FL - Execution
FL - Execution
Formatted: Font: 8 pt
                                                                                                             Formatted: Font: 8 pt
To view non-printing Editor's Notes that provide guidance for editing, click on MasterWorks/Single-
File Formatting/Toggle/Editor's Notes.
To read detailed research, technical information about products and materials, and coordination
checklists, click on MasterWorks/Supporting Information.
PART 1 - GENERAL
      A.   Drawings and general provisions of the Contract, including General and Supplementary
           Special Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
           1.      Construction layout.
           2.      Field engineering and surveying.
           3.      Installation of the Work.
           4.      Cutting and patching.
           5.      Coordination of OwnerRoyal Commission-installed products.
           6.      Progress cleaning.
           7.      Starting and adjusting.
           8.      Protection of installed construction.
B. Related Requirements:
1.3 DEFINITIONS
      A.   Cutting: Removal of in-place construction necessary to permit installation or performance of      Formatted: Font: 8 pt
           subsequent work.                                                                                  Formatted: Font: 8 pt
                                                                                                             Formatted: Font: 8 pt
                                                                                                             Formatted: Font: 8 pt
A. Cutting and Patching Conference: Conduct conference at [Project site] <Insert location>.
                   a.      Contractor's superintendent.
                   b.      Trade supervisor responsible for cutting operations.
                   c.      Trade supervisor(s) responsible for patching of each type of substrate.
                   d.      Mechanical, electrical, and utilities subcontractors' supervisors, to the extent
                           each trade is affecting by cutting and patching operations.
      C.   Cutting and Patching Plan: Submit plan describing procedures at least [10] <Insert
           number> days prior to the time cutting and patching will be performed. Include the
           following information:
           1.      Extent: Describe reason for and extent of each occurrence of cutting and patching.
           2.      Changes to In-Place Construction: Describe anticipated results. Include changes to
                   structural elements and operating components as well as changes in building
                   appearance and other significant visual elements.
           3.      Products: List products to be used for patching and firms or entities that will perform
                   patching work.
           4.      Dates: Indicate when cutting and patching will be performed.
           5.      Utilities and Mechanical and Electrical Systems: List services and systems that
                   cutting and patching procedures will disturb or affect. List services and systems that
                   will be relocated and those that will be temporarily out of service. Indicate length of
                   time permanent services and systems will be disrupted.
      D.   Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept
           hazardous materials, for hazardous waste disposal.                                                    Formatted: Font: 8 pt
                                                                                                                 Formatted: Font: 8 pt
      E.   Certified Surveys: Submit [two] <Insert number> copies signed by [land surveyor]
           [professional engineer].                                                                              Formatted: Font: 8 pt
                                                                                                                 Formatted: Font: 8 pt
      B.   Cutting and Patching: Comply with requirements for and limitations on cutting and patching
           of construction elements.
           3.      Other Construction Elements: Do not cut and patch other construction elements or
                   components in a manner that could change their load-carrying capacity, that results in
                   reducing their capacity to perform as intended, or that results in increased
                   maintenance or decreased operational life or safety.[ Other construction elements
                   include but are not limited to the following:]
PART 2 - PRODUCTS
2.1 MATERIALS
           1.      For projects requiring compliance with sustainable design and construction practices
                   and procedures, use products for patching that comply with sustainable design
                   requirements.
      B.   In-Place Materials: Use materials for patching identical to in-place materials. For exposed
           surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent
           possible.
           1.      If identical materials are unavailable or cannot be used, use materials that, when
                   installed, will provide a match acceptable to ArchitectRoyal Commission for the
                   visual and functional performance of in-place materials.
PART 3 - EXECUTION
3.1 EXAMINATION
      A.   Existing Conditions: The existence and location of underground and other utilities and
           construction indicated as existing are not guaranteed. Before beginning sitework, investigate
           and verify the existence and location of underground utilities,[ mechanical and electrical
           systems,] and other construction affecting the Work.
