MINISTRY OF EDUCATION, MALAYSIA
VOCATIONAL COLLEGE STANDARD CURRICULUM
COURSE INFORMATION
PROGRAMME : CONSTRUCTION TECHNOLOGY
COURSE NAME : TILING WORKS
COURSE CODE : WTP 3022
YEAR/SEMESTER : 2 / SEMESTER 3
CREDIT UNIT : 2.0
CONTACT HOUR : FACE TO FACE : 4.0 HOURS / WEEK
NON FACE TO FACE :
COURSE TYPE : VOCATIONAL
PREREQUISITE : -
CORE REQUISITE :
Document Page 1/13
COURSE OUTCOMES
At the end of the course, the students should be able to:-
1. Identify residential building finishes works requirement
2. Carry out tiling installation
COURSE DESCRIPTION
This course is designed as an introduction for students who wish to develop their competency relating to methods in servicing and maintaining
work place tools and equipment based on identification of materials for floor finishing by using blue print, work specification, catalogue and
brochures. The students will also be able to prepare good vertical backing surface to receive finishing and prepare good adhesives for tiling and
mosaic fixing using blue print, work specification, tools, scaffolding, brochures and tools.
This course will also focus on setting out and laying tiles on walls, on floor in a proper setting out using work specification, appropriate tools,
equipment and materials. Beside, students also will be able to identify, select and prepare materials and background surfaces by performing
water base or oil base painting according to proper method using blue print, work specification, appropriate tools, equipment and materials.
Workplace safety and cleanliness guidance are also included in this module that contributes to the state of knowledge about finishing work.
Document Page 2/13
CONTENT AND LEARNING STANDARDS
PROGRAMME : CONSTRUCTION TECHNOLOGY
COURSE NAME : TILING WORKS
CODE NAME : WTP 3022
CONTACT HOURS CONTENT STANDARD LEARNING STANDARD ASSESSMENT CRITERIA
80 HOURS 1. IDENTIFY RELATED KNOWLEDGE : i. Approved construction drawing interpreted and
(20 WEEKS) RESIDENTIAL finalize to determine design, dimension and
BUILDING FINISHES type of finishes work
WORKS i. Contract documents ii. Information regarding residential building
REQUIREMENT ii. Content of contract documents finishes works such as duration, budget,
Drawing resources and work schedule determined
Specification according to construction drawing
Bill of Quantities
Cost
Duration
iii. Approve construction drawing
Mechanical and Electrical plan ASSESSMENT CRITERIA
o Air con
o Fire fighting
o Electrical i. Type of finisher work listed and explained
Building plan according to approved construction drawing.
o Structure plan ii. Approved construction drawing details listed
o Architecture plan and explained based on design dimension and
o Internal plumbing type of finisher work
iv. Types of finishes such as
Wall finishes
Document Page 3/13
o Plaster and paint
o Wallpaper
o Pebble wash
o Wall tile
o Spray coating
o Stone cladding
Floor finishes
o Cement render
o Tile
o Pebble wash
o Marble
o Carpet
o Timber flooring
Ceiling finishes
o Fibrous ceiling
o Cement board
o Plaster ceiling
o Aluminium ceiling
o Timber ceiling
APPLIED SKILLS:
i. Obtain approved construction
drawing.
ii. Interpret approved construction
drawing
iii. Finalise approved construction
drawing details
iv. Determine information regarding
building residential building finishes
work
ATTITUDE/ SAFETY/ ENVIRONMENTAL :
Document Page 4/13
Attitude:
- Meticulous in
obtaining contract document
- Honesty in the privacy and
confidenciality of the contract documents
2. CARRY OUT TILING RELATED KNOWLEDGE : i. Type, size, colour, pattern of tiles determined
INSTALLATION according to approved construction drawing
i. Type, size, colour, pattern of tiles and client’s requirement
ii. Tiling preparation materials, tools and ii. Ensure waterproofing applied prior to the tiling
equipment installation
iii. Method and technique of level marking iii. Squareness and evenness of area determined
iv. Mixing cement mortar according to construction drawing
v. Method and technique of tail cutting iv. Materials, tools and equipment prepared
vi. Technique of tail Installation according to tiling installation requirement
vii. Technique of white cement application v. Marking level carried out according to
viii. Housekeeping and 3R activities construction drawing
vi. Cement mortar for jointing mixed according to
tiling requirement
APPLIED SKILLS: vii. Tile cut and arranged according to tiling
requirement
i. Determine type, size, colour, pattern of viii. Tiles installed according to installation
tiles practices
ii. Determine squareness and evenness of ix. White cement for jointing and pointing applied
area according to installation practices
iii. Prepare materials, tools and equipment x. Housekeeping and 3R (reduce, reuse and
iv. Carry out marking level recycle) activities carried out
v. Mixed Cement mortar for jointing
vi. Cut Tail according to tiling requirement ASSESSMENT CRITERIA
