RISK ASSESSMENT RECORDING FORM
Location or                                                  Date Assessment                                              Assessment undertaken
Address: Manchester                                          Undertaken: 21/05/18                                         By: Molly Watkiss
Activity or                                                  Review                                                       Signature
Situation Photographs for fashion spread                     Date: 25/05/18
(1)   Hazard                                  Risk    (2) Who might be harmed and how?            (3) What controls exist to reduce          (4) What action can be taken
                                                                                                      risk                                       to further reduce risk?
                                                      Local pedestrians might get hit by a        Be careful when crossing roads             Use a location where you don’t
Traffic                                       12      car                                         and use traffic lights                     have to cross a road
Bad weather                                   2       Camera equipment may get broken             Check on the weather before going          If weather is too bad find another
                                                      from rain                                   out to take photographs                    location there is nearby where you
                                                                                                                                             can go for shelter
                                                      People may get hurt or pushed over          Go to a quieter area in the city           Go on a week day in the evening
Crowded people                                3                                                                                              when it is less busy
          1. List hazards something with the potential to cause harm here:
             Seek to quantify the level of risk the likelihood of harm arising based on the number of persons affected, how often they are exposed to the hazard and the
             severity of any consequence.
          2. List groups of people who are especially at risk from the significant hazards which you have identified
          3. List existing controls here or note where the information may be found
          4. List the risks which are not adequately controlled and the action you will take. Have regard for the level of risk, the cost of any action and the benefit you expect to
             gain.
(1)   Hazard                                  Risk    (2) Who might be harmed and how?            (3) What controls exist to reduce          (5) What action can be taken
                                                                                    risk                                 to further reduce risk?
    RISK RATING
a SEVERITY                                 b LIKELIHOOD                                              c FINAL SCORE RATING: what needs to be done
5   Dying or being permanently disabled    5   Will almost certainly happen                          16-25 Stop! Do not start activity again until risk is
                                                                                                     controlled
4   Serious injury/long term illness       4   Highly likely to happen                               10-15 High risk level, High priority. Take action
                                                                                                     straight away to control the risk
3   Temporary disability/3 days off sick   3   Not so likely                                         6-9    Medium risk level. Tighten up controls and
                                                                                                     make a plan to do something about risk
2   Will need medical attention            2   Even less likely                                      3-5    Fairly low risk level. Low priority but keep
                                                                                                     possible action in mind
1   Minor injury eg. Bruise, graze         1   Unlikely to happen at all                             1-2    Low or trivial risk. No further action
                                                                                                     required.
                                                                    SO: a x b = c
Action Required                                                                     Responsible Person                    Date for Completion