0% found this document useful (0 votes)
626 views13 pages

Nepal Drawings

This document provides a construction layout map and material list for the 132/33/11kV Pangtan sub-station project. The layout map shows the locations of the 132kV line bay, 132kV bus coupler bay, 132kV transformer bay, and 33kV line bay within the sub-station. The material list includes the types, quantities, and specifications of equipment needed, such as power transformers, circuit breakers, disconnecting switches, instrument transformers, and lightning arrestors.

Uploaded by

narinder kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
626 views13 pages

Nepal Drawings

This document provides a construction layout map and material list for the 132/33/11kV Pangtan sub-station project. The layout map shows the locations of the 132kV line bay, 132kV bus coupler bay, 132kV transformer bay, and 33kV line bay within the sub-station. The material list includes the types, quantities, and specifications of equipment needed, such as power transformers, circuit breakers, disconnecting switches, instrument transformers, and lightning arrestors.

Uploaded by

narinder kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

FOR TENDER

PURPOSE ONLY
PANGTAN 132/33/11 kV SUBSTATION
PROJECT
CONSTRUCTION LAYOUT MAP OF
132/33/11kV PANGTAN SUB-STATION
+LA +LA
FOR TENDER
PURPOSE ONLY
132 kV Line Bay

same with BAY 1


NOTES:
132kV Bus Coupler Bay

132kV Transformer Bay

+LA
+LA
MATERIAL LIST
No. NAME TYPE SYMBOLUNIT QTY BOQ
1.1 Power Transformer
1.1.1 3-Phase Power Transformer 132/33 kV, 24/27/30 MVA, set 1 1
1.1.1 3-Phase Power Transformer 33/11 kV,6/8 MVA, set 1 1
1.2 Circuit Breakers
1.2.1 SF6 Circuit Breaker 145kV, 1250 A, 1 Pole Operation set 2 2
1.2.2 SF6 Circuit Breaker 145kV, 2000 A, 3 Pole Operation set 1 1
1.2.3 SF6 Circuit Breaker 145kV, 2000 A, 3 Pole Operation set 1 1
1.2.4 Vacuum Circuit Breaker 36 kV, 2000 A, 3 Pole Operation set 1 1
1.2.3 Vacuum Circuit Breaker 36 kV, 1250 A, 3 Pole Operation set 2 2
1.3 Disconnecting Switches
same with BAY 1

1.3.1 Disconnecting Switch with ES 145kV, 1250A set 2 2


33 kV Line Bay

1.3.2 Disconnecting Switch 145kV, 2000A set 2 2


1.3.3 Disconnecting Switch 145kV, 1250A set 10 10
+LA +LA
1.3.4 Disconnecting Switch with ES 36 kV, 800A set 2 2
1.3.5 Disconnecting Switch 36 kV, 1250A set 1 1
1.3.6 Disconnecting Switch 36 kV, 1250A set 4 4
+LA +LA
1.4 Instrument Transformer
1.4.1 Capacitor Voltage Transformer 145kV, 50VA, 132/ 3/0.11/ 3 Nos 12 12
1.4.2 Current Transformer 145kV, 30VA, 5 Core Nos 9 9
1.4.4 Voltage Transformer 36kV, 30VA, 33/ 3/0.11/ 3 Nos 3 3
+LA 1.4.5 Current Transformer 36kV, 15VA, 2 Core Nos 12 12
1.4.2 Current Transformer 145kV, 30VA, 4 Core Nos 3 3
1.5 LIghtening Arrestor
1.5.1 LIghtening Arrestor 120kV, 10kA Nos 9 9
1.5.1 LIghtening Arrestor 30 kV, 10kA Nos 6 6
1.5.2 LIghtening Arrestor 9kV, 10 kA Nos 9 9
1.8 VCB Switchgear
1.8.1 VCB Incomer 11kV, 1250A set 1 1
1.8.2 VCB Outgoing 11kV, 800A set 4 4
1.8.3 PT Panel 12 kV, set 1 1
1.11 Station Supply
1.11.1 Distribution Transformer 300 kVA, 33/0.4 kV set 1 1

