Catch Basin Detail: Property Line

The document provides notes for sanitary works that include pipe sizes, materials, installation requirements, testing procedures, and symbols. Key points include: - All pipes must meet local ordinances and national laws and pipe sizes are in millimeters unless noted otherwise. - Underground pipes must be coated in two layers of tar or carboline. Water pipes require a 0.3m extension and insulation for hot water pipes. - Pipes must be tested for leaks and pressure and flushed/disinfected before use. Drainage systems must also be tested for leaks. - Workmanship throughout installation must be of the highest quality to the satisfaction of the architects and engineers.

Uploaded by

B R PAUL FORTIN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
282 views1 page

Catch Basin Detail: Property Line

The document provides notes for sanitary works that include pipe sizes, materials, installation requirements, testing procedures, and symbols. Key points include: - All pipes must meet local ordinances and national laws and pipe sizes are in millimeters unless noted otherwise. - Underground pipes must be coated in two layers of tar or carboline. Water pipes require a 0.3m extension and insulation for hot water pipes. - Pipes must be tested for leaks and pressure and flushed/disinfected before use. Drainage systems must also be tested for leaks. - Workmanship throughout installation must be of the highest quality to the satisfaction of the architects and engineers.

Uploaded by

B R PAUL FORTIN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL NOTE: LAV LAVATORY

SFD SHOWER FLOOR DRAIN


8 ALL PIPES SIZES INDICATED ARE IN MILLIMETERS (mm) SYMBOLS: KS KITCHEN SINK
1. ALL SANITARY WORKS SHALL CONFIRM THE PREVAILING DIAMETERS UNLESS OTHERWISE NOTED.
REQUIREMENTS OF THE LOCAL ORDINANCE AND NATIONAL LAWS. LS LAUNDRY SINK
9 ALL UNDERGROUND G.I. PIPES SHALL BE COATED WITH 2 LAYERS VAC VENT ABOVE CEILING SHO SHOWER HEAD
2. READ THE DRAWING IN CONNECTION WITH THE OTHER DRAWINGS OF TAR OR CARBOLINE. PVC POLYVINYLCHLORID SV SHOWER VALVE
AND SPECIFICATIONS, THE ARCHITECT AND THE ENGINEERS SHALL 10 ALL WATER PIPES SHALL BE PROVIDED WITH 0.30m PIPE CWL CLEAN WATER LINE UPVC UNPLASTICISED POLY VINYL CHLORIDE
BE NOTIFIED IMMEDIATELY PF ANY DISCEPANCIES FOUND THEREIN. EXTENSION CAPPED AT THE END. PVC/SP PVC/SOIL PIPE
3 THE CONTRACTOR SHALL DETERMINE THE ACTUAL LOCATION DEPTH 11 ALL EXPOSED HOT WATER PIPES SHALL BE INSULATED. V VENT FB FOOT BATH
AND INVERT ELEVATION OF EXISTING PIPES AND STRUCTURES TO 12 ALL WATER PIPES SHALL HYDROSTATICALLY TESTED A PRESSURE PVC/DP PVC/DRAIN PIPE PT PNEUMATIC TANK 75mm Ø PVC 75mmØ PVC DOWN SPOUT
CONFIRM WITH THE PROPOSED SANITARY UTILITIES. OF 1034 KPA FOR 2 HOURS. 600
CV CHECK VALVE OF OVER FLOW DOWNSPOUT
4 THE CONTRACTOR SHALL BE RESPONSIBLE FO R ALL REQUIRED 13 ALL WATER PIPES SHALL BE THOROUGHLY FLUSHED AND DISINFECTED. 50 X 50mm ANGLE BAR FRAME
GV GATE VALVE CO CLEAN OUT 500 600
FLOOR AND WALL OPENINGS. 14 ALL SANITARY AND STORM DRAINAGE SHALL HYDROSTATICALLY TESTED WITH 12mmØ GRILLS (WELDED)
HB HOSE BIBB GCO GROUND CLEAN OUT 500
5 ALL PIPES SHALL BE INSTALLED AS INDICATED. ANY RELOCATION TO ENDURE THAT THE SYSTEM IS WATER TIGHT. 400 SPACE AS SHOWN
WM WATER METER FCO FLOOR CLEAN OUT 10mm Ø BAR COVER HANDLE
REQUIRED FOR PROPER EXECUTION OF OTHER TRADES SHALL BE 15 WORKMANSHIP OF THE WORK THROUGHOUT SHALL BE EXECUTED IN 10mm Ø
VTR VENT THRU ROOF WCO WALL CLEAN OUT # 4 CHB
PRIOR TO THE APPROVAL OF THE ARCHITECT AND THE ENGINEER. THE BEST AND MOST THOROUGH MANNER KNOWN TO TRADE AND THE 300 150mm Ø DOWEL BAR
WC WATER CLOSET VSTR VENT STACK THRU ROOF
6 ALL SLOPES FOR HORIZONTAL PIPE SHALL MAINTAIN 1% AS

