Survey Template No: xx/Feb.
2018/Ship name
Survey Template
1. General Information
Date of Survey/Inspection :
Owner :
Classification :
Designer :
Builder :
Vessel’s Name :
2. General Particular
Length Overall :
Length Perpendicular :
Breadth Moulded :
Depth Moulded :
Draught Moulded :
Crew :
Passenger (If any) :
Main Engine :
Gear Box :
Generator Set :
Speed (Estimated) :
Others :
:
:
:
3. Compartments
3.1 The number of compartment inside/on the hull of the vessel(i.e. Daily Oil Tank
(D.O.T.)), but not include that of conventional portable water/oil/lubricant tank:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Survey Template No: xx/Feb.2018/Ship name
4. Hull And Structure
4.1 The hull Inspection/survey shall at least have the following details (4.2), to be
considered complete.
4.2 Main Scantling of the Vessel:
a) Frame Spacing
i. Main Engine Area :
ii. Cargo Area :
iii. Others :
b) Main Deck Plate Thickness :
i. Main Deck Longi. Girder :
ii. Main Deck Longi. Stiffener :
iii. Main Deck Web :
iv. Main Deck Trans. Stiffener :
c) Bottom Deck Plate Thickness :
i. Bottom Deck Longi. Girder :
ii. Bottom Deck Longi. Stiffener :
iii. Bottom Deck Web :
iv. Bottom Deck Trans. Stiffener :
d) Side Shell Plate Thickness :
i. Shell Stiffener :
ii. Shell Web :
iii. Shell Horizontal Girder :
e) Brackets
i. Section Engine Room :
ii. Section Cargo Area :
f) Bulkhead Plate Thickness :
i. Vertical BHD Stiffener/Girder : /
ii. Longi. BHD Stiff./Girder(if any): /
iii. Trans. BHD Stiff./Girder(if any) : /
Survey Template No: xx/Feb.2018/Ship name
g) Deck House Plate Thickness :
i. Deck House Trans. Stiffener :
ii. Deck House Trans. Girder :
iii. Deck House Longi. Stiffener :
iv. Deck House Longi. Girder :
v. Bracket :
h) Wheelhouse Plate Thickness :
i. Wheelhouse Trans. Stiffener :
ii. Wheelhouse Trans. Girder :
iii. Wheelhouse Longi. Stiffener :
iv. Wheelhouse Longi. Girder :
v. Bracket :
i) Engine Girder Dimension :
i. Location from Centre Line :
ii. Location At Frame :
j) Pillar :
i. Location of Pillar at Frame :
k) Chine Shaft :
l) Fender :
m) Others (add if Any) :
Survey Template No: xx/Feb.2018/Ship name
5. Piping Arrangement
5.1 Filling, Ventilation And Sounding Pipe
5.2 Bilge And Fireman Piping System
5.3 Fuel Oil Piping
5.4 Domestic Fresh Water And Sea Water Supply System
5.5 Engine Cooling System
6. Engine Room Arrangement
7. Fire Control And Safety Plan
8. Electrical Arrangement
8.1 Arrangement of Electrical Appliances
8.2 Single Line Electrical Wiring Diagram
8.3 Electrical Loading Analysis