Client : SEC-EOA Riyadh Power Plant # 10 "
Contractor: BEMCO 10721026/00'
Sub Cont:
Orifice Plate Verification Report Form No: TS-I4002
Dtae: 13/02/09 Rev: 0
Tag No. : Type :
Make : P&ID No :
Line Size : Plate Dia(D) :
Plate Thickness : Bore Dia(d) :
Plate Material : Service :
Location : Date of Calibration :
Verification as per Data sheet :
Yes No
Tag no is correct :
Plate Thickness is correct :
Plate material is correct :
Bore dia is correct :
Plate dia is correct :
Vent / Drain holes are correct :
Test Equipment Used
Equip.Make
Equip.Model No
Equip.Sl.No
Equip.Calibration Certification No
Equip.Calibration Validity
Remarks
Company SUB CONTRACTOR ARABIAN BEMCO SEC
Signature
Name
Date
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont:
Verification of Thermowell Form No: TS-I4003
Dtae: 13/02/09 Rev: 0
Tag No. : Name/ Appln :
Flange rating : Type :
End connection : Make :
Insertion Length : Service
Verification as per Data sheet :
Yes No
Tag no is correct :
Thermowell length is correct :
Process connection is correct :
Material is correct :
Thermoelement length is
:
correct
Test Equipment Used
Equip.Make
Equip.Model No
Equip.Sl.No
Equip.Calibration Certification No
Equip.Calibration Validity
Remarks
Company SUB CONTRACTOR ARABIAN BEMCO SEC
Signature
Name
Date
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont:
INSTRUMENT CALIBRATION REPORT FOR
Form No: TS-I4004
TEMPERATURE ELEMENT
Dtae: 13/02/09 Rev: 0
NAME/APPLN :
TAG NO. : AREA/LOCATION :
TYPE : MAKE :
MODEL NO : RANGE :
P & ID NO. : SERVICE :
DATA SHEET REF : DATE OF CALIBRATION :
INST. SERIAL NO :
PRE-CALIBRATION INSPECTION :
TAG NUMBER CORRECT : YES / NO COMPLIANCE WITH SPECS. : YES / NO
GENERAL CONDITION SATISFACTORY : YES / NO INPUT RANGE :
BODY MATERIAL CORRECT : YES / NO OUTPUT RANGE :
AMBIENT CONDITION: FIELD/LAB ______________
TEST EQUIPMENT USED :
EQUIPMENT TYPE : RANGE :
EQUIPMENT SERIAL NO. : ACCURACY :
MAKE / MODEL : CALIBRATION DATE :
CERTIFICATE NO. : RE-CALIBRATION DUE :
INPUT OUTPUT IN Ohm/Mv % ERROR REMARKS
% Deg C OBSERVED EXPECTED
REMARKS :
SUB CONTRACTOR ARABIAN BEMCO SEC
SIGN
NAME
DATE
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont:
INSTRUMENT CALIBRATION REPORT
(TRANSMITTERS) Form No: TS-I4005
Dtae: 13/02/09 Rev: 0
TAG NO. : INSTRUMENT DESCRIPTION :__________________________
TYPE : AREA/LOCATION :__________________________
MAKE/MODEL : CALIBRATION RANGE: :__________________________
P & ID NO. : SPECIFIED ACCURACY: :__________________________
DATA SHEET REF. : SERVICE DESCRIPTION: :__________________________
INST. SERIAL NO : DATE OF CALIBRATION: :_______________________
PRE-CALIBRATION INSPECTION :
TAG NUMBER CORRECT SAFETY PROTECTION :
GENERAL CONDITION SATISFACTION INPUT CALIBRATION RANGE :
COMPLIANCE WITH SPECIFICATION OUTPUT CALIBRATION RANGE :
ZERO ELEVATION /SUPRESSION (IN ENGG. UNIT) :
AMBIENT CONDITION : FIELD / LAB. TEMP. : HUMIDITY :
