Oil Industry Safety Directorate
( Min. of P.& N.G., New Delhi )
Checklist:
DRILLING RIG
--------------------------------
DRILLING RIG
!i
EXTERNAL SAFETY AUDIT CHECKLIST/QUESTIONNAIRE
ORGANISATION _________________________________
DRILLING RIG ____________DR # 12.____________________
BUSINESS GROUP ________________________________
PROJECT _________ONGC – AHM ASST._______________________
PERIOD _______________________________
AUDIT ROUND ___________________________________
SAFETY AUDIT TEAM
--------------------- ----------------------- ----------------------
--------------------- --------------------- --------------------
----------------------- ------------------------
--------------------------- ----------
!ii
CONTENTS PAGE
1. GENERAL 1
2. SAFETY MANAGEMENT SYSTEM 1
3. TRAINING 2
4. ACCIDENT/INCIDENT REPORTING & INVESTIGATION 3
5. PLANNED INSPECTION AND MAINTENANCE 4
6. EMERGENCY PREPAREDNESS 10
7. WORK PERMIT SYSTEM 12
8. PERSONAL PROTECTIVE EQUIPMENT 12
9. HEALTH & HYGIENE CONTROL 12
10. COMMUNICATION 13
11. MODIFICATIONS 13
12. ENVIRONMENT 13
13. DISPOSAL OF ONSHORE DRILL CUTTINGS AND DRILLING FLUID 14
14. HOUSEKEEPING 16
15. SAFETY SIGNBOARDS AND MARKINGS 17
16. DOCUMENTATION 18
!iii
!iv
CHAPTER 1 : GENERAL
Brief Details of the Drilling Rig
1.0 Brief specification of the rig SJ PETROLIUM MACHINERY CO.LTD MODEL-
ZJ40 OF 1000HP
1.1 Date of commissioning 23.10.2016
1.2 Hook load capacity 250 T
1.3 Cycle speed
1.4 Total meterage & wells drilled 25099 & 18
1.5 Brief details of major events NA
complications etc.
1.6 Brief details of major modifications NA
/ replacements/ capital repairs undertaken.
1.7 Major achievements / Awards during last -
three years
-
1.8 Down time during last three years
CHAPTER 2: SAFETY MANAGEMENT SYSTEM :
2.1 Name of the safety officer designated for the rig? MR.Y.N.JOSHI
2.2 Do all levels understand their responsibilities? YES
2.3 Name of the project business group safety officer ? MR.M.MODI & MR.AZAZ
2.4 Is a copy of ONGC's/OIL's RCP(Recommended Code YES
of Practice)/ OISD standards(174,175,186,187,189,190)
2.5 available
Are copiesatof
site?
SOP(Safe Operating Procedures) YES
available?
2.6 Are following discussed in safety meetings held with YES
crew ?
a) Recommended practices and Safe operating procedures YES
b) Learning from past accidents/near misses. YES
7. Whether Pre-spud conference held? YES
a) No. of observations raised in last pre-spud conference 21
b) No. of unimplemented observations NIL
!i
8. Whether internal audits by following are carried out 09.05.2017
(Mention date of last audit)
a)Concerned Business Group
b) Project SEM
c) Regional SEM
d) DGMS YES
2.9 Whether system exists for monitoring recommendations YES
given by above audit teams?
2.10 Whether the recommendations are implemented with YES
time bound schedules?
2.11 How frequently are schedules reviewed by Area
Manager/ General Manager/Project Manager?
2.12 Are implications of un-implemented observations of YES
previous internal /external audits analysed?
2.13 Are due precautions taken for safe operation till YES
implementation of pending observations?
14. Do you have a schedule for inspection of all equipment YES
and systems available at the rig?
2.15 Are checklists used for these inspections? YES
2.16 Is it ensured after repair of the equipment that it would YES
perform safely to its capacity?
