Safety Inspection Offshore Rig

This document provides a checklist for safety inspections of offshore drilling rigs. It contains 30 sections covering general requirements, documentation, training records, personal protective equipment, living quarters, pipe rack areas, rig floors, drawworks, catheads, derricks, substructures, blowout preventers, shale shakers, mud tanks, sack storage, mud pumps, cementing units, storage areas, generators, fuel tanks, welding/burning, cranes, forklifts, helidecks, anchor/jacking systems, ballast control systems, lifesaving equipment, and H2S requirements. Each section includes items to check and space to comment on whether the item meets standards or needs action.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views27 pages

Safety Inspection Offshore Rig

This document provides a checklist for safety inspections of offshore drilling rigs. It contains 30 sections covering general requirements, documentation, training records, personal protective equipment, living quarters, pipe rack areas, rig floors, drawworks, catheads, derricks, substructures, blowout preventers, shale shakers, mud tanks, sack storage, mud pumps, cementing units, storage areas, generators, fuel tanks, welding/burning, cranes, forklifts, helidecks, anchor/jacking systems, ballast control systems, lifesaving equipment, and H2S requirements. Each section includes items to check and space to comment on whether the item meets standards or needs action.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 27

TotalFinaElf Date : Nov / 2000

CONTROL OF THE OFFSHORE


TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 1/27

PURPOSE
This procedure is aimed to provide a check list for items to be controlled during a safety visit of an
offshore drilling rig.
CONTENTS
1 GENERAL REQUIREMENTS & DOCUMENTATION ................................................................... 2
2 RECORDS AND TRAINING .......................................................................................................... 3
3 PERSONAL PROTECTIVE EQUIPMENT .................................................................................... 4
4 LIVING QUARTERS ...................................................................................................................... 5
5 PIPE RACK AREA ......................................................................................................................... 6
6 RIG FLOOR GENERAL................................................................................................................. 6
7 RIG FLOOR - TONGS & SLIPS .................................................................................................... 8
8 RIG FLOOR - DRAWWORKS & HOISTING GEAR ..................................................................... 9
9 RIG FLOOR - CATHEDS/HOISTS .............................................................................................. 10
10 DERRICK OR MAST ................................................................................................................... 11
11 SUBSTRUCTURE/CELLAR/WELL BAY/TEXAS DECK ............................................................. 12
12 BOP'S/ACCUMULATOR/CHOKE MANIFOLD............................................................................ 13
13 SHALE SHAKER AREA .............................................................................................................. 14
14 MUD TANKS/SOLIDS CONTROL EQUIPMENT ........................................................................ 15
15. SACK STORAGE/BULK TANKS ................................................................................................. 16
16 MUD HOPPER/MIXING BARREL ............................................................................................... 17
17 MUD PUMPS ............................................................................................................................... 17
18 CEMENTING UNIT...................................................................................................................... 18
19 STORAGE AREAS ...................................................................................................................... 18
20 GENERATOR/SCR AREA .......................................................................................................... 19
21 FUEL TANKS/FUEL TRANSFER ................................................................................................ 20
22 WELDING & BURNING ............................................................................................................... 21
23 CRANES ...................................................................................................................................... 22
24 FORKLIFT ................................................................................................................................... 23
25 HELIDECK ................................................................................................................................... 24
26 ANCHOR SYSTEM/JACKING SYSTEM ..................................................................................... 25
27 BALLAST CONTROL SYSTEM .................................................................................................. 25
28 LIFESAVING EQUIPMENT ......................................................................................................... 26
29 H2S REQUIREMENTS................................................................................................................ 27
30 POLLUTION CONTROL EQUIPMENT ....................................................................................... 28

SIGNATURE
Prepared by : Approved by :

JY.NEDELEC JL.JOUSSEAUME

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 2/27

ITEM QUALITY CHECK COMMENT


(where blank assume YES/NO or adequate/ (OK or action needed)
inadequate is criterion)

1 GENERAL REQUIREMENTS

 Safety gear available and worn. ____________

 Appropriate warning and safety ____________


signs displayed.

 Qualified first aid on each crew. Appropriate certification. ___________

 First aid supplies. Responsibility and Frequency of ___________


checks.

 Emergency eyewash & shower. ___________

 Electrical receptacles, plugs and ___________


wiring in good order.