           1.      Before construction, verify the location and invert elevation at points of connection of
                   sanitary sewer, storm sewer, and water-service piping; underground electrical
                   services; and other utilities.
           2.      Furnish location data for work related to Project that must be performed by public
                   utilities serving Project site.
      B.   Examination and Acceptance of Conditions: Before proceeding with each component of the
           Work, examine substrates, areas, and conditions, with Installer or Applicator present where
           indicated, for compliance with requirements for installation tolerances and other conditions
           affecting performance. Record observations.
           1.      Examine roughing-in for mechanical and electrical systems to verify actual locations
                   of connections before equipment and fixture installation.
           2.      Examine walls, floors, and roofs for suitable conditions where products and systems
                                                                                                                 Formatted: Font: 8 pt
                   are to be installed.
           3.      Verify compatibility with and suitability of substrates, including compatibility with         Formatted: Font: 8 pt
                   existing finishes or primers.                                                                 Formatted: Font: 8 pt
                                                                                                                 Formatted: Font: 8 pt
      D.   Proceed with installation only after unsatisfactory conditions have been corrected.
           Proceeding with the Work indicates acceptance of surfaces and conditions.
3.2 PREPARATION
      B.   Field Measurements: Take field measurements as required to fit the Work properly.
           Recheck measurements before installing each product. Where portions of the Work are
           indicated to fit to other construction, verify dimensions of other construction by field
           measurements before fabrication. Coordinate fabrication schedule with construction
           progress to avoid delaying the Work.
      D.   Review of Contract Documents and Field Conditions: Immediately on discovery of the need
           for clarification of the Contract Documents caused by differing field conditions outside the
           control of Contractor, submit a request for information to ArchitectRoyal Commission
           according to requirements in Section 013100 "Project Management and Coordination."
      A.   Verification: Before proceeding to lay out the Work, verify layout information shown on
           Drawings, in relation to the property survey and existing benchmarks. If discrepancies are
           discovered, notify ArchitectRoyal Commissions [ and Construction Manager] promptly.                 Formatted: Font: Not Bold
      B.   General: Engage a [land surveyor] [professional engineer] to lay out the Work using
           accepted surveying practices.
           1.      Establish benchmarks and control points to set lines and levels at each story of
                   construction and elsewhere as needed to locate each element of Project.
           2.      Establish limits on use of Project site.
           3.      Establish dimensions within tolerances indicated. Do not scale Drawings to obtain
                   required dimensions.
           4.      Inform installers of lines and levels to which they must comply.
           5.      Check the location, level and plumb, of every major element as the Work progresses.
           6.      Notify ArchitectRoyal Commissions [ and Construction Manager] when deviations               Formatted: Font: Not Bold
                   from required lines and levels exceed allowable tolerances.                                  Formatted: Font: 8 pt
           7.      Close site surveys with an error of closure equal to or less than the standard
                                                                                                                Formatted: Font: 8 pt
                   established by authorities having jurisdiction.
                                                                                                                Formatted: Font: 8 pt
                                                                                                                Formatted: Font: 8 pt
      E.   Record Log: Maintain a log of layout control work. Record deviations from required lines
           and levels. Include beginning and ending dates and times of surveys, weather conditions,
           name and duty of each survey party member, and types of instruments and tapes used. Make
           the log available for reference by ArchitectRoyal Commissions [ and Construction                  Formatted: Font: Not Bold
           Manager].
      B.   Reference Points: Locate existing permanent benchmarks, control points, and similar
           reference points before beginning the Work. Preserve and protect permanent benchmarks
           and control points during construction operations.
           1.      Do not change or relocate existing benchmarks or control points without prior written
                   approval of ArchitectRoyal Commission[ or Construction Manager]. Report lost or
                   destroyed permanent benchmarks or control points promptly. Report the need to
                   relocate permanent benchmarks or control points to ArchitectRoyal Commission[ and
                   Construction Manager] before proceeding.