CHAPTER 3 : TRAINING
1. Staff
Total No. Of Employees
TRAINING COURSE TRAINED REFRESHER
COURSE
i) 33
MV
T
ii) 84
Fire
Fig
iii) 84
Firs
t-
3.2 Officers
Total No Of Officers-
10
TRAINING COURSE TRAINED REFRESHER
COURSE
i) Well Control 10
!ii
ii) Fire Fighting 10
iii) First -Aid 10
3.3 Are First Aid /fire fighting 11
Trained Personnel available in
each shift? Give numbers.
CHAPTER 4 : ACCIDENT / INCIDENT REPORTING & INVESTIGATION
4.1 Is a record maintained of all injuries and dangerous YES
occurrences?
4.2 Is there any system for periodic review of accidents/ YES
fire for analysing trend and prevent accidents/Fire?
4.3 Does Installation Manager investigate accident? YES
4.4 Are enquiries held for major accident? NIL
4.5 Are recommendations of enquiry committees YES
circulated within project/region?
4.6 Is there a procedure for informing the employees about YES
an accident and remedial measures to prevent
4.7 recurrence
Are ofenquiry
accident similar accidents?
reports reviewed at higher YES
levels?
4.8 Are "Near Miss" cases reported and analysed ? YES
4.9 How many near miss incidents have been reported in 25
last two years?
- From project 25
- From other projects -
4.10 Whether project SEM has issued any accident analysis NIL
report of last five years?
CHAPTER 5 : PLANNED INSPECTION AND MAINTENANCE
a) Non Destructive Testing
Is NDT of Mast and sub-structure done? YES
Is NDT of tubulars and handling tools viz. slips ,tongs, YES
Elevators, links etc. done? (DEC-2016)
Equipment Inspection
Blowout Control Equipment
1. Pressure Testing Test Pressure Last Tested on
i) BOP
!iii
a)Annular Preventer 300/3500 19.06.2017
b)Pipe Ram 300/5000 19.06.2017
c)Shear Ram/Blind Ram 300/5000 19.06.2017
ii) Well Head: 300/3500 19.06.2017
iii) Choke / Kill Manifold 300/5000 19.06.2017
iv) H P Lines 300/5000 19.06.2017
v) Kelly Cocks( Upper & Lower) 300/5000 19.06.2017
vi) FOSV 300/5000 19.06.2017
vii) Inside BOP 300/5000 19.06.2017
2. Is Pressure Testing Schedule / procedure YES
followed as per OISD STD. 174
3. Is Function Testing Schedule / Procedures YE
followed as per OISD STD. 174 S
4. BOP Control Unit
i) Location of Unit ( 30 Mtrs. away from well center) YES
ii) Are electric and pneumatic system operational? YES
iii) Is Hydro electric switch in Auto mode? YES
iv) Condition of the Unit
• Pressure Gauges OK
• Pressure steel lines / Fire resistant hoses OK
• Level of Hydraulic Oil OK
• Charging of Unit OK
• Availability of sufficient number of charged bottles OK
v) Availability of Remote control panels
• At Derrick Floor YES
• At safe distance near supervisor’s office YES
a) Are light indicators provided on Remote control panels? YES
b) Is air supply kept on to both the control panels? YES
!iv
c) Condition of pressure gauges OK
vi) Is Trip tank available and connected? YES
vii) Whether Trip sheets are being maintained ? YES
viii) Is movement of float free and any change in volume is YES
clearly visible from the Driller’s stand?
ix) Is kill pressure recorded with each pump every shift? YES
x) Is Leak Off Test/PIT values taken at previous shoe to NO
know MAASP?
xi) Availability of BOP locking wheels with suitable YES
extension rods protruding min. of 0.6m out of sub-structure?
xii) Availability of Kill sheet? YES
2. Derrick Floor
i) Condition of Derrick floor area viz Chequered plates etc. OK
ii) Are all openings properly covered? OK
iii) Are railings with toe board provided to cover Derrick OK
Floor area?
iv) Condition of pipe hooks and fingers OK
v) Condition of pipe stand(raft) OK
vi) Availability of safety belt? YES
vii) Availability of brass hammer and other emergency YES
tools?