 Lighting adequate and properly ___________


protected.

 Fire extinguishers-all must be ___________


charged, in brackets, tagged and
sealed.

 Fire-fighting equipment available. Responsibility and Frequency of ___________


checks.

 Fire pumps tested, local/remote Record pressure and delivery rate. ___________
start functioned. Check power supply mode main
circuit/emergency.

 Fire prevention - Ignition hazards ___________


prohibited.

 Gas detection. Explosive meter and portable gas ___________


detectors.

 Pollution control - no fuel spills, Standing instructions/ ___________


reserve pit leaks, trash in pits, etc. Regulations known.

 General Housekeeping. ___________

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 3/27

 Confined space procedures in ef- Procedure clear in Permit System. ___________


fect.

 Lockout/Tagout procedures in ef- Procedure clear in Permit System. ___________


fect.

 High pressure lines secured/ Identified/Secured. ___________


anchored.

 Flare line(s) secured/staked. Hazard signs posted. ___________

 System of hazardous area classi- e.g. IP/API 500B/VERITAS. ___________


fication used.

 Safe drilling procedure and stan- Complete/Updated/Authorised. ___________


dards.

 Accident reporting forms. Complete/Updated/Authorised. ___________

 Procedure for reporting accidents. Availability. ___________

 Contingency plan (Critical H2S Procedures known and used ___________


wells). Breathing apparatus.

 Appropriate regulatory permits. Records kept. ___________

 Work permit forms. Records kept. ___________

 Current well control certificate. Refresher frequency/current status ___________


Tool pusher(s) - Supervisor level.
Driller(s) -Driller level.

2 RECORDS AND TRAINING

(These items are generally the responsibility of the Contractor's tool


pusher).

 Regular safety inspections by Availability on site. ___________


Contractor ; correction made ; re-
cords.

 Accident prevention program in Records kept/follow-up. ___________


effect.

 Safety meetings. Deficiencies corrected. ___________

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 4/27

 Pit drills/BOP drills : records. Realistic drills/frequency. ___________

 Fire/Abandon ship/Man overboard Frequency. ___________


drills records.

 Accident, injury & illness forms Action taken to prevent recur- ___________
filled out ; records ; follow-up on rence.
accidents.

 First aid log for minor injuries. Legible/up-to-date. ___________

 Training for personnel (first aid ; Responsibility for, how controlled. ___________
well control ; H2S ; other) certifi- Review process.
cation on file.

 All employees made aware of Method used : Booklet, Video, ___________


safety policies, orientation given to Letters, Posters.
all new employees.

 Hazardous/toxic substances iden- Storage & handling precautions ___________


tified. taken ; Materials Safety Data
Sheets (MSDS) on chemicals.

 Emergency telephone numbers When checked & tested. ___________


posted.

 Maintenance program & records Where kept, location. ___________


for critical equipment.

3 PERSONAL PROTECTIVE EQUIPMENT

 Hard hats & steel-toed boots/ Worn by all personnel on site. ___________
shoes.

 The following to be available & Accessibility (24 hrs/day). ___________


used as required.

 Visitor's hard hats. Accessibility (24 hrs/day). ___________

 Eye protection. Accessibility (24 hrs/day). ___________

 Gloves. Accessibility (24 hrs/day). ___________

 Protective clothing. Stocks adequate. ___________

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 5/27

 Hearing protection. Stocks adequate. ___________

 Respiratory protection. Stocks adequate. ___________

 Belts & safety lines. Stocks adequate. ___________

 Firemen outfits. Ensure adequate number. ___________

4 LIVING QUARTERS

 Clean & orderly. ___________

 Properly grounded. Earthing last measured & verified. ___________

 Electrical wiring & outlets in good Supply voltage checked, date of ___________
order. last check.

 Two means of exit provided. Exits clearly marked. ___________

 Smoke detector provided. Date of last function. ___________

 Fire extinguisher/hose cabinets pro- ___________


vided.

 Alarms. Which alarm/how initiated/audible ___________


in all areas. Date of last function
test.

 Ventilation, heating/air conditioning Satisfactory working condition. ___________


provided.

 Emergency lighting. Date of last test. ___________

 Station bills posted ; fire/abandon All personnel briefed & know their ___________
alarm station at each exit. stations.

