Sustainability
CSR produces a range of energy efficient building products and systems which
have the potential to reduce heating and cooling costs of homes and buildings,
essentially saving tonnes of greenhouse gases each year. Many of these products
are also produced from recycled materials thus:
• Reducing the demand for raw materials,
• Lowering emissions and pollution during manufacturing,
• Saving land-fill space.
Ceiling Systems E
Services Systems F
Index In
�
015 B10 231 B18 515 B20 722 D16 835 E9 958 E11
������������������������ 032
035
B10
B10
240
241
B19
B19
520
521
B21
B21
724
730
D16
D16
837
838
E9
E9
967
968
B31
B31
039 B11 243 B19 522 B21 731 D16 839 E9 969 B31
040 B12 244 B19 523 B21 732 D16 841 E10 970 B30
043 B14 248 B31 526 D12 737 D6 845 E10 971 B30
b a c k c o v e r. H e r e a l l
061 B27 291 B24 534 D12 764 D6 853 E14 987 E18
�
075 B12 293 B24 540 D10 766 D6 857 E14 993 E18
080 B12 294 B25 541 D10 767 D7 858 E14 994 E18
������������������������ 089
090
B29
B29
295
296
B25
B26
542
543
D10
D10
768
769
D7
D7
859
860
E14
E15
995
997
E18
E18
s y s t e m s a re l i s t e d i n
091 B29 297 B25 544 D11 774 D8 862 E13 75PP D13
�
121 B33 315 C6 550 C9 778 D9 866 E16 Hebel
122 B33 320 C6 551 D11 779 D9 867 E13 Powerwall D15
��������������������
numerical order with a
123 B33 325 C6 555 C9 780 D8 868 E13 001
�
SS12 F5
���������������� 171
175
B37
B23
411
415
C15
C15
652
653
C7
C8
807
808
E6
E6
902
903
C17
C17
SS17
SS18
F5
F6
178 B37 419 C15 654 C8 809 E6 911 C18 SS19 F6
179 B37 425 C13 660 C8 810 E7 912 C18 SS20 F6
SS21 F6
�
186 B35 455 C13 663 C14 813 E7 920 C20 SS23 F6
192 B38 475 C13 664 C14 814 E7 921 C20 SS24 F6
��������������������������������� 193
194
B38
B38
480
493
C13
C23
665
670
C8
C14
815
816
E7
E7
923
924
C20
C20
SS26
SS30
F6
F7
195 B38 494 C23 671 C14 817 E7 925 C20 SS31 F7
each page.
196 B38 495 C23 672 C14 818 E7 927 C20 SS32 F7
197 B38 496 C23 674 C10 819 E7 928 C20 SS33 F7
SS34 F7
��
198 B38 497 C23 675 C10 820 E6 940 B32
206 B15 498 C23 677 C9 821 E8 940+ SS38 F7
B32
����� 207 B15 500 C11 678 C9 822 E8 ExpressWall SS39 F7
208 B15 501 C11 680 C10 823 E8 941 B32 SS40 F8
212 B16 502 C11 681 C10 824 E8 942 B32 SS41 F8
216 B16 503 C11 682 C10 825 E8 945 B28 SS42 F8
217 B15 506 C12 690 C21 826 E8 946 B28 SS44 F4
218 B15 507 C12 693 C21 827 E8 947 B28 SS45 F4
222 B17 508 C12 694 C22 829 E8 950 E12 SS46 F4
223 B17 509 C12 695 C22 831 E9 951 E12
225 B17 510 B20 696 C21 832 E9 952 E12
�������������
�� The Red Book™
In
➊ ➋ ➌
Quick Find Application Index – Page A6 Typical Building Class Framing System Page
Symbol
& Application Type Nº Nº
A fast way to find a suitable system is to check the Application Index, page A6. This 206 B15
table provides recommended systems based on applications and building class. 218
216
B15
B16
Class 1, 2, 3 Steel
240 B19
➊ Select the appropriate Building Class and Application. 512 B20
➍ Party Walls –
1 to 3 storeys 294 B25
➋ Select a Framing Type. Walls separating sole
occupancy units with
678 C9
FRL 60/60/60, 575 C9
Timber
➌ Note System and Page number. (In this PDF file you can click on the System or Page Rw + Ctr > 50
and discontinuous
500 C11
502 C11
construction.
Number to go directly to the system page). EXIT
761 D6
Masonry 764 D6
➍ The relevant systems are tagged with the associated Shortcut Symbol. Check for 781 D8
PKA-052
➋ Check for appropriate fire rating (FRL if required). • Lining material as per system table.
• Steel Studs at 600mm maximum centres.
• Lining material as per system table.
NOTES: ➎ ➏ ➐
➌ Check for appropriate acoustic performance (Rw/Rw+Ctr if required).
Acoustic performance valid for studs of 0.50 BMT.
*ACR = Axial Capacity Reduction
– /60/60 (b) 50 Glasswool Partition batts – 14kg/m3 42/33 44/35 44/35 46/37 48/40
30/30/30 BOTH SIDES (c) 75 Glasswool Partition batts – 11kg/m3 – 45/36 44/35 46/37 48/40
60/60/60*
– /90/90
➊
CSR 055
(a) Nil
WALL THICKNESS mm
FAR2357
➍
BOTH SIDES
• 1 x 16mm GYPROCK
FYRCHEK plasterboard.
(d) TSB3/ASB3 Polyester batts
(e) 60 Soundscreen™ 1.6 batts
➌
(c) 75 Glasswool Partition batts – 14kg/m3 – 45/36 46/37 47/38 49/41
41/34 41/34 43/36 44/37 46/40
– 43/33 45/35 46/36 48/39
WALL THICKNESS mm 83 96 108 124 182
➏ Check the typical layout illustration for the basic system format.
(a) Nil 44/37 45/38 46/40 47/41 49/43
– /120/120 CSR 075 (b) 50 Glasswool Partition batts – 11kg/m3 49/40 50/41 51/43 52/44 53/45
90/90/90 BOTH SIDES
➑
(c) 75 Glasswool Partition batts – 11kg/m3 – 52/43 52/44 53/45 54/46
120/120/120* • 2 x 13mm GYPROCK
*ACR10% EXIT (d) TSB3/ASB3 Polyester batts 49/42 49/42 50/44 51/45 52/46
FYRCHEK plasterboard.
(e) 60 Soundscreen™ 1.6 batts – 51/41 52/43 53/44 54/45
FAR2357
– /180/180 CSR 080 (b) 50 Glasswool Partition batts – 11kg/m3 48/39 50/42 51/43 52/44 53/45
and BOTH SIDES (c) 75 Glasswool Partition batts – 11kg/m3 – 52/44 52/44 53/45 54/46
120/120/120 • 2 x 16mm GYPROCK
(d) TSB3/ASB3 Polyester batts 48/41 49/43 50/44 51/45 52/46
FYRCHEK plasterboard.
FAR2357 (e) 60 Soundscreen™ 1.6 batts – 51/42 52/43 53/44 54/45
➑ Check for alternative systems on the same and adjacent pages. WALL THICKNESS mm 115 128 140 156 214
section. Installation layouts are shown at the back of sections (where applicable).
��������
�� ��������������������
�� ���������������������������������������������������
���������������
��������������������������
��������������� �������������������� ��������������������
���������������
������ ����� ������
�����������
���� ��������������������������������� ����� �����
���� ������������������������������������
����� �����
���� �������������
�� ��������������
Contents
Application Index –
Common Solutions A6
An Introduction to The Red Book™ A7
Components A7 – A15
Product Properties A15 – A 17
Material & Construction Standards A17
Fire Testing A17 – A18
Building Acoustics A18 – A19
Building Acoustics in Practice A19 – A21
Definitions A21 – 22
Typical Building Class Framing System Page Typical Building Class Framing System Page
Symbol Symbol
& Application Type Nº Nº & Application Type Nº Nº
206 B15 Class – All 600 B11
Steel
218 B15 605 B11
216 B16 Walls in Wet Areas –
654 C8
Class 1, 2, 3 Steel Walls for residential Timber
240 B19 and commercial 503 C11
Party Walls – 512 B20 bathrooms Masonry 774 D8
1 to 3 storeys 294 B25 121 B33
Walls separating sole
678 C9
occupancy units with 127 B34
FRL 60/60/60, 575 C9 Class 1, 2, 3, 9c
Timber Steel 185 B35
Rw + Ctr > 50 500 C11
and discontinuous 167 B36
502 C11 Residential
construction. External Wall with 170 B37
761 D6 Fire Rating –
900 C17
Masonry 764 D6 Rated 60/60/60 from
outside 902 C17
781 D8 Timber
923 C20
Class 2, 3 223 B17
230 B18 696 C21
Party Walls – Steel 240 B19 122 B33
High Rise Class 5, 6, 8, 9
> 3 storeys 512 B20 Steel 129 B34
Walls separating 294 B25 Commercial
External Wall with 178 B37
SOU’s with FRL 761 D6
60/60/60, Fire Rating – Girts 940 B32
Rw + Ctr > 50 764 D6 Rated 60/60/60 or
Masonry Power-
and discontinuous 781 D8 90/90/90 from outside.
Hebel C19
construction. Wall
542 D10
Class 2, 3, 5, 6 970 B30
Class 2, 3, 9 075 B12
Steel
Steel Shaftwall/Laminated
Services Systems 967S B31
Walls in Corridors 614 B13
and Stairways –
EXIT Robust walls with 355 C7 SS10 F5
FRL 60/60/60 Class 2, 3, 4, 9
and 90/90/90 for Timber 375 C8 Steel SS12 F5
passageways and fire Walls Separating
stairs Services
455 C13 090 B29
Duct, pipe, etc., with
Rw + Ctr = 40
Class 2, 5, 6, 8 080 B12 or SS01 F4
Steel Rw + Ctr = 25. Timber
Walls in Plant Room 971 B30 SS02 F4
Fire rated walls with
Rw > 50 Timber 380 C8
Class 1, 2, 3 829 E8
010 B10
Class 5 Ceilings 827 E8
015 B10 Steel
Floor/Ceilings with
or
Steel 032 B10 Rw+Ctr >50
Partition Walls – Timber 839 E9
Walls with no fire or 055 B12 or
acoustic ratings for Roof/Ceilings with
290 B24 Rw>45 849 E10
offices, shops, etc.
310 C6
Timber 981 E17
354 C7 Class 6, 8, 9
983 E17
Class 1, 2, 5 208 B15 Steel
Ceilings with Fire 994 E18
Studio/High Rating from above
Steel 125 B22
Acoustic 997 E18
Performance Walls – Class 5, 6, 8, 9
061 B27
Walls with high
acoustic transmission 890 E19
480 C13 Ceilings with
performance for use in Acoustic Panels
home cinema rooms, Timber
music studios, etc. 403 C15
600mm (nominal)
recessed.
500mm
Gyprock ® Shaft Liner Panel is a 25mm thick sheet
composed of a glass fibre reinforced gypsum core encased
in a heavy duty linerboard. Gyprock Shaft Liner Panel is
used to enclose lift shafts, stairwells and service shafts in
multistorey construction. Gyprock Shaft Liner Panel can be 1100mm
1200mm (nominal)
used to achieve fire resistance in wall and ceiling systems.
Gyprock ® Flexible Plasterboard has been designed
for curved wall and ceiling systems and has an enhanced
core to enable bending to a small radius. It is composed of Supatone™ is a paper faced white ceiling tile suited to basic
a gypsum core encased in a heavy duty linerboard. Long commercial ceilings. A low maintenance bright white panel,
edges are recessed to assist in producing a smooth, even it can be wiped clean with a damp cloth.
and continuous surface once jointed. Gyprock® Flexible
Freshtone™ Diamond White has a lightly textured vinyl
Plasterboard is 6.5mm thick and is installed in two layers.
surface which resists fading and mould growth. With a
Cemintel™ Wallboard is an autoclaved, cellulose fibre white finish, it is suitable for shopping centres, factories and
reinforced cement sheet that is immune to permanent offices.
water damage and has high impact resistance. Cemintel™
Wallboard is suitable for internal walls as well as internal and
external ceiling applications. It has a recess on both long
edges so that sheets may be flush jointed, using CSR GFC
jointing materials.
Gyprock® Perforated Plasterboard has been designed
for use in ceilings where additional sound absorption is
required. It is composed of a gypsum core encased in a
heavy duty linerboard and incorporates CD technology. Long
edges are recessed for flush jointing. Perforations total 8.2%
of the sheet area. For detailed pattern information, refer to
Section ‘E’.
3600mm (nominal)
GYPROCK® GYPROCK®
Ecophon™ Ceiling Panels TEMPO CORNICE CLASSIC CORNICE
Ecophon™ ceiling panels have a bonded glasswool core
for high acoustic absorption performance and the Akutex T
finish to provide an attractive easy care surface.
The range includes:
Focus: 20mm thickness panels with a range of edge profiles.
Also available for direct fixing to battens or existing ceiling.
The Akutex T surface is micro-perforated vinyl paint that can
be easily wiped clean.
Advantage: 15mm thickness panels with a glass tissue
facing to meet general conditions and good acoustic
GYPROCK® SHADOWSET GYPROCK® SHADOWSET
performance. – FLUSH – PLANT-ON
Master: 40mm thickness panels with the highest acoustic
performance plus Akutex T finish.
Hygiene: 20mm thickness panels with a ‘cleanroom’
classification. Provides excellent
acoustic performance and the
Akutex T finish is suitable for
pressure wash-down situations. For
detailed information, please refer to
the ‘Ecophon Product Catalogue’
Akutex T
Product Abbreviation
45mm Bradford Rockwool Partition batts (1350 x 580mm – 38kg/m3) 45 Rockwool Partition batts
60mm Bradford Soundscreen™ R1.6 wall batts (Rockwool), 1350 x 430 or 580mm – 35kg/m3 60 Soundscreen™ 1.6 batts
75mm Bradford Soundscreen™ R2.0 wall batts (Rockwool), 1350 x 430 or 580mm – 32.5kg/m3 75 Soundscreen™ 2.0 batts
88mm Bradford Soundscreen™ R2.5 wall batts (Rockwool), 1350 x 430 or 580mm - 40kg/m3 88 Soundscreen™ 2.5 batts
120mm Bradford Soundscreen™ R3.0 floor / ceiling batts (Rockwool), 430 x 500mm - 30kg/m3 120 Soundscreen™ 3.0 batts
50mm Bradford Glasswool Partition batts, 450 or 600mm - 11kg/m3 50 Glasswool Partition batts – 11kg/m3
75mm Bradford Glasswool Partition batts, 450 or 600mm - 11kg/m3 75 Glasswool Partition batts – 11kg/m3
110mm Bradford Glasswool Partition batts, 450 or 600mm - 11kg/m3 110 Glasswool Partition batts – 11kg/m3
165mm Bradford Glasswool Partition batts, 450 or 600mm - 11kg/m3 165 Glasswool Partition batts – 11kg/m3
50mm Bradford Glasswool Partition batts, 450 or 600mm - 14kg/m3 50 Glasswool Partition batts – 14kg/m3
75mm Bradford Glasswool Partition batts, 450 or 600mm - 14kg/m3 75 Glasswool Partition batts – 14kg/m3
100mm Bradford Glasswool Partition batts, 450 or 600mm - 14kg/m3 100 Glasswool Partition batts – 14kg/m3
75mm Bradford Gold Batt™ R1.5 wall batts (Glasswool), 1160 x 430 or 580 – 8.8kg/m3 75 Gold Batts™ 1.5
90mm Bradford Gold Batt™ R2.0 wall batts (Glasswool), 1160 x 430 or 580 – 10.5kg/m3 90 Gold Batts™ 2.0
115mm Bradford ceiling Gold Batt™ R2.0 (Glasswool), 1160 x 430 or 580 – 6.0kg/m3 115 Gold Batts™ 2.0
140mm Bradford ceiling Gold Batt™ R2.5 (Glasswool), 1160 x 430 or 580 – 6.4kg/m3 140 Gold Batts™ 2.5
165mm Bradford ceiling Gold Batt™ R3.0 (Glasswool), 1160 x 430 or 580 – 6.7kg/m3 165 Gold Batts™ 3.0
185mm Bradford ceiling Gold Batt™ R3.5 (Glasswool), 1160 x 430 or 580 – 6.9kg/m3 185 Gold Batts™ 3.5
215mm Bradford ceiling Gold Batt™ R4.0 (Glasswool), 1160 x 430 or 580 – 6.9kg/m3 215 Gold Batts™ 4.0
Tontine TSB 2 (50mm) / Autex ASB 2 (50mm) Polyester Insulation TSB2/ASB2 Polyester batts
Tontine TSB 3 (65mm) / Autex ASB 3 (60mm) Polyester Insulation TSB3/ASB3 Polyester batts
Tontine TSB 4 (75mm) / Autex ASB 4 (70mm) Polyester Insulation TSB4/ASB4 Polyester batts
Tontine TSB 5 (85mm) / Autex ASB 5 (80mm) Polyester Insulation TSB5/ASB5 Polyester batts
Tontine Blanket (25mm) 10kg/m3 Polyester Insulation TBL/1025 Polyester
NOTES:
Type 'W' screws of equivalent length may be used as an alternative to Type S ‘NP’ when fixing to timber only.
Predrill 9mm and 12mm Wallboard for easier fixing.
Fixings are suitable for internal applications only.
NP = Needle Point Screws.
DP = Drill Point Screws.
GAL = Galvanised.
TABLE A9: FIXING FIBRE CEMENT AND PLASTERBOARD TO STEEL 0.5 – 0.8mm BMT
TABLE A10: FIXING FIBRE CEMENT AND PLASTERBOARD TO STEEL 0.8 – 2.0mm BMT
NOTES:
Predrill 9mm and 12mm Wallboard for easier fixing.
Fixings are suitable for internal applications only.
