S 4 Hana
S 4 Hana
   The information in this presentation is confidential and proprietary to SAP and may not be disclosed without the
   permission of SAP. Except for your obligation to protect confidential information, this presentation is not subject to your
   license agreement or any other service or subscription agreement with SAP. SAP has no obligation to pursue any
   course of business outlined in this presentation or any related document, or to develop or release any functionality
   mentioned therein.
   This presentation, or any related document and SAP's strategy and possible future developments, products and or
   platforms directions and functionality are all subject to change and may be changed by SAP at any time for any reason
   without notice. The information in this presentation is not a commitment, promise or legal obligation to deliver any
   material, code or functionality. This presentation is provided without a warranty of any kind, either express or implied,
   including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-
   infringement. This presentation is for informational purposes and may not be incorporated into a contract. SAP assumes
   no responsibility for errors or omissions in this presentation, except if such damages were caused by SAP’s intentional or
   gross negligence.
   All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ
   materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements,
   which speak only as of their dates, and they should not be relied upon in making purchasing decisions.
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                                   2
Introduction
   This document is an approach document for customers who are trying to carry out the system conversion
   of their Business Suite in their landscape. This document provides the sequence of steps that are defined
   logically and are technically important to follow during the system conversion. The definition of the
   sequence, the phases and steps in each of the phase are highlighted in the document. This document
   provides a overview of possible transition paths for a customer to convert ERP 6.0 system to S/4HANA
   1709 including information regarding HANA 1.0 to HANA 2.0 upgrade. Also this document will provide
   information for a source system with non-HANA DB to be converted to target S/4HANA 1709.
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                 3
Transition to SAP S/4HANA
Three Different approaches to move to SAP S/4HANA
                                                                                                                                  Software update
                                                           Cross-application & application specific preparation activities
                                                                                                                                  Data conversion
Simplification List
                                                                                                                                                      **)
                                                                                                                                                        incl. migration of FI
                                                                                                                                                      Customizing and Data
                                                                    *) incl.  preparation of
                                                                           financial data
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                                                                                      5
SAP System Conversion
Overview of Technical Process Steps
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   6
  SAP S/4HANA Family and Conversion Paths
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   7
SAP S/4HANA
System Conversion – Transition Paths Overview (1/2)
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   9
 SAP S/4HANA System Conversion or Upgrade
 SAP HANA 1 to SAP HANA 2
                                                                                  SAP Note 2524661 – SAP S/4HANA 1709 - SAP HANA Database Requirements
Note: S/4HANA 1709 requires min. HANA2.0 SPS01 Rev.12
                                                                                  SAP Note 2339267 – HANA client version versus HANA server version
 © 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                                                          10
SAP S/4HANA Conversion or Upgrade in Two Steps
With Upgrade from SAP HANA 1 to SAP HANA 2
Conversion
Upgrade
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   12
Size is important
Minimize & optimize data volume of SAP system landscapes & control data growth
                        Use SAP DVM: Data Volume Management Work Center in SAP Solution Manager
                        Archived Data are still accessible after conversion; data conversion happens during access to archive
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                                                                           13
 SAP System Conversion
 Sizing
Existing customers
(System Conversion)
sizing
 – Sizing report for SAP
   HANA Note 1872170
     ▫ Available for SoH, S/4
          HANA Simple Finance, and
          S/4HANA OP
     ▫    ABAP report
          /SDF/HDB_SIZING
     ▫    Once on S/4HANA OP,
          used to verify memory
          sizing.
 © 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   14
Version Interoperability for SAP S/4HANA
 Central NetWeaver Systems 7.31 Version as Basis and Central Fiori Front-End Server
 SAP Note: 2251604 for version interoperability                     Front-end server deployment
                                                                                                                            Enterprise Search
                                                                                                                          Enterprise Search
                                                                                                                                  Models
                                                                                                                               Models
                                                                                                             S/4HANA 1511/1610/1709
                                                                                                                 SAP Business Suite ABAP
                                                                                                               SAP Business Suite ABAP
                                                                                                               On-Premise Backend
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   16
    SAP Readiness Check for SAP S/4HANA
    Available for all customers
•      Customers can initiate their SAP ERP system
       analysis themselves, getting an overview on the
       most important aspects and potential requirements
       of an SAP S/4HANA system conversion (e.g.