TRANSMITTER DETAILS :
COMMUNICATION
TYPE OUTPUT FORM FAIL SAFE DIRECTION
MODE
SMART ANALOG LINEAR BURNOUT UPSCALE FAIL TO UPSCALE
ANALOG DIGITAL SQRT BURNOUT DOWNSCALE FAIL TO DOWNSCALE
HART SPECIAL BURNOUT LAST GOOD VALUE UNDEFINED
TEST EQUIPMENT USED :
EQUIPMENT TYPE : RANGE :
EQUIP. SERIAL NO. : ACCURACY :
MAKE : : CALIBRATED DATE :
CERTIFICATE NO. : CALIBRATION DUE DATE :
RESULT :
% OF CALIBRATED EXPECTED OUTPUT %
ACTUAL INPUT ACTUAL OUTPUT % ERROR REMARKS
SPAN OR mA
0%
25%
50%
75%
100%
75%
50%
25%
0%
REMARKS :
SUB CONTRACTOR ARABIAN BEMCO SEC
SIGN
NAME
DATE
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont:
SWITCH CALIBRATION REPORT ( PS/TS/LS-DPS ) Form No: TS-I4006
Date: 13/02/09 Rev: 0
TAG NO : _______________________ INSTRUMENT DESCRIPTION: __________________________
TYPE : _______________________ AREA/LOCATION : _________________________
MAKE / MODEL : _______________________ CALIBRATION RANGE : __________________________
P & ID NO : _______________________ SPECIFIED ACCURACY : __________________________
DATA SHEET NO & PAGE :____________________ SERVICE DESCRIPTION : _________________________
INSTRUMENT SERIAL NO :____________________ DATE OF CALIBRATION : __________________________
PRE- CALIBRATION INSPECTION :
VALVE FUNCTION CORRECTLY Y/N OPENING TIME : ______________ Sec
VALVE ACCUMULATOR FITTED Y/N CLOSING TIME : ______________ Sec
OPERATION OF ACCUMULATOR CHECKED Y/N ACCUMULATOR PRE CHARGE TO : _______ BAR
VALVE ACTION ON AIR / POWER FAILURE : FAIL OPEN / FAIL CLOSE
ZERO ELEVATION / SUPRESSION ( IN ENGG UNITS ) : __________________
AMBIENT CONDITION : FIELD / LAB TEMP : ________ HUMIDITY :___________
VALVE DETAILS :
COMMUNICATION
TYPE MODE OUTPUT FORM
SMART ANALOG LINEAR
ANALOG DIGITAL SQRT
HART SPECIAL
TEST EQUIPMENT :
TYPE OF EQPT MAKE MODEL # SERIAL # CERT NO CAL DATE EXP DATE
RESULTS :
INPUT % ACTUAL INPUT ACTUAL OUTPUT EXPECTED OUTPUT % ERROR REMARKS
0
25
50
75
100
75
50
25
0
REMARKS :
SUBCONTRACTOR BEMCO SEC
SIGN
NAME
DATE
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont:
LOCAL INSTRUMENT CALIBRATION REPORT (
PG/TG/LG ) Form No: TS-4007
Date: 13/02/09 Rev: 0
TAG NO : _______________________ INSTRUMENT DESCRIPTION: ___________________________
TYPE : _______________________ AREA/LOCATION : _________________________
MAKE / MODEL : _______________________ CALIBRATION RANGE : __________________________
P & ID NO : _______________________ SPECIFIED ACCURACY : __________________________
DATA SHEET NO & PAGE :____________________ SERVICE DESCRIPTION : _________________________
INSTRUMENT SERIAL NO :____________________ DATE OF CALIBRATION : __________________________
PRE- CALIBRATION INSPECTION
TAG NUMBER CORRECT Y/N COMPLIANCE WITH SPECIFICATION: _____________
GENERAL CONDITION SATISFACTORY Y/N INPUT CALIBRATION RANGE : ______________
BODY MATERIAL CORRECT Y/N OUTPUT CALIBRATION RANGE : ______________