 Signs for access to lifeboats or life ___________


rafts.

5 PIPE RACK AREA

 Pipe racks level and in good Pipe stops and stanchions provi- ___________
condition. ded.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 6/27

 Ends pinned & layers chocked. ___________

 V-door ramp & cat-walk. Level & in good condition. ___________


Buffer at cat walk end.

 Pipe stops provided. ___________

 Stacked material secured against ___________


falling.

 General housekeeping. Area free from obstruction/debris. ___________

6 RIG FLOOR GENERAL

 Emergency power shut-down at Regularly tested & checked. ___________


driller's console.

 Hand rails & toe board completely ___________


round rig floor.

 V-door guarded. Routinely used. ___________

 Stairs & steps non-skid ; secured ___________


with adequate handrails.

 Floor/rotary floor & racking area in No visible hazards. ___________


good condition.

 Non-skid material used on floor/ In good condition/effective. ___________


around rotary floor.

 Floors free of grease & tripping ___________


hazards.

 Condition of floor boards. Reinforced (if concurrent opera- ___________


tions : Production/Drilling)

 Smoking or open flames prohi- Sign(s) visible. ___________


bited.

 Fire extinguishers in area. ___________

 Openings on floor. Covered/guarded. ___________

 Moving machinery (drive belts, Properly guarded. ___________


chains, fans, gears, shafts).
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 7/27

 Lighting adequate, guarded & State standard used. ___________


explosion proof.

 Wiring & outlets in good condition. ___________

 Tools, hand tools, subs, bits, etc. In good condition & properly stored. ___________

 Stab-in safety valve & wrench Ready for installation. ___________


accessible ; BOP.

 Mud box. In good condition & properly rig- ___________


ged.

 Hose & lines for circulating in ___________


satisfactory condition & snubbed
off.

 Rotary hose & kelly spinner hose ___________


in satisfactory condition & snub-
bed off at stand pipe & swivel.

 BOP and diverter controls labelled Last function checked : frequency. ___________
& operating properly.

 Choke panel, gauges & controls. Function tested. Date. ___________

 Geolograph, flow-show, PVT equip- Functioning correctly. ___________


ment etc.

 Gas detectors and monitors. Hydrocarbon and H2S. ___________

 Two means of exit from doghouse ___________


& rig floor.

 Blowers. Two blowers needed if H2S fore- ___________


seen.

 Doghouse heaters not an ignition Explosion proof certification. ___________


source.

 Common drinking cups prohibited. ___________

 First aid kit, stretcher & eye wash Ready for immediate use. ___________
in doghouse.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 8/27

 Bulletin boards ; safety signs ; Correct information posted in line ___________


required notices ; BOP proce- with known procedures.
dures ; max. allowable casing
pressure ; fill-up information, etc.

 Communications. Appropriate for installation. ___________


Explosion proof equipment in clas-
sified area.

 Kick procedures, well control. Prominently displayed & up to date. ___________

7 RIG FLOOR - TONGS & SLIPS

 Power tongs ; stiff arm, safety In good condition. ___________


gate, back-up, positioner, hoses &
fittings.

 Snub lines & jerk lines. In good condition ; properly secu- ___________
red at both ends-3 clamps or
pressed fittings ; clamps on dead
ends.

 Jagged ends of wire rope on tong No frayed wire rope. ___________


lines cut & taped to prevent injury.

 Tongs : body & jaws. In good condition ; dies sharp & ___________
keepers in position ; handle safety
pin.

 Tongs counterweights adequately ___________


secured ; all weights inside counter-
weight buckets ; counterweights
allow overhead clearance.

 Slips. Sharp dies ; pins or keepers ins- ___________


talled ; handles in good shape.

 Power tongs - Iron roughneck. Guarded & in good condition. ___________

8 RIG FLOOR - DRAWWORKS & HOISTING GEAR

 "Crown-O-Matic" properly instal- Test/setting recorded in shift re- ___________


led ; setting maintained ; checked port, reset after slip/cut drill line.
each shift.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 9/27

 Drill line in good condition ; ton- When last visually inspected. ___________
mileage up to date ; slip/cut as
required.

 Dead-line anchor & retainer. When last visually inspected. ___________


Safety cable clamp on drilling line.
All bolts in place & tightened on
drill line anchor.

