Khorais Road Project - Riyadh
Saudi Diyar Consultants
                                       HVAC System
                                        Fan Coil Units
Project :
Date :                                          Ambient Temp, °F:
a- General :
    1-  Unit No :
    2-  Location :
    3-  Served area :
    4-  Serial Number :
    5-  Model Number :
    6-  Type :
    7-  Voltage :
    8-  Amperage :
        WATER
    9- Inlet Temperature , ° F:
    10- Outlet Temperature, ° F :
    11- Inlet Pressure, psi :
    12- Outlet pressure, psi :
                                                Design              Actual
    13- Water flow, gpm :
        AIR
    14- Leaving air temperature db/wb, ° F :                  /
    15- Entering air temperature db/wb, ° F :                 /
                                                Design              Actual
    16- Airflow, cfm :
        Electric Heater
    17- Heater , Kw :
    18- Stages :
                                                Design              Actual
    19- Supply air, cfm
    20- Return air, cfm
    21- Fresh air, cfm
NOTES :
                                                                  Name             Signature
05/07/2018
                                                General                                           1
19:44:07
Khorais Road Project - Riyadh
                                                                           Saudi Diyar Consultants
b- Check List :
    1   -   Unit is installed with anti vibration mounts             ok         not ok
    2   -   Alignment and Levelling                                 good          bad
    3   -   Condensate drain pipe connected to nearest FD            ok         not ok
    4   -   Condensate drain pipe shall have a P-Trap              found       not found
    5   -   Chilled water pipes installation                        good          bad
    6   -   Chilled water pipes insulation                          good          bad
    7   -   FDI installation on main ChW return pipe               found       not found
    8   -   Pipes identifications                                    ok         not ok
    9   -   Valves tagging                                           ok         not ok
  ###   -   2-way valve installation                               found       not found
   11   -   Connection to BMS                                      found       not found
  ###   -   Strainer installation                                  found       not found
  ###   -   General cleaning                                         ok         not ok
  ###   -   Duct vibration or ratling                              found       not found
  ###   -   Die electric union installation (copper to steel)      found       not found
  ###   -   Electric heater installation                           found       not found
  ###   -   Ducts installations                                     good          bad
  ###   -   Ducts insulation                                        good          bad
  ###   -   Ducts identification                                   found       not found
  ###   -   Canvas installation at main supply and return ducts    found       not found
  ###   -   Fresh air duct installation                            found       not found
  ###   -   Volume damper installation at FA duct with filter      found       not found
  ###   -   Filter cleaning                                         good          bad
NOTES :
                             Name                  Signature      Date
05/07/2018
                                                 Checklist                                      2
19:44:07
Khorais Road Project - Riyadh
                                                                           Saudi Diyar Consultants
c- Electrical Checklist
 FCU is connected to MCC panel No. :
Voltage :
Amperage :
    1   -   Control panel installation                              good          bad
    2   -   Indication lamps                                       found       not found
    3   -   Phase failure unit protection                          found       not found
    4   -   Overload protection                                    found       not found
    5   -   Wires are tightly connected                             good          bad
c- Control Checklist
 FCU is connected to DDC panel No. :
Thermostat setting:
                                 Min, ° F   Max, ° F
                 occupied
               not occupied
                   RH %
    1   -   2-way valve connection to DDC panel                     ok           not ok
    2   -   Fan flow switch connection to DDC panel                 ok           not ok
    3   -   Thermostat installation and connection to DDC           ok           not ok
    4   -   Heater connection to DDC panel                          ok           not ok
    5   -   Sequence of operation programming                       ok           not ok
    6   -   Interlocking with fire alarm system                     ok           not ok
NOTES :
                              Name                     Signature   Date
05/07/2018
                                              Electrical&Control                                3
19:44:07
Khorais Road Project - Riyadh
                                                                                  Saudi Diyar Consultants
d- Air Balancing
                                              Velocity Reading
       UNIT No. :                          Section:          Main Supply     Location:
         Width, in                 Av. FPM             0.0     SCFM           0.0 Design CFM
Duct
         Depth, in               Reading No.             1     ACFM           0.0 Actual CFM
         Area, ft²         0.0   Corr, Factor         0.90   Deviation %               100.00
        INPUT DATA
       CALCULATED
            XY    1    2          3       4        5          6          7   8     9
            1
            2
            3
            4
            5
            6
            7
            8
            9
           10
       Measured data
        INPUT DATA
       CALCULATED
NOTES :
                           Name           Signature               Date
05/07/2018
                                                   Supply                                              4
19:44:07
         Khorais Road Project - Riyadh
                                                  Saudi Diyar Consultants
               1
               0
100.00
         05/07/2018
                                         Supply                        5
         19:44:07
Khorais Road Project - Riyadh
                                                                                  Saudi Diyar Consultants
d- Air Balancing
                                              Velocity Reading
       UNIT No. :                          Section:          Main Return     Location:
         Width, in                 Av. FPM             0.0     SCFM           0.0 Design CFM
Duct
         Depth, in               Reading No.             1     ACFM           0.0 Actual CFM
         Area, ft²         0.0   Corr, Factor         0.90   Deviation %               100.00
        INPUT DATA
       CALCULATED
            XY    1    2          3       4        5          6          7   8     9
            1
            2
            3
            4
            5
            6
            7
            8
            9
           10
       Measured data
        INPUT DATA
       CALCULATED
NOTES :
                           Name           Signature               Date
05/07/2018
                                                   Return                                              6
19:44:07
         Khorais Road Project - Riyadh
                                                  Saudi Diyar Consultants
               1
               0
100.00
         05/07/2018
                                         Return                        7
         19:44:07
Khorais Road Project - Riyadh
                                                                                   Saudi Diyar Consultants
d- Air Balancing
                                              Velocity Reading
       UNIT No. :                          Section:          Fresh Air Duct   Location:
         Width, in                 Av. FPM             0.0       SCFM          0.0 Design CFM
Duct
         Depth, in               Reading No.             1      ACFM           0.0 Actual CFM
         Area, ft²         0.0   Corr, Factor         0.90   Deviation %                100.00
        INPUT DATA
       CALCULATED
            XY    1    2          3       4        5          6          7    8     9
            1
            2
            3
            4
            5
            6
            7
            8
            9
           10
       Measured data
        INPUT DATA
       CALCULATED
NOTES :
                           Name           Signature               Date
05/07/2018
                                                  Fresh air                                             8
19:44:07
         Khorais Road Project - Riyadh
                                                     Saudi Diyar Consultants
               1
               0
100.00
         05/07/2018
                                         Fresh air                        9
         19:44:07
Khorais Road Project - Riyadh
                                                                            Saudi Diyar Consultants
d- Air Balancing
                                           Velocity Reading
    UNIT No. :                          Served Area:                   Location:
     Length, ft                   Av. FPM          0.0     SCFM         0.0 Design CFM
    Area factor                 Reading No.          1     ACFM         0.0 Actual CFM
       Type                     Corr, Factor      0.90   Deviation %             100.00
    INPUT DATA
    CALCULATED
                    Measured data, FPM
NOTES :
                         Name            Signature           Date
05/07/2018
                                                Air Outlet                                      10
19:44:07
         Khorais Road Project - Riyadh
                                                      Saudi Diyar Consultants
               1
               0
100.00
         05/07/2018
                                         Air Outlet                       11
         19:44:07