pressure
                                                                     Gauge
                                                                 Battery Power
                                                                    Switch
Voltmeter
Computer Power
                                             6-2                http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
      Shifter
      Neutral
      Position
6. Start the engine and idle run for more than 5 minutes.
7. Perform pressure test for the high pressure lines and start pumping the prepad fluid.
(Skip over these steps if no such tasks.)
8.1 Increase the engine speed to 1800 ~ 2100rpm (providing hydraulic power for the
recirculating pump and the water pump).
                                                                                 Observe
                                                                                 engine
                                                                                  speed.
8.2 Open the valve1# or 2#, 13#. Start the clear water pump. Half open the control valve. Fill the
mixing tub to 1/2. Close the clear water valve (the clear water pump can still run).
8.3 Open the valves 6#. Start the recirculating pump. Half open the control valve.
8.4 When the mixing tub level is flooded over the agitator, half open the control valve.
8.5 Turn the handles of control valves for cement valve and water valve. Check them for flexibility
in turning.
                                                6-3                   http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
                                                                               Press the
                                                                             throttle down
                                                                             to return the
                                                                            engine back to
                                                                                 IDLE.
9. Maintain the engine at idle and enter the auto control screen.
                                                                         Turn on the
                                                                          computer
                                                                        power switch.
9.2 While the computer begins to perform self diagnosis, the cement valve should work
automatically. After completion of self diagnosis, the valve is stopped at the 0 position. Manually
adjust the control valve to position the valve to the 2 position.
9.4 Ex-factory value for cement absolute density is 3.15. Customer can modify it according to
actual situation.
                                                6-4                   http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
Press the Set Density key. Use the right side numerical keys popped out from the window to
input your job density and press the Enter for confirmation.
Press the Job No. key. Press the right side numerical keys popped out from the window to input
your job number and press the Enter for confirmation.
9.6 Accept all settings. Switch the cement valve to manual control.
                                                                 Press Manual/Auto to
                                                                 switch to Manual.
                                              6-5                     http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
Press Start.
10.2 Increase the engine speed to 1800 ~ 2100rpm (providing hydraulic power for the
recirculating pump and the water pump).
10.3 Open the control valve of the agitator in the mixing tub to its maximum.
10.4 Slowly open the main butterfly valve for the cement valve to begin cement mixing.
10.5 From the Run Screen in the computer, observe the changes of density and the changes of
level in the mixing tub. When the displayed actual density value is 0.06g/cm less than the set
density value, (start the clear water pump) open the main butterfly valve in the water line to start
water supply. Operate the clear water manual valve to keep water flow rate to 300L, and at the
same time, operate the manual control valve for the dry cement valve to slowly open the dry
cement valve. Control the slurry density close to its set value.
10.6 At this time, the level in the mixing tub reaches to 2/3 height. Shift the transmission to its
3rd gear to start the plunger pump and the booster centrifugal pump as well. (Note: This gear is
pre-calculated.)
10.7 To maintain stable level in the mixing tub, observe the Cement Supply Capability. Adjust
the water manual valve and cement proportional valve to ensure slurry density reaches to the set
value and maintains stable.
10.8 In the continuous mixing and pumping processes, the level height in the mixing tub should
be kept at 2/3 level of the mixing tub.
11. Begin the auto mixing when the slurry density is close to the set valve.
                                                                  Press Manual/Auto
                                                                   to switch to Auto.
In case of unstable dry cement supply or clear water supply in the auto mixing process, the switch
should be changed to Manual status. In the mixing process, Set Density value can be modified
as per requirements.
                                                6-6                   http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
12.1 When pumping is completed as per the pre-calculated job volume, prepare end of job.
Press Stop.
                                                            Press Manual/Auto to
                                                            switch to Manual.
After completion of cleaning the equipment,            the density display value        less
than0.01g/cm is regarded as cleaning is OK.
                                            6-7                  http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
                                           6-8              http://www.sjs.ServaCorp.com
                        PCS-521B Twin Engine and Twin Pump Cementing Skid
                                Operation and Maintenance Manual
                                        B01-00-217_A
                                       6-9                http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
                   Section 7
    Power System and Plunger Pump Overview
The equipment power is basically provided by two CAT C15 Series engines. These two engines
drive two TPH400 triplex plunger pumps thru two ALLISON 4700FS transmissions.
Here, we only provide brief technical description on the engines, transmissions and plunger
pumps. For detailed operations, repair and maintenance of them, please refer to the
documentations provided together with the shipment of the equipment.
