0% found this document useful (0 votes)
45 views1 page

Space Design Load Summary For CORRIDOR 4b

The document provides a space design load summary for Corridor 4b in Barka Mall. It includes tables that list the component cooling and heating loads for the corridor, including loads from the roof, skylights, overhead lighting, people, and other sources. The total calculated cooling load is 46,645 Watts sensible and 7,302 Watts latent. The total calculated heating load is 3,776 Watts sensible and 0 Watts latent.

Uploaded by

mechmohsin4745
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views1 page

Space Design Load Summary For CORRIDOR 4b

The document provides a space design load summary for Corridor 4b in Barka Mall. It includes tables that list the component cooling and heating loads for the corridor, including loads from the roof, skylights, overhead lighting, people, and other sources. The total calculated cooling load is 46,645 Watts sensible and 7,302 Watts latent. The total calculated heating load is 3,776 Watts sensible and 0 Watts latent.

Uploaded by

mechmohsin4745
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 1

Space Design Load Summary for CORRIDOR 4b

Project Name: 21014 BARKA MALL R4 08/01/2017


Prepared by: Amjaad 07:56AM

TABLE 1.1.A. COMPONENT LOADS FOR SPACE '' CORRIDOR 4b '' IN ZONE '' Zone 1 ''
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Jun 1300 HEATING DATA AT DES HTG
COOLING OA DB / WB 44.5 C / 29.8 C HEATING OA DB / WB 12.0 C / 10.0 C
OCCUPIED T-STAT 21.0 C OCCUPIED T-STAT 20.0 C
Sensible Latent Sensible Latent
SPACE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 47 m 16457 - 47 m - -
Wall Transmission 0 m 0 - 0 m 0 -
Roof Transmission 267 m 2820 - 267 m 2161 -
Window Transmission 0 m 0 - 0 m 0 -
Skylight Transmission 47 m 4472 - 47 m 1615 -
Door Loads 0 m 0 - 0 m 0 -
Floor Transmission 0 m 0 - 0 m 0 -
Partitions 211 m 5148 - 211 m 0 -
Ceiling 0 m 0 - 0 m 0 -
Overhead Lighting 11738 W 8216 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 1565 W 1565 - 0 0 -
People 52 4512 6954 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 8% / 5% 3455 348 0% 0 0
>> Total Zone Loads - 46645 7302 - 3776 0

TABLE 1.1.B. ENVELOPE LOADS FOR SPACE '' CORRIDOR 4b '' IN ZONE '' Zone 1 ''
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(m) (W/(m-K)) Coeff. (W) (W) (W)
H EXPOSURE
ROOF 267 1.014 - 2820 - 2161
SKYLIGHT 47 4.342 0.782 4472 16457 1615