NP = Needle Point Screws.
DP = Drill Point Screws.
GAL = Hot-Dip Galvanised.
Properties For wet area walls and external ceilings subject to intermittent
high humidity where plasterboard is specified, Gyprock
Aquachek™ or Gyprock FyrchekMR™ or Cemintel™ Wallboard
Thermal & Moisture Stability must be used. In all cases follow product installation
CSR GFC plasterboard and fibre cement products are stable brochures.
building materials when subjected to the normal range of
interior temperature and humidity conditions.
Thermal coefficient of Linear Expansion (α).
• Plasterboard: α =16.2 x 10 -6 mm (mm/ºC) in the
temperature range 4°C to 38°C.
• Fibre cement: α = 7.5 x 10-6/°C.
Structural Properties
Cemintel™ Wallboard properties at EMC*/Saturated.
• Density (kg/m3) 1350/–.
• Flexural Strength. Impact Resistance
Parallel to sheet length. Gyprock ® plasterboard of 10mm and 13mm thickness
- ultimate (MPa) 13/9.
provide adequate resistance to soft body impacts likely in
- yield (MPa) 10/6.
Parallel to sheet width. domestic or light commercial use respectively.
- ultimate (MPa) 16/11. Walls lined with Gyprock Fyrchek ™ , Impactchek ™ and
- yield (MPa) 12/8.
Cemintel™ Wallboard can meet various requirements of
• Modulus of Elasticity (GPa) 6/4. Specification C1.8 of the Building Code of Australia 2004.
NOTE: *EMC = Equilibrium Moisture Content. This clause specifies resistance to Uniform Distributed Loads
(UDLs), surface indentation and impact from a weighted
sand bag that is dropped from a specified height. Refer to
Table A11 for performance details.
TABLE A11: IMPACT AND UDL RESISTANCE FOR STUD SPACING AND LINING MATERIAL COMBINATIONS
Typical Wall Application Wall Lining Material Stud Spacing Soft Body Impact Resistance UDL Resistance
Walls of stairways and 2 x 13mm Gyprock Fyrchek 600mm 175mm ≥ 0.35 kPa
service shafts and fire
isolated exits generally. 1 x 16mm Gyprock Fyrchek 600mm 150mm ≥ 0.35 kPa
900
800
700
600
500
Moderate
Low
Degradation
Minimum Performance Levels
for Services
Single stud, insulated The BCA sets out minimum performance levels for isolation
of noise from services based on acceptable standards for
affordable housing. The performance levels are in terms of
Rw and Rw+Ctr.
Low Low Degradation
These levels may need to be increased for:
Double stud, insulated • The nature of the noise source and adjacent occupant
activity. Some noises are particularly annoying to
occupants.
• Systems that meet the new BCA minimum R w +C tr
requirements may have lower performance than systems
that meet the corresponding Rw requirements.
• Variation in occupant perceptions of noise,
Contents
Steel Stud Selection Tables B2 – B5
Introduction B5
Design Considerations B5 – B7
Installation B7 – B8
Components B8 – B9
System Specifications
Single Stud B10 – B13
Rondo Quiet Stud B14
Double Stud B15 – B16
StrataWall™ B17 – B19
Party Wall B20 – B21
Staggered Stud B22 – B23
SecurityWall™ B24 – B26
Resilient Mount & Furring B27
Cinema Wall B28
Studs Lined One Side B29
Shaft Wall B30
Services Walls B31
External Walls B32 – B37
Column & Beam B38
System Installation Details B39 – B49
TABLE B1: MAXIMUM WALL HEIGHT WITH RONDO LIPPED STEEL STUDS – NON LOADBEARING WALLS
– WALLS GENERALLY (LOAD = 0.25kPa)
Stud Size 51 64 76 92 150
Wall Frame and
BMT 0.5 0.75 0.5 0.75 1.15 0.55 0.75 1.15 0.55 0.75 1.15 0.75 1.15
Lining Configuration
Linings (mm) Maximum Wall Height (m)
10 2.77 2.91 3.33 3.93 4.17 3.70 4.43 4.65 4.54 4.83 5.11 6.55 7.22
600mm max. cts
13 3.20 3.32 3.72 4.22 4.43 4.13 5.02 5.22 4.94 5.50 5.75 6.99 7.54
16 3.38 3.52 3.91 4.35 4.52 4.30 5.25 5.42 5.18 5.71 5.92 7.19 7.65
CSR 080(-/180/180) 2.60 2.60 3.30 3.60 4.30 3.80 4.10 5.00 4.40 4.80 5.00 7.00 7.65
600mm max. cts 10 2.32 2.60 2.72 3.13 3.53 3.20 3.58 4.05 3.61 4.13 4.69 5.33 6.81
13 2.32 2.60 2.72 3.25 3.58 3.24 3.82 4.05 3.61 4.18 4.69 5.37 6.81
16 2.32 2.60 2.75 3.28 3.59 3.25 3.87 4.05 3.61 4.20 4.69 5.37 6.81
TABLE B2: MAXIMUM WALL HEIGHT WITH RONDO LIPPED STEEL STUDS – NON LOADBEARING WALLS
– WALLS OF SHAFTS AND FIRE ISOLATED EXITS (LOAD = 0.35kPa)
Stud Size 51 64 76 92 150
Wall Frame and
BMT 0.5 0.75 0.5 0.75 1.15 0.55 0.75 1.15 0.55 0.75 1.15 0.75 1.15
Lining Configuration
Linings (mm) Maximum Wall Height (m)
10 2.42 2.55 2.93 3.49 3.70 3.25 3.81 3.81 3.81 3.81 3.81 3.81 3.81
600mm max. cts
13 2.81 2.92 3.29 3.75 3.94 3.65 4.43 4.60 4.39 4.84 5.06 5.71 5.71
16 3.00 3.12 3.45 3.84 3.99 3.78 4.62 4.77 4.60 5.01 5.20 6.37 6.89
CSR 080(-/180/180) 2.60 2.60 3.30 3.60 4.30 3.78 4.10 4.77 4.40 4.80 5.00 6.37 6.89
600mm max. cts 10 2.07 2.34 2.34 2.80 3.15 2.76 3.20 3.62 3.06 3.70 3.81 3.81 3.81
13 2.07 2.34 2.34 2.80 3.17 2.76 3.37 3.62 3.06 3.70 4.20 4.83 5.53
16 2.07 2.34 2.34 2.90 3.18 2.76 3.41 3.62 3.06 3.70 4.20 4.83 5.53
NOTES:
TABLE B3: MINIMUM NUMBER OF NOGGINGS
Deflection Limit is span/240 to a maximum of 30mm, in accordance
with BCA Specification C1.8. Lining Configuration Wall Height (m) Number of Noggings
Tabulated heights do not include axial loads (except self weight) or 0 - 4.4 0
shelf loading. Lined Both Sides
4.4 - 8.8 1
Loadings: Table B1 Pultimate = 0.375 kPa, Pservice = 0.25 kPa. 0.0 - 3.0 1
Loadings: Table B2 Pultimate = 0.525 kPa, Pservice = 0.35 kPa. Lined One Side 3.0 - 6.0 2
Walls are not for external applications.
6.0 - 8.0 3
All loadings in accordance with AS1170:2002.
Staggered Studs All 0
Walls analysed in accordance with AS4600:1996.
Noggings in accordance with Table B3.
Staggered stud walls use 64mm lipped studs in 92mm track with
Gyprock® Staggered Stud Clip.
Tables have been prepared by Rondo Building Services Pty Ltd.
2 layers x 13mm
300mm max. cts 3.00 3.50 3.90 5.90 6.40
GYPROCK FYRCHEK
9mm Cemintel™
3.00 3.44 3.71 5.90 6.00
300mm max. cts Wallboard
Supplier Stramit
Wall Frame Steel Stud Type TH64075 TH64100 TH64120 TH96075 TH96100 TH96120
and Lining Configuration Stud Depth/BMT mm 64/0.75 64/1.00 64/1.20 96/0.75 96/1.00 96/1.20
Min. Lining Thickness Maximum Wall Height (m)
2 layers x 13mm
300mm max. cts 3.86 4.17 4.37 4.96 5.44 5.81
GYPROCK FYRCHEK
9mm Cemintel™
3.50 3.87 4.11 4.82 5.30 5.65
300mm max. cts Wallboard
TABLE B6: MAXIMUM WALL HEIGHT FOR RONDO QUIET STUD – WALLS GENERALLY (UDL = 0.25kPa)
13 4.13 4.41
16 4.30 4.58
Wall Frame and Lining Configuration Security Panel Minimum Lining Thickness (mm) Maximum Wall Height (m)
TABLE B8: MAXIMUM WALL HEIGHT FOR GYPROCK STRATAWALL™ WITH H-STUDS AT 600mm CENTRES
0.25 3.0 –
0.25 – 3.0
or or
TABLE B9: MAXIMUM WALL HEIGHT FOR GYPROCK STRATAWALL™ WITH C-STUDS AT 600mm CENTRES – WALL
SYSTEM FRL –/60/60
• To be in accordance with AS4600 or AS3740. • In wet areas, Gyprock Fyrchek MR™ must be used in lieu
of Gyprock Fyrchek™.
• Assuming no contribution to axial strength is required of
the wall linings. • For single layer applications, butt joints must be backed by
either a stud or nogging. This is not required for recessed
To meet the stated Fire Resistance Level (FRL), the axial load
joints.
capacity of some wall systems is reduced. This is a result of
the steel weakening at high temperature during a fire test. • For double layer vertically sheeted applications,
The systems are noted with an Axial Capacity Reduction plasterboard butt joints may be reinforced using laminating
percentage (ACR%). For these systems, the designer must screws without the need for framing support.
increase the applied loads before selecting stud size to • Joints in the outer layer of all systems lined with
compensate for the axial capacity reduction percentage, as plasterboard or Wallboard must be set with Gyprock®
shown in the system specification. paper tape. As a minimum, a single coat finish may be
Studs are to be placed at 600mm maximum centres with used.
nogging provided as detailed in Table B1 or B2, or as noted • All joints in Texture Base Sheets must be formed on
in the system table. framing.
The capacity of head and base tracks for walls subject to • Joints in external systems lined with Cemintel™ Texture
wind loads must be checked. Typically, studs are cleated Base Sheet must be set with the tape and compound
at head and base with a Rondo angle bracket. Contact recommended for the texture coating system
Rondo for more information on designing walls subject to
• Spacing of girts in horizontally framed systems must be
wind loads.
as shown in installation detail FIG B17.
The steel frame wall systems in this manual are suitable For information on frame design and detailing, including
for the stated FRL when designed in accordance with the treatment at junctions, sub floor and roof areas, cavity barriers
structural considerations above. and penetrations, refer to Section ‘Z’ of this manual, and
brochure NºGYP544, Gyprock Steel Frame Wall Systems.
CSR GFC fire rated steel stud wall systems have been
designed with fire protection that limits the temperature of the The Fire Resistance Level (FRL) of the systems detailed in
steel framing to a maximum of 450°C at the fire resistance this section will not be detrimentally affected by;
level (FRL) stated. Therefore the structural design of the • Increasing the thickness of the wall.
framing need only provide for normal temperature conditions, • Increasing the cross-sectional dimensions of the framing
and no additional consideration of fire rating is required. In elements.
some systems this temperature is exceeded and the axial
capacity of the stud must be reduced to compensate for the • Decreasing the stud spacing.
loss of strength. The percentage reduction is noted for each • Decreasing the fixing centres of wall sheet materials.
affected systems. For more information regarding the fire • The inclusion of bulk cavity insulation materials such as
resistance of steel stud walls, refer to BRANZ assessment Glasswool, Rockwool and Polyester.
FAR 2357.
• The use of Fyrchek™ MR plasterboard in lieu of Fyrchek™
To protect structural steel beams and columns that are plasterboard of the same thickness.
entirely within a wall, the FRL of the wall system must be at
• Additional layers of plasterboard or Cemintel ™ f ibre
least equivalent to that required by the structural member.
cement.
For example, a wall system with FRL 90/90/90 provides FRL
90/–/– for a steel column within the wall. • Wall curved in plan with a radius of curvature no less than
3m.
Framing & Lining
• The addition of a timber cladding.
Steel framed walls required to have an FRL must comply
with the following: • The addition of any other cladding meeting BCA Spec
C1.1 Clause 2.4.
• At each storey or rise of studs. Other steel components of equivalent performance may be
used, however it is the responsibility of the manufacturer of
External Walls the component to substantiate equivalent performance with
the recommended component.
Gyprock® GFC external wall systems rely on a range of
cladding systems to provide weather resistance. There is a
range of effectiveness of these systems, and CSR Gyprock
recommends the cladding be installed with a drained cavity.
Cavity systems allow drainage and drying of any water
that penetrates, and are known to have good long-term
performance.
Sarking is also recommended to provide additional weather
protection to framing and lining.
External walls require specific design for condensation
control and energy efficiency, depending on the climate and
internal environment. Contact CSR Bradford for information
on thermal insulation systems and products.
0.55 – – ✓ ✓ –
0.75 ✓ ✓ ✓ ✓ ✓ 61mm
1.15 – ✓ ✓ ✓ ✓
RONDO LIPPED C STUD PROFILES
35.5 35.0
LYSAGHT TS120
40mm
8.15 8.0
Depth
Depth
BMT BMT
0.50/0.55/0.75 1.15
120mm
6.35 8.0
33.5 35.0
STRAMIT TH64
34mm RHINO STEEL UNISPAN 53
40mm
6mm
43mm
64mm 53mm
STRAMIT TH96
GYPROCK STAGGERED STUD CLIP
34mm
Rondo
64mm
Lipped
Steel
Stud
Rondo
96mm 92mm
Track
CSR Gyprock®
Staggered Stud Clip
PKA-052
NOTES:
Acoustic performance valid for studs 0.50 BMT.
PKA-052
NOTES:
Acoustic performance valid for studs 0.50 BMT.
PKA-052
NOTES:
Acoustic performance valid for studs of 0.50 BMT.
*ACR = Axial Capacity Reduction
– /180/180 CSR 080 (b) 50 Glasswool Partition batts – 11kg/m3 48/39 50/42 51/43 52/44 53/45
and BOTH SIDES (c) 75 Glasswool Partition batts – 11kg/m3 – 52/44 52/44 53/45 54/46
120/120/120 • 2 x 16mm GYPROCK
(d) TSB3/ASB3 Polyester batts 48/41 49/43 50/44 51/45 52/46
FYRCHEK plasterboard.
FAR2357 (e) 60 Soundscreen™ 1.6 batts – 51/42 52/43 53/44 54/45
WALL THICKNESS mm 115 128 140 156 214
PKA-052
NOTES:
Acoustic performance valid for studs 0.50 BMT.
*ACR = Axial Capacity Reduction
PKA-052
NOTES:
Acoustic performance valid for studs 0.50 BMT.
*ACR = Axial Capacity Reduction
NOTES:
Unless otherwise specified cavity infill is required in one
stud row only.
CSR 217 and 218 require batts in each stud row.
*ACR = Axial Capacity Reduction
SIDE ONE
– /60/60 CSR 216
30/30/30 • 1 x 13mm GYPROCK (a) 165 Glasswool Partition batts – 11kg/m3
FYRCHEK Plasterboard. 55/50 ➀
60/60/60* & 50 Glasswool Partition batts – 11kg/m3
(*ACR15%) SIDE TWO
• 1 x 16mm GYPROCK
FAR 2357
FYRCHEK Plasterboard.
WALL THICKNESS mm 201
① Test
• Lining material as per system table laminated to Shaft ATF 1912
Liner Panel.
• 2 x 25mm GYPROCK Shaft Liner Panel in H-Studs at ② Test
600mm maximum centres. ATF 19322
Rw / Rw+Ctr
FRL SYSTEM
WALL LININGS CAVITY INFILL GAP + STUD DEPTH
Report/Opinion Nº
76mm 100mm
Rw / Rw+Ctr
FRL SYSTEM
WALL LININGS CAVITY INFILL (Both Sides) STUD DEPTH
Report/Opinion Nº
64mm 76mm
PKA-018
• Lining material as per system table.
• Steel Framing in accordance with AS4600 or AS3740.
Discontinuous
• Cavity insulation as per system table. Construction
Rw / Rw+Ctr
FRL SYSTEM
WALL LININGS CAVITY INFILL STUD DEPTH
Report/Opinion Nº
70mm 90mm
60/60/60 BOTH SIDES (b) 75mm Bradford Partition Batts - both sides 59/46 60/48
CSR 510 • 1 x 10mm (c) ASB3 Autex or TSB3 Tontine Polyester - both sides 56/43 57/45
WFRA GYPROCK
SF45743.3 SOUNDCHEK. (d) ASB5 Autex or TSB5 Tontine Polyester - both sides 60/47 61/49
60/60/60 BOTH SIDES (b) 75mm Bradford Partition Batts - both sides 59/46 60/47
CSR 513 • 1 x 6mm Cemintel™
WFRA
SF45743.3 Wallboard.
MINIMUM WALL THICKNESS mm 217 257
60/60/60 BOTH SIDES (b) 75mm Bradford Partition Batts - both sides 63/51 64/52
CSR 515 • 2 x 10mm (c) ASB3 Autex or TSB3 Tontine Polyester - both sides 61/49 62/50
WFRA GYPROCK
SF45743.3 SOUNDCHEK. (d) ASB5 Autex or TSB5 Tontine Polyester - both sides 65/53 66/54
60/60/60 BOTH SIDES (b) 75mm Bradford Partition Batts - both sides 61/49 62/50
CSR 516 • 1 x 9mm Cemintel™
WFRA
SF45743.3 Wallboard.
