FORM 1.1 SELF-ASSESSMENT CHECK
INSTRUCTIONS: This Self-Check Instrument will give the trainer necessary
data or information which is essential in planning training
sessions. Please check the appropriate box of your answer
to the questions below.
CORE COMPETENCIES
CAN I…? YES NO
1. Install Computer Systems and Networks
1.1 Plan and prepare for installation /
1.2 Install equipment / device / system /
1.3 Conduct test /
2. Configure Computer Systems and Networks
2.1 Plan and prepare for configuration /
2.2 Configure computer systems and networks /
2.3 Inspect and test configured computer systems and /
networks
3. Diagnose and Troubleshoot Computer Systems
3.1 Plan and prepare for diagnosis of faults of computer /
systems
3.2 Diagnose faults of computer systems /
3.3 Rectify/correct defects in computer systems and networks /
3.4 Test systems and networks /
4. Maintain Computer Systems and Networks
4.1 Plan and prepare for maintenance /
4.2 Maintain computer systems and networks /
4.3 Inspect and test the computer systems and networks /
Note: In making the Self-Check for your Qualification, all required competencies
should be specified. It is therefore required of a Trainer to be well- versed
of the CBC or TR of the program qualification he is teaching.
Evidences/Proof of Current Competencies
Form 1.2: Evidence of Current Competencies acquired related to
Job/Occupation
Current
Proof/Evidence Means of validating
competencies
Install Computer
Systems and
Networks
Configure Practitioner Portfolio, interview,
Computer Systems observation.
and Networks
Diagnose and Practitioner Portfolio, interview,
Troubleshoot observation.
Computer Systems
Maintain Practitioner Portfolio, interview,
Computer Systems observation.
and Networks
Identifying Training Gaps
From the accomplished Self-Assessment Check (Form 1.1) and the
evidences of current competencies (Form 1.2), the Trainer will be able to
identify what the training needs of the prospective trainee are.
Form 1.3 Summary of Current Competencies Versus Required
Competencies (Sample)
Required Units of Current Training
Competency/Learning Competencies Gaps/Requirements
Outcomes based on CBC
Install Computer Systems Install Computer
and Networks Systems and
Networks
Configure Computer Configure Computer
Systems and Networks Systems and
Networks
Diagnose and Troubleshoot Diagnose and
Computer Systems Troubleshoot
Computer Systems
Maintain Computer Maintain Computer
Systems and Networks Systems and
Networks
Using Form No.1.4, convert the Training Gaps into a Training Needs/
Requirements. Refer to the CBC in identifying the Module Title or Unit of
Competency of the training needs identified.
Form No. 1.4: Training Needs
Module Title/Module of
Gaps Duration (hours)
Instruction
Install Planning and
Computer preparing for 20 hours
Systems and installation
Networks
Installing
equipment/device/ 20 hours
system
Conduct testing 20 hours
TRAINING PLAN
Qualification: Computer Hardware Servicing NC II
Facilities/ Date
Trainees’ Training Training Mode of Assessment
Staff Tools and Venue and
Requirements Activity/Task Training Method
Equipment Time
Install Computer Planning and OJT/DUAL Joviner Y. Module Computer Hands-on
Systems and preparing for TRAINING Lactam Laboratory Direct
Tools
Networks installation observation
Magic Wand Industry
Computer Practical
Computer demonstration
Repair Shop
Installing Joviner Y. Module Hands-on
OJT/DUAL
equipment/devic Lactam Direct
TRAINING Tools Computer
e/system observation
Magic Wand Laboratory
Computer Practical
Computer Industry demonstration
Repair Shop
Module Computer Hands-on
Laboratory Direct
Conduct testing OJT/DUAL Joviner Y. Tools
Lactam Industry observation
TRAINING Computer Practical
Magic Wand demonstration
Computer
Repair Shop
Instructions:
This Trainees’ Record Book (TRB) is intended to serve Technical Education and Skills Development Authority
as record of all accomplishment/task/activities while Saint Estanislao Kostka College
undergoing training in the industry. It will eventually Poblacion, Manukan, Zamboanga del Norte
become evidence that can be submitted for portfolio
assessment and for whatever purpose it will serve you. It is TRAINEE’S RECORD BOOK
therefore important that all its contents are viably entered
by both the trainees and instructor.
The Trainees’ Record Book contains all the required
competencies in your chosen qualification. All you have to I.D.
do is to fill in the column “Task Required” and “Date
Accomplished” with all the activities in accordance with
the training program and to be taken up in the school and
with the guidance of the instructor. The instructor will Trainee’s No.: SEKC CHS-000200
likewise indicate his/her remarks on the “Instructors
Remarks” column regarding the outcome of the task
accomplished by the trainees. Be sure that the trainee will
personally accomplish the task and confirmed by the NAME : Domingo, Abria C.
instructor.