       Simplifications, Custom Code, Business Functions,
       Add-ons and Transactions).
    © 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   17
SAP Readiness Check for SAP S/4HANA
Approach
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL        18
SAP Readiness Check for SAP S/4HANA
Setup
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                               19
SAP Readiness Check for SAP S/4HANA
Simplification items
•      Simplification Items represent application or
       architecture changes in comparison to ERP
                                                                                                                                   Recommended Fiori Apps
•      About 470 Simplification Items exist for
                                                                                                                                   •   Fiori apps recommended based on the
       S/4HANA 1610
                                                                                                                                       transaction usage history in the evaluated
•      They are grouped by business priority (e.g.                                                                                     system
       Core Finance) and industry, respectively
                                                                                 Transactions
                                                                                 •   SAP GUI transactions replaced or
                                                                                     deprecated in SAP S/4HANA, such as
                                                                                     Classic MM-PUR GUI transactions
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                                                                                          20
SAP Readiness Check for SAP S/4HANA
Two Examples of Detailed Output – Accessible via the Dashboard
1. How is my custom code impacted when I want to convert my SAP ERP 6.0 system to SAP S/4HANA?
2. Which SAP S/4HANA simplifications impact me when I want to convert my SAP ERP 6.0 system to SAP S/4HANA?
                                                                                 SAP Help Portal: SAP Readiness Check and SAP note 2290622
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                                               21
SAP System Conversion
Overview of Technical Process Steps
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   22
    SAP System Conversion
    Simplification List
    © 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   23
Transition DB  Simplification Item Catalog
  With SAP S/4HANA 1709 the webbased UI for searching and displaying Simplification Items that has so far only been
  available SAP internally (Transition DB) will also become externally.
 https://launchpad.support.sap.com/#/sic/
In parallel the Simplification List for SAP S/4HANA 1709 will still be available as PDF document.
 Pre-checks are shipped as SAP Notes to customers that plan to convert to SAP S/4HANA. Pre-Checks
 Pre-checks are executed on the (SAP Business Suite) start system (preparation phase)
  to determine relevant Simplification Items.
 Pre-Checks are executed again as step in the Software Update Manager (SUM). In case
  dedicated Simplification Items require mandatory preparation steps the conversion procedure can stop to ensure a consistent system
  conversion.
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   27
    SAP System Conversion
    Maintenance Planner
    © 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   28
SAP System Conversion
Maintenance Planner
Maintenance Planner
 Solution hosted in SAP Support Portal at:
  http://apps.support.sap.com/sap/support/mp
    Define changes (based on your landscape data in customer profile)
    Explore Systems  {SID}  Verify  Plan
    Select files
    Push all required tools, archives and stack.xml to your download basket
2 4
5 7
6 8
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   32
    SAP System Conversion
    Simplification Item Checks
•      Replace the previous Pre-Check Framework (check
       classes) to be run before the conversion to SAP
       S/4HANA for target SAP S/4HANA 1709
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   34
What is ABAP Test Cockpit?