MINIMUM WALL THICKNESS mm 223 263
Rw / Rw+Ctr
FRL SYSTEM
WALL LININGS CAVITY INFILL STUD DEPTH
Report/Opinion Nº
70mm 90mm
90/90/90 BOTH SIDES (b) 75mm Bradford Partition Batts - both sides 62/49 63/51
CSR 520 • 1 x 10mm (c) ASB3 Autex or TSB3 Tontine Polyester - both sides 59/46 60/48
WFRA GYPROCK
SF45743.3 SOUNDCHEK. (d) ASB5 Autex or TSB5 Tontine Polyester - both sides 63/50 64/52
90/90/90 (b) 75mm Bradford Partition Batts - both sides 63/51 64/52
BOTH SIDES
CSR 521 • 1 x 9mm Cemintel™ (c) ASB3 Autex or TSB3 Tontine Polyester - both sides 60/48 61/49
WFRA
SF45743.3 Wallboard. (d) ASB5 Autex or TSB5 Tontine Polyester - both sides 64/52 65/53
90/90/90 BOTH SIDES (b) 75mm Bradford Partition Batts - both sides 63/51 64/52
CSR 522 • 1 x 13mm (c) ASB3 Autex or TSB3 Tontine Polyester - both sides 60/48 61/49
WFRA GYPROCK
SF45743.3 SOUNDCHEK. (d) ASB5 Autex or TSB5 Tontine Polyester - both sides 64/52 65/53
90/90/90 BOTH SIDES (b) 75mm Bradford Partition Batts - both sides 64/52 65/53
CSR 523 • 2 x 10mm (c) ASB3 Autex or TSB3 Tontine Polyester - both sides 62/50 63/51
WFRA GYPROCK
SF45743.3 SOUNDCHEK. (d) ASB5 Autex or TSB5 Tontine Polyester - both sides 66/54 67/55
PKA-052
• Lining material as per system table.
• Staggered Steel Studs at 600mm maximum centres each NOT
side. Deemed
Discontinuous
• 64mm Rondo lipped steel stud, located in 92mm track Construction
top and bottom, using the Gyprock Staggered Stud Clip.
OR
• Top hat Steel Studs located in track or angle at top and
bottom with minimum 22mm clearance between stud and
opposing lining.
• Lining material as per system table.
PKA-052
• Lining material as per system table.
• Staggered Steel Studs at 600mm max. centres each side. ① TEST
• 64mm Rondo lipped steel stud, located in 92mm track TL461
top and bottom, using the Gyprock Staggered Stud Clip.
NOT
OR Deemed
• Top hat Steel Studs located in track or angle at top and Discontinuous
Construction
bottom with minimum 22mm clearance between stud and
opposing lining.
• Lining material as per system table.
NOTES: *ACR = Axial Capacity Reduction
PKA-054
Discontinuous
Construction
• Lining material as per system table.
• Gyprock SecurityWall™ Panel 27.
• Cavity determined by track width.
• Gyprock SecurityWall™ Panel 27.
• Lining material as per system table.
PKA-054
• Lining material as per system table. Discontinuous
Construction
• Gyprock SecurityWall™ Panel 27.
• Cavity width as per system table.
• Steel Studs at 600mm maximum centres with minimum
20mm gap to Security Wall Panel.
• Lining material as per system table.
NOTES:
*ACR = Axial Capacity Reduction.
PKA-054
• Lining material as per system table.
Discontinuous
• Gyprock SecurityWall™ Panel 50. Construction
NOTES:
^ SecurityWall™ Panel ribs offset to enable insulation to fit.
PKA-054
Discontinuous
• Lining material as per system table. Construction
– /180/180 (b) 50 Glasswool Partition batts – 11kg/m3 55/47 55/47 56/48 57/49
and BOTH SIDES (c) 75 Glasswool Partition batts – 14kg/m3 57/49 57/49 58/50 58/50
120/120/120 CSR 062 • 2 x 16mm GYPROCK (d) TSB3/ASB3 Polyester batts 55/49 55/49 55/49 56/50
FYRCHEK plasterboard.
FAR2357 (e) 60 Soundscreen™ 1.6 batts 57/48 57/48 57/48 58/49
MINIMUM WALL THICKNESS mm 156 168 184 242
PKA-052
FRL SYSTEM
WALL LININGS CAVITY INFILL Rw
Report/Opinion Nº
PKA-052
PKA-052
FRL SYSTEM
WALL LININGS CAVITY INFILL Rw
Report/Opinion Nº
CSR 967S
– /90/90
• 3 x 13mm GYPROCK FYRCHEK plasterboard (screw fixing). (a) Nil 35
FCO 1786
– /90/90
CSR 967SA • 3 x 13mm GYPROCK FYRCHEK plasterboard (screw & adhesive fixing). (a) Nil 35
FCO 1786
– /120/120
CSR 968S • 3 x 16mm GYPROCK FYRCHEK plasterboard (screw fixing). (a) Nil 36
FCO 1786
– /120/120
CSR 967SA • 3 x 16mm GYPROCK FYRCHEK plasterboard (screw & adhesive fixing). (a) Nil 36
FCO 1786
RP 02267S
FRL SYSTEM
WALL LININGS CAVITY INFILL Rw / Rw + Ctr
Report/Opinion Nº
PKA-055
CSR 940
60/60/60 EXTERNAL SIDE
(from outside only) • 2 x 16mm GYPROCK 600 (a) Nil 33
FYRCHEK MR
FAR2357 plasterboard
PKA-055
FRL SYSTEM
WALL LININGS CAVITY INFILL Rw / Rw + Ctr
Report/Opinion Nº
• Vapour barrier.
• Lining material as per system table to outside of steel
studs.
• Steel studs at 600mm maximum centres.
• Lining material to internal wall side as per system table.
NOTES:
Acoustic performance valid for studs of 0.80 BMT.
*ACR = Axial Capacity Reduction.
NOTES:
Acoustic performance valid for studs 0.80 BMT.
*ACR = Axial Capacity Reduction.
OUTSIDE OF STUD
(a) Nil 41/34 42/35
• 1 x 13mm GYPROCK FYRCHEK
60/60/60* MR plasterboard. (b) 75 Gold Batts™ 1.5 47/38 48/39
*ACR 15% CSR 128
FAR2357 INTERNAL WALL SIDE (c) 75 Soundscreen™ 2.0 batts 48/38 49/39
• 1 x 16mm GYPROCK FYRCHEK
plasterboard. WALL THICKNESS mm 113 129
OUTSIDE OF STUD
(a) Nil 41/34 42/35
60/60/60 • 1 x 16mm GYPROCK FYRCHEK
90/90/90* MR plasterboard. (b) 75 Gold Batts™ 1.5 47/38 48/39
(from outside only) CSR 126
ACR 15%
INTERNAL WALL SIDE (c) 75 Soundscreen™ 2.0 batts 48/38 49/39
FAR2357 • 1 x 10mm GYPROCK CD
plasterboard. WALL THICKNESS mm 110 126
OUTSIDE OF STUD
CSR 129 (a) Nil 39/32 40/33
60/60/60 • 1 x 16mm GYPROCK FYRCHEK
MR plasterboard. (b) 75 Gold Batts™ 1.5 45/36 46/37
90/90/90*
*ACR 15% INTERNAL WALL SIDE (c) 75 Soundscreen™ 2.0 batts 46/36 47/37
FAR2357
• 1 x 16mm GYPROCK FYRCHEK
plasterboard. WALL THICKNESS mm 116 140
PKA-055
PKA-055
PKA-055
SYSTEM SPECIFICATION – Residential RendaLine™ TYPICAL LAYOUT (CSR 167a shown) ACOUSTIC
OPINION
PKA-055
(a) Nil 42
PKA-055
SYSTEM SPECIFICATION – Commercial RendaLine™ TYPICAL LAYOUT (CSR 179a shown) ACOUSTIC
OPINION
PKA-055
(a) Nil 45
120/–/–
• 3 x 13mm GYPROCK
CSR 196
CSIRO FYRCHEK plasterboard. CSR Gyprock ® Universal
FCO 1494 Encasement Clips at
800mm maximum centres
• 1 x 13mm GYPROCK along column flanges and
150mm maximum from
120/–/– FYRCHEK plasterboard. each end of column
CSR 197 +
CSIRO
FCO 1494 • 1 x 25mm GYPROCK
SHAFT LINER PANEL
• 2 x 25mm GYPROCK
180/–/– SHAFT LINER PANEL
CSIRO
CSR 198 +
Rondo Wall Furring
FCO 1494 • 1 x 13mm GYPROCK Track (Nº140) held in
FYRCHEK plasterboard. back tongue of CSR
Gyprock ® Universal
Encasement Clips Screw fix each
layer at 200mm
maximum centres
to all steel framing
300mm
CSR Bradford Acoustic max.
Insulation if required
200mm
min.
Refer to Section ‘Z’ for
perimeter details
FIG B5: INSTALLATION DETAIL FOR INTERNAL WALL SYSTEMS – SINGLE LAYER – VERTICAL SHEETING
FIRE RATED
Fixing Specifications
Screws Refer to Section ‘A
CSR Bradford Acoustic Location Fixing & Spacing
Insulation if required Field Screws at 300mm
max. centres
Recessed Screws at
Edges 300mm max. centres
Butt Screws at
Joints 200mm max. centres
300mm Corners & Screws at
max. Openings 300mm max. centres
SUITABLE FOR:
300mm 300mm
One layer of GYPROCK max. max.
FYRCHEK plasterboard
to each side of wall in
accordance with system
specifications
FIRE RATED
Fixing Specifications
Screws Refer to Section ‘A
Location Fixing & Spacing
Field Screws at 300mm
300mm max. centres
max. Recessed Screws at
Edges 300mm max. centres
SUITABLE FOR:
200mm
max.
200mm
max.
FIG B7: INSTALLATION DETAIL FOR INTERNAL WALL SYSTEMS – TWO LAYER – VERTICAL SHEETING
FIRE RATED
Fixing Specifications
Screws Refer to Section ‘A
CSR Bradford Acoustic 1st Layer Fixing & Spacing
Insulation if required
Recessed Screws at 600mm
Edges max. centres
& Field
2nd Layer Fixing & Spacing
Field Screws at 300mm
max. centres
300mm
max. Recessed Screws at
Edges 300mm max. centres
Butt Screws at
Joints 200mm max. centres
600mm Corners & Screws at
max. Openings 300mm max. centres
SUITABLE FOR:
Two layers of GYPROCK
FYRCHEK plasterboard
to each side of wall in 300mm
accordance with system 300mm
max. max.
specifications
FIRE RATED
Fixing Specifications
Screws Refer to Section ‘A
CSR Bradford Acoustic 200mm 1st Layer Fixing & Spacing
Insulation if required max.
Recessed Screws at 600mm
Edges max. centres
& Field
300mm
max. 2nd Layer Fixing & Spacing
Field Screws at 300mm
max. centres
300mm
max. Recessed Screw at
Edges each stud
Butt Screws at
Joints 200mm max. centres
600mm Corners & Screws at
max. Openings 300mm max. centres
SUITABLE FOR:
Two layers of GYPROCK
FYRCHEK plasterboard
to each side of wall in
accordance with system Where butt
specifications joints are
formed off
studs, laminate
to first layer
with laminating
screws at
200mm max.
600mm
max.
FIRE RATED
Fixing Specifications for
Vertical Sheeting (shown)
400mm
Screws Refer to Section ‘A
1st Layer Fixing & Spacing
Recessed Screws at 600mm
Edges, max. centres on
400mm Field, studs
Butt Joints,
Corners &
Refer to Section ‘Z’ for Openings
perimeter details 2nd Layer Fixing & Spacing
400mm Recessed Screws at 600mm
Edges max. centres on
studs
Field Screws at 300mm
max. centres on
studs
Corners & Screws at 300mm
Openings max. centres
Butt Joints Screws at 200mm
max. centres on
studs
3rd Layer Fixing & Spacing
Recessed Laminating screws
Edges, at 400x400mm max.
Field, Butt grid
Joints
Corners &
Openings
SUITABLE FOR:
FIRE RATED
Set Joints in at Fixing Specifications for
least one layer Vertical Sheeting (shown)
Screws Refer to Section ‘A
1st Layer Fixing & Spacing
35 x 35 x 0.8mm
angle screw fixed at Recessed Screws at 600mm
400mm centres to Edges, max. centres on
each stud Field, studs
Corners &
Openings
2nd Layer Fixing & Spacing
300mm 300mm
FIRE RATED
Fixing Specifications for
Vertical Sheeting (shown)
Screws Refer to Section ‘A
1st Layer Fixing & Spacing
Recessed Screws at 600mm
400mm Edges, max. centres on
400mm Field, studs
Butt Joints,
Corners &
Openings
2nd Layer Fixing & Spacing
Refer to 400mm Recessed Screws at 600mm
Section ‘Z’ for Edges max. centres on
perimeter studs
details
Set outer Field Screws at 300mm
layer joints max. centres on
Offset all joints from studs
300mm min. from accessible Corners & Screws at 300mm
previous layer side Openings max. centres
Butt Joints Screws at 200mm
max. centres on
studs
3rd Layer Fixing & Spacing
SUITABLE FOR: Recessed Laminating screws
Edges, at 400x400mm max.
Field, Butt grid
Joints
Corners &
Openings
Alternative stud
type for in-line
stud framing
FIRE RATED
J Track Fixing Specifications for
Vertical Sheeting (shown)
Screws Refer to Section ‘A
C-H Studs
1st Layer Fixing & Spacing
Recessed Screws at 600mm
Edges, & max. centres on
Field studs
2nd Layer Fixing & Spacing
300mm Field Screws at 300mm
25mm GYPROCK max. centres
Shaft Liner Panels max.
Recessed Screws at
Edges 300mm max. centres
Butt Screws at
600mm Joints 200mm max. centres
max. Corners & Screws at
Openings 300mm max. centres
300mm
max.
300mm
1st layer of max. IMPORTANT
GYPROCK FYRCHECK Walls enclosing lift shafts MUST
plasterboard have both layers of GYPROCK
FYRCHEK separately fastened to the
top and bottom J tracks with screws
at 300mm maximum spacings.
600mm
Refer to Section ‘Z’ for max.
perimeter details
75mm 400mm
IBS Backing Steel Angle max.
Rod at head internal
of 1st layer framing
Apply adhesive*
and screw fix
2nd layer to
75mm 400mm vertical steel
600mm max. max. angles with Apply adhesive*
25/45mm and screw fix
Gyprock screws. body of 3rd
Fix body with layer with
laminating laminating
screws at screws only at
600mm max. 600mm max.
horizontal x horizontal x
400mm max. 400mm max.
vertical centres vertical centres
Security Wall
Track 27
FIRE RATED
300mm Fixing Specifications for
Gyprock max.
SecurityWall Vertical Sheeting (shown)
Panel 27 Screws Refer to Section ‘A
1st Layer Fixing & Spacing
Recessed Screws at 600mm
Edges, & max. vertical centres
Field x 300mm max.
horizontal centres
Butt Screws at
Joints 200mm max. centres
Corners & Screws at
1x 13mm Openings 300mm max. centres
GYPROCK
FYRCHEK 600mm
plasterboard max.
Cavity
Insulation
Blanket
300mm
max.
Base Track
FIG B14: INSTALLATION DETAIL – STEEL FRAME SECURITYWALL™ SYSTEM CSR 292
Security Wall
FIRE RATED
Track 27
Fixing Specifications for
Vertical Sheeting (shown)
Steel Stud Profiles as Screws Refer to Section ‘A
per system table at Adhesive
600mm centres or 300mm
Gyprock SecurityWall max. 1st Layer Fixing & Spacing
Panel 50
Recessed Screws at 600mm
Edges, & max. vertical centres
Gyprock Field to all stud profiles
SecurityWall OR
Panel 27 200mm Screws at 600mm
max. max. vertical centres
1x 10mm and 300mm max.
GYPROCK horizontal centres to
plasterboard CD steel sheeting
2nd Layer Fixing & Spacing
200mm
1x 16mm min. Recessed Screws at corners
GYPROCK Edges and 600mm max. cts
FYRCHEK 600mm
max. 300mm Field Rows of Adhesive
plasterboard max. Daubs at 600mm
max. horizontal cts x
300mm max. vertical
Cavity cts and 200mm min.
Insulation from fastener points
Blanket Screw along
centreline at 1200mm
max. cts
600mm Butt Screws at
max. Joints 200mm max. centres
300mm
max. Corners & Screws at
Base Track Openings 300mm max. centres
FIRE RATED
Security Wall
Secur
Track 50
50 Fixing Specifications for
Vertical Sheeting (shown)
Screws Refer to Section ‘A
1st Layer Fixing & Spacing
Gyprock
Gyproc
Securrity
Secu ityWWall Top, Bottom Screws at 600mm
Panel 50
50 & Field max. vertical centres
x 216mm max.
horizontal centres to
all steel ribs
Butt Screws at
216mm Joints 216mm max. centres
max. Corners & Screws at
Openings 300mm max. centres
1x 13mm
GYPR
GYP ROCK
FYRCHEK 600mm
plasterboard max.
Cavity
Insulation
Blankket
Blan 300mm
max.
Base Track
FIG B16: INSTALLATION DETAIL – STEEL FRAME SECURITYWALL™ SYSTEM CSR 296
Head Angle
FIRE RATED
Security Wall
Track 50 Fixing Specifications for
Vertical Sheeting (shown)
Steel Stud Profiles as Screws Refer to Section ‘A
per system table at Adhesive
600mm centres or
Gyprock SecurityWall 1st Layer Fixing & Spacing
Panel 50 Recessed Screws at 600mm
200mm Edges max. vertical centres
Gyprock max. & Field to all stud profiles
SecurityWall OR
Panel 50 Screws at 600mm
max. vertical centres
216mm x 216mm max.
max. horizontal centres to
1x 10mm all steel ribs
GYPROCK
plasterboard CD 2nd Layer Fixing & Spacing
200mm min. Recessed Screws at 433mm
1x 16mm Edges max. cts
GYPROCK
FYRCHEK 600mm Field Rows of Adhesive
max. 300mm max. Daubs at 600mm
plasterboard
max. horizontal cts x
300mm max. vertical
cts and 200mm min.