7.2 TRANSMISSION
Allison 4700OFS automatic transmission, c/w oil filling port, dipstick, torque converter and 1810
series output flange.
Gear ratios:
 1st Gear: 7.63
 2nd Gear: 3.51
 3rd Gear: 1.91
 4th Gear: 1.43
 5th Gear: 1.00
Heavy-duty shafts are installed between the transmission and the triplex plunger pump, including
heavy-duty universal joints and 1810 series flanges.
 Installation angles of the heavy-duty drive shafts meet the maximum installation angles
   recommended by the OEMs.
 Metal housings are provided for convenience of adding grease.
                                               7-1                  http://www.sjs.ServaCorp.com
                                   PCS-521B Twin Engine and Twin Pump Cementing Skid
                                           Operation and Maintenance Manual
                                                   B01-00-217_A
Technical specifications:
TPH400 Pump
For introduction, operations and adjustment procedures of the plunger pump power end and
packing lubrication system, please refer to the Operation Manual of TPH400, PN# A08012200C.
                                                               7-2                           http://www.sjs.ServaCorp.com
                             PCS-521B Twin Engine and Twin Pump Cementing Skid
                                     Operation and Maintenance Manual
                                             B01-00-217_A
                                   Section 8
                                Hydraulic System
8.1 WORKING PRINCIPLE
The hydraulic system consists of hyd. oil tank, 4 variable plunger pumps, 4 gear oil pumps, 4
constant displacement motors, vane motors, oil cooler, cylinders, control valves and other hyd.
accessories.
The hydraulic system consists of two independent systems, closed and open. The closed hydraulic
system is designed to drive 4 centrifugal pumps. The open hydraulic system is designed to drive
the agitator in the mixing tub, the agitator in the displacement tank, the injector cylinder and dry
cement cylinder.
8.2 OPERATIONS
In the closed hydraulic system, the speeds of the drive motors (Part 13, Part 14) of 4 centrifugal
pumps can be continuously adjusted from zero to maximum by using the combination valve
installed in the control box. The combination valve (Part 6) is an overflow valve set to adjust and
limit the maximum speeds of four centrifugal pumps. This valve is set before shipment. The max.
speed of the clear water centrifugal pump is set as 2900RPM. The speed of circulating centrifugal
pump is 2100RPM. The speed of the charging centrifugal pump is set as 1900RPM. The continuous
working pressure of the closed hydraulic system can reach up to 21MPa (3000psi), and max. oil
pressure up to reach up to 35MPa (5000psi). The working pressure is indicated by the pressure
gauge on the control console.
In the open hydraulic system, the speeds of the motors (Part 4, Part 20) of the agitators of the
mixing tank and the displacement tank are controlled between 0~300RPM by the choke valve c
(Part 8) /w overflow valve on the control console. The set values for the overflow valves in the
agitating systems of the metering tank and mixing tub are set separately as 21MPa and 11.5MPa.
Actions of the dry cement oil cylinder and the clear water cylinder are manually controlled by the
manual direction-changing valve (Part 9) c/w overflow valve or automatically controlled by the
computer system via the solenoid valve (Part 10). The overflow pressure of the manual valve is
set as 5MPa. The working oil pressure is displayed by the pressure gauge on the instrument
console.
When the oil return filter is dirty, the flow rate will drop or fluctuate. The filter indicator should be
observed at ordinary times and changed every three months according to experience or working.
                                                 8-1                      http://www.sjs.ServaCorp.com
Fig. 8-1 Working Principle of the Hydraulic System
                  8-2                                http://www.sjs.ServaCorp.com
              PCS-521B Twin Engine and Twin Pump Cementing Skid
                      Operation and Maintenance Manual
                              B01-00-217_A
SN      Qty                            Description
                  Hydraulic System Assembly
0001   1.0000     Hyd. Oil Tank Assy.
0002   3.0000     Variable Displacement Oil Pump Installation Assy.
0003   1.0000     Variable Displacement Oil Pump Installation Assy.
0004   2.0000     Agitating Oil Pump Assy.
0005   1.0000     Control Oil Pump Assy.
0006   1.0000     Pressure Releasing Valve Installation Assy.
0007   1.0000     Filter Assy.
0008   3.0000     Motor Speed Regulating Valve and Adapter Assy.
0009   1.0000     Two-Combination Manual Valve Adaptor Asst.
                  Proportional Electro-Hydraulic Valve Adaptor Assy.