It is of great importance that the content should be
QUALIFICATION : Compute Hardware Servicing NC II
written legibly on ink. Avoid any corrections or erasures
and maintain the cleanliness of this record.
This will be collected by your trainer and submit the TRAINING DURATION: 356 Hours
same to the Vocational Instruction Supervisor (VIS) and
shall form part of the permanent trainee’s document on file.
TRAINER : Joviner Y. Lactam
NOTES: Unit of Competency: Install computer systems and
networks
________________________________________________________
________________________________________________________
NC Level II
________________________________________________________
Learning Outcome Task/Activity Date Instructors
________________________________________________________ Required Accomplished Remarks
________________________________________________________ Plan and Performed the September 15,
standard procedures 2012
prepare for
________________________________________________________ in installing devices
installation
Operate and handle
________________________________________________________ operating system and September 22,
devices according to 2012
________________________________________________________ workplace needs and
standard.
________________________________________________________
Install devices and
________________________________________________________ systems in
accordance to
manufacturers
________________________________________________________ specification
________________________________________________________ To performed safety
in accordance to unit
________________________________________________________ specification and
workplace standard.
________________________________________________________
________________________________________________________ Install
________________________________________________________ equipment/device
system
________________________________________________________ Conduct test
________________________________________________________
________________________________________________________
________________________________________________________ Trainee’s Signature Trainer’s Signature
________________________________________________________
Unit of Competency: Configure Computer Systems and
Networks
NC Level II Unit of Competency: Diagnose and Troubleshoot
Learning Task/Activity Date Instructors Computer Systems
Outcome Required Accomplished Remarks
NC Level II
Plan
and prepare Learning Task/Activity Date Instructors
for Outcome Required Accomplished Remarks
configuration
Plan and
Confi prepare for
gure diagnosis of
computer faults of
systems and computer
networks systems
Diagnose
I faults of
nspect and computer
test systems
configured
computer
systems and Rectify/co
networks rrect defects in
computer
systems and
networks
Test
Trainee’s Signature Trainer’s Signature systems and
networks
Trainee’s Signature Trainer’s Signature
Unit of Competency: Maintain Computer Systems and
NOTES: Networks
NC Level II
________________________________________________________
Learning Outcome Task/Activity Date Instructors
________________________________________________________ Required Accomplished Remarks
________________________________________________________ Plan and
prepare for
________________________________________________________
maintenance
________________________________________________________
________________________________________________________ Maintain
computer systems
________________________________________________________ and networks
________________________________________________________
________________________________________________________ Inspect and
test the computer
________________________________________________________ systems and
________________________________________________________ networks
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________ Trainee’s Signature Trainer’s Signature
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
TRAINEE’S PROGRESS SHEET
Name : ABRIA, DOMINGO C. Trainer: JOVINER Y. LACTAM
Qualification : Computer Hardware Servicing NC II Nominal Duration: 320 hours
Units of Training Date Date Trainee’s Supervisor’s
Training Activity Rating Initial Initial
Competency Duration Started Finished
Install Plan and prepare for installation May 5, May 8,
Computer 2012 2012
Systems and
Networks Install equipment/device/system 60 hours May 9, May 12,
2012 2012
Conduct test May 13, May 16,
2012 2012
Configure Plan and prepare for
Computer configuration
Systems and
Networks Configure computer systems and 100 hours May 17, JULY 5,
networks 2012 2012
Inspect and test configured
computer systems and
networks
Diagnose and Plan and prepare for diagnosis of
Troubleshoot faults of computer Systems
Computer
Systems Diagnose faults of computer 100 hours July 6, July 20,
systems 2012 2012
Rectify/correct defects in
computer systems and networks
Test systems and networks
Maintain Plan and prepare for
Computer maintenance
Systems and Maintain computer systems and 60 hours
Networks networks
July 21, JULY 20,
Inspect and test the computer 2012 2012
systems and networks
Total
320
hours
Note: The trainee and the supervisor must have a copy of this form. The column for rating maybe used either by giving a numerical rating or simply indicating
competent or not yet competent. For purposes of analysis, you may require industry supervisors to give a numerical rating for the performance of your trainees. Please
take note however that in TESDA, we do not use numerical ratings
Average Ratings
PREPARATION Average
1. Workshop layout conforms with the components
of a CBT workshop
2. Number of CBLM is sufficient
3. Objectives of every training session is well
explained
4. Expected activities/outputs are clarified
General Average