 Brakes in good condition ; ad- Last inspection & adjustment re- ___________
justed & working properly. corded.

 Weight indicator in good shape & Functioning correctly, compatible ___________


working properly. units.

 Travelling block & hook in good When last NDT tested/overhauled. ___________
condition ; regularly maintained.

 Overall maintenance & appea- Electric motors safely cooled. ___________


rance of drawworks.

 Spinning Chain. If used, check for defects, damage. ___________

 Elevators, bails. NDT crack detection test. Date of ___________


last test.

 Top drive system. When last NDT tested/overhauled. ___________


If electric, for motor cooling, air
intake at monkey board or closed
circuit system.

9 RIG FLOOR - CATHEADS/HOISTS

 Catheads smooth, ungrooved, Emergency stop effective & used. ___________


guarded ; rope divider in good
condition.

 Automatic cathead. In proper working order. ___________

 Headache post. In good condition & properly se- ___________


cured.

 Air hoist line. In good condition ; properly ___________


spooled with line guide ; guarded;
anchored.

 Are air tuggers marked with safe ___________


load.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 10/27

 Hooks. In good condition. ___________

 Wire rope loops. Secured with three clamps or ___________


pressed fittings ; clamps on dead
end.

 Overall condition of all rope, wire A systematic check on all lifting ___________
rope, chains, slings & hooks used equipment, slings & shackles.
for lifting.

 Man-riding winch. Fail safe brake fitted, adequate ___________


procedures in place & enforced.

10 DERRICK OR MAST

 Derrick pins & keepers. All in place & in good condition. ___________

 Escape line with Geronimo. Properly rigged. ___________

 Safety belts & lines. In good condition (vertical safety ___________


lines installed at derrick man plat-
form and Csg stabbing board).

 Derrick ladder. Safe to use - no rungs bent or ___________


missing.

 Climbing assist. Installed, adjusted & used. ___________

 Pipe fingers snubbed with safety ___________


chain.

 Adequate derrick lighting. Explosion proof, secured. ___________

 Sills/bumper board to prevent run- ___________


ning into crown.

 Crown block. Regularly maintained and equip- ___________


ped with anti-jump device.

 Flashing red light in crown. ___________

 Any tools used in derrick properly ___________


secured.

 Stand pipe secured ; mud hose ___________


snubbed at both ends.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 11/27

 All wire rope in good condition. No wire rubbing against structural ___________
members.

 Hydraulic system & cylinders. No leaks visible. ___________

 Manual latch dogs. Properly locked. ___________

 Condition of derrick (cracks/corro- ___________


sion).

 All sheaves secured with safety To retain both sheave and wire ___________
slings
 Gas-burner vent line. Must be routed to a position ___________
commensurate with max. dilution.

11 SUBSTRUCTURE/CELLAR/WELL BAY/TEXAS DECK

 Assembly pins in place & secured ___________


with keepers.

 Beams & braces in good con- ___________


dition.

 Adequate lighting ; guarded ; ex- State standard applied. ___________


plosion proof.

 Proper scaffolding. ___________

 Cellar area free of debris. ___________

 Fire extinguisher in area. Date last checked. ___________

 Lower & upper substructure bolted ___________


or pinned together.

 Drilling line properly installed on ___________


anchor & keyed.

 Air tank drained daily ; relief valves. Reported/last checked & tested. ___________

 Ladders on location in good con- ___________


dition.

 Work vests available & used. Safety lines/inertia brakes used/ ___________
use enforced ?

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 12/27

 Ring buoys for man overboard. Provided & easily accessible in this ___________
area.

12 BOP'S/ACCUMULATOR/CHOKE MANIFOLD

 BOP arrangement & pressure ___________


ratings to meet Operators specifi-
cations.

 BOP's tested as required. BOP Drills reported, frequency, date of ___________


drills, closing procedure & casing last test to full rating.
pressure limit posted.

 No missing bolts ; all bolts tight & Bolts checked weekly & reported. ___________
secure.

 Metal control lines ; good condi- Lines not in use blanked off. No ___________
tion . leaks

 BOP's securely braced to sub- ___________


structure, adequate design.
 Accumulator unit & controls. What distance from wellhead ? ___________
Accumulator bottles/bladders load
checked ?