0010   1.0000
                  (Two-Combination)
0011   1.0000     Hydraulic Oil Cooling Fan Installation Assy.
0012   1.0000     Adaptor Body Assy.
0013   2.0000     5x6 Centrifugal Pump Motor Assy.
0014   2.0000     4x3 Centrifugal Pump Motor Assy.
0015   1.0000     Cement Valve Cylinder Assy.
0016   1.0000     Water Valve Cylinder Assy.
0017   3.0000     Agitator Motor Adaptor Assy.
0018   1.0000     Averaging Agitator Motor Adaptor Assy.
0019   1.0000     Averaging Agitator Motor Adaptor Assy.
0020   1.0000     Agitator Oil Pump Assy.
                             8-3                    http://www.sjs.ServaCorp.com
                         PCS-521B Twin Engine and Twin Pump Cementing Skid
                                 Operation and Maintenance Manual
                                         B01-00-217_A
8.3 TROUBLESHOOTING
When the hydraulic system is found not working normally, the operator should conduct an
inspection according to the following Table 8-2.
                                              8-4                     http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
                                     Section 9
                                    Air System
9.1 WORKING PRINCIPLE
The air system consists of air reservoir tank, pressure relief valve, oil/water separator, and all
control valves. The air system pressure is 0.60.8MPa to provide power for engine startup &
shutdown, operations of butterfly valves and lubrication of centrifugal pumps and plunger pump
packings.
The air source for engine startup should meet the requirements of pressure of 0.7MPa and min.
flow rate of 14.3L/s.
The compressed air from the externally-connected air source first enters the air reservoir tank.
The function of the air reservoir tank is to resolve the contradiction between supply and demand
                                               9-1                    http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
aroused from extensive use of air in a short time and separate water and oil from the gas by
natural cooling at the same time. On its outlet, a safety valve with set pressure of 0.8MPa is
installed. The oil/water separator and oil fogger component on the side of the control box
separates the foreign objects, oil and water from the compressed air, atomizes the lube oil and
injects into the air flow, follows the compressed air to enter the locations requiring lubrication
leads to achieve the lubrication purposes. The compressed air, after treatment, is led to each
control valve to operate the related actuators.
9.2 OPERATIONS
1. The air tank should be conducted water drainage periodically. Water drainage should be done
thru ball valve for start and finish of each job. Also should be done for long-time suspension.
                                                9-2                  http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                         Operation and Maintenance Manual
                                                  B01-00-217_A
Otherwisely, moisture will accompany the air flow to enter and rust each pneumatic element and
rust to the air tank as well. This will cause potential safety hazard.
2. The oil/water separator and atomized lubricator component should be frequently conducted
water drainage and oil adding. Also frequently inspect the oil for deterioration so as to guarantee
normal performance of pneumatic elements.
                                                9-3                   http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
                                 Section 10
                             Lubrication System
10.1 BRIEF INTRODUCTION
This section only introduces lubrication of plunger pumps and centrifugal pumps. For lubrication
of other components, please refer to the related technical documents. Lubrication system of this
skid basically consists of lubrication of plunger pump power end, lubrication of plunger pump fluid
end and lubrication of centrifugal pump packings.
Lubrication of plunger pump power end mainly consists of oil pump, overflow valve, suction end
screen, filter, pressure gauge, temperature gauge, etc. For details of the power end lubrication,
please refer to the Operation Manual of TPH400 Plunger Pump.
The plunger pump fluid end and the centrifugal pump packing adopt an air-over-hydraulic type
lubrication system to provide continuous cooling & lubricating oil to the plunger pump packing
system and two centrifugal pump packings. Mainly consists of: Lube oil tank, pressure reducing
valve, switch, needle valve, check valve, ball valve and pipeline. Fig. 10-1 - Schematic Diagram
of the Power End Lubrication System. Table 10-1  Main Parts List. Fig. 10-2  Structural Photo.
                                                                                   5
            2
                                                                                   6
            3
1.   Packing Lube Oil Tank: Pressure vessel with capacity of 38L. Oil is #13 Double Curve EP Oil or
     SAE 15W40 Oil.
2.   Pressure Regulating Valve: PN# is X04-00-633. Used to drop the air source system pressure
     to the pressure required by the packing lubrication, usually 0.3-0.4MPa (10-60 PSI).
                                                10-2                  http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                       Operation and Maintenance Manual
                                                   B01-00-217_A
3.   Pressure Release Switch: PN# X04-00-634. 1/4 pressure release ball valve.
4.   Pressure gauge: PN# is X04-01-888. Used to indicate the pressure in the lube oil tank.
     Indication range is 0-60 psi.