Cavity from fastener points
Insulation Screw along
Batts 300mm
600mm max. centreline at 1300mm
max. max.cts
Butt Screws at
Joints 200mm max. centres
Corners & Screws at
433mm Openings 300mm max. centres
433mm max.
Base Angles max.
200mm
400mm
200mm
Refer to
system table
for girt spacing
200mm
400mm
200mm
FIRE RATED
Fixing Specifications for SUITABLE FOR:
Vertical Sheeting (shown)
Screws Refer to Section ‘A
1st Layer Fixing & Spacing
Field & Screws at 200mm
Butt Joints max. centres to all
girts
2nd & 3rd Fixing & Spacing
Layers
Recessed Laminating Screws at
Edges & 200mm max. centres
Butt Joints
Field Laminating Screws at
400 x 400mm max.
grid
Stud centres
400mm
max. ctrs
450mm
max. ctrs
400mm
max. ctrs
450mm
max. ctrs Butt Joints
in 3rd/4th
layers offset
600mm min.
Stagger joints
300mm min.
450mm
max. ctrs
FIRE RATED
Fixing Specifications
Screws Refer to Section ‘A
1st Layer Fixing & Spacing
At all studs Screws at 400mm SUITABLE FOR:
max. centres
2nd, 3rd & Fixing & Spacing
4th Layers
Recessed Laminating screws at
Edges, 450mm max.
Field & horizontal centres
Butt Joints and 400mm max.
vertical centres
Contents
Timber Stud Height Tables C2
Introduction C3
Design Considerations C3 – C4
Installation C5
Components C5
System Specifications
Single Stud C6 – C8
Double Stud C9 – C10
Party Wall C11 – C12
Staggered Stud C13 – C14
Resilient Mount & Furring C15
Single Sided C16
External Walls C17 – C22
Column & Beam C23
System Installation Details C24 – C29
450mm 70 3.2 3.5 3.5 3.8 3.7 4.0 3.6 3.9 3.9 4.3 4.1 4.5
cts.
90 4.1 4.5 4.5 4.9 4.7 5.1 4.6 5.1 5.0 5.5 5.3 5.8
120 5.5 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
600mm cts.
70 2.7 2.9 2.9 3.2 3.1 3.3 3.0 3.3 3.3 3.6 3.5 3.8
90 3.4 3.7 3.8 4.1 4.0 4.3 3.9 4.2 4.2 4.6 4.5 4.9
300mm 300mm
cts. cts.
120 4.6 5.0 5.0 5.5 5.3 5.8 5.2 5.7 5.6 6.0 6.0 6.0
450mm 70 3.4 3.7 3.8 4.1 3.9 4.3 3.9 4.2 4.2 4.6 4.5 4.9
cts.
90 4.4 4.8 4.9 5.3 5.1 5.5 5.0 5.5 5.4 5.9 5.8 6.0
120 5.9 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
600mm cts.
70 2.9 3.1 3.2 3.3 3.6 3.9 3.0 3.6 3.5 3.9 3.8 4.1
90 3.7 4.0 4.1 4.4 4.3 4.7 4.2 4.6 4.6 5.0 4.9 5.3
300mm 300mm
cts. cts.
120 5.0 5.4 5.5 5.9 5.7 6.0 5.6 6.0 6.0 6.0 6.0 6.0
Design NºGYP545
To meet the stated Fire Resistance Level (FRL), the axial load
capacity of some wall systems is reduced. This is a result
Considerations of loss of stud section from charring during a fire test. The
systems are noted with an Axial Capacity Reduction (ACR)
Group number. In these systems, the designer must increase
Structural Design the applied loads to compensate for the axial capacity
All walls must be designed for the applied loads. Guidance reduction percentage, as shown in Table C3.
is given for the selection of studs in non-loadbearing internal
walls only. For loadbearing walls and walls subject to wind TABLE C3: AXIAL CAPACITY REDUCTION (%) DUE TO
THE EFFECT OF TIMBER CHAR
pressures, walls shall be designed to the appropriate
Australian Standards or construction manuals. Timber Size Group 1 Group 2 Group 3
90x45 0% 0% 25%
Non Loadbearing Walls
90x35 0% 10% 30%
Maximum wall height and the required stud size may be 70x45 3% 25% 40%
selected from Table C1 or C2 appropriate for the selected
70x35 8% 35% 45%
system. These walls are designed for lateral loads only, using
the composite action of the frame and sheeting.
Fire Resistance
Non load bearing walls in this manual have been designed
The timber frame wall systems in this manual are suitable
as follows for a minimum design pressure of 0.25kPa and a
for the stated FRL when designed in accordance with the
maximum deflection of (height ÷ 240) or 30mm maximum.
structural considerations above.
(Based on BCA Specification C1.8, 3.4 (b)).
The fire design of timber framing is based on the principle that
Wall plates must be fixed to floors and ceilings at 600mm
a particular level of char is acceptable without compromising
maximum centres. Each plate fixing is required to withstand
the performance of the wall. CSR GFC has carried out
a shear load of 0.75kN for a UDL of 0.25kPa
testing to verify the char limit, and where it is exceeded, the
Tall multi-residential buildings often have operable doors and allowable axial capacity of the stud is reduced to account for
windows, resulting in internal walls being subject to wind the loss of section. For more information regarding the fire
pressure. In these cases, walls must be designed for the resistance of timber stud walls, refer to BRANZ assessment
appropriate loads. FAR 2303.
To protect structural timber and steel beams and columns
within a wall, the FRL of the wall system must be at least
equivalent to that required by the structural member. For
example, a wall system with FRL 90/90/90 provides FRL
90/–/– for a steel column within the wall.
For detailed information on wall junctions, intersections, • At junctions with other building elements.
frame attachments and penetrations, refer to Section ‘Z’ of • At junctions with different lining materials.
this manual.
• At change of structural support system.
Walls curved in plan may be built with timber stud frames.
• At each storey or rise of studs.
Table for stud centres and plasterboard thickness for various
curvatures can be found in CSR Gyprock Residential
External Walls
Installation, Guide NºGYP547.
Gyprock ® timber frame external wall systems rely on a
Gyprock® Party Wall systems have additional installation
range of cladding systems to provide weather resistance.
requirements. Refer to brochure NºGYP513 Gyprock Party
There is a range of effectiveness of these systems, and
Wall Systems.
CSR Gyprock recommends the cladding be installed with
a drained cavity. Cavity systems allow drainage and drying
Wallboard & Plasterboard Fixing of any water that penetrates, and are known to have good
Walls may be built to achieve a particular ‘Level of Finish’ long-term performance.
as defined in AS/NZS2589.1. The Level of Finish specified
Sarking is also recommended to provide additional weather
can have requirements for frame alignment, jointing and
protection to framing and lining.
back blocking methods, and sheet orientation. Cemintel™
Wallboard and Gyprock ® plasterboard may be installed External walls require specific design for condensation
vertically or horizontally, although for some Levels of Finish control and energy efficiency, depending on the climate and
horizontal sheeting must be used. internal environment. Contact CSR Bradford for information
on thermal insulation systems and products.
Walls lined with Gyprock ® plasterboard or Cemintel ™
Wallboard may be finished with tiles. For tiles greater than
32kg/m2 or over 6.5mm thickness, specific installation details
apply. Refer to the appropriate installation manual. Components
Plasterboard Jointing & Finishing Lining & Fixing Materials
Refer to the Gyprock ® Residential Installation Guide, Refer to Section ‘A’ for detailed information on CSR
NºGYP547 and Cemintel ™ Wet Area Lining Systems, Gyprock and Cemintel lining products, fixings, adhesive
NºFC101 for detailed jointing and finishing information. and accessories.
It should be noted that: For details on Cemintel™ Texture Base Sheet, refer to manual
• Multi-layered systems only require jointing and finishing of NºFC122, ‘Cemintel™ Texture Base Sheet for Applied Finish
the outer layer. Systems’
PKA-051
PKA-051
PKA-051
NOTES:
*ACR = Axial Capacity Reduction. (refer to Table C3)
NOTES:
Unless otherwise specified, cavity infill is required in one
stud row only.
NOTES:
Unless otherwise specified, cavity infill is required in one
stud row only.
*ACR = Axial Capacity Reduction. (refer to Table C3).
FRL SYSTEM STUD DEPTH mm 70 90 120 140
WALL LININGS
Report/Opinion Nº CAVITY INFILL (Refer to Section ‘A’) Rw / Rw+Ctr
(a) Nil 43/36 45/39 47/41 47/41
BOTH SIDES (b) 75 Gold Batts™ 1.5 52/43 54/46 56/48 56/48
–/–/– CSR 674 • 1 x 6mm Cemintel™ (c) 75 Soundscreen™ 2.0 batts 53/43 55/46 57/48 57/48
Wallboard . (d) TSB3/ASB3 Polyester batts 51/44 53/47 55/49 55/49
WALL THICKNESS mm 172 212 272 312
(a) Nil 47/41 48/42 50/44 50/44
BOTH SIDES (b) 75 Gold Batts™ 1.5 56/48 57/49 59/51 59/51
–/–/– CSR 675 • 1 x 9mm Cemintel™ (c) 75 Soundscreen™ 2.0 batts 57/48 58/49 60/51 60/51
Wallboard. (d) TSB3/ASB3 Polyester batts 55/49 56/50 58/52 58/52
WALL THICKNESS mm 178 213 278 318
(a) Nil 50/44 51/45 53/47 53/47
– /60/60 BOTH SIDES
(b) 75 Gold Batts™ 1.5 59/51 60/52 62/54 62/54
and • 1 x 6mm Cemintel™
60/60/60 CSR 680 Wallboard (against studs). (c) 75 Soundscreen™ 2.0 batts 60/51 61/52 63/54 63/54
• 1 x 13mm GYPROCK (d) TSB3/ASB3 Polyester batts 58/52 59/53 61/55 61/55
FAR 2303 FYRCHEK plasterboard.
WALL THICKNESS mm 198 238 298 338
BOTH SIDES (b) 90 Gold Batts™ 2.0 batts - both sides 60/48 62/51
60/60/60
CSR 501 • 1 x 10mm GYPROCK (c) TSB3/ASB3 Polyester batts - both sides 56/44 58/47
WFRA SF45743.3 FLAMECHEK MR (d) TSB5/ASB5 Polyester batts - both sides 58/46 60/49
WALL THICKNESS mm 225 265
(a) 75 Gold Batts™ 1.5 - both sides 62/51 64/54
CSR 502
BOTH SIDES (b) 90 Gold Batts™ 2.0 batts - both sides 64/53 66/56
60/60/60
• 1 x 13mm GYPROCK (c) TSB3/ASB3 Polyester batts - both sides 60/49 62/52
WFRA SF45743.3 SOUNDCHEK (d) TSB5/ASB5 Polyester batts - both sides 62/50 64/54
WALL THICKNESS mm 231 271
CSR 503 (a) 75 Gold Batts™ 1.5 - both sides 59/46 61/49
60/60/60 BOTH SIDES
• 1 x 6mm Cemintel™
WFRA SF45743.3 (b) 90 Gold Batts™ 2.0 batts - both sides 61/48 63/51
Wallboard
BOTH SIDES (b) 90 Gold Batts™ 2.0 batts - both sides 64/51 65/53
90/90/90
CSR 506 • 1 x 10mm GYPROCK (c) TSB3/ASB3 Polyester batts - both sides 60/47 61/49
WFRA SF45743.3 SOUNDCHEK (d) TSB5/ASB5 Polyester batts - both sides 64/51 65/53
WALL THICKNESS mm 243 283
(a) 75 Gold Batts™ 1.5 - both sides 63/50 64/52
BOTH SIDES (b) 90 Gold Batts™ 2.0 batts - both sides 64/51 65/53
90/90/90
CSR 507 • 1 x 10mm GYPROCK (c) TSB3/ASB3 Polyester batts - both sides 60/47 61/48
WFRA SF45743.3 FLAMECHEK MR (d) TSB5/ASB5 Polyester batts - both sides 64/51 65/52
WALL THICKNESS mm 243 283
(a) 75 Gold Batts™ 1.5 - both sides 64/52 65/53
BOTH SIDES (b) 90 Gold Batts™ 2.0 batts - both sides 65/53 66/54
90/90/90
CSR 508 • 1 x 13mm GYPROCK (c) TSB3/ASB3 Polyester batts - both sides 61/49 62/50
WFRA SF45743.3 SOUNDCHEK (d) TSB5/ASB5 Polyester batts - both sides 65/53 66/54
WALL THICKNESS mm 249 289
(a) 75 Gold Batts™ 1.5 - both sides 63/50 64/51
BOTH SIDES (b) 90 Gold Batts™ 2.0 batts - both sides 64/51 62/52
90/90/90
CSR 509 • 1 x 6mm Cemintel™ (c) TSB3/ASB3 Polyester batts - both sides 60/47 61/48
WFRA SF45743.3 Wallboard (d) TSB5/ASB5 Polyester batts - both sides 64/51 65/52
WALL THICKNESS mm 235 275
PKA-051
• Lining material as per system table.
NOT
• Staggered timber studs at 600mm maximum centres each Deemed
side. Discontinuous
Construction
• Minimum 20mm clearance between stud and opposing
lining.
• No noggings or any connection between studs.
• Cavity insulation as per system table. (Insulation may need
to be cut and placed between studs).
• Lining material as per system table.
PKA-051
NOT
• Lining material as per system table. Deemed
• Timber studs at 600mm maximum centres with noggings Discontinuous
Construction
at 1350mm maximum centres.
• Cavity insulation as per system table.
• Gyprock® Resilient Mounts and RONDO Nº308 or 129
Furring Channel clipped to resilient mounts.
• Lining material as per system table.
PKA-051
– /60/60
and
ONE SIDE ONLY (a) Nil 35/32
60/60/60
CSR 391 • 2 x 16mm GYPROCK
Fire rated from FYRCHEK plasterboard.
lined side only
FAR 2303 WALL THICKNESS mm 102
– /90/90
and
ONE SIDE ONLY (a) Nil 38/35
90/90/90
CSR 392 • 3 x 13mm GYPROCK
Fire rated from FYRCHEK plasterboard.
lined side only
FAR 2303 WALL THICKNESS mm 109
– /120/120
and
ONE SIDE ONLY (a) Nil 38/35
120/120/120
CSR 393 • 3 x 16mm GYPROCK
Fire rated from FYRCHEK plasterboard.
lined side only
FAR 2303 WALL THICKNESS mm 118
• Vapour barrier.
• 1 x 16mm GYPROCK FYRCHEK MR plasterboard.
• Timber studs at 600mm maximum centres.
• Cavity insulation as per system table.
• Lining material as per system table to internal side.
(a) Nil 38
PKA-055
NOTES:
To achieve stated acoustic performance masonry must be
a minimum of 90mm thick and 170kg/m2.
*ACR = Axial Capacity Reduction. (refer to Table C3).
INTERNAL SIDE
(a) Nil 54/46
• 1 x 6mm Cemintel™
60/60/60* Wallboard (against studs).
(b) 75 Gold Batts™ 1.5 61/53
• 1 x 13mm GYPROCK
* ACR Group 1 CSR 927
FYRCHEK plasterboard.
(c) 88 Soundscreen™ 2.5 batts 62/54
FAR 2303 EXTERNAL SIDE
• Masonry veneer wall with
WALL THICKNESS mm 259
FRL 60/60/60.
INTERNAL SIDE (a) Nil 56/49
• 2 x 13mm GYPROCK
90/90/90 FYRCHEK plasterboard. (b) 75 Gold Batts™ 1.5 63/56
CSR 921
FAR 2303 EXTERNAL SIDE (c) 88 Soundscreen™ 2.5 batts 64/57
• Masonry veneer wall with
FRL 90/90/90. WALL THICKNESS mm 266
INTERNAL SIDE
(a) Nil 56/49
• 1 x 6mm Cemintel™
90/90/90* Wallboard (against studs).
(b) 75 Gold Batts™ 1.5 63/56
• 1 x 16mm GYPROCK
* ACR Group 3 CSR 928
FYRCHEK plasterboard.
(c) 88 Soundscreen™ 2.5 batts 64/57
FAR 2303 EXTERNAL SIDE
• Masonry veneer wall with
WALL THICKNESS mm 262
FRL 90/90/90.
PKA-051
(a) Nil 39
INTERNAL SIDE (b) 75 Gold Batts™ 1.5 45
–/–/– CSR 690 • 1 x 10mm GYPROCK
Plasterboard CD. (c) 88 Soundscreen™ 2.5 batts 45
SYSTEM SPECIFICATION – Cemintel RendaLine™ TYPICAL LAYOUT (CSR 693a shown) ACOUSTIC
OPINION
PKA-055
• 1 x Cemintel RendaLine™ sheet on timber battens.
• Vapour barrier.
• 1 x 13mm GYPROCK FYRCHEK MR plasterboard.
• Timber studs at 600mm maximum centres.
• Cavity insulation as per system table.
• Lining material as per system table to internal side.
(a) Nil 45
SYSTEM SPECIFICATION – Cemintel RendaLine™ TYPICAL LAYOUT (CSR 695a shown) ACOUSTIC
OPINION
75mm
max.
60/ – / – • 1 x 25mm GYPROCK
CSIRO CSR 495
SHAFT LINER PANEL
FCO 1494
200mm max.
120/ – / – • 3 x 16mm GYPROCK FYRCHEK Offset Butt Joints in
CSIRO CSR 498 consecutive layers
plasterboard. by 300mm min.
FCO 1494
300mm max.
200mm max.
Apply External
Angle Bead to all
corners and set
200mm
max.
SUITABLE FOR:
300mm min.