 Regulator by-pass valve. All control hoses tested to full ___________


accumulator pressure. Date last
tested.

 Accumulator controls labelled ; ___________


gauges working ; hydraulic lines
protected.

 Primary/remote controls. Labelled & functioning properly. ___________

 Personnel trained in how to Training plan schedule available. ___________


operate BOP controls.

 Choke manifold. Define specification. ___________

 Valve(s) check on kill line and val- ___________


ve(s)/HCR on choke line.

 Choke & kill lines. Secure/snubbed. ___________

 Mud gas separator (atmospheric). Means of preventing gas blow- ___________


back into mud system, vent line
adequate, secure & properly
directed.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 13/27

 Blast points on buffer chamber. Protected by bull plugs. ___________

 Ram type BOP's have wedge ___________


locks attached.

 Automatic choke panel. In good condition & working pro- ___________


perly.

 Overall condition & maintenance ___________


of well control equipment.

 Trip tank. Mechanical & electronic. ___________


Level indicators.
Capacity : 6 m3 minimum.
Section : 2.5 m2 maximum.

13 SHALE SHAKER AREA

 Gas sensors. For hydrocarbon and H2S detec- ___________


tion.

 Moving machinery. Properly guarded, guards secure. ___________

 Stairs. In good condition ; non-skid pro- ___________


perly secured.

 Handrails. Fitted on all passageways & stairs ; ___________


in good condition ; secure ; toe
boards.

 Passageways. Safe clearance ; no obstructions ; ___________


no missing, loose or unsafe gra-
ting.

 Condition of grating and floor. ___________

 Adequate lighting. ___________

 Electrical equipment. Explosion proof, state standard/ ___________


code.

 Eye wash station nearby. ___________

 Personal protective equipment ___________


available.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 14/27

 Ventilation. Specification, Hazardous Area clas- ___________


sification.

 This area should contain foam, fire ___________


fighting equipment if oil base mud
is used.

14 MUD TANKS

 Passageways. Safe clearance ; no obstruction ; ___________


no missing or unsafe grating.

 Stairs. In good condition ; non-skid ; pro- ___________


perly secured.

 Hand rails on all passageways & In good condition ; secure ; toe ___________
stairs. boards on passage handrails.

 Lighting. Adequate for area, explosion ___________


proof.

 Moving machinery. Properly guarded (belt guides, ___________


etc.).

 Electrical wiring. In accordance with hazardous ___________


area classification.

 PVT equipment. Secure & working properly. ___________

 Function test PVT equipment & ___________


check calibration.

 Pressure relief lines. Lines properly secured, sloping ___________


away from relief valve.

 Personal protective gear ; aprons/ Available & used. ___________


goggles/masks/eyes wash.

 Valves. Accessible, in good condition ; ___________


handles secure.

 General housekeeping. ___________

 Ventilation. Enclosed mud pits room main- ___________


tained with under pressure.
Doors equipped with automatic
closing device.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 15/27

 Smoking prohibited. ___________

 This area should contain foam, Fix foam fire fighting equipment. ___________
fire fighting equipment if oil base
mud is used.

15. SACK STORAGE/BULK SILOS

 Pallets of sack material & mud ___________


properly stacked in an orderly
fashion.

 Torn sacks - cleaned up ; kept to a ___________


minimum.

 Caustic soda & other hazardous Properly labelled, stored & hand- ___________
chemicals. led.
Storage area separated and
closed.

 No asbestos products ("Flo-Seal", ___________


etc.) on location.

 Chemical warning signs. ___________

 Adequate ventilation. ___________

 Lights work. ___________

 Eye wash & personal protective ___________


equipment available & used.

 Forklift properly maintained & ope- Driver properly trained/qualified ___________


rated safely. (see chapter 24).

 Bulk & cement tanks equipped Pressure gauge on each silo. ___________
with rupture disks and/or pressure Safety valves last function test.
relief devices that function pro-
perly.

 Bulk tanks (cement silos must be Equipped with weight indicators. ___________
physically separated from barite Last calibration check.
or bentonite silos).

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 16/27

16 MUD HOPPER/MIXING BARREL

 Mud hopper. Safe means of access & egress. ___________

 Chemical barrel safety construc- ___________


ted & located.