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                                     35
SAP S/4HANA readiness checks in
AS ABAP 7.51
                                                                                       S4HANA_READINESS includes
                                                                                       S/4HANA and HANA checks
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                     36
Check custom code with ABAP                                                      ATC transaction
Test Cockpit (ATC)
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                         37
SAP System Conversion
Custom Code Related Process
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   38
SAP System Conversion
Overview of Technical Process Steps
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   39
 SAP System Conversion
 Technical Conversion by Software Update Manager (SUM)
           Database migration
            Provide SAP HANA database (if required)
           Software update
            Provide new applications and new tables
           Data conversion
            Conversion of table content to new data model
 © 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   40
 SAP System Conversion
 SUM 2.0 for all Conversion Paths
• Software Update Manager (SUM) 2.0 introduced in Q3 2017 (part of SL Toolset 1.0 SPS 21)
• SUM 1.0 and SUM 2.0 will be offered in parallel, exclusive scenarios (other version will reject to run)
• Maintenance Planner will provide the respective version for maintenance activity
• SUM 2.0 includes R3load already (LOADTOOLS.SAR), no need to download separately SAP note
  2472835 - Embedding load tools in Software Upgrade and Software Provisioning Manager
 © 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                             41
 SAP System Conversion
 Procedure (source is non-HANA DB)
                           SUM Activities
Uptime:
           Pre-checks
Downtime:
     Application data migrated
 System update
 © 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   42
SUM Prerequisites Check
Provided with SUM 2.0
• Source OS version
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL   43
Automatic Load of Table Placement
Introduced with SUM 1.0 SP 20
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                44
SAP System Conversion
Overview on required and optional tools
Readiness Check - Requires SAP Solution Manager, includes other tool checks
Maintenance Planner Checks                                                   Req. for SBX, DEV, QA   Requires SAP Solution Manager (workaround possible)
                                                                             & PRD
Maintenance Planner Plan                                                     Req. for SBX, DEV, QA   Requires successful Maintenance Planner checks
                                                                             & PRD
Pre-Checks                                                                   Req. for SBX, DEV, QA   Manual run optional, but SUM run will stop for issues
                                                                             & PRD
Custom Code Worklist                                                         Req. for SBX, DEV, QA   Not required for SBX, but will lead to inconsistent target state
                                                                             & PRD
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ EXTERNAL                                                                                              45
SAP System Conversion
Overview About Phases and Tools
                                                                                                                                                          **)incl. migration of
                                                    Readiness Check                                                                                       FI Customizing and
               *) incl.                                                                                                                                            Data
      preparation of                                            Transformation Navigator
      financial data
                                                                                   Roadmap Viewer
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                                                                                          46
     SAP S/4HANA system conversion
     Sample Mock Process
Basis Basis Conducting SUM of DMO uptime User lockout and ramp-down business operation Basis conducting SUM of DMO downtime
     © 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                                                                                                                                                           47
  SAP S/4HANA – System Conversion
  APPROACH – A BIG PICTURE - EXAMPLE( 3 TIER LANDSCAPE )
SAP Business Suite                                                                              SAP S/4HANA
                                                                                                                                             Prepare Phase
                        SAP ERP 6.0, EHP xx                                                                 SAP S/4HANA, on-      FES       B1    Maintenance Planner
                                                         12 Prepare Phase            13 Realize Phase      premise edition 1709         P
                                                                                                                                        R
                         AnyDB or SAP HANA                                                                      SAP HANA                O   F1    Pre- Check
                                                                   F1 D1             B2 F2                                              D
          6                                   11                                                                           14               D1    Custom Code Check And Analysis
                                                                                                                                              Realize Phase
                                                                                                                                                  SUM- Data Migration, Software Update,
                        SAP ERP 6.0, EHP xx               8         Prepare Phase 9 Realize Phase          SAP S/4HANA, on-       FES       B2    Data Conversion
                                                                                                          premise edition 1709          Q
                                                                                                                                        A         Application Preparation/ Post
                         AnyDB or SAP HANA                       F1 D1               B2 F2                     SAP HANA                 U   F2    Processing and Testing
                                                                                                                                        L
                                          7                                                                              10                 D2    Custom Code Adaption
                                                                                                                                              Realize Phase
                                                                                                           SAP S/4HANA, on-       FES       F3    Delta Process / Functionality
                        SAP ERP 6.0, EHP xx                4 Prepare Phase           5 Realize Phase      premise edition 1709
                                                                                                                                        D         Delta Development – Fiori / Report/
                                                                                                                                        E   D3
         1
                         AnyDB or SAP HANA
                                                              B1 F1 D1 F2            B2 F2 D2 F3 D3             SAP HANA
                                                                                                                                        V
                                                                                                                                                  Enhancement
                                                                                                                                        S