vii. Install Tiles according to installation
practices i. Type, size, colour, pattern of tiles listed and
viii. Apply White cement for jointing and explained
pointing ii. Materials, tools and equipment condition check
ix. Carry out housekeeping and 3R activities and arranged
Document Page 5/13
ATTITUDE/ SAFETY/ ENVIRONMENTAL : iii. Tiling area squareness, evenness and making
level quality checked according to construction
drawing
Attitude: iv. Cement mortar Mixed according to proper
proposition
- Ensure timely completion of work v. Tail prepared according to tiling preparation
- Diligent in carrying out finishes work quality and practices
alignment and sequence vi. Tiles installed according to tiling preparation
quality and practices
Safety vii. White cement used according to tiling
preparation quality and practices
- Adhere to safety requirement viii. Housekeeping and 3R activities properly done
according to safety procedure
3. COORDINATE RELATED KNOWLEDGE :
TILING INSPECTION i. Authorized personnel such as local authority,
i. Authorize site personnel such as registered architect and engineer determined
Local authority ii. Dimension, size, alignment, verticality,
Registered architect/engineer strength, durability, cleanliness, surface,
ii. Finishes inspection criteria pattern, squareness, evenness and jointing
Size determined according to the approved
Alignment construction drawing
Verticality iii. Inspection finishes work arranged
Strength/tie iv. Any non compliance finishes work rectified
Durability according to inspection result
v. Housekeeping and 3R (reduce, reuse and
Surface
recycle) activities carried out
Pattern
vi. Regulatory body requirement complied in
Cleanliness
accordance with finishes works activities
Squareness practices
Evenness vii. Safety rules and regulation adhered in
Jointing accordance with regulatory body requirement
Functionality
iii. Types of inspection form (RIN, RFI, etc) ASSESSMENT CRITERIA
used before, during and after inspection
Document Page 6/13
iv. Inspection form format i. Authorise personnel listed and confirmed
v. Method of filling in inspection form ii. Finishes work inspection excuted in
vi. Finishes inspection arrangement accordance with planning schedule
vii. Housekeeping and 3R activities iii. Size, dimension and alignment checked
viii. Regulatory body requirement on according to inspection criteria
residential building finishes such as iv. Finishes work non compliance rectification
Safety and health works done and quality checked according to
Quality control inspection result
v. Regulatory body requirement complied related
APPLIED SKILLS: to finishes work
Safety rules and regulation applied related
i. Confirm authorized personnel from to finisher work
authorities and consultant
ii. Confirm dimension size, alignment,
verticality, strength, durability,
cleanliness, surface, pattern,
squareness, evenness, functionality and
jointing
iii. Arrange finishes work Inspection
iv. Rectify any non compliance finishes
work
v. Carry out housekeeping and 3R activities
vi. Comply to regulatory body requirement
vii. Adhere to safety rules and regulation
ATTITUDE/ SAFETY/ ENVIRONMENTAL :
Attitude
- Ability to collaborate and cooperate with
other department
Document Page 7/13
CORE ABILITY
CORE ABILITY
SILA RUJUK LAMPIRAN A : JADUAL PEMETAAN NOSS DAN KSKV
SILA RUJUK LAMPIRAN B : JADUAL PEMETAAN NOSS DAN CORE ABILITY
Tools, Equipment and Materials (TEM)
ITEMS RATIO (TEM : Trainees)
1. Laser 1:5
2. String/Plumb bob 1:5
3. Spirit level 1:5
4. L-angle 1:5
5. Measuring tape 1:5
6. PPE 1:5
7. Trowel 1:1
8. Bucket 1:5
9. Wheelbarrow 1:5
10. Right angle 1:5
11. Levelling equipment 1:5
12. Hammer 1:5
13. Pliers 1:5
14. Brush 1:5
Document Page 8/13
15. Sponge 1:5
16. Tile cutter 1:5
17. Drill 1:5
18. Sample for construction drawing 1:1
19. Building plan approval documents) 1:1
References
REFERENCES
1. Edward Allen, Joseph Iano, (2009) Fundamentals of Building Construction: Material and Method, John Wiley And Son Inc, New Hersey, ISBN 978-
0-470-07468-8
2. Francis D.K. Ching, (2010), Building Construction Illustrated Fourth Edition, John Wiley And Son Inc, New Jersey, ISBN: 378-0-470-08781-7
3. Edward Allen, Rob Thallon, Fundamentals of Residential Construction, John Wiley And Son Inc, New Jersey, ISBN 978-0-470-5-4085-4
4. Whitney C Clark Huntington (2001), Building Construction Materials and Types Of Construction, Robert E. Mickadeit
5. N. Jackson (1984), Civil Engineering Materials, English Language Book Society Macmillan (Elbs).
6. William Irvine (2005), Surveying for Construction, McGraw-Hill Education.
7. Nunally, S.W (1998), Construction Methods and Management, Prentice Hall.
8. Wang, B.T.H (1987), Construction and Development - With Reference to Malaysian Practice', Pelanduk Publication.
9. Peter Domone, John Hilston(1994), Construction Materials.
Document Page 9/13