3. Tongs
i) Condition of snubbing lines OK
ii) Condition of jerk line OK
iii) Clamps used on jerk line/snub lines/guy ropes/ OK
cat line as per safety rules?
iv) Condition of tong safety line OK
v) Condition of tong dies OK
vi) Condition of body and jaws of tongs OK
vii) Condition of elevators OK
viii) Condition of rotary slips OK
!v
ix) Condition of rollers and pneumatic lines of pneumatic OK
power tong
x) Are Anchors of back up lines available? OK
4. Air Winch
i) Condition of Air Winch OK
ii) Condition of foundation and its fastening with bolts OK
iii) Condition of Wire line OK
iv) Condition of Brake OK
v) Winding of wire line OK
vi) Guard of winch drum NOT AVAILBLE
5. Draw Works
i) Is the cat head drum smooth ? N/A
ii) Cat head divider provided? N/A
iii) Condition of automatic cat head N/A
iv) Condition of casing line OK
v) Condition of kick-back roller NOT INSTALLED
vi) Is casing line properly lubricated? YES
vii) Condition of draw works brake bands OK
viii) Condition of brake cooling system OK
ix) Condition of Air valves and hoses for any leakage OK
x) Condition of Auxiliary Brake OK
xi) Air ducts of blower motors extended to suck air from a NO
safe distance & height from well mouth?
6. Condition of twin safety device
a) Crown -o matic OK
b) Floor -o -matic, NOT WORKING
!vi
7. Driller’s Console Available Operational(Y/N)
i) Condition of Brake lever along-with locking chain YES YES
ii) Effectiveness of Air purging of Driller’s console YES YES
iii) Stand pipe pressure gauge YES YES
iv) Driller’s console pressure gauge YES YES
v) Drillometer YES YES
vi) Rotary Torque Gauge/Ammeter YES YES
vii) RPM meter YES YES
viii) Pump SPM meter YES YES
ix) Drillograph YES YES
x) Ton -mile indicator YES YES
xi) MVT(Mud Volume Totaliser) YES YES
xii) For MVT,have tank valves been tested for their YES YES
integrity to isolate active tanks?
xiii) On line Gas detection system with audio visual alarm NOT WORKING NOT WORKING
xiv) Emergency shutdown switch( Should operate on air YES YES
shut of engines)
xv) Portable Gas Detector YES YES
8. Mud Pump
i) Is approach to mud pump proper? YES
ii) Condition of safety valves with proper setting of relief OK
pressure & last checked on 17/06/2017
iii) The bleed line anchored or not YES
iv) H.P. Mud manifold lines secured YES
v) Provision of safety chain to HP vibratory hose YES
vi) Condition of pump floor working platform and area OK
around
vii) Condition of discharge pressure gauges OK
viii) Provision of proper guards on Cooling pump OK
ix) lube pump and supercharger pumps? OK
!vii
x) Condition of dampeners? When suction/ discharge 22\06\2017
dampeners were last charged and at what pressure? 600-650PSI
5.9 Air System
i) Whether Air drier unit provided in the system? YES
ii) Has hydraulic testing of Air tanks been done? YES
iii) Pressure relief valves of air tanks serviced and set YES
at appropriate pressure
5.10 Engines
i) Are all engines provided with discharge muffler and IN BULT -YES
spark arrestor?
ii) Are these regularly serviced? YES
iii) Condition of gauges and instruments OK
iv) Condition of diesel tank and injection line for leakages OK
v) Housekeeping in the engine house OK
vi) Are over-speed trips, low lube oil and hot engine shut YES
downs tested and recorded ?
vii) Are All moving parts properly guarded? YES
11. Electrical System
i) Proper double earthing of all electrical equipment / Mast YES
done with appropriate GI strip
ii) Maintenance of earthing pit and its resistance YES
measurement
iii) FLP features of Junction Boxes , lighting and cable YES
connection viz airgaps ,glands etc maintained in
iv) Availability and use of flame proof environment working YES
tools?
v) Insulation record? YES
vi) Proper mat near electrical panel? YES
vii) Lighting voltage phase to phase ( 215 V) YES
viii) Are all fuses/relays/circuit breakers are installed at their YES
respective places and no system is bypassed?
ix) Are values of settings of fuses relays within prescribed YES
limits (Check records and few samples )?