5.   Ball Valve: Switch of the plunger pump packing lube pipeline. Used to open or close lube oil
     in the pipeline.
6.   Regulating Valve of Plunger Packing Lube Oil Volume: Two to regulate oil volume of plunger
     pump packing lube oil. Another two to regulate oil volume of centrifugal pump packing lube
     oil.
7.   Cover and Dipstick: To indicate lube level in the tank. Caution: When add oil, the tank should
     be pressure released.
8.   Drain Valve (on the bottom of oil tank): Used to drain the foreign objects deposited in the
     tank.
9.   Check Valve: PN# is X04-00-652. Used to prevent the slurry from entering the lube pipeline
     after leaking from the packing sealing.
The air pressure required by the lubrication system is 0.3-0.4MPa. Therefore, before starting the
plunger pumps and centrifugal pumps, the air source switch (Part 3) must be firstly open.
Regulate and confirm the air pressure from the regulating valve (Part 2) to the air reservoir tank
(Part 1). When for initial use, the lube oil volume should be regulated. Steps are: Remove the oil
pipe to the plunger pump and centrifugal packings. Separately open the ball valve switch (Part 5)
and regulating needle valve (Part 6) on each pipeline. Observe lube oil flow rate for stable and
steady flow. Well connect the oil pipe line. For later works, you only need to open and close the
ball valve without repetition of the above-mentioned steps. After completion of job, you should
timely close ball valves on each line to avoid waste of lube oil. Before each cementing job, you
should check the lube oil volume. The lube oil volume should no less than 1/2 of the dipstick
marking.
Caution: When opening the packing lube oil tank to add oil, please first close the
pressure release ball valve on the air line to release pressure from the packing lube oil
tank. When the pressure gauge reading is 0, slowly open the lube oil tank. When
under pressure, the lube oil tank should not be opened.
The pump power end lubrication system needs no operations. It will automatically cool down
through fan and radiator when temperature is up to a certain degree.
                                                10-3                  http://www.sjs.ServaCorp.com
             PCS-521B Twin Engine and Twin Pump Cementing Skid
                     Operation and Maintenance Manual
                             B01-00-217_A
                            10-4                 http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
                               Section 11
                         Fluid Delivery System
11.1 DISPLACEMENTTANK
The displacement tank is a stainless steel structure with effective volume of 20bbls, consisting of
two compartments, each capacity is 10bbls. Within the tank, scale is provided. Min. metering unit
is 0.1 m3. Outside the tank, metering counters are provided with each group of 20 ea. The
discharge end of the displacement tank is connected with 6 butterfly valve and 6 pipeline to
guarantee the fluid flowing speed to the booster pump and plunger pump satisfy the system
requirements. The backflow and release pipeline is used to discharge the pressure fluid of the
triplex plunger pump into the displacement tank. The displacement tanks release pipe includes 3
overflow pipe and 4 release pipeline. These two pipelines are connected at the bottom to guide
to LH and RH sides of the metering tank for release of fluid from the above-mentioned two
compartments. The manifold is designed with clamps for easy removal and installation.
                                               11-2                  http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
                           Section 12
                     Automatic Mixing System
12.1 MIXING SYSTEM
The mixing system is a high energy recirculating type. It mainly consists of high energy mixer,
cement valve, diffuser tub, mixing tank, agitator impeller, recirculating pump, booster pump and
water pump. The required high energy for mixing comes from water centrifugal pump and
recirculating centrifugal pump. Dry bulk cement goes to the cement valve with a rate controlled
by hand or controlled by computer. Water current injected by the high energy mixer at high
speed not only form a negative pressure to suction the dry cement, but also moisture the dry
bulk cement to the maximum extent. The recirculating pump is used to secondary or more
circulation for the slurry between the mixing tube and the injector. The diffuser tub is used to
remove gas in the initial mixed slurry and dust from the mixing tank. The 20bbl mixing tank
allows a certain holding time to fully and uniformly mix the slurry. The deep tank design can
ensure better pumping head to maximally reduce vortex and cavitation effects. The
hydraulically-driven agitator impellers can effectively increase high mixing energy to make the
slurry density more uniform.
1) Mixing tank: Effective volume is 8bbl, the place for mixing of slurry.
2) Agitator: Help to further mixing of the old and new slurry. Increase mixing energy.
