0% found this document useful (0 votes)
71 views1 page

Scheduling PDF

This document is a construction schedule for the Nippon Premium Bakery Project in Santo Tomas, Batangas, Philippines from May to July 2018. It details the scope of works to include checking and installing purlins, rollforming metal panels, installing insulation and roof panels, flashing, gutters, sidings and other metal accessories. The schedule outlines the planned timeline for mobilization, materials delivery, and completion of each task over the three month construction period with remarks column.

Uploaded by

kenkenmusic
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views1 page

Scheduling PDF

This document is a construction schedule for the Nippon Premium Bakery Project in Santo Tomas, Batangas, Philippines from May to July 2018. It details the scope of works to include checking and installing purlins, rollforming metal panels, installing insulation and roof panels, flashing, gutters, sidings and other metal accessories. The schedule outlines the planned timeline for mobilization, materials delivery, and completion of each task over the three month construction period with remarks column.

Uploaded by

kenkenmusic
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NISHIN METAL CORPORATION

DATE ISSUED : 12 APRIL 2018 SHEET NO. 1


DATE START : 15 MAY 2018 PREPARED BY :
DATE FINISH : 29 JUNE 2018 Construction of NIPPON PREMIUM BAKERY PROJECT Santo Tomas Project Kenneth Bryan M. Umadhay, C.E.
REFERENCE NO. : NN-17-048-8 CHECKED BY :
CLIENT : TPCI LOT 10, BLOCK 2, FPIP II - SEZ, SAN RAFAEL, STO. TOMAS, BATANGAS Chester Mark E. Balisme, C.E.
INDEX

WORK DESCRIPTION MAY 2018 JUNE 2018 JULY 2018 REMARKS


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7

I. PROJECT DURATION
(MOBILIZATION)
MOBILIZATION, PREPARATION &
II. (PREPARATION)
MACHINE/MATERIALS DELIVERY

(STAGING)
III. SCOPE OF WORKS BY OTHERS

a Purlin Checking, Alignment & Markings

b Rollforming & Fabrication Works

c Installation of Chicken Wiremesh

d Installation of Clips

Installation of Aluminum Foils &


e
Glasswool Insulations

f Installation of Roof Panels

g Installation of Gutter

Installation of Flashings & Other Bended


h
Accessories

i Installation of Eaves & End Closers

j Installation of Metal Sidings

k Installation of Mouldings

l Housekeeping

n Inspection / Punchlist

NOTE: OFFICE AREA


PRODUCTION AREA A
PRODUCTION AREA B1
PRODUCTION AREA B2