!viii
x) Condition of buss works and its IR survey OK
xi) Is air-conditioning of PCR room proper? YES
xii) Condition of electrical connections and cable OK
xiii) Laying of cables done properly? YES
xiv) Is emergency light provided for switch gear room ? YES
xv) Is aviation light of intermittent type fitted at top of the YES
mast?
xvi) Is safety torch available and properly maintained? NOT WORKING
12. Mud System
i) Minimum quantity of baryte stock as indicated in G.T.O YES
available at drillsite?
ii) Quantity and specific gravity of reserve mud as per plan YES
available?
iii) Are all rotating parts at Desander ,Desilter Shaleshaker YES
motors ,Mud agitators and Degasser motors adequately
iv) Condition of grating at shale shaker area? OK
13. De-gasser
i) Is degasser at shale shaker available in good working YES
condition?
ii) Is vacuum pump operating properly? YES
iii) Are degasser and mud/gas separators vented in a safe YES
manner(10 m vent of adequate size pipe)?
iv) Is poor boy degasser(mud gas separator) of proper size YES
Installed?
v) Is Poor boy degasser vented to a safe distance(10m)? YES
14. Emergency Escape Device
i) Escape device installed or not? YES
ii) Condition of escape device (working or not) YES
iii) Is angle of rope within permissible limits? YES
iv) Periodical operation / inspection carried out every week YES
v) Condition of track rope OK
vi) Condition of haulage rope OK
!ix
vii) Condition of hand brake OK
viii) Condition of clamps OK
ix) Condition of landing pad and escape route OK
x) Is it ensured that travel path is free from any YES
obstruction?
xi) Are all topmen confident of using the device? YES
5.15 Stairs and ladders
i) Condition of stairs/steps OK
ii) Whether stairs are leveled well secured and clear ? YES
iii) Whether side rails of stairs,rig floor and mud tanks in YES
position ?
iv) Condition of Mast ladder OK
v) Is ladder properly incured with the mast? YES
vi) Provision of fall prevention device and its condition OK
vii) Is fall prevention device used regularly by topmen? YES
viii) Are sufficient number of safety belts available? YES
15. Material Handling & Storage
i) Are there adequate storage facilities for the material YES
handled?
ii) Are all lifting appliances like crane ,fork lifts ,Chain CRANE CERTIFICATOR AVALABLE
pulley blocks etc. marked with safe working load (SWL)?
iii) Is chart showing safe lifting load at different boom angle NO
displayed in operator’s cabin?
iv) Are prescribed inspections and tests performed? YES
v) Who performs these inspections and tests? HSE AND RECORD MAINTAIN
vi) Are records of inspections maintained? YES
vii) Are all slings in good condition? YES
viii) Are safety devices like limit switch working? NOT
WORKING
ix) Are charts indicating capacity of each sling at different YES
angles and hitch available?
x) Are mud chemicals stacked properly? YES
!x
CHAPTER 6 : EMERGENCY PREPAREDNESS :
6.1 Is there a contingency plan? YES
6.2 Does it cover all anticipated emergency scenarios? YES
6.3 Whether resource requirement and role of different YES
personnel and agencies properly identified?
6.4 Are key personnel familiar with their emergency duties? YES
6.5 Are copies of duties of individuals to be performed in YES
emergency distributed and pasted at prominent places?