NAME PLATE AVAILABLE Y/N ACCURACY : ______________
INITIAL / FINAL TIMER SETTING Y/N
ZERO ELEVATION / SUPRESSION ( IN ENGG UNITS ) : __________________
AMBIENT CONDITION : FIELD / LAB TEMP : ________ HUMIDITY :___________
TEST EQUIPMENT USED :
TYPE OF EQPT MAKE MODEL # SERIAL # CERT NO CAL DATE EXP DATE
TEST RESULTS :
INPUT % APPLIED INPUT BAR INSTRUMENT READING % ERROR REMARKS
deg c
deg C
0
25
50
75
100
75
50
25
0
REMARKS :
SUBCONTRACTOR BEMCO SEC / SAUD CONSULT
SIGN
NAME
DATE
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont: INSTRUMENT LOOP TEST SHEET - PRESSURE /
LEVEL / FLOW / TEMPERATURE TRANSMITTER / Form No: TS-I4008
OTHER TRANSMITTERS Dtae: 13/02/09 Rev: 0
INSTRUMENT KKS NO : ___________________________________
INSTRUMENT DESCRIPTION : ___________________________________
SERVICE : ___________________________________
REFERENCE P&I DIAGRAM : ___________________________________
REFERENCE LOOP DIAGRAM : ___________________________________
MANUFACTURER : ___________________________________
TYPE : ___________________________________
MODEL : ___________________________________
RANGE : ___________________________________
INPUT SIGNAL : ___________________________________
CABLE CONTINUITY TEST/ IR TEST OK NA
DOUBLE/TRIPLE MEASUREMENT OK NA
DISCREPANCY OK NA
TREND OK NA
TOTALIZER OK NA
MEASURE TRANSMITTER DCS MEASURE TRANSMITTER DCS
INPUT OUTPUT INDICATION INPUT OUTPUT INDICATION
0% 75%
25% 50%
50% 25%
75% 0%
100%
OVER RANGE
UNDER RANGE
STATIC HEAD CORRECTION (PRESSURE TRANSMITTERS) ..mm of liquid column
THRESHOLDS
SET ERROR SWITCHING VALUE
THRESHOL LOGIC
% During During DEAD BAND ALARM
DS Value FUNCTION
Meas. Percentage Increase Decrease
INVALID SIGNAL
MAX 2
MAX 1
MIN 1
MIN 2
REMARKS:
SUBCONTRACTOR ARABIAN BEMCO SEC / SAUD CONSULT
SIGNATURE
NAME
DATE
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont:
INSTRUMENT LOOP TEST SHEET - RTD Form No: TS-I4009
Dtae: 13/02/09 Rev:
INSTRUMENT DESCRIPTION : ___________________________________
SERVICE : ___________________________________
K.K.S.NUMBER : ___________________________________
REFERENCE P&I DIAGRAM : ___________________________________
REFERENCE LOOP DIAGRAM : ___________________________________
MANUFACTURER : ___________________________________
TYPE : ___________________________________
MODEL : ___________________________________
RANGE ___________________________________
INPUT SIGNAL : RTD PT-100(
CABLE CONTINUITY TEST / IR TEST OK NA
DOUBLE/TRIPLE MEASUREMENT OK NA
DISCREPANCY OK NA
TREND OK NA
TOTALIZER OK NA
0
RESISTANCE VALUE DCS INDICATION C
0
100 =0 C
THRESHOLDS
SET ERROR SWITCHING VALUE
LOGIC
THRESHOLDS % Meas. During During DEAD BAND ALARM
Value FUNCTION
Range Percentag Increase Decrease
INVALID SIGNAL
MAX 2
MAX 1
MIN 1
MIN 2
REMARKS:
SUBCONTRACTOR ARABIAN BEMCO SEC / SAUD CONSULT
SIGNATURE
NAME
DATE
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont:
INSTRUMENT LOOP TEST SHEET - DCS DIGITAL