Plasterboard to each side Butt Nails at
of wall 2 Nails Joints 150mm max. centres
50mm or
apart or Screws at
1 Screw 200mm max. centres.
Noggings at 1350mm Corners & Nails at
maximum vertical centres Openings 150mm max. centres
or
Screws at
300mm max. centres
Studs at 600mm maximum
centres 600mm NOTE:
max.
Single layer systems are fixed to the
same specifications as detailed for
CSR Bradford Insulation the 2nd layer.
where applicable
SUITABLE FOR:
Nails at 150mm max.
Stagger butt joints in Screws at 200mm max.
adjacent sheets and
between 1st and 2nd
layers by one stud
minimum
FIG C5: INSTALLATION DETAIL – TIMBER STUD WITH RESILIENT MOUNTED FURRING CHANNEL –
GYPROCK FYRCHEK TWO LAYER – HORIZONTAL SHEETING – SCREW FIXING
centres
Recessed Screw at each stud
CSR Gyprock® Resilient Edges
Mounts to each stud at
1200mm max. from tracks Butt Screws at
and 1200mm max. centres Joints 200mm max. centres
Corners & Screws at
Noggings at 1350mm Openings 300mm max. centres
maximum vertical centres NOTE:
Stagger butt joints by
600mm one stud minimum Single layer systems are fixed to the
max. same specifications as detailed for
Studs at 600mm maximum the 2nd layer.
centres 300mm
max.
CSR Bradford Insulation SUITABLE FOR:
where applicable
200mm
Refer to Section ‘Z’ for max.
perimeter details
Rondo Track or
Angle fixed to floor Fasteners at 10 to 16mm
from sheet edges
300mm min.
stagger all horizontal joints
300mm minimum Butt Nails at
2 Nails Joints 150mm max. centres
50mm or
apart or Screws at
1 Screw 200mm max. centres.
Noggings at 1350mm Corners, Nails at
maximum vertical centres Openings, 150mm max. centres
Top & or
Bottom Screws at
300mm max. centres
Studs at 600mm maximum
centres
SUITABLE FOR:
FIRE RATED
Fixing Specifications for
Vertical Sheeting (shown)
Fasteners Nails or Screws
Refer to Section ‘A
1st Layer Fixing & Spacing
Recessed Screws or Nails at
Edges, 600mm max. centres
600mm Field, on studs
600mm Corners &
Openings
2nd Layer Fixing & Spacing
Recessed Screws or Nails at
Edges 300mm max. centres
on studs
Field 1 Screw or 2 Nails at
300mm max. centres
on studs
300mm 300mm
Butt Joints Laminating Screws at
200mm max. centres
Corners & Screws at 300mm max.
Studs at 600mm maximum Openings centres
centres or
Nails at 150mm max.
400mm centres
3rd Layer Fixing & Spacing
Recessed Laminating screws at
Edges, 400x400mm max. grid
400mm Field,
Offset all joints 300mm Corners &
min. from previous layer Openings
Butt Joints Laminating screws at
400mm 200mm max. centres
FIRE RATED
Studs at 600mm maximum
centres Fixing Specifications
200mm Fasteners Refer to Section ‘A’
Stagger horizontal joints
300mm minimum between max. 1st Layer Fixing & Spacing
1st and 2nd layer
Edges & Nails or Screws at
300mm Field 600mm max. centres
Stagger butt joints in max.
adjacent sheets and 2nd Layer Fixing & Spacing
between 1st and 2nd layer
by one stud minimum Field Nails at 300mm max.
200mm centres
300mm min.
Fasteners 50mm
200mm max. min. from sheet
corners
One layer of GYPROCK
FYRCHEK MR
Plasterboard fixed to FIRE RATED
studs
Fixing Specifications
Fasteners Refer to Section ‘A’
Joint and finish outer 200mm 1st Layer Fixing & Spacing
layer only (refer to max.
‘Jointing’ specification). Edges & Nails or Screws at
All joints to be formed on Field 600mm max. centres
framing
2nd Layer Fixing & Spacing
Recessed Nails to framing at
200mm Joints, 200mm max. centres
Sarking max. Field,
Top &
Noggings at 1350mm max Bottom
Plates
Corners & Nails at
Openings 200mm max. centres
200mm
CSR Bradford Insulation max.
where applicable
NOTE: Fixing spacings for Cemintel™ Texture Base Sheet may need to be reduced to meet wind loadings. Refer to
publication NºFC122, CSR Cemintel Texture Base Sheet for Applied Finish Systems.
Contents
Stud Selection Tables D2 – D3
Introduction D3
Design Considerations D3 – D4
Installation D5
Components D5
System Specifications
TABLE D1: MAXIMUM WALL HEIGHT WITH RONDO LIPPED STEEL STUDS – NON LOADBEARING WALLS
– WALLS GENERALLY (LOAD UDL = 0.25kPa)
10 2.32 2.60 2.72 3.13 3.53 3.20 3.58 4.05 3.61 4.13 4.69 5.33 6.81
600mm max. cts
13 2.32 2.60 2.72 3.25 3.58 3.24 3.82 4.05 3.61 4.18 4.69 5.37 6.81
16 2.32 2.60 2.75 3.28 3.59 3.25 3.87 4.05 3.61 4.20 4.69 5.37 6.81
TABLE D2: MAXIMUM WALL HEIGHT WITH RONDO LIPPED STEEL STUDS – NON LOADBEARING WALLS
– WALLS OF SHAFTS AND FIRE ISOLATED EXITS (LOAD UDL = 0.35kPa)
10 2.07 2.34 2.34 2.80 3.15 2.76 3.20 3.62 3.06 3.70 3.81 3.81 3.81
600mm max. cts
13 2.07 2.34 2.34 2.80 3.17 2.76 3.37 3.62 3.06 3.70 4.20 4.83 5.53
16 2.07 2.34 2.34 2.90 3.18 2.76 3.41 3.62 3.06 3.70 4.20 4.83 5.53
NOTES:
Deflection Limit is span/240 to a maximum of 30mm, in accordance with BCA Specification C1.8.
Tabulated heights do not include axial loads (except self weight) or shelf loading.
Loadings: Table D1 Pultimate = 0.375 kPa, Pservice = 0.25 kPa.
Loadings: Table D2 Pultimate = 0.525 kPa, Pservice = 0.35 kPa.
Walls are not for external applications.
All loadings in accordance with AS1170:2002.
Walls analysed in accordance with AS4600:1996.
Noggings in accordance with Table D3.
Tables have been prepared by Rondo Building Services Pty Ltd.
TABLE D3: MINIMUM NUMBER OF NOGGINGS TABLE D4. MAXIMUM SPACING OF WALL SUPPORT
CLIPS FOR FURRING CHANNELS.
Lining Configuration Wall Height (m) Number of Noggings WALLS GENERALLY (LOAD UDL = 0.35kPa)
0.0 - 3.0 1
Rondo Furring Channel Part Nº Maximum Spacing of Clips (mm)
Lined One Side 3.0 - 6.0 2
308 (16mm) 900
6.0 - 8.0 3
129 (28mm) 1200
NOTE: Support clips include Gyprock® Resilient Mounts and Rondo
direct fixing clips.
13mm GYPROCK
FYRCHEK 3.00 3.44 3.71 4.93 4.93
plasterboard
600mm max. cts
2 layers x 13mm
GYPROCK FYRCHEK 3.00 3.50 3.90 5.90 6.40
plasterboard
9mm Cemintel™
3.00 3.44 3.71 5.90 6.00
Wallboard
Supplier Stramit
Steel Stud Type TH64075 TH64100 TH64120 TH96075 TH96100 TH96120
Wall Frame Stud Depth/BMT mm 64/0.75 64/1.00 64/1.20 96/0.75 96/1.00 96/1.20
and Lining Configuration Min. Lining Thickness Maximum Wall Height (m)
13mm GYPROCK
3.50 3.87 4.11 4.82 4.93 4.93
FYRCHEK plasterboard
600mm max. cts
2 layers x 13mm
GYPROCK FYRCHEK 3.86 4.17 4.37 4.96 5.44 5.81
plasterboard
9mm Cemintel™
3.50 3.87 4.11 4.82 5.30 5.65
Wallboard
NOTES: All stud heights and tracks comply with the requirements of the Earthquake Code (AS1170.4) Clause 5.2 where ‘aS’ is less than 0.21.
Introduction
Gyprock® plasterboard and Cemintel™ Wallboard can be conditions apply to the substrates to achieve the system
used with masonry walls for effective fire and acoustic performance values, and these are stated in the system
solutions. These linings can eliminate the need for render, specifications. Specific fixing details apply to each type of
increase the fire rating of the masonry, or provide an acoustic substrate.
performance to meet sound transmission and sound impact
These wall systems are generally used in internal applications
ratings.
in commercial, industrial, institutional, domestic and high-rise
Systems incorporating masonry and an insulated cavity are domestic construction, or in the renovation of older buildings.
generally used where there is a requirement for excellent A number of systems for external masonry veneer walls can
acoustic performance and discontinuous construction. The be found in Section ‘B’ and Section ‘C’.
provision of a cavity also allows the inclusion of services such
as water pipes.
Gyprock ® plasterboard may be directly applied to the
masonry substrate, screw fixed to metal furring channels
Design
that are fixed to the masonry, or may be fixed to separate
stud framing. Cemintel™ Wallboard may be fixed to furring
Considerations
channels or studs.
Systems in this section are suitable for a wide range of
Structural Performance.
masonry products. These are typically clay and concrete All wall elements must be designed for the applied loads.
blocks, autoclaved aerated concrete blocks and panels, and Vertical loads may be supported by the masonry element of
may include cast concrete elements. Minimum performance the wall or by the stud framing.
For systems without a stated Fire Resistance Level (FRL), The acoustic performance of wall systems will not be reduced
the system FRL is equal to the FRL of the masonry wall by:
element. The FRL of masonry walls is dependant on the • The addition of Gyprock ® plasterboard or Cemintel ™
height and width of the wall; contact the manufacturer for linings.
more information. • The use of deeper studs or larger cavities.
To achieve the required fire performance of a wall, it is • The use of timber studs of at least equal depth in lieu of
essential that installation is in accordance with the masonry steel studs.
manufacturer’s details and relevant installation standards. This
should include fire sealing at the wall head and perimeters, • Omitting the lining direct fixed to masonry.
and filling of mortar joints. All gaps and penetrations should Refer to Section ‘A’ for detailed information.
be effectively fire sealed.
Perimeter Sealing.
Vermiculite plaster has no capacity to accommodate building To attain the stated R w in systems that do not rely on
movement and may not be suitable for use as a general plasterboard for the fire rating, use CSR Gyprock Wet
purpose fire rated caulking. Its use is specified in some Area Acrylic Sealant, CSR Gyprock Fire Mastic or other
wall/ceiling junctions. Refer to the Gyprock® Ceiling Systems tested acoustic rated material of equivalent or better
Installation Guide, NºGYP570. performance.
In systems with Gyprock Fyrchek® plasterboard, framing,
jointing and fire sealing must be in accordance with Section
For detailed information on wall junctions, intersections, • Tiled internal walls with fibre cement outer layer: at 4.2m
frame attachments and penetrations, refer to Section ‘Z’ of maximum centres.
this manual. • Walls with plasterboard outer layer: at 12m maximum
Refer to manual NºGYP544, Steel Frame Wall Systems centres.
Installation Guide for detailed information on installation of • At junctions with other wall elements.
stud framing.
• At changes of lining material.
PKA-053
Discontinuous
Construction
• Lining as per table, fixed to studs.
• Steel stud framing, as per table, at 600mm max. centres.
• Cavity infill as per table.
• 12mm minimum cavity between masonry and framing.
• Single Brick, Block or Concrete wall with Rw as stated.
• 1 x 13mm GYPROCK plasterboard CD direct fixed to
masonry.
PKA-053
Discontinuous
Construction
• Lining as per table, fixed to studs.
• Steel stud framing, as per table, at 600mm max. centres.
• Cavity infill as per table.
• 12mm minimum cavity between masonry and framing.
• Single Brick, Block or Concrete wall with Rw as stated.
• 1 x 13mm GYPROCK plasterboard CD direct fixed to
masonry.
PKA-053
PKA-053
PKA-053
Discontinuous
• Lining as per table, fixed to studs. Construction
• Steel stud framing, as per table, at 600mm max. centres.
• Cavity infill, as per table.
• 12mm minimum cavity between masonry and framing.
• Single Brick, Block or Concrete wall with Rw as stated.
• 28mm furring channel, fixed to masonry.
• Furring cavity infill, as per table.
• Lining as per table, fixed to furring.
PKA-053
Discontinuous
• Lining as per table, fixed to studs. Construction
• Steel stud framing, as per table, at 600mm max. centres.
• Cavity infill, as per table.
• 12mm minimum cavity between masonry and framing.
• Single Brick, Block or Concrete wall with Rw as stated.
• 28mm furring channel, fixed to masonry.
• Furring cavity infill, as per table.
• Lining as per table, fixed to furring.
PKA-053
NOT
Deemed
• Lining as per table, direct fixed to furring. Discontinuous
Construction
• 28mm furring channel at 600mm max. centres, fixed to
masonry with CSR Gyprock Resilient Mounts.
• Cavity infill, as per table.
• Single Brick, Block or Concrete wall with Rw as stated.
• 1 x 13mm GYPROCK plasterboard CD direct fixed to
masonry.
Masonry
SYSTEM
Wall WALL LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr
Nº
Requirements
ATF-1023
FRL SYSTEM
WALL LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr
Report/Opinion Nº
Up to BOTH SIDES
HEBEL (a) 50 Glasswool Partition batts – 11kg/m3 64/59
– /240/240
• 1 x 10mm GYPROCK
75PP
FCO 2073 plasterboard CD.
WALL THICKNESS mm 200
FRL SYSTEM
WALL LININGS CAVITY INFILL (Both Sides) (Refer to Section A) Rw / Rw+Ctr
Report/Opinion Nº
➀ ATF-1020
➁ 2001502/
• Plasterboard as per table, fixed to studs. 1109A
• 64mm steel studs at 600mm max. centres. R5/VF
2001502/
• Plasterboard as per table, fixed to furring.
1109A
• Rondo Nº129 furring channel at 600mm max. centres. R5/VF
• 50mm Glasswool Partition batts. Discontinuous
• 75mm CSR Hebel PowerPanel™ Construction
PKA-A034
• Lining as per table, fixed to studs.
Discontinuous
• Timber studs at 450mm max. centres. Construction
N/A
FRL SYSTEM
WALL LININGS ADDITIONAL FRL
Report/Opinion Nº
BOTH SIDES
CSR 730 • 1 x 16mm GYPROCK X+30 / Y+60 / Z+60
Masonry FYRCHEK plasterboard
Wall BOTH SIDES
CSR 731 • 2 x 13mm GYPROCK X+60 / Y+120 / Z+120
X/Y/Z FYRCHEK plasterboard.
FCO 382 BOTH SIDES
CSR 732 • 2 x 16mm GYPROCK X+90 / Y+180 / Z+180
FYRCHEK plasterboard.
N/A
FIG D1: CONCRETE COLUMN ENCASEMENT SYSTEM FIG D3: CONCRETE COLUMN ENCASEMENT SYSTEM
– FIRE RATED – PLASTERBOARD FIXED TO FURRING – FIRE RATED – PLASTERBOARD DIRECT FIXED
Track cut and fixed to furring channels at
top and bottom of column
Fix External Angle
GYPROCK FYRCHEK fixed Bead and set all
to furring channel at 200mm external angles
max. centres
Fasten at butt
joints with
laminating screws 200mm max.
at 200mm max
centres
Apply External
Angle Bead to
all corners and
set
Adhesive daubs
50mm max. Adhesive daubs
from sheet at 460mm max.
edge Adhesive daubs
centres 50mm max. NON FIRE RATED
from sheet
edge FIRE RATED
Adhesive daubs
100mm max from Fixing Specifications
top edge of sheet
Adhesive Refer to Section ‘A’
Location Fixing & Spacing
Field Adhesive at 460mm
max. centres
beginning 100mm
max. from top and
bottom sheet edges
and 50mm max.
from recessed sheet
edges
Butt Joints, Adhesive at 460mm
Adhesive Corners & max. centres 50mm
daubs GYPROCK Openings max. from sheet
at 460mm Plasterboard edges
max.
centres
Adhesive daubs
100mm max from
bottom edge of
sheet
Daubs of GYPROCK Masonry Adhesive.
Rondo Track or
Angle fixed to ceiling
frame
Rondo Track or
Angle fixed to floor
Fasteners at 10 to 16mm
from sheet edges
300mm
max.
6mm min.
gap
600 mm
max.
FIG D7: INSTALLATION DETAIL – HEBEL AAC WALL – HORIZONTAL SHEETING – SCREW FIXING
GYPROCK
Plasterboard
300mm
max.
6mm min.
gap
600mm
10-16mm max.
min. from
each edge
Contents
Introduction E2
Design Considerations E2 – E3
Installation E4
Components E4 – E5
System Specifications
Floor/Ceiling Systems E6 – E11
Hebel PowerFloor™
Floor/Ceiling System E11
Roof/Ceiling Systems E12 – E16
Ceiling Systems
- Fire Rated from Above E17
Ceiling Systems - Fire Rated
from Above and/or Below E18
Acoustic Tile Ceiling Systems E19
System Installation Details E20 – E24
CSR GFC ceiling systems use various fixing techniques for Direct-Fix Framing Systems
the attachment of linings. These include: Ceiling linings may be fixed directly to primary timber or steel
a) Direct fixing to timber and steel joists or truss bottom framing, or to secondary members such as furring channels
chords. and battens.
b) Screw fixing to steel furring channels that are attached to Timber members to which plasterboard will be fixed
joists. must comply with AS1684 ‘Residential Timber-Framed
c) Screw fixing to resilient or resiliently mounted furring Construction’, or be designed in accordance with AS1720.1
channels. ‘Timber Structures: Design Methods’.
d) Screw fixing to suspended concealed metal grid. Steel framing to which plasterboard will be fixed must comply
with AS/NZS4600, ‘Cold Formed Steel Structures’.
e) Lay-in tiles in suspended exposed metal grid or Fricker
Easy Access System®. Suspended Ceiling Systems
Ceiling suspension systems must be designed to
AS/NZS2785 ‘Suspended Ceilings – Design and Installation’.