6.6 Is contingency plan up-dated regularly keeping in view YES
transfers/re-deployment of crew?
7. Is Disaster Management Plan available? YES
8. Whether commitment from all outside agencies obtained? YES
9. Are following available as per OISD standard-189? YES
a)Fire water and pump YES
b)Monitor/Hydrants YES
c)fire hoses YES
6.10 Are different type of portable fire extinguishers available YES
in sufficient numbers and kept at appropriate place?
11. Is 150 Kg. Trolley mounted foam type extinguisher placed YES
near diesel storage tanks?
6.12 How frequently are fire drills held? YES WEEKLY
6.13 Is response time of crew, activities carried out in mock YES
fire reported?
6.14 Are deficiencies observed in fire drill recorded and YES
corrective measures taken?
6.15 Do safety officers/fire officers brief crew about YES
combating fire in different Scenarios?
16. How frequently are BOP drills and trip drills held? MINIMUM 01 IN EACH SHIFT
17. Are BOP drills and trip drills held as per OISD STD. 174? YES
18. Any deficiency observed in BOP drill recorded and YES
corrective measures taken?
19. Is there a written procedure to check availability and YES
reliability of emergency equipment?
20. Who is responsible for checks? SHIFT INCHARGE
21. Are check lists used? YES
22. Is there an emergency vehicle available? YES
!xi
23. Is it in good working condition? YES
H2S Hazard Control
24. Is H2S anticipated in the area? NO
25. If so, are H2S detectors available at the rig? YES
26. Do employees understand H2S hazard and safety YES
procedures?
27. Is wind sock available? YES
28. Are chemicals like Iron sponge to neutralise H2S in mud NO
available in sufficient quantity?
29. Is self contained breathing apparatus available in adequate NOT AVALIBLE
number?
30. Are these fully charged and crew trained to use these sets? NOT AVALIBLE
Plant Security
31. Whether Rig is enclosed with fence? YES
32. Whether gates are manned? YES
33. Whether identity badges/cards are issued and worn by YES
employees and visitors and contractor personnel for
CHAPTER 7: WORK PERMIT SYSTEM :
1. Are cold /hot work permit in OISD proforma available? YES
2. Are all potential hazards before issuing permit analysed YES
and safety measures taken to prevent any incident?
3. Are all hazards explained by a responsible officer to YES
workmen assigned to execute the job?
7.4 Is execution of job supervised by competent officers? YES
CHAPTER 8: PERSONAL PROTECTIVE EQUIPMENT
1. Are work places where use of proper clothes safety shoes YES
helmets hand gloves goggles safety belts fall arrestors &
ear muffs etc. are compulsory : clearly demarcated?
2. Do persons use these equipment? YES
3. Is it ensured that contractual labourers use PPE’s? YES
8.4 Are individuals violating these instructions warned? YES
8.5 Is the quantity of PPE adequate? YES
!xii
8.6 Does the quality of PPE meet the approved standards? YES
8.7 Is there a program for changing out these equipment? YES
8.8 Where necessary are breathing apparatus & escape masks NOT AVALIBLE
readily available?
8.9 Are persons familiar with their use? NOT AVALIBLE
CHAPTER 9 : HEALTH & HYGIENE CONTROL :
1. Is there a contingency plan available for medical YES
emergency including evacuation?
2. Is it well understood? YES
3. Is there a medical check-up schedule for the employees? YES
4. If so ,what is the frequency of the check-up? TO-45YEAR -5YEAR
45-50YEAR - 3YEAR ABOVE
5. What percentage of employees have been medically ON GOING
checked?
6. Is there noise problem? NO
7. Has the problem been evaluated at engine room ,pump YES
house & Derrick floor area?
8. Is drinking water available?’ YES
9. Is test report of drinking water available? YES
10. Whether toilet provided at drillsite with water connection? YES
11. Do persons loading barytes and other chemicals use masks YES
and hand gloves?
