220/66kV ITI S/s
S.N                                                        Submissi     Engg      Action
 O              Drawings Required Very Urgent              on Date     Remarks      by
      CIVIL Drawings
      Complete Super Structure for CRB Cum 66kV GIS                   Approved
      cum Control Room Building.
      (i) Layout & Detail of Lintel Beam for CR Building
      (ii) Layout & Detail of Staircase for 66kV GIS cum              Shall be     Sankar
      CR Building                                                     submitted Pajamal
                                                                      progressive e
      (iii)Layout & Detail of Beam at Corbel level and                ly latest by
      Platform Details                                                15.12.2017
                                                           14.12.20
      (iv)Layout & Detail of Beam and Slab at              17
      Roof level
      (v) Layout & Details of Terrace & Mumty Beam &
1     Slab for CR Building
      (vi) Layout & Details of 1st Floor Beam and Slab              Civil details Sankar
      for CR Building                                               shall be      Pajamal
                                                                    submitted e
      (vii) Layout & Details of 2nd Floor Beam and Slab             by
      for CR Building                                               26.12.2017.
                                                                    Indoor        Sankar
                                                                    cable         Pajamal
                                                                    trench        e
                                                                    routing is
                                                                    under
                                                                    finalization
                                                                    and
                                                                    discussion
                                                                    with KPTCL.
                                                                    Submission
                                                                    expected
                                                                    by
                                                                    13.12.2017.
                                                                    Standard
                                                                    Cable
                                                                    trench
                                                                    section is
                                                                    already
                                                           20.12.20 approved.
2     220 KV GIS Floor with Indoor Trench Details          17       Same shall
                                                         be
                                                         followed.
                                                         Civil details
                                                         of GIS
                                                         foundation
                                                         with floor
                                                         shall be
                                                         submitted
                                                         by
                                                         20.12.2017
                                                         Expected Sankar
                                                         submission Pajamal
    RCC Details for GIB DUCT Foundations -      20.12.20 by 22.12.20 e
3   220 & 66kV GIS                              17       17
                                                         Indoor        Sankar
                                                         cable         Pajamal
                                                         trench        e
                                                         routing is
                                                         under
                                                         finalization
                                                         and
                                                         discussion
                                                         with KPTCL.
                                                         Submission
                                                         expected
                                                         by
                                                         13.12.2017.
                                                         Standard
                                                         Cable
                                                         trench
                                                         section is
                                                         already
                                                         approved.
                                                         Same shall
                                                         be
                                                         followed.
                                                         Civil details
                                                         of GIS
                                                         foundation
                                                         with floor
                                                         shall be
                                                         submitted
    66 KV GIS Floor cum CRB Floor with indoor   20.12.20 by
4   Trench Details                              17       20.12.2017
    66KV NGEF Equipment Foundation Drawings -CT,        25.12.20 SCF
5   CB, ISO, LA, BPI, CTTS.                             17       and Structu
                                                                 re height
                                                                 data
                                                                 expected
                                                                 from
                                                                 electrical
                                                                 by
                                                                 19.12.2017.
                                                                 Structure/ Ramann
                                                                 Foundation a
                                                                 design and Menda/
                                                                 drgs shall Sankar
                                                                 be          Pajamal
                                                                 submitted e
                                                                 by
                                                                 26.12.2017.
                                                                 Structure
                                                                 drawings
                                                                 shall be
                                                                 submitted
    66kv Structure Drawing for 66kv CT, LA, ISO, CTS,   25.12.20 by
6   BPI                                                 17       09.01.2018.
                                                                 This        Sankar
                                                                 foundation Pajamal
                                                                 is coming e
                                                                 in existing
                                                                 substation
                                                                 area and
                                                                 constructio
                                                                 n may not
                                                                 be feasible
                                                                 as of now.