 Chemical warning signs. ___________

 Personnel instructed in safe hand- Procedure in place & enforced. ___________


ling of chemicals.

 Personal safety equipment-rubber Available & used as required. ___________


gloves, rubber apron, goggles,
dust mask.

 Emergency eye wash station Primed & ready for use, deluge ___________
nearby. shower required.

 Material Safety Data Sheets Readily available, copies with rig ___________
(MSDS). medic & toolpusher.

17 MUD PUMPS

 Relief valves (pop-off) pinned, set When tested/pressure setting. ___________


& covered.

 Relief lines. Properly vented & secured and ___________


sloping away from relief valves.

 Vibrator hose. Snubbed at both ends. ___________

 Moving machinery properly guar- ___________


ded.

 Proper tools & equipment for pump ___________


maintenance.

 Fire extinguishers in area. ___________

 General housekeeping. ___________

 Valves & controls properly label- ___________


led.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 17/27

 Lock-out switch on each pump. Last tested. ___________

 Pulsation dampeners :
i. high pressure. Check pre-charge pressure & fluid ___________
used.

ii. low pressure. Check method used to charge ___________


(e.g. hand pump).

 Pressure gauges. Fitted to discharge of each pump. ___________

18 CEMENTING UNIT

 Moving machinery. Properly guarded. ___________

 Adequate ventilation. Dust masks available. ___________

 Fire extinguisher provided. ___________

 Piping & connection. Adequate for anticipated pres- ___________


sures ; properly secured.

 Spill prevention equipment provi- ___________


ded ; curbs, drip pans, drains, etc.

 Pressure relief valve fitted. ___________

19 STORAGE AREAS

 Paint storage. Fire protection with CO2. ___________


Explosion proof lighting and venti-
lation provided.

 Paint & paint thinner containers ___________


covered.

 Explosive & radio-active storage. Containers properly labelled Jet- ___________


tison support frame for the explo-
sive container.

 Safety cans available for trans- ___________


porting of paint thinner.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 18/27

 Spill prevention equipment provi- ___________


ded ; curbs, drip pans, drains,
sumps, etc.

 General housekeeping. ___________

20 GENERATOR/SCR AREA

 High voltage signs visible. ___________

 Hearing protection available & ___________


signs visible.

 Fire extinguishers. Enclosed generators room and ___________


SCR room protected with CO2

 Non-conductive mats in place & ___________


clean.

 All switches labelled. ___________

 Wiring receptacles & lighting in ___________


good order.

 Switches & connector boxes have ___________


covers in place.

 Generator grounded. ___________

 Doors properly propped & pinned. ___________

 All moving machinery properly ___________


guarded.

 Lock-out procedure incorporated & ___________


used.

 General housekeeping ; no oil on ___________


floor ; combustibles contained or
eliminated.

 Local & remote emergency stop Date of last test. ___________


buttons function tested.

 First aid instructions (in case of Posted in SCR room. ___________


electrical shock).

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 19/27

 One special hook & pair of special Available in SCR room. ___________
gloves.

 Emergency generator. Check starting devices (two separate ___________


systems-air, electric-with action in
case of power failure).

21 FUEL TANKS/FUEL TRANSFER

 Contents labelled. Labels understood "fire hazard", ___________


"no smoking", "no hot work".

 Tanks vented. Vents open. ___________

 Fire extinguishers provided. Within easy reach/suitable type. ___________

 Fuel tanks safely located. Away from heat, oxygen bottles ___________
oxidising agents.

 Fuel transfer equipment. In good condition ; static ground ___________


device ; "deadman control nozzle".

 Fuel transfer procedures posted & Date of last procedure checked. ___________
enforced.

 General housekeeping. No visible leaks. ___________

 Spill prevention equipment provi- How is pollution prevented ? ___________


ded ; curbs, drip pans, sumps, etc.

 Ladder secured & in good condi- ___________


tion.

 Pressurised tanks rated for pres- Certification expiry date. ___________


sure.

 Overfill. If tank overfills, what happens to ___________


spill ?

 "No Smoking" signs. Must be clearly visible. ___________

 Items prevented from falling. Toe plate, cages, otherwise ___________


secured.

