Item/Description Schedule Cost Progress Report

This document provides a project schedule and budgetary costs for a proposed 2-storey residential building from January to June. It outlines the project in divisions including general requirements, site construction, concrete, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveying systems, mechanical and electrical. For each month it shows the targeted percentage of work to be completed that week, the actual percentage, the targeted percentage of project accomplishment and the cumulative percentage accomplished. It is prepared by Jason B. Villa, a BS in Architecture student.

Uploaded by

Jason Villa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views8 pages

Item/Description Schedule Cost Progress Report

This document provides a project schedule and budgetary costs for a proposed 2-storey residential building from January to June. It outlines the project in divisions including general requirements, site construction, concrete, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveying systems, mechanical and electrical. For each month it shows the targeted percentage of work to be completed that week, the actual percentage, the targeted percentage of project accomplishment and the cumulative percentage accomplished. It is prepared by Jason B. Villa, a BS in Architecture student.

Uploaded by

Jason Villa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

PROJECT: PROPOSED 2-STOREY RESIDENTIAL BUILDING

SUBJECT: PROJECT SCHEDULE & BUDGETARY COSTS


DATE: JULY 27, 2015
JANUARY FEBRUARY MARCH APRIL
SCHEDULE COST PROGRESS REPORT
ITEM/DESCRIPTION DURATI ITEM WK1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 11 WK 12 WK 13 WK 14 WK 15 WK 16 WK 17
ON START FINISH COST WT% % ACCOMPLISHED ACTUAL WT%
Division 1 - General Requirements
1 - Summary
2 - Price and Payment Procedures
3 - Administrative Requirements
4 - Quality Requirements
5 - Temporary Facilities and Controls
6 - Product Requirements
7 - Execution Requirements
8 - Facility Operation
9 - Facility Decommissioning
Division 2 - Site Construction
1 - Basic Site Materials and Methods
2 - Site Remediation
3 - Site Preparation
4 - Earthwork
5 - Tunneling, Boring and Jacking
6 - Foundation and Load-Bearing
Elements
7 - Utility Services
8 - Drainage and Containment
9 - Bases, Ballasts, Pavements and
Appurtenances
10 - Planting
Division 3 - Concrete
1 - Basic Concrete Materials and
Methods
2 - Concrete Forms and Accessories
3 - Concrete Reinforcement
4 - Cast-In-Place Concrete
5 - Cementitious Decks and
Underlayment
6 - Grouts
7 - Mass Concrete
Division 4 - Masonry
1 - Basic Masonry Materials and
Methods
2 - Masonry Units
3 - Stone
Division 5 - Metals
1 - Basic Metal Materials and
Methods
2 - Structural Metal Framing
3 - Ornamental Metal
4 - Expansion Control
Division 6 - Wood and Plastics
1 - Basic Wood and Plastic Materials
and Methods
2 - Rough Carpentry
3 - Finish Carpentry
4 - Architectural Woodwork
5 - Plastic Fabrications
Division 7 - Thermal and Moisture
Protection
1 - Basic Thermal and Moisture
Protection Materials and Methods
2 - Damproofing and Waterproofing
3 - Thermal Protection
4 - Shingles, Roof Tiles, and Roof
Coverings
5 - Roofing and Siding Panels
6 - Membrane Roofing
7 - Flashing and Sheet Metal
8 - Roof Specialties and Accessories
9 - Fire and Smoke Protection
Division 8 - Doors and Windows
1 - Basic Door and Window Materials
and Methods
2 - Metal Doors and Frames
3 - Wood and Plastic Doors
4 - Windows
5 - Skylights
6 - Hardware
7 - Glazing
8 - Glazed Curtain Wall
Division 9 - Finishes
1 - Basic Finish Materials and
Methods
2 - Plaster and Gypsum Board
3 - Tile
4 - Terrazzo
5 - Ceilings
6 - Flooring
7 - Wall Finishes
8 - Acoustical Treatment
9 - Paints and Coatings
Division 10 - Specialties
1 - Visual Display Boards
2 - Louvers and Vents
4 - Service Walls
5 - Wall and Corner Guards
6 - Fire Protection Specialties
7 - Protective Covers
8 - Partitions
9 - Storage Shelving
10 - Exterior Protection
11 - Telephone Specialties
12 - Toilet, Bath, and Laundry
Specialties
13 - Wardrobe and Closet Specialties
Division 11 - Equipment
1 - Maintenance Equipment
2 - Vehicle Service Equipment
3 - Solid Waste Handling Equipment
4 - Water Supply and Treatment
Equipment
5 - Hydraulic Gates and Valves
6 - Fluid Waste Treatment and
Disposal Equipment
7 - Residential Equipment
8 - Unit Kitchens
Division 12 - Furnishings
1 - Fabrics
2 - Furnishings and Accessories
3 - Furniture
4 - Interior Plants and Planters
Division 13 - Special Construction
1 - Building Modules
2 - Lightning Protection
3 - Security Access and Surveillance
4 - Detection and Alarm
5 - Fire Suppression
Division 14 - Conveying Systems
1 Scaffolding
Division 15 - Mechanical
1 - Basic Mechanical Materials and
Methods
2 - Process Piping
3 - Fire Protection Piping
4 - Plumbing Fixtures and
Equipment
5 - Refrigeration Equipment
6 - Heating, Ventilating, and Air
Condition Equipment
Division 16 - Electrical
1 - Basic Electrical Materials and
Methods
2 - Wiring Methods
3 - Electrical Power
4 - Transmission and Distribution
5 - Low-Voltage Distribution
6 - Lighting
CONTINGENCIES
TOTAL
TARGET % OF THE WEEK
ACTUAL % OF THE WEEK
TARGET % ACCOMPLISHMENT
COMMULATIVE %
ACCOMPLISHMENT
STATUS
Prepared By:

Jason B. Villa
BS-ARCHITECTURE 5-A
PRIL MAY JUNE
WK 17 WK 18 WK 19 WK 20 WK 21 WK 22 WK 23 WK 24 WK 25 WK 26 WK 27