0% found this document useful (0 votes)
49 views2 pages

Tacheometric Detailing/Stadia Field Book

IP1, IP3, R5, R10, R3, L1, T1, T2, and other points were recorded using horizontal and vertical angles as well as distance measurements from the total station located at IP2 with a height of 1.57m. Target heights, reduced levels, and coordinates were obtained for over 15 points to map the topography in the area.

Uploaded by

Prashant Sah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views2 pages

Tacheometric Detailing/Stadia Field Book

IP1, IP3, R5, R10, R3, L1, T1, T2, and other points were recorded using horizontal and vertical angles as well as distance measurements from the total station located at IP2 with a height of 1.57m. Target heights, reduced levels, and coordinates were obtained for over 15 points to map the topography in the area.

Uploaded by

Prashant Sah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Sagarmatha Engineering College

Department Of Civil Engineering


sanepa-2, lalitpur
"survey Camp 2073-Kartik, ITC of Nepal Scouts, Kakani, Nuwak
Observer: TACHEOMETRIC DETAILING/STADIA FIELD BOOK
Recorder: (Indirectly by manual booking using Total Staion)
instrument:
Instrument at :IP2 height of instrument:1.57 zero set at: IP1
Horizantal Angle (H.A) EDM DISTANCE (m) Target/Prism R.L of
Sighted To D M S Horizantal (H) Vertical (V) Height (m) points(m)
IP1 0 0 0 37.161 -5.613
IP3 97 38 17 50.336 -3.319
0+165.04 0 0 0 13.998 -3.033 2.1
R5 343 50 31 13.871 -2.094
R10 324 11 17 16.888 -1.742
0+176.508 48 49 9 -2.07
R3 51 41 8 1.894 0.248 TREE
R 238 18 21 5.858 2.131
L1 52 8 9 6.796 -2.627
T1 39 38 25 7.719 -2.277
T2 64 20 16 6.957 -2.571
0+229.348 97 38 17 13.995 -3.281
R6 129 46 11 15.912 -1.744
R10 142 22 56 17.874 -0.762
ng College
ngineering

couts, Kakani, Nuwakot"


TADIA FIELD BOOK location:
using Total Staion) weather:
Temperature:
date:

You might also like