 Wiring & outlets in good order ; ___________


lighting adequate.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 20/27

 Trash containers. Covered container for oil saturated ___________


rags.

 Combustibles away from light Kept separate & clearly labelled/ ___________
fixtures. hazard signs.

 "No Weld" signs. Posted on tank walls. ___________

22 WELDING & BURNING

 Hot work permit procedure in Hazardous area limits known, per- ___________
place & enforced. mits used & details included in
work permit.

 Fire watch personnel required ___________


during welding/burning.

 Fire extinguishers provided. ___________

 Adequate ventilation. ___________

 Welding machines properly groun- Date earthing last tested, welding ___________
ded. machines use earth return to set.

 Hoses, fittings, gauges & regu- In good working order ; friction ___________
lators. lighters used ; matches prohibited.

 Compressed gas cylinders. Properly stored & secured, sepa- ___________


rated by distance/barrier.

 Proper personal protective equip- ___________


ment available & use enforced.

 General housekeeping. ___________

 Perforating notices for welding Available on site & used during ___________
machines. "radio silence".

23 CRANES

 Load rating chart. Posted in the driver cabin. ___________

 Weight indicator. In good working order, date of last ___________


calibration.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 21/27

 Hand signals posted. ___________

 Moving machinery. Properly guarded & guards secure. ___________

 Boom angle indicator & stops pro- ___________


vided.

 Boom structure in good condition. ___________

 Limit switches device provided. Regularly tested on hoist & boom. ___________

 Wire ropes. In good condition, anti-twist. ___________

 Hooks. Provided with safety clip. ___________

 Tag lines. Available & their use required. ___________

 Personnel baskets. In good condition & procedures ___________


adequate. Back-up safety wire
provided between basket and
hook.

 Controls. Properly labelled. ___________

 Drip pan provided. ___________

 Crane test certificate. Record of test. ___________

 Communications. Appropriate to installation. ___________

 Operating manual. Complies with MODU Code where ___________


applicable.

 Crane driver. Certified. ___________

 Crane SWL (Safe Working Load) Clearly indicated on the crane. ___________
at two different radii.

24 FORKLIFT

 Engine equipped with emergency Shall cut air and fuel supply. ___________
stop.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 22/27

 Flashing warning light. ___________

 Acoustic signal for reverse. ___________

 Driver. Certified. ___________

25 HELIDECK

 Fire fighting equipment. Foam monitor & mains water supply ___________
to hose.
Date last function test.

 Two access/egress routes avai- Fire/crash procedure in place. ___________


lable.

 Warning signs posted at entrances. Passengers adequately briefed. ___________

 Deck lights in good working order. In accordance with MODU or other ___________
code.

 Heliport clear of loose objects & ___________


obstructions.

 Safety net in good condition. At least 1.5 m wide. ___________

 Non-skid surface on landing area. Net recommended on floating rigs. ___________

 Helicopter tie down points. In good condition and recessed. ___________

 Wind direction indicators. Visible from helicopter approa- ___________


ching landing area and in good
working order.

 Drains. Separate from common drains in ___________


case of fuel spillage.

 Assembly point. Safe location. ___________

 Refuelling tanks. Safely located "no smoking" signs ___________


Protected by deluge system.

 Fuel transfer equipment. In good condition, earthing wire ___________


connected, deadman control noz-
zle, no leaks.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 23/27

 Spill prevention equipment. Curbs, drip pans, drains. ___________

26 ANCHOR SYSTEM/JACKING
SYSTEM

 Moving machinery/gears. Properly guarded. ___________

 Motors. Sealed or covered. ___________

 Electrical equipment/cables. In good condition. ___________

 Dogs. In good condition. ___________

 Mooring bits, cleats, pad eyes, fair ___________


leads & roller type chocks in good
condition.

 Brake bands in good working Wear measurements taken ___________


order. regularly.

 Emergency release provided on Date of last function test. ___________


mooring system.

 Line out & tension meters. Date of last calibration. ___________


Tension read out in control room.

 Emergency towing arrangements. "Dead-ship" deployment. ___________

 Access hatches & watertight Well greased, W.T. doors regu- ___________
doors. larly tested.

 Mooring lines. Lines must be checked for wear ___________


(diameter & broken wires).