                                                                                                                                            Transport Request   B   Basis Activity/Effort
                                                                                                                                        A
                                                                                                                                        N
                                                                                                                                                                F   Functional Activity/Effort
   SAP ERP 6.0, EHP xx                                 2 Prepare Phase               3 Realize Phase       SAP S/4HANA, on-
                                                                                                                                  FES   D
                                                                                                                                        B   System Copy
                                                                                                          premise edition 1709
                                                                                     B2 F2 D2 F3 D3                                     O                       D   Development Activity/Effort
    AnyDB or SAP HANA                                    B1 F1 D1 F2                                           SAP HANA                 X
    © 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                                                                                     48
SAP S/4HANA – System Conversion
Steps & Details
    1      Create ERP Sand Box using Production Data                                                        Customer should be aware that when approaching the ERP Quality system conversion, ERP
                                                                                                             Development and ERP Quality system will not be available for fixes to be carried in current ERP
           Prepare Phase in Sand Box System-Maintenance Planner, Readiness Check, Pre-Check,                 Production system(Customer Code Freeze)
    2      Custom Code Check and Analysis and Application Preparation
                                                                                                                  Prepare Phase in Quality System- Readiness Check, Pre-Check, Custom Code
   As a best practice stack file for all the system in landscape should be created on                       8    Check and Analysis and Application Preparation, Release Transport requests from
    the same day as there are solution updates happening very frequently in the                                   ERP Quality system
    maintenance planner
            Realize phase – SUM- Data Migration, Software Update, Data Conversion, Application
                                                                                                             9    Realize phase – SUM- Data Migration, Software Update, Data Conversion,
    3       Preparation/ Post Processing, Custom Code Adaption, Delta Process / Functionality, Delta
            Development – Fiori / Report/ Enhancement. System converted to S4HANA and Testing                     Import Transport Requests in S4HANA Quality environment Application Preparation/ Post
                                                                                                             10   Processing, Custom Code Adaption, Delta Process / Functionality, Delta Development – Fiori
   Customer does practice and capture learning of System Conversion steps involved                               / Report/ Enhancement and Testing, Release Transport requests
   Estimate time taken for the different steps involved in System Conversion
                                                                                                             11   Import Transport Requests in ERP Production environment
   Effort Estimate matrix – Resource – Basis , Functional and Development
   Detail project planning of System conversion of customer landscape                                            Prepare Phase in Production System- Readiness Check, Pre-Check, Custom Code
                                                                                                             12   Check and Analysis and Application Preparation,
   Customer should be aware that when approaching the ERP Development system
    conversion, ERP Development system will not be available for fixes to be carried in current              13   Realize phase – SUM- Data Migration, Software Update, Data Conversion,,
    ERP Production system (Customer Code Freeze)
                                                                                                                  Import Transport Requests in S4HANA Production environment Application Preparation/ Post
           Prepare Phase in Development System-Maintenance Planner, Readiness Check, Pre-Check,
    4      Custom Code Check and Analysis and Application Preparation, Release Transport requests from
                                                                                                             14   Processing and Testing, Custom Code Adaption, Delta Process / Functionality, Delta
                                                                                                                  Development – Fiori / Report/ Enhancement,
           ERP Development system
           Realize phase – SUM- Data Migration, Software Update, Data Conversion, Application               Any Miss-match found between configuration and development objects between S4HANA
    5      Preparation/ Post Processing, Custom Code Adaption, Delta Process / Functionality, Delta          Development System and S4HANA Quality system should be redone in S4HANA Development
           Development – Fiori / Report/ Enhancement and Testing, Release Transport requests                 system and transport requests should be generated for same all the way into S4HANA Quality and
                                                                                                             Production system
    6      Carry out a Refresh of Production data into the Quality System
                                                                                                            Testing in S4HANA solution with/without Fiori need to be done extensively by Customer Users in
    7       Import Transport Requests in ERP Quality environment                                             different systems
     © 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP INTERNAL                                                                                                                     49
             Contact information:
Thank you.   Venkata Tanguturi
             S/4HANA RIG Americas
             Venkata.tanguturi@sap.com
© 2017 SAP SE or an SAP affiliate company. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an SAP affiliate company.
The information contained herein may be changed without prior notice. Some software products marketed by SAP SE and its distributors contain proprietary software components
of other software vendors. National product specifications may vary.
These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind, and SAP or its affiliated
companies shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP or SAP affiliate company products and services are those that are
set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.
In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business outlined in this document or any related presentation, or to develop or release
any functionality mentioned therein. This document, or any related presentation, and SAP SE’s or its affiliated companies’ strategy and possible future developments, products,
and/or platform directions and functionality are all subject to change and may be changed by SAP SE or its affiliated companies at any time for any reason without notice. The
information in this document is not a commitment, promise, or legal obligation to deliver any material, code, or functionality. All forward-looking statements are subject to various
risks and uncertainties that could cause actual results to differ materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements,
and they should not be relied upon in making purchasing decisions.
SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate company)
in Germany and other countries. All other product and service names mentioned are the trademarks of their respective companies.