           2.      Replace lost or destroyed permanent benchmarks and control points promptly. Base
                   replacements on the original survey control points.
           1.      Record benchmark locations, with horizontal and vertical data, on Project Record
                   Documents.
           2.      Where the actual location or elevation of layout points cannot be marked, provide
                   temporary reference points sufficient to locate the Work.
           3.      Remove temporary reference points when no longer needed. Restore marked
                   construction to its original condition.
      D.   Certified Survey: On completion of foundation walls, major site improvements, and other
           work requiring field-engineering services, prepare a certified survey showing dimensions,
           locations, angles, and elevations of construction and sitework.
      E.   Final Property Survey: Engage a [land surveyor] [professional engineer] to prepare a final
           property survey showing significant features (real property) for Project. Include on the
           survey a certification, signed by [land surveyor] [professional engineer], that principal
           metes, bounds, lines, and levels of Project are accurately positioned as shown on the survey.
                                                                                                              Formatted: Font: 8 pt
           1.      Show boundary lines, monuments, streets, site improvements and utilities, existing
                                                                                                              Formatted: Font: 8 pt
                   improvements and significant vegetation, adjoining properties, acreage, grade
                   contours, and the distance and bearing from a site corner to a legal point.                Formatted: Font: 8 pt
                                                                                                              Formatted: Font: 8 pt
3.5 INSTALLATION
      A.   General: Locate the Work and components of the Work accurately, in correct alignment and
           elevation, as indicated.
      C.   Install products at the time and under conditions that will ensure the best possible results.
           Maintain conditions required for product performance until Substantial Completion.
      F.   Tools and Equipment: Where possible, select tools or equipment that minimize production
           of excessive noise levels.
      G.   Templates: Obtain and distribute to the parties involved templates for work specified to be
           factory prepared and field installed. Check Shop Drawings of other portions of the Work to
           confirm that adequate provisions are made for locating and installing products to comply
           with indicated requirements.
      H.   Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate
           size and number to securely anchor each component in place, accurately located and aligned
           with other portions of the Work. Where size and type of attachments are not indicated,
           verify size and type required for load conditions.
           1.      Mounting Heights: Where mounting heights are not indicated, mount components at
                   heights directed by ArchitectRoyal Commission.
           2.      Allow for building movement, including thermal expansion and contraction.
           3.      Coordinate installation of anchorages. Furnish setting drawings, templates, and
                   directions for installing anchorages, including sleeves, concrete inserts, anchor bolts,
                   and items with integral anchors, that are to be embedded in concrete or masonry.
                   Deliver such items to Project site in time for installation.
      I.   Joints: Make joints of uniform width. Where joint locations in exposed work are not
           indicated, arrange joints for the best visual effect. Fit exposed connections together to form        Formatted: Font: 8 pt
           hairline joints.
                                                                                                                 Formatted: Font: 8 pt
      J.   Repair or remove and replace damaged, defective, or nonconforming Work.                               Formatted: Font: 8 pt
                                                                                                                 Formatted: Font: 8 pt
      A.   Cutting and Patching, General: Employ skilled workers to perform cutting and patching.
           Proceed with cutting and patching at the earliest feasible time, and complete without delay.
      B.   Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or
           damaged during installation or cutting and patching operations, by methods and with
           materials so as not to void existing warranties.
      D.   Protection: Protect in-place construction during cutting and patching to prevent damage.
           Provide protection from adverse weather conditions for portions of Project that might be
           exposed during cutting and patching operations.
      E.   Adjacent Occupied Areas: Where interference with use of adjoining areas or interruption of
           free passage to adjoining areas is unavoidable, coordinate cutting and patching according to
           requirements in Section 011000 "Summary."
      G.   Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and
           similar operations, including excavation, using methods least likely to damage elements
           retained or adjoining construction. If possible, review proposed procedures with original
           Installer; comply with original Installer's written recommendations.