 Rig position indicator. In good working order. ___________

27 BALLAST CONTROL SYSTEM

 Moving machinery properly guard. ___________

 Fire extinguishers provided. ___________

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 24/27

 Control board gauges, lights & Properly labelled and in good ___________
switches. working order.

 Adequate ventilation/lighting. ___________

 Emergency lighting. In good working order. ___________

 Watertight doors/windows. In good condition. ___________

 Normal ballast controls. In good working order. ___________

 Standby/ballast controls. In good working order. ___________

 Normal/emergency ballast control Personnel adequately trained with ___________


procedures documented & readily alternates availability.
available.

28 LIFESAVING EQUIPMENT

 Coverage of life-jackets per regu- ___________


lation ; properly stored ; approved ;
labelled ; whistles, lights, reflective
tape.

 Work vests provided & used for Including safety lines etc. ___________
work over water.

 Ring Life Buoys - proper number, Equipped with light and smoke ___________
properly positioned. signals.

 Inflatable life-rafts equipped with Stored in good condition ; inspected ___________


automatic hydrostatic release de- annually ; instructions posted ;
vice and weak link. launching mechanism in good
condition.

 Totally Enclosed Motor Propelled Capacity as per MODU code. ___________


Survival Craft (TEMPSC). Clear, easy access provided.
Craft labelled per regulation
Maintained in working order
Regularly inspected and tested
Date of last lowering drill.
 Fast Rescue Craft per regulation. ___________

 Immersion suits per regulation. Availability, quantity, type. ___________

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 25/27

 Gas detection equipment. ___________

 H2S sensors should be installed at the drill floor, cellar deck, shale ___________
shaker, mud pit & mud pump room. H2S monitors installed in the control
room & in the mud logging unit.

 Hydrocarbon gas detectors installed in the same places with monitors in ___________
the control room & in the mud logging unit.

 Portable gas detection apparatus and explosive meter available. ___________

 Fire detection equipment. ___________

 Heat detectors, flame & smoke ___________


detectors in accommodation &
service areas with monitors in the
control room & the radio room.

29 H2S REQUIREMENTS

 Copy of appropriate H2S regu- Name of regulatory authority, copy ___________


lations. on site?

 Copy of well contingency plan on ___________


location.

 H2S safety training of personnel. Type & frequency of training. ___________

 H2S drills. Frequency, deficiencies corrected. ___________

 Materials & equipment suitable for Determine criteria for equipment ___________
H2S service. selection.

 Two wind direction indicators at ___________


strategic locations.

 Automatic H2S detection & alarm Alarms set at 10 ppm low level ___________
system. and 20 ppm high level, response
tested. Acoustic and visual signal.

 Flare line or flare boom. Flare ignition. ___________

 Self contained breathing At least 12 SCBA on board. ___________


apparatus (SCBA) maintained at
two places on board.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 26/27

 Escape masks Available for everybody ___________

Spare cartridge available.

 System of breathing air manifold, Also available on the choke ___________


hoses & masks on rig floor & in manifold and the shale shakers
briefing areas (cascade system). areas. Capacity no. of masks
available at each area.

 Systems to refill individual bottles ___________


and cascade bottles.

 O2 resuscitator ; stokes litter ; Personnel trained to use. ___________


retrieval ropes with harness.

 Facial hair requirements. Beards prohibited ? ___________

 Chalk boards ; bull horns. Fully equipped with pens & erasers. ___________

 Safe breathing areas designated. Muster areas identified & known. ___________

 Water base mud pH 10.0 or Available in significant quantities on ___________


greater ; mud additives to site.
neutralise H2S.

3 POLLUTION CONTROL EQUIPMENT

 Drain lines in good working order. ___________

 Drip pans provided below pollution ___________


sources.

 Oil & paint storage properly con- ___________


tained.

 Storage areas for liquid/solid was- ___________


tes properly contained.

 Sump system in good working ___________


order.

 Spill response notification infor- ___________


mation available on site.

 Labels/markings for hazardous Included on transport & cargo ___________


materials/ wastes & equipment. manifests.

 Salvage drums available. ___________

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?

Page : 27/27

 Segregated waste containers/ ___________


bins.

 Hazardous waste containers should ___________


be less than 30 gallons.

 Standby or supply vessels. Must be equipped with spray ___________


booms.

safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.