Design Ceilings in this manual are not trafficable. Trafficable systems
shall be designed in accordance with AS1657 ‘Fixed
20mm
NºGYP547 for detailed jointing and finishing of ceilings
40mm (Nº129)
28mm (Nº308)
lined with plasterboard. In multi-layer systems, jointing and
finishing is required on the visible outer layer only.
Expressed joints are recommended for ceilings lined with Furring Channel
Cemintel™ products. Refer to Cemintel™ Ceiling Systems Nº129 or Nº308
Control Joints
Control joints are used to reduce the possibility of cracks
forming from structural movement, thermal and moisture Top Cross Rail
movement and the like. Locations for joints should be chosen
Resilient Mount to
by the designer with regard to building shape, structural Top Cross Rail Clip
NOTE: For fire rated systems with single layer lining fixed
direct to joists, no control joint detail is available. Use a
double layer system or furring channels where control joints
are required.
Other
Suspended Ceilings
Sarking with mass at least 350g/m2 is specified in some
For detailed information on installation and maintenance of
roof/ceiling systems to achieve the acoustic value.
suspension systems, contact CSR Fricker Ceiling Systems
Suitable products are Bradford Thermofoil ™ 733 and
on 1300 374 253.
Thermotuff™ SS.
75mm
1200mm (nominal)
nom.
3600mm (nominal)
1200mm (nominal)
1050mm
450mm 150mm 450mm
Overall 3600mm (nominal)
PKA–056
SYSTEM Carpet +
FRL Bare Floor
CEILING LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr Underlay
Report/Opinion Nº Ln,w+CI
Ln,w+CI
PKA–056
SYSTEM Carpet +
FRL Bare Floor
CEILING LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr Underlay
Report/Opinion Nº Ln,w+CI
Ln,w+CI
(a) Nil 39/32 – 60 – 65
• 1 x 10mm GYPROCK
–/–/– CSR 810 (b) 90 Gold Batts™ 2.0 44/35 – 60 – 65
SUPACEIL plasterboard.
(c) 75 Soundscreen™ 2.0 batts 44/35 – 60 – 65
(a) Nil 41/34 – 55 – 60
• 1 x 13mm GYPROCK
–/–/– CSR 811 (b) 90 Gold Batts™ 2.0 46/37 80 – 85 55 – 60
Plasterboard CD.
(c) 75 Soundscreen™ 2.0 batts 46/37 80 – 85 55 – 60
(a) Nil 41/34 – 55 – 60
• 1 x 6mm Cemintel™
–/–/– CSR 812 (b) 90 Gold Batts™ 2.0 46/37 80 – 85 55 – 60
Wallboard.
(c) 75 Soundscreen™ 2.0 batts 46/37 80 – 85 55 – 60
(a) Nil 43/37 – 55 – 60
• 1 x 9mm Cemintel™
–/–/– CSR 813 (b) 90 Gold Batts™ 2.0 48/40 80 – 85 55 – 60
Wallboard.
(c) 75 Soundscreen™ 2.0 batts 48/40 80 – 85 55 – 60
(a) Nil 42/36 – 55 – 60
30/30/30 • 1 x 13mm GYPROCK
CSR 815 (b) 90 Gold Batts™ 2.0 47/39 80 – 85 55 – 60
FCO 1373 FYRCHEK plasterboard.
(c) 75 Soundscreen™ 2.0 batts 47/39 80 – 85 55 – 60
PKA–056
• Floor finished bare or with carpet and underlay, as per
system table.
• 1 x 19mm or 22mm particleboard, or timber flooring of at
least 15kg/m2.
• Timber or steel joists.
• Minimum 230mm cavity depth.
• RONDO Furring Channel clipped to Gyprock®
Resilient Mounts
OR
RONDO Resilient Furring Channel (Nº581).
• Cavity infill as per system table.
• Ceiling lining as per system table, fixed to furring channel.
SYSTEM Carpet +
FRL Bare Floor
CEILING LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr Underlay
Report/Opinion Nº Ln,w+CI
Ln,w+CI
(a) Nil 46/37 75 – 80 55 – 60
• 1 x 13mm GYPROCK
–/–/– CSR 821 (b) 90 Gold Batts™ 2.0 55/46 65 – 70 50 – 55
Plasterboard CD.
(c) 75 Soundscreen™ 2.0 batts 54/44 65 – 70 50 – 55
(a) Nil 46/40 75 – 80 55 – 60
• 1 x 10mm GYPROCK
–/–/– CSR 823 (b) 90 Gold Batts™ 2.0 55/47 65 – 70 50 – 55
SOUNDCHEK plasterboard.
(c) 75 Soundscreen™ 2.0 batts 54/45 65 – 70 50 – 55
(a) Nil 49/43 75 – 80 55 – 60
• 2 x 10mm GYPROCK
–/–/– CSR 824 (b) 90 Gold Batts™ 2.0 58/50 65 – 70 50 – 55
SOUNDCHEK plasterboard.
(c) 75 Soundscreen™ 2.0 batts 57/48 65 – 70 50 – 55
(a) Nil 47/41 75 – 80 55 – 60
30/30/30 • 1 x 13mm GYPROCK
CSR 825 (b) 90 Gold Batts™ 2.0 56/48 65 – 70 50 – 55
FCO 1373 FYRCHEK plasterboard.
(c) 75 Soundscreen™ 2.0 batts 55/46 65 – 70 50 – 55
60/60/60 (a) Nil 46/40 75 – 80 55 – 60
+RISF 30 • 1 x 16mm GYPROCK
CSR 826 (b) 90 Gold Batts™ 2.0 55/47 65 – 70 50 – 55
minutes FYRCHEK plasterboard.
FCO 1373 (c) 75 Soundscreen™ 2.0 batts 54/45 70 – 75 50 – 55
CSR 829
60/60/60 • 1 x 13mm GYPROCK (a) Nil 50/44 70 – 75 50 – 55
+RISF 60 FYRCHEK (against frame).
(b) 90 Gold Batts™ 2.0 59/51 60 – 62 45 – 50
minutes • 1 x 16mm GYPROCK
FCO 964 FYRCHEK plasterboard. (c) 75 Soundscreen™ 2.0 batts 58/48 60 – 62 45 – 50
PKA–056
SYSTEM Carpet +
FRL Bare Floor
CEILING LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr Underlay
Report/Opinion Nº Ln,w+CI
Ln,w+CI
(a) Nil 46/39 80 – 85 60 – 65
• 1 x 13mm GYPROCK
–/–/– CSR 831 (b) 90 Gold Batts™ 2.0 52/45 75 – 80 55 – 60
Plasterboard CD.
(c) 75 Soundscreen™ 2.0 batts 52/45 75 – 80 55 – 60
(a) Nil 46/40 80 – 85 60 – 65
• 1 x 10mm GYPROCK
–/–/– CSR 833 (b) 90 Gold Batts™ 2.0 52/46 75 – 80 55 – 60
SOUNDCHEK plasterboard.
(c) 75 Soundscreen™ 2.0 batts 52/46 75 – 80 55 – 60
(a) Nil 48/42 80 – 85 60 – 65
• 2 x 13mm GYPROCK (b) 90 Gold Batts™ 2.0 54/48 75 – 80 55 – 60
–/–/– CSR 832
Plasterboard CD. (c) 75 Soundscreen™ 2.0 batts 54/48 75 – 80 55 – 60
(d) 165 Glasswool Partition batts 56/50 70 – 75 55 – 60
(a) Nil 49/43 80 – 85 60 – 65
• 2 x 10mm GYPROCK (b) 90 Gold Batts™ 2.0 54/49 75 – 80 55 – 60
–/–/– CSR 834
SOUNDCHEK plasterboard. (c) 75 Soundscreen™ 2.0 batts 54/49 75 – 80 55 – 60
(d) 165 Glasswool Partition batts 56/51 70 – 75 55 – 60
(a) Nil 46/40 80 – 85 60 – 65
30/30/30 • 1 x 13mm GYPROCK
CSR 835 (b) 90 Gold Batts™ 2.0 52/46 75 – 80 55 – 60
FCO 1373 FYRCHEK plasterboard.
(c) 75 Soundscreen™ 2.0 batts 52/46 75 – 80 55 – 60
60/60/60 (a) Nil 46/40 80 – 85 60 – 65
+RISF 30 • 1 x 16mm GYPROCK
CSR 836 (b) 90 Gold Batts™ 2.0 52/46 75 – 80 55 – 60
minutes FYRCHEK plasterboard.
FCO 1373 (c) 75 Soundscreen™ 2.0 batts 52/46 75 – 80 55 – 60
CSR 839 (a) Nil 50/44 75 – 80 55 – 60
60/60/60 • 1 x 13mm GYPROCK
+RISF 60 FYRCHEK (against frame). (b) 90 Gold Batts™ 2.0 56/50 70 – 75 50 – 55
minutes • 1 x 16mm GYPROCK (c) 75 Soundscreen™ 2.0 batts 56/50 70 – 75 50 – 55
FCO 964 FYRCHEK plasterboard.
(d) 165 Glasswool Partition batts 58/52 70 – 75 50 – 55
(a) Nil 49/43 80 – 85 55 – 60
90/90/90
+RISF 60 • 2 x 16mm GYPROCK (b) 90 Gold Batts™ 2.0 55/49 70 – 75 50 – 55
CSR 837
minutes FYRCHEK plasterboard. (c) 75 Soundscreen™ 2.0 batts 55/49 70 – 75 50 – 55
FCO 1373
(d) 165 Glasswool Partition batts 57/51 70 – 75 50 – 55
(a) Nil 52/46 75 – 80 55 – 60
120/120/120
+RISF 60 • 3 x 16mm GYPROCK (b) 90 Gold Batts™ 2.0 58/52 70 – 75 50 – 55
CSR 838
minutes FYRCHEK plasterboard. (c) 75 Soundscreen™ 2.0 batts 58/52 70 – 75 50 – 55
FCO 1373
(d) 165 Glasswool Partition batts 60/54 65 – 70 50 – 55
PKA–056
SYSTEM Carpet +
FRL Bare Floor
CEILING LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr Underlay
Report/Opinion Nº Ln,w+CI
Ln,w+CI
(a) Nil 48/41 75 – 80 55 – 60
• 1 x 13mm GYPROCK (b) 90 Gold Batts™ 2.0 54/47 70 – 75 50 – 55
–/–/– CSR 841
Plasterboard CD. (c) 75 Soundscreen™ 2.0 batts 54/47 70 – 75 50 – 55
(d) 165 Glasswool Partition batts 56/49 65 – 70 50 – 55
(a) Nil 48/42 75 – 80 55 – 60
PKA–056
• 125mm concrete slab.
• RONDO Suspended Ceiling System with Gyprock®
Resilient Mounts.
• Minimum 150mm cavity.
• Cavity infill as per system table.
• Ceiling lining as per system table, fixed to furring channel.
SYSTEM Carpet +
FRL Bare Floor
CEILING LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr Underlay
Report/Opinion Nº Ln,w+CI
Ln,w+CI
(a) 50 Glasswool Partition batts 64/56 55 – 60 40 – 45
Refer to • 1 x 13mm GYPROCK – 11kg/m3
CSR 958
AS3600 Plasterboard CD.
(b) TSB4/ASB4 Polyester batts 64/56 55 – 60 40 – 45
SYSTEM Carpet +
FRL Bare Floor
CEILING LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr Underlay
Report/Opinion Nº Ln,w+CI
Ln,w+CI
(a) 50 Glasswool Partition batts 59/51 60 – 62 40 – 45
Refer to • 1 x 13mm GYPROCK – 11kg/m3
CSR 959
AS3600 Plasterboard CD.
(b) TSB4/ASB4 Polyester batts 59/51 60 – 62 40 – 45
FRL SYSTEM
CEILING LININGS CAVITY INFILL Rw / Rw+Ctr Ln,w+CI
Report/Opinion Nº
240/240/240
from above PF-001 • Nil (a) Nil 33/30 45
FCO 1303
240/240/240
from above
• 3 x 16mm GYPROCK FYRCHEK
120/120/120 PF-001 (a) 75 Gold Batts™ 1.5 61/55 30
plasterboard
from below
FCO 1373
PKA–056
60/60/60 • 1 x 13mm GYPROCK (a) 165 Gold Batts™ 3.0 44/39 44/39 46/40
+RISF 60 FYRCHEK (against frame).
minutes
CSR 870 (b) 215 Gold Batts™ 4.0 45/40 45/40 47/41
• 1 x 16mm GYPROCK
FCO 964 FYRCHEK plasterboard. (c) 120 Soundscreen™ 3.0 batts 44/39 44/39 46/40
PKA–056
• 1 x 6mm Cemintel™ (a) 165 Gold Batts™ 3.0 40/35 40/35 42/36
Wallboard.
–/–/– CSR 868 (b) 215 Gold Batts™ 4.0 41/37 41/36 43/38
(Furring at 450mm max.
centres). (c) 120 Soundscreen™ 3.0 batts 40/35 40/35 42/36
60/60/60 • 1 x 13mm GYPROCK (a) 165 Gold Batts™ 3.0 46/41 46/41 48/42
+RISF 60 FYRCHEK (against frame).
minutes
CSR 875 (b) 215 Gold Batts™ 4.0 47/42 47/42 49/43
• 1 x 16mm GYPROCK
FCO 964 FYRCHEK plasterboard. (c) 120 Soundscreen™ 3.0 batts 46/41 46/41 48/42
PKA–056
PKA–056
FRL SYSTEM
CEILING LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr
Report/Opinion Nº
60/60/60
• 1 x 16mm GYPROCK (a) 140 Gold Batts™ 2.5 44/35
+RISF 30
CSR 892
minutes FYRCHEK plasterboard. (b) 120 Soundscreen™ 3.0 batts 44/35
FCO 1373
PKA–056
FRL SYSTEM
CEILING LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr
Report/Opinion Nº
PKA–056
• A low slope metal roof.
• 150mm Timber or Steel Purlins.
• RONDO Furring Channel fixed to purlin with fixing clips
(Nº226).
• Cavity infill as per system table.
• Ceiling lining as per system table, fixed to furring channel.
FRL SYSTEM
CEILING LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr
Report/Opinion Nº
(a) Nil 39/32
• 1 x 10mm GYPROCK
–/–/– CSR 877 (b) 165 Gold Batts™ 3.0 47/38
SOUNDCHEK plasterboard.
(c) 120 Soundscreen™ 3.0 batts 46/37
PKA–052
FRL SYSTEM
CEILING LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr
Report/Opinion Nº
ABOVE (a) Nil 38/31
60/60/60
from top • 1 x 16mm GYPROCK FYRCHEK.
CSR 981 (b) 50 Glasswool Partition batts – 11kg/m3 42/33
only BELOW
FAR 2358 • 1 x 10mm GYPROCK Plasterboard CD. (c) 90 Gold Batts™ 2.0 45/36
ABOVE
60/60/60
from top • 2 x 16mm GYPROCK FYRCHEK.
CSR 982 (a) Nil 33/30
only BELOW
FAR 2358 • Nil.
ABOVE
120/120/120
• 2 x 16mm GYPROCK FYRCHEK. (a) Nil 44/37
from top
CSR 983
only BELOW (b) 75 Glasswool Partition batts – 14kg/m3 50/41
FAR 2358 • 1 x 10mm GYPROCK Plasterboard CD.
ABOVE
90/90/90
from top • 3 x 13mm GYPROCK FYRCHEK.
CSR 986 (a) Nil 36/33
only BELOW
FAR 2358 • Nil.
ABOVE
120/120/120
from top • 3 x 16mm GYPROCK FYRCHEK.
CSR 985 (a) Nil 36/33
only BELOW
FAR 2358 • Nil.
PKA–052
• Ceiling lining as per system table, fixed to framing.
• Steel framing maximum 1.6mm BMT.
• Minimum cavity depth 150mm.
• Cavity infill as per system table.
• Ceiling lining as per system table, fixed to framing.