12. Are all hazardous/toxic chemicals used are marked and YES
anti-dote mentioned?
13. Is eye-wash facility available at hopper area? YES
14. Are adequate first aid boxes available readily? YES
15. Is stretcher available? YES
16. Is blanket available? YES
CHAPTER 10 : COMMUNICATION :
10.1 Is round the clock communication facility from/to the rig YES
exists?
!xiii
2. What communication systems are available at the rig viz. INTER COM
MART ,VHF set ,TELNET etc.?
3. Do these systems have battery back-up in case of power YES
failure?
4. Is there a schedule for maintenance of these equipment? YES
CHAPTER 11 : MODIFICATIONS :
11.1 Has any major modifications/alterations on the rig been NO
done?
2. Is risk analysis done before modifications/alterations? NO REQ.
3. Was DGMS approval obtained prior to the changes? NO REQ.
CHAPTER 12 : ENVIRONMENT
12.1 Layout of Drillsite
a) Peripherial trench exists YES
b) Ring bund YES
12.2 Waste pit
a) Waste pit exists YES
b) Impervious lining/ brick lining done in the waste pit HDPA SHEEPRING
to prevent contamination of ground water?
c) Distance of waste pit from well center? 30 METER.
12.3 Cutting Pit
a) Cutting Pit exists? WASTE PIT ONLY
12.4 Oil Pit
a)Oil pit constructed to receive oil discharges NA
b)Distance of oil pit from well center in metres NA
c)Distance of oil pit from road in metres NA
12.5 Air Pollution
a)Ambient air quality YES
12.6 Water
a)Facilities for recycling water NO
b)Oil content in disposable water NIL
!xiv
12.7 Noise
a) Is noise level within limit? YES
b)Do employees use ear muffs/plugs where noise level is YES
more ?
CHAPTER-13 DISPOSAL OF ONSHORE DRILL CUTTINGS AND DRILLING FLUIDS:
1.0 GENERAL:
Name and location of Drilling rig WNGZ
Layout plan of drill site including effluent pit. Please YES
attach a sketch of the site indicating the location of
different facilities.
General housekeeping of the drill site Good / Satisfactory/ poor
2.0 TECHNICAL ENVIRONMENTAL DATA:
Meterage well-wise and wells drilled by the drilling 25099MTR
rig during last year along-with locations (whether
hilly terrain, plane land area, marshy land, coastal
locations, river basin)
Mud system WBM PHPA+WBM
being used at
the present
well and
details of the
mud system
used well
wise during
last year
Effluents being generated well-wise (m3/well drilled ONE WELL 77M/WELL -1314M3
and cumulative for the year)
Environment Management Plan of drilling location is
available at site ?
Brief of scheme of drilling waste water treatment and N/A
disposal facility with flow charts (Please enclose
separate sheets, if required)
!xv
Date and validity of the Environmental clearance / N/A
consent from MoEF / SPCB obtained for the location
/ installation /field.
Environment statement submitted N/A
to SPCB for the year
3.0 WATER ENVIRONMENT:
S.No. Item Observations of the Observation/recommend-
Organization
ation by OISD ESA Team
Source of fresh water: River / Lake / Tube-well TUBE WELL
/ other
Average water consumption in m3/day 30M3
20M3
i) Fresh :
ii) Recycled :
Ground water sampling test results before and NO
after drilling around the drill site.
(Enclose copy of results)
4.0 DISPOSAL OF DRILL CUTTINGS & DRILLING FLUIDS:
S.No. Item Observations of the Observation/recommend-
Organization
ation by OISD ESA Team
Whether oil based mud (OBM), NA
Synthetic base mud (SBM) is used for
operation / geological requirement?
Was MOEF/SPCB informed about its
use?
How the drill cuttings are disposed off? NA
Whether drill cuttings being washed
before disposal?
Whether drill cuttings being analysed NA
for toxicity and oil content (in case of
OBM) before disposal? If yes, please
furnish the result.