3) High energy mixer (Injector for short): the device for initial mixing of slurry. The high
   pressure clean water produced by the clean water centrifugal pump forms injected water
   current in the injector. The negative pressure energy produced thereof suction and fully mix
                                              12-1                  http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
    the dry bulk cement in the cement line. The slurry returned from the recirculating centrifugal
    pump refills the mixer to complete secondary or more circulation. Adjustment of the clean
    water rate for the mixer is controlled by the manual valve through the clean water cylinder.
4) Adjusting cylinder for clear water: Actuator for adjustment of the clear water rate. Manual
    valve controlled.
5) Metering valve for dry bulk cement.
6) Main control valve for the recirculating pipeline: This valve is used to cut off the recirculating
    slurry loop to the injector. This valve is a normally-open valve. When the booster pump cannot
    work normally, close this valve. The recirculating pump is regarded as the booster pump. This
    valve can be also used to clean the equipment or clean the slurry on the densitometer.
7) Diffuser tub: To remove the air in the dry bulk cement and maximally reduce the air content
    in the slurry and remove the dust in the mixing tank under normal operating conditions.
8) Manual valve for adjustment of clear water: To adjust the clear water rate to the injector. Also
    the controller for the clear water adjusting cylinder. Normally, max. clear water rate is 1.9
    m3/min (500gal/min).
    Note: Under normal conditions, adjustment of this valve cannot completely cut off the clean
    water.
9) Manual valve for dry bulk cement: To adjust opening of the dry bulk cement and control dry
    bulk cement volume under manual mode.
10) Speed regulating valve for mixing agitator: To regulate speed of the mixing agitator, normally
    in the range of 0-300RPM.
11) Speed regulating valve for agitator in displacement tank: To regulate speed of the agitator in
    the range of 0-300RPM.
12) Main control valve for clear water (not shown in the photo): 3 butterfly valve, normally-open
    valve, PN# B10-07-010, used to completely cut off the clear water.
1) Metering valve for dry bulk cement (cement valve for short): The device to adjust delivery
   volume of dry bulk cement. This valve can reliably meter the delivery volume of dry bulk
   cement even when the delivery volume is relatively low. Dry bulk cement can avoid caking to
   block the delivery line. The cement valve is of approximate linearity. When the delivery
   pressure is at 0.17-0.21Mpa (25-30psi), the valve is positioned at 2-5 to guarantee the
   system can work normally under general conditions. Usually, air pressure is related to the
   cement line size, delivery distance and type of cement. If the dry bulk cement delivery system
   pressure drops such as the air compressor for the dry bulk cement cannot meet the system
   requirements, the cement valve should be further opened. When the cement valve is opened
   to 80%, that means the dry bulk cement tank is almost empty or the delivery line is blocked
   or the air compressor pressure is insufficient. At this time, slurry rate should be decreased.
   The cement valve should not be wet or flushed with clean water during the mixing process.
2) Double acting cylinder: PN# X00-00-483, the actuator for adjustment of opening of the
   cement valve. Either manually controlled by the manual valve or automatically controlled by
   the computer system thru solenoid valve.
                                                12-2                   http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
For details of technical parameters, operation, repair and maintenance of the 5x6 centrifugal
pump, please refer to the Operation Manual --A08010410C provided at shipment of equipment.
                                                12-3                  http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
1) Drain valve: Used to drain residual fluid in the pump after completion of job. If still have fluid,
   it will possibly damage the pump. Especially in winter the residual fluid will be frozen to
   damage the pump housing. Therefore at this period, this valve should be kept open.
2) RA56 recirculating pump: An oilfiled special-purpose centrifugal pump with features of simple
   construction, light weight, and economic and practical use.
3) Packing lubrication line and check valve: Before operations, the lube oil switch must be opened
   before operations and close after completion of operations to avoid pollution and waste caused
   by leakage of the packing.
4) Bearing lubrication: At both ends of the bearing cartridge, grease fittings are installed. The
   bearing should be regularly greased according to the job time and job temperature. Usually,
   every three months, the bearing catridge should be filled with grease by using a grease gun.
Note: Under general conditions, the recirculating centrifugal pump and the booster centrifugal
pump are used as special pumps. When one of these two pumps has a problem, the other one can
be used as substitution or one pump can be used to complete tasks of two pumps.
This section only briefly introduces the ACM-IV.1 automatic density control mixing system. For
details, please refer to the Operation Manual of ACM-IV.1.
The ACM-IV.1 automatic density control mixing system is the most advanced computerized
automatic density control system. The system can perform real-time adjustment according to the
changes slurry set density, dry bulk cement supply capability, water supply conditions and slurry
displacement to ensure the slurrys stable density.