FRL SYSTEM
CEILING LININGS CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr
Report/Opinion Nº
ABOVE & BELOW (a) Nil 41/35
60/60/60 CSR 994 • 1 x 16mm GYPROCK FYRCHEK
FAR 2358
plasterboard. (b) 50 Glasswool Partition batts – 11kg/m3 45/37
90/90/90
from below
ABOVE & BELOW (a) Nil 47/41
120/120/120
from above CSR 992 • 2 x 16mm GYPROCK FYRCHEK
+RISF 60 plasterboard. (b) 50 Glasswool Partition batts – 11kg/m3 51/43
minutes
FAR 2358
ABOVE
PKA–052
System CSR 890 with Material & CAC Recycled Ceiling System*
NRC LR Edge Details
Acoustic Ceiling Tile Options Thickness (db) Content TWE TWA OWE FC
Mineral Fibre
Fine Fissured 0.55 33-35 0.83 Square, Tegular 52-62% •
16mm
Mineral Fibre
Vantage 10™ & Directional Fissured 0.55 33-35 0.82 Square, Tegular 52-62% •
16mm
Mineral Fibre
Sand Micro™ 0.50 35 0.87 Square, Tegular 52-62% •
16mm
Mineral Fibre
Symphony® m 0.70 35 0.89 Square, Tegular 82-88% •
19mm
Mineral Fibre Square, Tegular,
Solaton #’s 723, 627, 721 0.60 37-40 0.91 85% • • • •
15mm Kerfed, Shiplap
Mineral Fibre Square, Tegular,
Solaton #’s 611 & 616 0.55 37-40 0.91 85% • • • •
15mm Kerfed, Shiplap
Mineral Fibre Square, Tegular,
Solaton #’s 615 & 725 0.50 37-40 0.91 85% • • • •
15mm Kerfed, Shiplap
Mineral Fibre Square, Tegular,
Solaton Nashiji Extra White 0.70 31 0.90 85% • • •
15mm Kerfed, Shiplap
Mineral Fibre Square, Tegular,
Solaton Nashiji High Acoustical 0.80 31 0.90 85% • • •
19mm Kerfed, Shiplap
Glass Wool 21 (A)
Ecophon Focus™ A & E 0.85 0.84 Square, Tegular 70% •
20mm 23 (E)
Glass Wool
Ecophon Focus™ D 0.85 25 0.84 Shiplap 70% •
20mm
Glass Wool
Ecophon Focus™ F 0.85 NA 0.84 Shiplap (F) 70% •
20mm
Perforated Plasterboard (with Bradford Plasterboard
0.49 NA NA Square NA •
Anticon 55, foil face up) 13mm
Perforated Metal Pan (1820 perf with Steel
0.70 13 0.68 Square, Tegular 25% • • • •
black fleece backing) 0.7mm
Perforated Metal Pan (1820 perf with Steel
0.85 30 0.68 Square, Tegular 25% • • • •
18mm x 80kg/m3 insulation) 0.7mm
* Key to Systems: TWE = Two Way Exposed, TWA = Two Way Access, OWE = One Way Exposed, FC = Fully Concealed
NOTE: Custom tile options, metal pan perforations and module sizes are available. Please contact CSR Fricker Ceiling Systems’ National
Technical Advice Centre on 1300 374 253 for further information or detailed technical data sheets on individual products.
Solaton products offer an optional patented Enet™ feature. Enet™ improves the performance of wireless local area networks.
FIG E4: INSTALLATION DETAIL – TWO LAYER – ADHESIVE & SCREW FIXING
NON FIRE RATED
Timber or Steel Framing Fixing Specifications
at 600mm max. centres 1st Layer Refer to Section ‘A’
Screws Gyprock Stud Adhesive
2nd Layer
Fasteners Refer to Section ‘A’
Adhesive Gyprock Stud Adhesive
200mm max. 1st Layer Fixing & Spacing
Body Screw fix to each
Sheet framing member at
230mm 300mm max. centres
max. Width
900mm 4 screws equally spaced
1200mm 5 screws equally spaced
1350mm 6 screws equally spaced
300mm Butt Joints Screw fix at 200mm
max. on framing max. centres
Sheet Screw fix at 300mm
Ends & max. centres
Openings
300mm max. 2nd Layer Fixing & Spacing
for cornice finish 200mm min. Body Adhesive Daubs at
150mm max. 230mm max. centres
for set finish 230mm max. Sheet and 200mm min. from
Width fastener points
200mm min.
Adhesive 900mm 2 daubs
Daubs 1200mm 4 daubs
1350mm 4 daubs
Recessed Screw fix at each
Temporary block Joints frame member
For Levels of Finish 0 to Centreline Screw fix at each frame
3, Butt Joint on member of Sheet member
and screw fix at 200mm
max. centres Butt Joints Screw fix at 200mm
on framing max. centres
For Level of Finish 4 and 5,
where Butt Jointing is Butt Joints Laminating screws at
unavoidable, joint centrally Begin 1st layer between 200mm max. centres
between members, fix with Butt Joints in 1st with a half framing
laminating screws at 200mm layer may be on width sheet Openings Screws at 200mm max.
same member centres
Offset Butt Joints in 2nd
layer 600mm min. in Begin 2nd layer with a full width sheet Sheet For cornice finish, screw
adjoining sheets and and offset recessed joint 300mm Ends fix at 300mm max. cts.
between layers minimum between 1st and 2nd layer For set finish, screw fix
at 150mm max. centres
200mm max.
Where permitted, Butt Joint
on member and screw fix at
200mm max. centres
(Levels of Finish 0 to 3)
Refer to system
specifications
FIRE RATED
Fixing Specifications
Fasteners Refer to Section ‘A’
Location Fixing & Spacing
Body of Fasten to each framing
Sheet member at 10 to 16mm
1st & 2nd from sheet edges and
200mm Layer at 200mm maximum
max. centres
Butt Butt Joint on framing
150mm Joints and fasten at 150mm
max. 1st layer max. centres
Butt Framing at 450mm max.
Joints spacing – Butt Joint on
2nd layer framing and fasten at
150mm max. centres (or
as detailed for 600mm
frame spacing).
For framing at 600mm 200mm max. Framing at 600mm max.
max. centres, Butt Joints spacing – Butt Joint
in 2nd layer must be 150/200mm max. within 50mm of centre
centred between framing line between framing
members and fix to 1st layer with
For framing at 450mm centres, Laminating Screws at
Butt Joints in 2nd layer may be on or 200mm max. centres
centrally between framing members Openings Fasten at
150mm max. centres
Butt Joints in 2nd layer must be offset Sheet Cornice finish – Fasten
600mm minimum in adjoining sheets and Ends at 200mm max. centres
between layers Set finish – Fasten at
150mm max. centres
Begin 1st
Butt Joints in 1st layer with half NOTE: Single layer systems to be
Perimeter track/angle fixed as per 2nd layer, Butt joints
required in fire rated layer may be on width sheet
same member between framing are to be fully back
ceiling systems (refer blocked and fixed with laminating
to Perimeter Framing screws.
& Caulking) Begin 2nd layer with full width sheet
and offset recessed joint 300mm
minimum between 1st and 2nd layer
FIG E8: INSTALLATION DETAIL – THREE LAYER FIXING TO STEEL OR TIMBER FRAMING – NAIL OR SCREW FIXING
Perimeter track/angle
required in fire rated
ceiling systems (refer Begin 1st layer with 400mm width sheet
to Perimeter Framing Begin 2nd layer with 800mm width sheet
& Caulking) Begin 3rd layer with full width sheet
FIRE RATED
Top Layers Fixing Specifications
Fasteners Refer to Section ‘A’
300mm Location Fixing & Spacing
max.
Body of Fix to upper framing at
150mm 200mm Sheet max. 300 centres.
max. max. All Layers Fix lower framing
through to upper
framing at 200mm max.
centres
150mm Butt Fix to upper framing at
max. Joints 300mm max. centres.
Fix lower framing
through to upper
framing at 150mm max.
centres
Sheet Fix at 150mm max.
Ends centres
150mm 150mm
max. 200mm max.
max.
FIRE RATED
Bottom Layers
Fixing Specifications
Fasteners Refer to Section ‘A’
Location Fixing & Spacing
Body of Fasten to each framing
Sheet member at 10 to 16mm
from sheet edges and at
200mm max. centres.
Sheet
Width
1200mm 7 fasteners equally spaced
1350mm 8 fasteners equally spaced
Butt Framing at 450mm max.
Joints spacing – Butt Joint on
framing and fasten at
150mm max. centres.
OR
Framing at 600mm max.
spacing – Butt Joint
within 50mm of centre
line between framing.
Fully backblock and fix
with laminating Screws
at 200mm max. centres
Openings Fasten at
150mm max. centres
Sheet Cornice finish – Fasten
Ends at 200mm max. centres
Set finish – Fasten at
150mm max. centres
SUITABLE FOR:
Practical
minimum 150mm Wall
Angle
Trim
1200mm
max. between
suspension points
Main
300mm Runner
600mm
300mm
GYPROCK plasterboard tile
1200 x 600 x 13mm
(nominal)
1200mm
600mm
Main Runner
Duo 1/Duo 3
Cross Runner
Duo 2/Duo 4
FIG E11: TYPICAL INSTALLATION DETAIL – FRICKER EASY ACCESS SYSTEM® WITH ACOUSTIC CEILING TILES
Fricker Suspension Clip
and 5mm hanging rod
staggered at 1200mm
centres
Modules of
1000 x 1000mm to
1500 x 1500mm
Tiles can be
rotated 90° in
modules
Contents
Introduction F2
Fire Resistance F2
Acoustic Performance F2
Framing & Lining F3
Components F3
System Specifications
Services Systems with Timber
Framing – Rw + Ctr F4
Services Systems with Steel
Framing – Rw + Ctr F5
Services Systems with Timber
Framing – Rw F6
Services Systems with Steel
Framing – Rw F7
Services Systems with Cavity –
Timber or Steel Framing
– Rw/Rw + Ctr F8
Acoustic Separation between
Habitable Room and Waste Pipe
– Rw F8
Fire Resistance Penetrations for downlights must be neat and tight to the
fitting. No additional sealing is required. Ensure insulation
material is kept clear of fittings and that transformers are
The services systems in this section have no Fire Resistance
supported separately from the plasterboard lining.
Level. They may be used in conjunction with fire rated
wall and ceiling systems selected from elsewhere in this The installation of exhaust grilles and ducting may reduce the
manual. performance of the systems. The building designer should
contact the exhaust system manufacturer for performance
details.
Similarly, access panels might be required. Contact the panel
manufacturer for suitable products.
Lagging of pipes or ducts is specified in some services
systems. Lagging must provide complete coverage for the
full extent of the pipe or duct.
Bradford Glasswool
batts
Maximum
number of Locally remove
downlights as insulation
per system
specification
PKA–058
• Cavity insulation:
Walls – 75mm Bradford Glasswool Partition batts –
11kg/m3.
Ceilings – 90mm Bradford Gold Batt™ R2.0 wall batts
(minimum 1200mm each side of pipe or
duct).
Maximum Nº
Insulation
System Nº Linings Pipe Lagging Downlights Rw + Ctr
(Refer to System Specification)
per 5m2
PKA–058
• Cavity insulation:
Walls – 75mm Bradford Glasswool Partition batts –
11kg/m3.
Ceilings – 90mm Bradford Gold Batt™ R2.0 wall batts
(minimum 1200mm each side of pipe or
duct).
Maximum Nº
Insulation
System Nº Linings Pipe Lagging Downlights Rw + Ctr
(Refer to System Specification)
per 5m2
PKA–058
• Cavity insulation:
Walls – 75mm Bradford Glasswool Partition batts –
11kg/m3.
Ceilings – 90mm Bradford Gold Batt™ R2.0 wall batts
(minimum 1200mm each side of pipe or
duct).
Maximum Nº
Insulation
System Nº Linings Pipe Lagging Downlights Rw
(Refer to System Specification)
per 5m2
PKA–058
• Cavity insulation:
Walls – 75mm Bradford Glasswool Partition batts –
11kg/m3.
Ceilings – 90mm Bradford Gold Batt™ R2.0 wall batts
(minimum 1200mm each side of pipe or
duct).
Maximum Nº
Insulation
System Nº Linings Pipe Lagging Downlights Rw
(Refer to System Specification)
per 5m2
PKA–052
• Inner layer lining (as per system table) direct fixed to timber
or steel framing, to encase services.
• Cavity of 70mm minimum.
• Cavity insulation as per system table. For ceiling, minimum
1200mm each side of pipe or duct.
• Outer layer/ceiling lining (as per system table) direct fixed
to timber or steel framing.
Maximum Nº
Insulation
System Nº Linings Downlights Rw/Rw+Ctr
(Refer to System Specification)
per 5m2
INNER LAYER
50 Glasswool Partition batts – 11kg/m3 Nil 46/37
• 1 x 13mm GYPROCK SOUNDCHEK plasterboard.
CSR SS40
OUTER LAYER
TSB4 Polyester batts Nil 46/39
• 1 x 10mm GYPROCK Plasterboard CD.
INNER LAYER
50 Glasswool Partition batts – 11kg/m3 Nil 49/40
• 2 x 13mm GYPROCK FYRCHEK.
CSR SS41
OUTER LAYER
TSB4 Polyester batts Nil 49/42
• 1 x 10mm GYPROCK Plasterboard CD.
INNER LAYER
50 Glasswool Partition batts – 11kg/m3 Nil 53/44
• 2 x 13mm GYPROCK FYRCHEK.
CSR SS42
OUTER LAYER
TSB4 Polyester batts Nil 53/46
• 2 x 13mm GYPROCK Plasterboard CD.
FIG Z061: ACOUSTIC SEPARATION BETWEEN HABITABLE ROOM AND WASTE PIPE
Rw 45 through wall. (Estimate PKA Acoustic Consulting).
Rw 30 through ceiling.
Gyprock® Wet Area Acrylic Sealant
for acoustic integrity
1 x 13mm
GYPROCK
Plasterboard CD
Waste Pipe
10mm GYPROCK
Plasterboard CD
each side of steel
studs
1 x 13mm GYPROCK
Plasterboard CD
Contents
Introduction Z2
Flanking Paths via Ceiling or Floor Z2 – Z7
Head & Base Details Z8 – Z14
Flanking Paths via Wall Z15 – Z17
Wall Junction Details Z18 – Z20
Wall Control Joints Z21
Service Penetrations Z22 – Z23
Gyprock Silencer™ Z24
Penetrations in Fire Rated Walls Z25 – Z29
Penetrations in Fire Rated Ceilings Z30 – Z33
Ceiling Control Joints Z34 – Z35
Ceiling Perimeter Details Z36 – Z40
PKA–A031
PKA–A031
• Concrete slab soffit.
• 200mm minimum cavity.
• 50mm Bradford Glasswool Partition batts – 11kg/m3 to
extent specified in table.
• Ceiling lining as per system table.
• Wall with required sound rating, to 100mm minimum
above ceiling.
PKA–A031
Refer to Detail
CEILING LININGS Rw / Rw+Ctr
FIG Nº
PKA–A031
Refer to Detail
CEILING LININGS Rw / Rw+Ctr
FIG Nº
Z807 (a) 1 x 10mm GYPROCK Plasterboard panel. 50/40
PKA–A031
• Concrete slab soffit.
• 200mm minimum cavity.
• Bradford Wavebar Quadzero Loaded Vinyl barrier
(4.0kg/m2).
• 50mm Bradford Glasswool Partition batts – 11kg/m3,
600mm wide over wall.
• Ceiling lining, as per system table.
• Wall with required sound rating, to underside of ceiling.
Refer to Detail
CEILING LININGS Rw / Rw+Ctr
FIG Nº
Z809 (a) 1 x 10mm GYPROCK Plasterboard panel. 50/40
PKA–A031
PKA–A031
PKA–A031
PKA–A031
Refer to Detail
CEILING LININGS Rw / Rw+Ctr
FIG Nº
(a) 100mm 55/50
PKA–A031
Refer to Detail
CEILING LININGS Rw / Rw+Ctr
FIG Nº
(a) 1 x 10mm GYPROCK Plasterboard CD. 43/37
6 – 10mm
100mm max. clearance to
to first fastener GYPROCK
(Do not fix plasterboard
through track) RONDO P50 or P60
Shadowline Stopping
Fill gap with CSR Bead (finish as
Gyprock Sealant for required)
acoustic integrity
Stud Fix wall sheets at 10
6mm to15mm below head NOTE: This method of
NOTE: Junction may be clear Track section with track flanges Stud construction is not
finished square, with of 32mm flange fastened recommended for studs
stopping bead or with soffit to soffit at 600mm adjacent to windows or
cornice. Do not rigidly centres max. doors or studs carrying
fix cornice to walls loads greater than
where friction joints are 0.25kPa.
used
FIG Z002: DEFLECTION HEAD FIG Z005: HEAD FOR SUSPENDED CEILING
FIG Z003: HEAD USING ALUMINIUM HEAD TRACK FIG Z814: DEFLECTION HEAD
20mm gap
GYPROCK plasterboard Proprietary extruded
ceiling fixed to furring aluminium track 100mm max.
channel at appropriate (do not fix Fix cornice to
centres through track) ceiling only with
Gyprock Cornice
Cement
NOTE: Stopping bead
or cornice finish as Flexible Mastic
Stud
required. Do not rigidly
fix cornice to walls Deflection Head Track
where friction joints are fastened at 600mm
used Stud centres max.
Ceiling frame
FIG Z810: FLANKING PATH DETAIL FOR FIG Z809: FLANKING PATH DETAIL FOR
PLASTERBOARD CEILING OVER WALL PANEL CEILING OVER WALL
System insulation
Continuously
fill gap with
Wall with required Gyprock
sound rating sealant
Continuously
fill gap with System insulation
Gyprock Seal skirting with 3mm
sealant polyethylene tape
Discontinuous
flooring Continuously
GYPROCK fill gap with
plasterboard ceiling Gyprock
system direct fixed sealant
to joists or to
furring/batten Tape and set or
cornice finish
Discontinuous
flooring
res
ent
a x. c
mmm
600
res
ent
ax. c
m mm
600
FIG Z016: FRICTION FIT HEAD FIG Z221: STUDS LINED ONE SIDE ONLY
(Maintains the FRL of the wall system in which it is installed).
Continuous bead of Track section with
CSR Gyprock Fire 32mm flange fastened
Continuous bead of CSR Gyprock® Fire Mastic when acoustic to ceiling at 600mm
Mastic when acoustic integrity required integrity required maximum centres
Furring Channel
over wall Suspended Ceiling
Top Cross Rail
GYPROCK
Staggered plasterboard
stud profiles
Facade bottomed in Fix stud to track
panel track/angle with 1 x 10g pan
head screw
Smoke
seal as
required Caulk 6 – 10mm
75mm max. to gap under outer
first fastener. plasterboard layer
with CSR Gyprock
Fire Mastic
(25mm min.)