Form No: TS-I4010
INPUT SIGNALS ( SWITCHES )
Dtae: 13/02/09 Rev: 0
INSTRUMENT DESCRIPTION : ___________________________________
SERVICE : ___________________________________
K.K.S.NUMBER : ___________________________________
REFERENCE P&I DIAGRAM : ___________________________________
REFERENCE LOOP DIAGRAM : ___________________________________
MANUFACTURER : ___________________________________
TYPE : ___________________________________
MODEL : ___________________________________
RANGE : ___________________________________
ALARM SET POINT : ___________________________________
CABLE CONTINUITY TEST / IR TEST OK NA
DOUBLE /TRIPLE MEASUREMENT OK NA
DISCREPANCY OK NA
THRESHOLDS
SET ERROR SWITCHING VALUE
DEAD LOGIC
THRESHOLDS % Meas. During During ALARM
Value BAND FUNCTION
Range Percentage Increase Decrease
INVALID SIGNAL
MAX 2
MAX 1
SEE RELEVANT CALIBRATION CERTIFICATE FROM I&C LABORATORY
MIN 1
MIN 2
SHORT CIRCUIT
WIRE BREAK
REMARKS:
SUBCONTRACTOR ARABIAN BEMCO SEC / SAUD CONSULT
SIGNATURE
NAME
DATE
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont:
INSTRUMENT LOOP TEST SHEET- MOTOR
Form No: TS-I4011
OPERATED VALVE
Dtae: 13/02/09 Rev: 0
INSTRUMENT DESCRIPTION : ___________________________________
SERVICE : ___________________________________
K.K.S.NUMBER : ___________________________________
REFERENCE P&I DIAGRAM : ___________________________________
REFERENCE LOOP DIAGRAM : ___________________________________
MANUFACTURER : ___________________________________
TYPE : ___________________________________
SERIAL NUMBER : ___________________________________
FULL STROKE TIME OPEN / CLOSE : ________/________ Sec.
RUNNING TIME MONITORING : _________________ Sec.
OPEN : _________________ Nm
CLOSED : _________________ Nm
OK N/A
CABLE CONTINUITY TEST / IR TEST
OPEN POSITION CLOSE POSITION
VALVE LIMIT SWITCH
LIMIT
CLOSING ON TORQUE
LIMIT
OPENING ON TORQUE
TRIP INTERLOCK
RELEASE INTERLOCK
OPERATION FROM LOCAL PANEL OPEN CLOSE
OPERATION FROM LOCAL OPEN CLOSE
RUN
ALARMS ELECTRICAL FAILURE LIMIT SWITCH DISCREPANCY TIME
STATUS INDICATION ON DCS NA OPEN CLOSE FAULT
REMARKS:
SUBCONTRACTOR ARABIAN BEMCO SEC
SIGNATURE
NAME
DATE
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont:
INSTRUMENT LOOP TEST SHEET - PNEUMATIC
Form No: TS-I4012
VALVES
Dtae: 13/02/09 Rev: 0
INSTRUMENT DESCRIPTION : ___________________________________
SERVICE : ___________________________________
K.K.S.NUMBER : ___________________________________
REFERENCE P&I DIAGRAM : ___________________________________
REFERENCE LOOP DIAGRAM : ___________________________________
LOCAL PANEL NAME : ___________________________________
MANUFACTURER : ___________________________________
TYPE : ___________________________________
SOLENOID TYPE : ___________________________________
POWER SUPPLY : ___________________________________
FULL STROKE TIME OPEN / CLOSE : ________/________ Sec.