                                                                 Expected
                                                                 submission
                                                        22.12.20 by
7   31.5 MVA Transformer Foundation Drawing             17       10.01.2018
                                                                 Approval Venkatara
                                                                             mani/
                                                                 of
                                                                             Sankar
                                                                 Transforme Pajamale
                                                                 r GA
                                                                 drawings
                                                        22.12.20 expected
8   150 MVA Transformer drawing                         17       by
                                                            15.12.2017.
                                                            Civil design
                                                            and drgs
                                                            shall be
                                                            submitted
                                                            by
                                                            22.12.2017
                                                            Vendor       SCM –
                                                            drawings Tanvi/
                                                            are still    Praful
                                                            awaited. Ci
                                                            vil design
                                                            and drgs
                                                            shall be
                                                            submitted
                                                            by within a
                                                            week of
                                                            receipt of
                                                 25.12.20   approved
9    Auxiliary Transformer Foundation Drawings   17         GA drg.
                                                            Vendor has Project
                                                            not been team/
                                                            finalized    Nagaraj
                                                            due to       a G.
                                                            pending
                                                            inputs from
                                                            KPTCL. Civil
                                                            design and
                                                            drgs shall
                                                            be
                                                            submitted
                                                            by within a
                                                            week of
                                                            receipt of
                                                 25.12.20   approved
10   Capacitor Bank Panel Foundation Drawing     17         GA drg.
                                                            Adoption Project
                                                            of already team/
     66kV Cable Termination Tower Foundation     02.01.20   erected      Nagaraj
11   Drawing                                     18         tower        a G.
                                                            foundation Project
                                                            to be taken team/
                                                            up by        Nagaraj
     220kV Cable Termination Tower Foundation    02.01.20   projects at a G.
12   Drawing                                     18         Bangalore.
     Electrical Drawings
                                                                   Shall        Ramann
                                                                   be submitt a Menda
                                                        20.12.20   ed by
1    66 KV CT Vendor Drawing                            17         13.12.2017
                                                                   Shall        Ramann
                                                                   be submitt a Menda
                                                        18.12.20   ed by
2    Outdoor Cable Trench route layout Drawing          17         13.12.2017
                                                                   Vendor       SCM -
                                                        22.12.20   drawings Tanvi/
3    Auxiliary Transformer Drawings                     17         are awaited Praful
                                                                   Vendor       SCM -
                                                        28.12.20   drawings Tanvi/
4    ACDB Drawing                                       17         are awaited Praful
                                                                   Shall        Ramann
                                                                   be submitt a Menda
                                                        28.12.20   ed by
5    Battery Charger Drawing                            17         13.12.2017
                                                                   Revised      SCM -
                                                                   drawings Tanvi/
                                                                   are awaited Praful
                                                        18.12.20   from
6    EOT Crane Drawing                                  17         Vendor.
                                                        20.12.20   Indoor
7    220 KV GIS building Indoor Trench routing layout   17         cable
                                                                   trench
                                                                   routing is
                                                                   under
                                                                   finalization
                                                                                Ramann
                                                                   and
                                                                                a Menda
                                                                   discussion
                                                                   with KPTCL.
                                                                   Submission
                                                                   expected
     66 KV GIS cum CR Building Indoor Trench            20.12.20   by
8    routing layout                                     17         13.12.2017
                                                                   Vendor       SCM -
                                                                   drawings Tanvi/
                                                                   still        Praful
9    Auxiliary Transformer Drawings                                awaited
                                                                   Vendor has Project
                                                                   not been team/
10   Capacitor Bank Panel Drawings                                 finalized
                                                                                   due to      Nagaraj
                                                                                   pending     a G.
                                                                                   inputs from
                                                                                   KPTCL.
                                                                                   Vendor
                                                                                   drawings
                                                                                   still
                                                                                   awaited
Dear sir,
As per the Site requirement, we required Out Door Power Distribution Box for providing Power Supply
to the SBU, sub-contractor & 2 Nos. Bore-well Pump for the Construction Activities and Water facilities for
Site .
The panel board consists of
1.Bus Chamber R,Y,B,N
2.125 AMPS Incomer 4 pole MCCB