Insitu Internal Membrane
applied to face of
Flexible Sealant
(minimum 1 x 13mm
(minimum 1 x 13mm
Bath
Foam plastic rod
used as essential
bond breaker Support Batten
Mortar Bed fixed to framing
10mm GYPROCK
Single AQUACHEK or
or FYRCHEK MR
double
stud 1 or 2 layers of GYPROCK
wall FYRCHEK MR
GYPROCK FYRCHEK required)
system
Waterproofing sealer
Plasterboard lining not shown
applied to face of
plasterboard behind
tiled area
(minimum 1 x 13mm
Vertical Corner
Angle Flashing
Ceramic Tiles
Nogging for
plasterboard fixing
Flashing Tape
(25mm min.)
Flexible Sealant
6mm
Preformed
Shower Base
Mortar Bed
PKA–A031
BARRIER
Refer to Detail
CEILING LININGS Nil 6mm Cemintel™ Wallboard
FIG Nº
Rw / Rw+Ctr
(a) 1 x 10mm GYPROCK Plasterboard CD. 39/30 59/50
PKA–A031
Refer to Detail
CEILING LININGS Rw / Rw+Ctr
FIG Nº
(a) 90kg/m2 53/48
Z010
Z014 (b) 150kg/m2 55/50
Z242
(c) 200kg/m2 56/51
PKA–A031
Refer to Detail
CEILING LININGS Rw / Rw+Ctr
FIG Nº
(a) 1 x 10mm GYPROCK Plasterboard CD. 51/43
PKA–A031
Refer to Detail
CEILING LININGS Rw / Rw+Ctr
FIG Nº
(a) 1 x 10mm GYPROCK Plasterboard CD. 58/50
Z208
(e) 1 x 16mm GYPROCK FYRCHEK plasterboard. 58/50
PKA–A031
Refer to Detail
CEILING LININGS Rw / Rw+Ctr
FIG Nº
(a) 1 x 10mm GYPROCK Plasterboard CD. 45/40
PKA–A031
Refer to Detail
CEILING LININGS Rw / Rw+Ctr
FIG Nº
(a) 1 x 10mm GYPROCK Plasterboard CD. 51/43
FIG Z011: CORNER DETAIL PLASTERBOARD WALL FIG Z013: WALL END DETAIL PLASTERBOARD WALL
Track
than 25°
m
0m
10
Metal track
fixings
GYPROCK
FYRCHEK
Track plasterboard
Stud frame wall system with min. Stud frame wall system with min.
75mm Bradford Gold™ batts 75mm Bradford Gold™ batts
Continuous
bead of
sealant
10mm
nom. gap
Wall with required from Wall with required Tape and
sound rating masonry sound rating set corners
to lining
Fix end stud to masonry
at 500mm maximum Sealant
vertical centres
Dampcourse
Tape and
set corners
600mm maximum
Finish corners
as required
100mm
max. 100mm
GYPROCK max.
plasterboard
Angle or Track
CSR Gyprock®
Staggered Stud Clip
GYPROCK
Plasterboard
92 mm Stud
Attach with
plasterboard
laminating screws at
600 mm centres
Additional stud to
Tracks discontinuous Additional stud to form control joint
at control joint form control joint RONDO P35
Control Joint Stud in
normal Cemintel™
20mm min. position Wallboard
2 x 13mm GYPROCK
Finish surface
15-20mm FYRCHEK plasterboard
as per external angles
Finish surface Backing Rod
as per external angles 15-20mm – non fire rated
gap 22mm dia. for
FIG Z023: CONTROL JOINT FOR COMPOSITE WALL acoustic integrity
SYSTEMS – STEEL OR TIMBER STUD FRAME
(Maintains FRL of the wall system in which it is installed).
FIG Z010: CONTROL JOINT AT INTERSECTION OF
MASONRY AND STEEL STUD WALL
Concrete Slab
Water supply
Mixer
only
Head
Silencer inside Track
track and held by
Rondo clip Gyprock
Silencer Fire Performance
Power outlets and light switches can be installed in fire
rated walls using either fire rated switch boxes, standard
switches within a Gyprock Silencer™, or standard switches
with a baffle in the wall cavity. When installed correctly,
these methods maintain the FRL of the wall system in which
they are installed.
The Fire Resistance of electrical penetrations was tested at
the CSR Research NATA Laboratory. Standard power points
were positioned back to back within Gyprock Silencers™
without degrading the fire resistance of the wall system up
to –/120/120.(CSIRO assessment FCO 2039).
Gyprock
Base Track Silencer
or Angle Where fire and acoustic rated switch boxes are specified,
CSR recommends the use those manufactured by
PROMAT, CLIPSAL or HPM to eliminate the need for baffle
Screw fix Gyprock Silencer construction and to assist in maintaining the acoustic
to base track or angle
integrity of wall systems. A maximum of two fire rated
switch boxes are permitted per wall face in any one stud
For risers, ducts and ceiling systems to protect against opening.
noise generated by services, refer to Section ‘F’ ‘Service
Systems’. These systems may incorporate standard
downlights equally spaced over any 5m 2 area. Where
a higher density of downlights is required, sound rated
downlights such as Regal R1012/FRD, or surface mounted
lights should be used.
Sealant to suit,
System Rondo support (not required to System
bracket 75mm Bradford
insulation be fire rated) Partition batts insulation
min.
CSR Gyprock®
Fire Mastic
Non fire rated
Fire rated access Backing Rod
panel installed to
manufacturer’s
Wall studs and noggings details 2 layer
around cutout GYPROCK
FYRCHEK
wall system
GYPROCK FYRCHEK
fixed to studs and
noggings around cutout Set over stopping bead
at 150mm maximum around opening
centres
FIG Z050: POWER OUTLET/LIGHT SWITCH FIG Z051: POWER OUTLET/LIGHT SWITCH
INSTALLATION USING NON FIRE RATED SWITCHES INSTALLATION USING NON FIRE RATED SWITCHES
AND CAVITY BAFFLE – FRL – /60/60 AND CAVITY BAFFLE – FRL – /120/120
Timber Batten
Batten
GYPROCK FYRCHEK
wall lining sheets
Batten Batten
Baffle 300mm min.
GYPROCK FYRCHEK
Baffle (same thickness as
GYPROCK FYRCHEK wall lining sheet) to extend
plasterboard 300mm min. above and
below penetrations
Ceramic Tiles
GYPROCK
FYRCHEK IBS™ strips 15mm 15mm
Cable Tray 50 x 19mm 6mm CSR Gyprock®
wall lining min. Wet Area Acrylic Sealant min.
GYPROCK FYRCHEK MR
plasterboard
GYPROCK
12mm FYRCHEK
1 or 2
Support Batten
38mm max.
layers
Ceramic Tiles
CSR Gyprock
Fire Mastic 15mm 6mm CSR Gyprock® 15mm
min. Wet Area Acrylic Sealant min.
2 layers GYPROCK
16mm 16mm 16mm 16mm FYRCHEK MR
plasterboard
FIG Z025: INSTALLATION DETAIL FOR FIRE DAMPER IN STUD WALL SYSTEM
APPRAISAL: CSIRO FCO 2106
Boxed studs
Deflection Head
Track fixed to studs
Caulk between
plasterboard and
Mechanical fire damper body sides
damper tested and with Promaseal
approved for Acrylic Mastic 5mm
AS1530.4 min. depth
1 or 2 layers
GYPROCK
FYRCHEK
Plasterboard as
per FRL
Sheetmetal
Riser
Sheetmetal ductwork
J-Track
Mechanical fire
damper tested and
approved for
AS1530.4 10mm dia. MS rod
fixed to slab and
support angle
1400mm max.
Steel studs
at 600mm
centres
Two 35 x 35mm Rondo
angles mechanically
fixed to studs with Nº6
Type ‘S’ drill point
screws
2 layers
GYPROCK
FYRCHEK Steel studs at
plasterboard 600mm centres
Spigot to terminate
with break away
joint as detailed in
AS1882.2
CSR Gyprock
Fire Spring
Where electrical wires or conduits penetrate a ceiling with
an FRL, the penetration may be back-blocked with two 100
CSR Gyprock x 100mm pieces of 16 mm GYPROCK FYRCHEK.
Fire Mastic
Recess the lower piece to accommodate the wiring, and fix
both blocks in position with Gyprock® Cornice Cement or
Gyprock® Base Coat.
Two layers
16mm GYPROCK
FYRCHEK FIG Z056: BACK-BLOCKING OF ELECTRICAL
plasterboard PENETRATION ON CEILING
141mm
127mm
7mm
250 x 50 x 3mm
support 285mm 2 layer x 16mm
GYPROCK FYRCHEK
Light trim
1 or 2 layers of GYPROCK
FYRCHEK plasterboard
Hanging bolts 2 layers 16mm GYPROCK
FYRCHEK screw fixed to
Framing Detail steel box at 300mm max.
312mm centres
670mm Wiring
penetration
312mm
12
of 94m
she m
etin to o
g ut sid
e
Nogging
50 x 50mm min.
Suspension
Rod
Suspension
Clip
Support stirrup
fabricated from stud
or furring channel
and Nº226 clips
Recessed light
protection box Furring
Channel
IBS Strip
60 x 20mm Wire Mesh
Shield
diameter
twice that
of pipe
1, 2 or 3 layers
of GYPROCK
6mm FYRCHEK
15mm min. plasterboard
Gyprock Fire
Additional short Mastic
length of Top Cross 100mm max.
Rail to support
Furring Channels
Light Fitting screw fixed FIG Z070: PVC PIPE PENETRATION THROUGH CEILING
to Furring Channels Installation must be to fire rated collar manufacturer’s specifications.
1, 2 or 3 layers
of GYPROCK
FYRCHEK
plasterboard
PROMAT™
Fyre Collar
fixed to support
framing
Additional short
length of Top Cross
Rail to support FIG Z071: FIRE SPRINKLER PIPE PENETRATION
Furring Channels THROUGH CEILING
Light Fitting screw fixed
to Furring Channel
Support sprinkler
pipe independently
of ceiling lining
1, 2 or 3 layers of
GYPROCK
Sprinkler Pipes FYRCHEK
Plasterboard
Sprinkler pipe
The penetration through fire rated ceilings for sprinkler pipes Hole diameter =
Pipe diameter +
should not exceed the pipe diameter plus 10mm. 10mm max.
Fusible Link
Furring Channel
FIG Z034: CONTROL JOINT PARALLEL TO STEEL FIG Z035: CONTROL JOINT PERPENDICULAR TO
FRAMING – 2 LAYERS STEEL FRAMING – 2 LAYERS
(Maintains FRL of the ceiling system in which it is installed). (Maintains FRL of the ceiling system in which it is installed).
Continuous back-block of Continuously fill gap Back-block between furring Continuously fill gap
GYPROCK FYRCHEK same with CSR Gyprock® channel with GYPROCK with CSR Gyprock®
thickness as ceiling sheet Fire Mastic to depth FYRCHEK same thickness Fire Mastic to depth
Fix one side of back-block of first layer minimum as ceiling sheet of first layer minimum
with laminating screws at Fix one side of back-block
600mm max. centres or with laminating screws at
plaster based adhesive Furring Channel
600mm max. centres or Joiner Nº138
60 to 70mm plaster based adhesive
Furring
Channel 200mm min.
Furring Channel
FIG Z037: CONTROL JOINT PARALLEL TO STEEL FIG Z038: CONTROL JOINT PERPENDICULAR TO
FRAMING – 3 LAYERS STEEL FRAMING – 3 LAYERS
(Maintains FRL of the ceiling system in which it is installed). (Maintains FRL of the ceiling system in which it is installed).
RONDO P35 1st and 2nd layers of 2nd and 3rd layers of
GYPROCK FYRCHEK RONDO P35
Control Joint Control Joint GYPROCK FYRCHEK
15 to 20mm gap plasterboard fixed to 15 to 20mm gap plasterboard fixed with
with set finish with set finish
furring at 200mm max. laminating screws to
3rd layer of GYPROCK centres layer above at 200mm
FYRCHEK plasterboard max. centres
fixed with laminating screws
at 200mm max. centres
FIG Z040: CONTROL JOINT PARALLEL TO TIMBER FIG Z041: CONTROL JOINT PERPENDICULAR TO
FRAMING – 2 LAYERS TIMBER FRAMING – 2 LAYERS
(Maintains FRL of the ceiling system in which it is installed). (Maintains FRL of the ceiling system in which it is installed).
Back-block between trimmers Continuously fill gap
Back-block between trimmers Continuously fill gap with GYPROCK FYRCHEK same with CSR Gyprock®
with GYPROCK FYRCHEK same with CSR Gyprock® thickness as ceiling sheet Fire Mastic to depth
thickness as ceiling sheet Fire Mastic to depth of first layer minimum
Laminating screws at of first layer minimum
Laminating screws at
200mm max. centres 200mm max. centres
Trimmers at 450mm
max. centres
Joist
300mm min.
Joist Joist
200mm min. 200mm min.
GYPROCK GYPROCK
RONDO P35 FYRCHEK
Control Joint FYRCHEK
15 to 20mm gap plasterboard 15 to 20mm gap plasterboard
with set finish
RONDO P35
Laminating screws at Control Joint Laminating screws at
200mm max. centres with set finish 200mm max. centres
FIG Z043: CONTROL JOINT PARALLEL TO TIMBER FIG Z044: CONTROL JOINT PERPENDICULAR TO
FRAMING – 3 LAYERS TIMBER FRAMING – 3 LAYERS
(Maintains FRL of the ceiling system in which it is installed). (Maintains FRL of the ceiling system in which it is installed).
Back-block between trimmers Continuously fill gap Back-block between trimmers Continuously fill gap with CSR
with GYPROCK FYRCHEK same with CSR Gyprock® with GYPROCK FYRCHEK same Gyprock® Fire Mastic to depth
thickness as ceiling sheet Fire Mastic to depth thickness as ceiling sheet of one layer minimum
of first layer minimum
Fix back-block to ceiling sheet Fix back-block to ceiling sheet
with plaster based adhesive with plaster based adhesive
or laminating screws Trimmers at 450mm or laminating screws
max. centres
300mm min.
Joist Joist Joist
200mm min. 200mm min.
Step 1: Step 2:
Choose a suitable Choose a suitable
ceiling perimeter perimeter caulking
framing detail. detail.
Refer to Refer to
FIG Z101 FIG Z140
to to
FIG Z130 FIG Z147
Ceiling Joist
Angle may be
required as backing
1 or 2 layers of for caulking
GYPROCK FYRCHEK Packer to suit 1 or 2 layers of
GYPROCK FYRCHEK
Rondo Wall Track fixed at
Refer to FIG Z100 Non fire 600mm max. centres
rated or Blocking to suit FRL. Refer to 'National
lower Association of Forest Industries Ltd'
NOTE: Caulking of the rated publication 'MRTFC'
ceiling perimeter may timber
be necessary before wall
fixing wall linings GYPROCK system GYPROCK
Plasterboard Plasterboard
Ceiling Joist
1, 2 or 3 layers of
GYPROCK FYRCHEK 1, 2 or 3 layers of
Rondo Wall Track fixed at GYPROCK FYRCHEK
Rondo Wall Track fixed at
600mm max. centres with 600mm max. centres with
metal fasteners metal fasteners
Fire rated
wall system
Refer to FIG Z100
600mm max.
1, 2 or 3 layers of
GYPROCK FYRCHEK 1, 2 or 3 layers of
Steel Track fixed at GYPROCK FYRCHEK
600mm max. centres Steel Angle or Track fixed
with metal fasteners at 600mm max. centres
with metal fasteners
1, 2 or 3 layers of
GYPROCK FYRCHEK 1, 2 or 3 layers of
GYPROCK FYRCHEK
Steel Angle fixed at Steel Angle fixed at
600mm max. centres with 600mm max. centres with
metal fasteners metal fasteners
1, 2 or 3 layers of 1, 2 or 3 layers of
GYPROCK FYRCHEK GYPROCK FYRCHEK
Refer to FIG Z100
Ceiling Joist
Ceiling Joist
Ceiling Joist
1, 2 or 3 layers of 1, 2 or 3 layers of
GYPROCK FYRCHEK GYPROCK FYRCHEK
Rondo Wall Track fixed at
600mm max. centres with Rondo Wall Track fixed at
metal fasteners 600mm max. centres with
metal fasteners
Refer to FIG Z100
Wall System
Backing rod
(non fire rated)
10mm Continuously fill gap at
min. Continuously fill gap at edge of all sheets with
edge of sheet with CSR Gyprock® Fire Mastic
CSR Gyprock® Fire Mastic
min. 16mm depth
Wall System
Shadowline stopping bead
Rondo P50 Continuously fill gap at
Continuously fill gap at edge of all sheets with
edge of sheet with vermiculite plaster
CSR Gyprock® Fire Mastic
min. 16mm depth Tape and set joint
70mm max.
max.
CSR recommends that only products, components 277 Whitehall Street, Yarraville VIC 3013
and systems recommended by it be used. South Australia
If this is not done, CSR will need to be satisfied that any
Lot 100 Sharp Court, Mawson Lakes SA 5095
defect in its product is attributable to our failure to meet
our standard (and not another cause) before this guarantee Western Australia
applies. 21 Sheffield Road, Welshpool WA 6106
This guarantee excludes all other guarantees and liability for Tasmania
damage or loss in connection with defects in CSR's product,
PO Box 61, Glenorchy TAS 7010
other than those imposed by legislation.
Northern Territory
New Zealand
This manual is current at September 2007 and supersedes 147 Gracefield Rd, Seaview, Wellington
all previous versions of the Fire and Acoustic Design Guide. Ph: 04 568 4520 Fax: 04 568 4528
Information including acoustic and fire rating has been
sourced from recognised third parties and is current at
the time of printing. Systems, Standards and Building
Codes are subject to change. To ensure the information
is current, check the websites www.gyprock.com.au or
www.cemintel.com.au or contact CSR Gyprock and Fibre
Cement. No responsibility is assumed for any errors that
may inadvertently appear in this manual.
Publication GYP500.BMS8800.0907