same with BAY 1

same with BAY 1

same with BAY 1


PANGTAN 132/33/11 kV SUBSTATION
PROJECT
SINGLE LINE DIAGRAM OF
132/33/11kV PANGTAN SUB-STATION
FOR TENDER
PURPOSE ONLY
PANGTAN 132/33/11 kV SUBSTATION
PROJECT
LAYOUT PLAN & SECTION OF
132/33/11kV PANGTAN SUB-STATION
This drawing is for tender purpose only and
contractor may submit drawing with some
modifications acceptable to employer.
9.98
OPENING SCHEDULE
2.63 2.18 3.00 2.18 S.No. Description Qty. Dimension Remarks
1 Window W 1 2x1.2 Shill Ht.=0.9
2 Window W1 4 1.2x1.2
W 1.20
3
4
Window W2
DOOR D
3
2
0.9x1.2
1.00x2.25
5 DOOR D1 1 0.8x1.9
DESIGN OF DOORS AND WINDOWS WILL BE AS PER SITE
CONDITION OR AS PER ORDER OF ENGINEER
5.25
W1 Common Room W1 1.80
9.60
D 2.70
1.50 Verandah D
D1
Kitchen
W1 1.80
2.85 Toilet
Kitchen Slab
W2 W1 1.00
3.00 6.98
9.98
PANGTAN 132/33/11 kV SUBSTATION
PROJECT
LAYOUT FOR GUARD HOUSE
20.30
4.50 5.50 5.50 4.50
Verandah
W1 W3 W2 W2 W3 W1
D2 D2
T+B T+B
Kitchen slab

Kitchen slab

Bed Room W1
4.80 W1 Kitchen/Dining Kitchen/Dining 4.80
Bed Room
D1 D2 D2 D1
D1 D1 D1 D1
W3
12.30 rest slab rest slab 12.30
W1 Living Room Living Room
4.80 W1 4.80
UP UP
W1 D W1 D1 D1 W1 D W1
2.40 Verandah Verandah 2.40
4.50 5.50 5.50 4.50
20.30
GROUND FLOOR PLAN S.No.

OPENING SCHEDULE
Description Qty. Dimension Remarks
1 Window W1 10 1.5x1.5
3 Window W2 2 1.2x1.2
4 Window W3 2 0.90x0.90
5 DOOR D 2 1.2x2.40 Double shutter
PANGTAN 132/33/11 kV SUBSTATION
6 DOOR D1 8 1.00x2.20 Single shutter
PROJECT
7 DOOR D2 4 0.80x2.20 Single shutter
LAYOUT FOR STAFF QUARTER
NOTE :- DESIGN OF DOORS AND WINDOWS WILL BE AS PER SITE
CONDITION OR AS PER ORDER OF ENGINEER
20.30
4.50 5.50 5.50 4.50
Verandah
W1 W3 W2 W2 W3 W1
D2 D2
T+B T+B
Kitchen slab

Kitchen slab

Bed Room W1
4.80 W1 Kitchen/Dining Kitchen/Dining 4.80
Bed Room
D1 D2 D2 D1
D1 D1 D1 D1
W3
12.30 rest slab rest slab 12.30
W1 Living Room Living Room
4.80 W1 4.80
UP UP
W1 D W1 D1 D1 W1 D W1
2.40 Verandah Verandah 2.40
4.50 5.50 5.50 4.50
20.30
FIRST FLOOR PLAN S.No.
1 Window W1

OPENING SCHEDULE
Description Qty.
10
Dimension
1.5x1.5
Remarks
3 Window W2 2 1.2x1.2
4 Window W3 2 0.90x0.90
5 DOOR D 2 1.2x2.40 Double shutter
6 DOOR D1 8 1.00x2.20 Single shutter
PANGTAN 132/33/11 kV SUBSTATION
7 DOOR D2 4 0.80x2.20 Single shutter PROJECT
NOTE :- DESIGN OF DOORS AND WINDOWS WILL BE AS PER SITE LAYOUT FOR STAFF QUARTER
CONDITION OR AS PER ORDER OF ENGINEER
ROOF PLAN GROUND & FIRST FLOOR
PANGTAN 132/33/11 kV SUBSTATION
PROJECT
LAYOUT FOR STAFF QUARTER
TOP PLAN
NOTES
SECTION THROUGH SLOPES SHOWING STEPS
GABION WALL - NATURAL GROUND
OUTSIDE S/S SLOPING UPWARDS (TYP)
SECTION THROUGH SLOPE BETWEEN SUBSTATION LEVELS
FOR TENDER PURPOSE
ONLY
GABION WALL - NATURAL GROUND
OUTSIDE S/S SLOPING DOWN (TYP)
FOR MISCELLANEOUSE CIVIL WORKS AND S/S AS PER
DETAILS OF SLOPE PROTECTION WITHIN SUBSTATION PANGTAN 132/33/11 kV SUBSTATION
PROJECT
REQUIREMENT
SECTIONAL DRAWINGS AT RETAINING
WALL / SLOPE PROTECTION AND DRAINS
A SECTION
TYPICAL FENCE VIEW
FOR TENDER PURPOSE
ONLY
LEGENDS
SOLU CORRIDOR 132kV
TRANSMISSION LINE PROJECT
CHAIN LINK FENCE AND GATE DETAILS

You might also like