Whether drill cuttings and unusable NA
drilling fluid disposed off in a pit, lined
with impervious liner as per CPCB
guidelines, located off-site or on-site?
If so quantity in m3 of drill cutting and
drilling fluid?
!xvi
Whether toxicity data of chemical NA
additives used in the drilling fluid is
available and in line with MoEF
guidelines?
Whether the biodegradable chemical NA
additives (mainly organic constituents)
are used?
How drill cut wash and floor wash NA
water is being:
Treated:
Recycled:
Disposed:
Whether analysis of Hg & Cd contents NA
in mg/kg in the barite is available?
5. Chemical handling:
S.No. Item Observations of the Observation/recommend-
Organization
ation by OISD ESA Team
List of the chemicals used in drilling fluids? BARITE\BENTONITE
PHPA\CMC\SODA ASH
COSTIC SODA
Whether appropriate PPEs identified and being YES
used while handling chemicals?
Whether eyewash and body wash facility YES
available at the place of use of chemicals?
Whether MSDS of all chemicals used at site is YES
available?
Whether regular occupational health monitoring YES
of personnel handling hazardous chemicals is
being carried out?
CHAPTER 14 : HOUSE KEEPING
14.1 Are following operating area clean
a) Engine Room YES
b) PCR Control Room YES
c) Compressor Room YES
!xvii
d) Storage/Godowns YES
e) Loading / Unloading of chemicals YES
f) Mud Pump YES
g) Storm Water Channels YES
h) Diesel Oil Tank YES
i) Effluent Treatment Plant NO
j) Derrick Floor YES
k) Cellar Pit YES
14.2 Are there sufficient disposal bins with lid for rags and oil YES
waste?
14.3 Are these regularly emptied? YES
14.4 Do operators deal with spillages as they occur? YES
14.5 Is there water logging inside site during rains? NO
!xviii
CHAPTER 15 : SAFETY SIGN BOARDS AND MARKINGS
15.1 Is there a system of displaying safety signs for physical YES
hazards,mandatory action warnings, safety information?
15.2 Display of prohibitory signs like YES
a) No Smoking YES
b) No naked Lights YES
c) Photography prohibited YES
d) Un-authorised entry prohibited YES
e) Carrying Match Box, Lighters ,Explosives YES
prohibited
f) Electrical Danger Signs YES
g) Areas where safety shoes/helmets to be worn YES
h) Are hazardous zones demarcated as per OMR YES
15.3 Whether site plan has been properly displayed? YES
15.4 Whether contingency plan displayed to meet YES
Emergency / Fire?
15.5 Display of names of
a) First aid trained employees YES
b)Fire fighting trained employees YES
CHAPTER 16 : DOCUMENTATION :
16.1 Are following registers maintained at the installation
1. Training
- First Aid YES
- MVT YES
- Fire fighting YES
- Well Control YES
2. Form 'J' - Return for minor accident YES
3. Form 'K' - Minor accident register YES
4. 'Near Miss" Incidents Register YES
5. Minutes of Pre-spud meeting YES
!xix
6. Safety Meetings YES
7. PME of employees record YES
8. Fire Drill YES
9. B.O.P Drill (Trip drill/pit drill) YES
10. B.O.P ,HP lines, Choke& Kill manifold Pressure test YES
record
11. B.O.P. Function test YES
12. Inspection record ,Topman escape device YES
13. Casing line work done ,slip & cut record YES
14. Pressure Vessels hydraulic test YES
15. Earth Test Records YES
16. Insulation test records YES
17. Status of fire fighting equipment YES
16. 2 Are following records kept in files? YES
1. Safety circulars -
2. Audit by OISD YES
3. Internal Audits YES
4. Hot/Cold work permits YES
5. Daily checklists YES
6. Copies of DPR(Daily Progress Report) YES
7. N.D.T. records YES
16. 3 Equipment logbooks and maintenance record of all equipment to be maintained.
!xx
!i