The control system responds to three possible changes during the job: water rate, density, and
cement bulk delivery. The water flow meter measures the water rate and provides feedback to the
controller. Then the controller uses this data to set control gain values and the cement metering
valve nominal operating position. The result is that for whatever reasons the water rate changes,
the cement metering valve will be repositioned appropriately without waiting for the density
change. The controller takes density readings every second and PID algorithm uses the data
along with water rate to adjust the opening of the cement metering valve. PID coefficients vary
with throughput rate and tub volume. Usually operators like to change the set density so that they
can thicken the slurry at the tail end of the mixing. In this case, the controller calculates the new
valve position based on the current calibration, the new density and water rate. The new valve
position is not based primarily on an error signal but a known go-to position. Once it reaches
that position and still there is some error, then the PID control takes over. This error is normally
minimal. Position corrections of the cement metering valve can also be required due to irregular
and/or declining bulk cement delivery from the bulk supply. The ACM continually calculates the
actual calibration value of the valve, which is the amount of cement being delivered by the valve
at its current position. With the updated calibration and the known amount of cement required for
preset density (calculated by the ACM microprocessor) and slurry rate, the cement valve again is
driven to a go-to position.
The tub level system was designed to make the operators job easier. The operator presets the
desired tub level system before starting the job (normally, once the level has been set, it should
not need to be changed). The job should be started with the tub level system in manual operation.
Once the job has started and the tub level has reached close to the set point (desired level), then
the operator turns on the automatic tub level with the separate switch. The automatic tub level
can be switch back and forth between manual and automatic during the job. Normally it should be
left auto. When all the cement has been mixed, the tub level should be turned man so that the
remaining slurry in the tub can be pumped away without the system trying to add more water to
maintain the tub level.
The controller can be placed in a simulation mode, which is useful for operator training and
system functional verification. This mode allows the operator to control the complete system as
if he were doing a cement job but without cement. This quality training is available for each
cementer without added expense. It will help insure that operators are qualified and confident in
operating the system for an actual job. In the training mode, the operator would circulate water
through the mixer without mixing cement. The operator can adjust the cement metering valve
manually or have the ACM system control it automatically. The controller reads the valve position
and calculates an assumed bulk flow based on a microprocessor stored curve.
The controller calculates the theoretical real-time density that would have been mixed in the tub
if cement had been used. This simulation takes into account the mix water flow (job throughput
rate), tub volume, water density, and dry bulk cement absolute density. The systems functional
verification works the same as when the controller is in the training mode. All lines, cables, flow
meter, hydraulic system, feedback system and controller are tested during the simulation.
The microprocessor is capable of recording a group of job data every 1 second and storing for
300hrs. All these data can be downloaded thru the computer network interface.
On the tank, corresponding numbers as provided.
                                                 12-5                   http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
                               Section 13
                         High Pressure Manifold
The high pressure manifold mainly consists of 2" plug valves, 2"1" plug valves, 2" safety valves,
pressure transducers, high pressure straight pipes, high pressure swivel joints and high pressure
tees. All threads are 1502 integral union connections.
High pressure fluid from the plunger pump is connected the wellsite manifold through H type
manifold. An overpressure protection device is provided to avoid danger from high pressure. High
pressure fluid is released by manually-controlled 2" 1" plug valve through the pressure release
pipeline.
1.   Electronic Pressure Transducer: PN# is X00-06-200. Used to measure the fluid pressure of
     the plunger pump discharge end. The measured electronical signal is transmitted to the
     computer system.
2.   Mechanical Pressure Gauge: PN# is X04-04-927. Used to measure the fluid pressure of the
                                                13-1                   http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                       Operation and Maintenance Manual
                                                B01-00-217_A
     plunger pump discharge end and transmit the pressure to the M/D gauge on the console.
3.   Relief Valve: PN# is X05-91-628. Pressure set as working pressure of 2 plunger pumps and
     calibration
     Release valve: 2" 1" plug valve, PN# is X05-91-602, release the plunger pump pressure to
     the measuring tank.
                                             13-2                 http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
                                  Section 14
                               Electric System
14.1 POWER SUPPLY CIRCUIT
Power supply to the electric system is from the external AC power. You can use the power switch
to select your required power supply.
Due to heat generated in the use of the power switch, you can feel hot on the power packaged
enclosure. This is normal and does not affect the use. After completion of using the equipment,
we recommend that you should cut off the circuit breaker in the distribution box and pull off the
power plug when the external AC power starts to supply power to avoid damage to the switch
power for no load status of no output for long time.
