FINAL INSPECTION
REPORT
Project No.:
Customer: Report No.: Date:
Rev.: Contract No.:
Drawing No.:
Contractor and Equipment Details
Steel Work Contractor:
Equipment Number:
The Fanial Inspection has been carried out as per given drawings the result is shown below.
Yes N/A No.
1. Dimensional Inspection after Welding of Main Beam. q q q
2. Cleaning after Welding Structural steel work. q q q
3. Straightness of Main Beam after Welding. q q q
4. Structural steel work fully bolted. q q q
Comments and Exclusions:
NAME: NAME:
DATE: DATE:
SIGNATURE: SIGNATURE:
This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the
content is strictly prohibited. © Copyrights Ordinance 2002, All rights reserved.
d out as per given drawings the result is shown below.
NAME:
DATE:
SIGNATURE:
This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the
content is strictly prohibited. © Copyrights Ordinance 2002, All rights reserved.