75
SATISFACTION PF THE ARCHITECT AND THE ENGINEERS. LAV LAVATORY CB CATCH BASIN PVC OUTLET NGL.
MINIMUM UNLESS OTHERWISE NOTED.

250
SFD SHOWER FLOOR DRAIN DS DOWN SPOUT
7 ALL FIXTURES SHALL BE VENTED UNLESS OTHERWISE NOTED.
150mm Ø

300
8 ALL PIPES SIZES INDICATED ARE IN MILLIMETERS (mm)

400
PVC OUTLET

500
3000 670

475
PROPERTY LINE

400
600

500
385

100
600mm X 600mm 100mmØ PVC SANITARY
150mm Ø
CATCH BASIN LINE BENT DOWN TO PVC INLET
GUTTER SECOND FLOOR
100mmØ PVC SANITARY

1600
LINE BENT UP TO SEPTIC VAULT DS DS
150mm Ø
PVC INLET
P L A N SECTION
SECOND FLOOR

HB
3 CATCH BASIN DETAIL

900
DS DS
SHO
CB CB NOT TO SCALE
KS SHO FD
LAV
WC FD
WC
KITCHEN
LAV
3000
BED 10mm Ø TOP & BOTT.
BARS @ 200mm O.C. 400 X 400mm CONC.
ROOM 100 1800 100 900 100 MANHOLE COVER
BED BOTHWAYS

PROPERTY LINE
ROOM

100
BED
ROOM
400 400
DINING

DS DS C.O.

1600

1400

1600
400

400
CB CB DN.
PROPERTY LINE

FAMILY

100
UP
LIVING
ROOM
P L A N
LIVING
ROOM

3000 10mm Ø HOR. @


EVERY 3 LAYERS OF
PORCH DS CHB
100mm Ø PVC 400 400
INLET PIPE C.O.
CB

125
HB

UP
DS BALCONY

LEACHING
DS DS WELL

1775
2100

2100
DIGESTION CHAMBER
CB

DS DS
150mm Ø PVC PIPE 150mm Ø PVC PIPE
STORM DRAIN

600
STORM DRAIN

200

200
2 SECOND FLR.PLUMBING LAY. 300
10mm Ø BOTTOM BARS
200mm O.C. B.W. 300 300
10mm Ø LONG BARS WITH
SCALE : 1 : 100 MTRS. 10mm Ø TIES @ 300mm
0.C.
SECTION

4 SEPTIC VAULT DETAIL


1 GROUND FLR.PLUMBING LAYOUT NOT TO SCALE
SCALE : 1 : 100 MTRS.

DESGNED BY : REVISIONS : DATE : ENGINEER : PROJECT TITLE : PROJECT OWNER : SHEET CONTENTS : SHEET NUMBER :

CAD BY :
ENGR. CHESTER P. MILLAMA 2 STOREY RESIDENTIAL BLDG.
CHECKED BY : PRC NO. : PTR NO. : MR. & MRS. JOEL B. ECHIPARE AS INDICATED 12/12
DATE RELEASED : 03-14-14 TIN NO. : DATE OF ISSUE : LOCATION :