NOTE:1) Disconnect the DC power supply after using the equipment, that is to switch off the
battery switch on the side of battery to avoid low voltage power-lack for the battery for no load
status for long time. 2) Periodically start the engine to recharge the battery.
Automatic density control circuit apparatus includes: water flowmeter, cement valve position
sensor, water valve position sensor, densitometer, cement valve solenoid valve, water valve
solenoid valve control, liquid indicator, high/low liquid level warning device, pressure sensor.
I water metering
                                                14-1                  http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                       Operation and Maintenance Manual
                                                 B01-00-217_A
Water flow is measured by the flowmeter and the water flow signal is then transmitted to
computer.
The flowmeter is a turbine flowmeter, the water flows through the flowmeter to drive the turbine
to rotate. Turbine blades rotate to cut the sensor magnetic field to produce a electric pulse
signal. The computer can obtain the current water flow value through collecting this pulse
signal.
The current cement valve open is turned into electrical signal through valve position sensor to
be transmitted to the computer, and then the ideal valve open is calculated by the computer
through real-time computing.
The solenoid valve is a electronic control hydraulic valve and receives the control signal from the
computer to control the hydraulic pressure direction of the two-way cylinder which drives the
cement valve to rotate to achieve the computer to control the cement valve open. The
proportional electromagnetic has the function of fine adjustment and accuracy control for valve
position.
                                                 14-2                  http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
IV. Densitometer
V. Liquid indicator
                                                14-3                  http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                        Operation and Maintenance Manual
                                                  B01-00-217_A
The liquid indicator is a guided wave rod radar liquid indicator, the radar guided wave rod dips
into the tank, after sensing the level, transmits the 4-20mA analog signal to the computer and
then to be displayed.
Radar liquid indicator transmits the signal through a metal rod. It is not easy to be interfered by
foaming; it is with stable performance, accuracy measurement, and strong anti-interference
capacity.
The metal rod on the radar liquid indicator must be cleaned after job. When there is thicker
cement cladding on the metal rod after several jobs, you can scrap the cement with abrasive
paper and related tools.
VI. High/low liquid level warning device
An electron pressure sensor is mounted on the plunger pump discharge high pressure manifolds
with a range of 105Mpa. This pressure sensor can be calibrated through computer.
                                                 14-4                  http://www.sjs.ServaCorp.com
                                  PCS-521B Twin Engine and Twin Pump Cementing Skid
                                          Operation and Maintenance Manual
                                                  B01-00-217_A
    14.3 control cabinet
    The control cabinet is of stainless steel materials. The operation panel is made up of the upper
    panel and the lower panel, distributions on the upper panel are: electric instrument and 10inch
    auto mixing display operating screen, distributions on the lower panel are: pressure display
    instrument and air-operated valve and electric switch elements.
1 2 3
5 6 7 8 9 10 11 12 13
                                                      14-5               http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                       Operation and Maintenance Manual
                                                B01-00-217_A
 10       X04-08-191    Pressure Gauge    To indicate working pressure of the hydraulic circuit of
                                          the recirculating centrifugal pump.
 11       X04-08-191    Pressure Gauge    To indicate working pressure of the hydraulic circuit of
                                          the booster centrifugal pump.
 12       X04-08-191    Pressure Gauge    To indicate working pressure of the hydraulic circuit of
                                          the backup water centrifugal pump.
 13       X04-00-548   Combination Valve To control speed of clear water, recirculating and
                                          booster centrifugal pumps.
1 2 3
6 7 8 9 10 11 12
                                                   14-6                   http://www.sjs.ServaCorp.com
                  PCS-521B Twin Engine and Twin Pump Cementing Skid
                           Operation and Maintenance Manual
                                   B01-00-217_A
9    X04-08-189     Pressure Gauge   To indicate working pressure of the hydraulic
                                     circuit of the cooling fan.
10   X00-01-755         Switch       To control shutdown of inlet valve of the
                                     engine.