           1.      In general, use hand or small power tools designed for sawing and grinding, not
                   hammering and chopping. Cut holes and slots neatly to minimum size required, and
                   with minimum disturbance of adjacent surfaces. Temporarily cover openings when
                   not in use.
           2.      Finished Surfaces: Cut or drill from the exposed or finished side into concealed
                   surfaces.
           3.      [Concrete] [and] [Masonry]: Cut using a cutting machine, such as an abrasive saw
                   or a diamond-core drill.
           4.      Excavating and Backfilling: Comply with requirements in applicable Sections where
                   required by cutting and patching operations.
           5.      Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to
                   be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to
                   prevent entrance of moisture or other foreign matter after cutting.
           6.      Proceed with patching after construction operations requiring cutting are complete.
      H.   Patching: Patch construction by filling, repairing, refinishing, closing up, and similar           Formatted: Font: 8 pt
           operations following performance of other work. Patch with durable seams that are as
                                                                                                              Formatted: Font: 8 pt
           invisible as practicable. Provide materials and comply with installation requirements
           specified in other Sections, where applicable.                                                     Formatted: Font: 8 pt
                                                                                                              Formatted: Font: 8 pt
                   a.      Clean piping, conduit, and similar features before applying paint or other
                           finishing materials.
                   b.      Restore damaged pipe covering to its original condition.
           3.      Floors and Walls: Where walls or partitions that are removed extend one finished area
                   into another, patch and repair floor and wall surfaces in the new space. Provide an
                   even surface of uniform finish, color, texture, and appearance. Remove in-place floor
                   and wall coverings and replace with new materials, if necessary, to achieve uniform
                   color and appearance.
                   a.      Where patching occurs in a painted surface, prepare substrate and apply primer
                           and intermediate paint coats appropriate for substrate over the patch, and apply
                           final paint coat over entire unbroken surface containing the patch. Provide
                           additional coats until patch blends with adjacent surfaces.
      I.   Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint,
           mortar, oils, putty, and similar materials from adjacent finished surfaces.
      A.   Site Access: Provide access to Project site for OwnerRoyal Commission's construction
           personnel.
      B.   Coordination: Coordinate construction and operations of the Work with work performed by
           OwnerRoyal Commission's construction personnel.
           4.      Coordinate progress cleaning for joint-use areas where Contractor and other
                   contractors are working concurrently.
      C.   Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for
           proper execution of the Work.
      D.   Installed Work: Keep installed work clean. Clean installed surfaces according to written
           instructions of manufacturer or fabricator of product installed, using only cleaning materials
           specifically recommended. If specific cleaning materials are not recommended, use cleaning
           materials that are not hazardous to health or property and that will not damage exposed
           surfaces.
E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.
      F.   Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to
           ensure freedom from damage and deterioration at time of Substantial Completion.
      G.   Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials
           down sewers or into waterways. Comply with waste disposal requirements in
           [Section 015000 "Temporary Facilities and Controls."] [Section 017419 "Construction
           Waste Management and Disposal."]
      H.   During handling and installation, clean and protect construction in progress and adjoining
           materials already in place. Apply protective covering where required to ensure protection
           from damage or deterioration at Substantial Completion.
   D.      Test each piece of equipment to verify proper operation. Test and adjust controls and
           safeties. Replace damaged and malfunctioning controls and equipment.
   A.      Provide final protection and maintain conditions that ensure installed Work is without
           damage or deterioration at time of Substantial Completion.
   B.      Protection of Existing Items: Provide protection and ensure that existing items to remain
           undisturbed by construction are maintained in condition that existed at commencement of
           the Work.
C. Comply with manufacturer's written instructions for temperature and relative humidity.
                                                                                                             Formatted: Font: 8 pt
                                                                                                             Formatted: Font: 8 pt
                                                                                                             Formatted: Font: 8 pt
                                                                                                             Formatted: Font: 8 pt