CABLE CONTINUITY TEST / IR TEST OK N/A
POWER FAIL POSITION OPEN CLOSE
AIR FAIL POSITION OPEN CLOSE
VALVE OPERATION FROM LOCAL CONTROL PANEL OPEN CLOSE
STATUS INDICATION ON DCS NA OPEN CLOSE FAULT
REMARKS:
SUBCONTRACTOR ARABIAN BEMCO SEC
SIGNATURE
NAME
DATE
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont:
Instrument Loop Test - Solenoid Valve Form No: TS-I4013
Dtae: 13/02/09 Rev: 0
INSTRUMENT DESCRIPTION : ___________________________________
SERVICE : ___________________________________
K.K.S.NUMBER : ___________________________________
REFERENCE P&I DIAGRAM : ___________________________________
REFERENCE LOOP DIAGRAM : ___________________________________
LOCAL PANEL NAME : ___________________________________
MANUFACTURER : ___________________________________
TYPE : ___________________________________
SOLENOID TYPE : ___________________________________
POWER SUPPLY : ___________________________________
CABLE CONTINUITY TEST / IR TEST OK N/A
OPERATION FROM LOCAL PANEL OPEN CLOSE
POWER FAIL POSITION OPEN CLOSE
STATUS INDICATION ON DCS NA OPEN CLOSE FAULT
REMARKS:
SUBCONTRACTOR ARABIAN BEMCO SEC
SIGNATURE
NAME
DATE
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont:
SWITCH CALIBRATION REPORT ( PS/TS/LS-DPS ) Form No: TS-I4014
Date: 13/02/09 Rev: 0
TAG NO : _______________________ INSTRUMENT DESCRIPTION :______________________
TYPE : _______________________ AREA/LOCATION : ___________________
MAKE / MODEL : _______________________ OVERRANGE : __________________________
P & ID NO : _______________________ PROOF RANGE :_________________________
INSTRUMENT SERIAL NO :____________________ DIFFERENTIAL ADJUSTABLE :_________________________
SET VALUE :________________ DIFFERENTIAL VALUE :__________________________
SERVICE :________________ DATE OF CALIBRATION :___________________________
DATA SHEET NO & PAGE :____________________
PRE- CALIBRATION INSPECTION :
TAG NUMBER CORRECT Y/N SAFETY PROTECTION : ______________
GENERAL CONDITION SATISFACTORY Y/N INPUT CALIBRATION RANGE : ______________
COMPLIANCE WITH SPECIFICATION Y/N
AMBIENT CONDITION : FIELD / LAB TEMP : ________ HUMIDITY :___________
OPEN ON RISING H SWITCH SET ___________ RESET ____________
CLOSE ON FALLING
OPEN ON RISING H H SWITCH SET ___________ RESET ____________
CLOSE ON FALLING
TEST EQUIPMENT USED :
TYPE OF EQPT MAKE MODEL # SERIAL # CERT NO CAL DATE EXP DATE
RESULTS :
NO CONTACT NC CONTACT DEAD BAND CABLE CORE
REMARKS :
SUBCONTRACTOR ARABIAN BEMCO SEC / SAUD CONSULT
SIGN
NAME
DATE
Client : SEC-EOA
Riyadh Power Plant # 10 " 10721026/00'
Contractor: BEMCO
Sub Cont:
TRUMENT & CONTROL CABLE MEGGER / CONTINUITY TEST REPOForm No: TS-I4001
Dtae: 13/02/09 Rev: 0
PANEL / JB No .: AREA/LOCATION .: REPORT No.:
DRWG. REF. NO .: APPLIED VOLTAGE .: DATE.:
CABLE SCREEN/
ITEM CONDUCTOR TO CONDUCTOR TO CONDUCTOR SHIELD TO CONTINUITY
CABLE NO. CABLE TYPE/SIZE FROM TO LENGTH - SHIELD TO REMARKS
NO. CONDUCTOR SHIELD TO ARMOUR SHIELD TEST
Mtrs ARMOUR
N/A
N/A
N/A
N/A
N/A
N/A
N/A
TYPE OF INSTRUMENT : Remarks:
INSTRUMENT NO/SR. NO. :
INSTRUMENT MAKE/MODEL :
CALIBRATION CERTIFICATE NO. :
INSTRUMENT CALIBRATION DATE/DUE :
SUB CONTRACTOR ARABIAN BEMCO SEC
Name
Signature
Date