11   X04-01-239       Key Switch     To control startup and shutdown of the engine.
     X04-01-240
12   X04-09-672          Throttle      To control speed of the engine.
                                     14-7                http://www.sjs.ServaCorp.com
                     PCS-521B Twin Engine and Twin Pump Cementing Skid
                             Operation and Maintenance Manual
                                     B01-00-217_A
14.4 Electric wring diagram
                                   14-8              http://www.sjs.ServaCorp.com
PCS-521B Twin Engine and Twin Pump Cementing Skid
        Operation and Maintenance Manual
                B01-00-217_A
                14-9            http://www.sjs.ServaCorp.com
PCS-521B Twin Engine and Twin Pump Cementing Skid
        Operation and Maintenance Manual
                B01-00-217_A
                14-10           http://www.sjs.ServaCorp.com
                     PCS-521B Twin Engine and Twin Pump Cementing Skid
                             Operation and Maintenance Manual
                                     B01-00-217_A
14.5 GUIDELINE FOR TROUBLESHOOTING
No
      Pls check the indicator status below the transducer:          Pls check the densitometer
       Normal: The indicator flashes 1 time per minute.             transducer for any cement
        Alarm: The indicator flashes 4 times per minute.                       cake.
                                                  14-11                      http://www.sjs.ServaCorp.com
                        PCS-521B Twin Engine and Twin Pump Cementing Skid
                                Operation and Maintenance Manual
                                        B01-00-217_A
         Check the mixing tub        Poor mixing effect causes       Poor supply capability
          for large amount of         the water-over-cement           of dry bulk cement.
         bubbles to cause air           status in the sensor.
         pocket in the sensor.
                                               14-12                   http://www.sjs.ServaCorp.com
                         PCS-521B Twin Engine and Twin Pump Cementing Skid
                                 Operation and Maintenance Manual
                                         B01-00-217_A
1. Symptom: after startup, the dry bulk cement metering valve is turned to one side
    and then stopped. At the same time, manual mode and auto mode are out of
    operation.
           After startup, the dry bulk cement metering valve is turned to one side
           and then stopped. At the same time, manual mode and auto mode are
           out of operation.
Yes
Yes
Re-calibrate
   Note: To avoid such problem to happen, we recommend the user should make a marking
   before remove the oil lines and periodically change hydraulic oil. In the cold season, you
   should conduct simulates running of the cement valve to avoid the hydraulic oil becomes
   thickened. Such thickened oil plus slight blocking of the solenoid valve will cause the job
   failure.
                                                14-13               http://www.sjs.ServaCorp.com
                              PCS-521B Twin Engine and Twin Pump Cementing Skid
                                      Operation and Maintenance Manual
                                              B01-00-217_A
14.5.4.       Symptom: After startup, the manual mode and the auto mode are out of
operation.
After startup, the manual mode and the auto mode are out of operation.
Yes No
Yes No
OK No
OK No
OK No
          Check the hydraulic oil and filter           Change the oil pump.
          element are dirty or not.
Yes
                                                      14-14                       http://www.sjs.ServaCorp.com
                          PCS-521B Twin Engine and Twin Pump Cementing Skid
                                  Operation and Maintenance Manual
                                          B01-00-217_A
14.5.5. Symptom: Whatever degree the dry bulk cement metering valve is opened, the
   displayed value is always 0% or 100%.
             Whatever degree the dry bulk cement metering valve is opened, the
                             displayed value is always 0% or 100%.
OK No
Yes
Yes No
                                No
                                                                     Pls contact us.
                                                  14-15                      http://www.sjs.ServaCorp.com
                         PCS-521B Twin Engine and Twin Pump Cementing Skid
                                 Operation and Maintenance Manual
                                         B01-00-217_A
Yes No
           Check the connection of the related cable        Input the correct factor.
           and the plug is OK or not.
Yes
No
                                                 14-16                 http://www.sjs.ServaCorp.com
                           PCS-521B Twin Engine and Twin Pump Cementing Skid
                                   Operation and Maintenance Manual
                                           B01-00-217_A
14.5.7. Symptom: Indication of the clear water rate, but no real rate passes through the
   metering gauge.
No Yes
                   Check the gap between the                      Cancel the simulation and return
              electro-magnetic sensor and the flow                  back to the normal status.
                       meter is too small.
                                Yes                                No
                 Adjust the distance to the                Pls contact us.
                   appropriate position.
                                                   14-17                      http://www.sjs.ServaCorp.com
                         PCS-521B Twin Engine and Twin Pump Cementing Skid
                                 Operation and Maintenance Manual
                                         B01-00-217_A
                                               14-18              http://www.sjs.ServaCorp.com
                            PCS-521B Twin Engine and Twin Pump Cementing Skid
                                    Operation and Maintenance Manual
                                            B01-00-217_A
                                         No
                                                           Clean the detector head.
No
14-19 http://www.sjs.ServaCorp.com