Fabrication - Steel Scope of Work
Fabrication - Steel Scope of Work
PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 1 OF 40
DB POWER LIMITED
VOLUME: II B
SECTION - D
SUB-SECTION – D17
1
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 2 OF 40
C0NTENT
1.00.00 SCOPE 3
2.00.00 GENERAL 3
3.00.00 WORKMANSHIP 19
2
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 3 OF 40
1.00.00 SCOPE
2.00.00 GENERAL
d) Furnish all materials, labour, tools and plant and all consumables required
for fabrication and supply, all necessary rivets, bolts, nuts, washers, tie
rods and welding electrodes for field connections,
f) Suitably mark, bundle, and pack for transport all fabricated materials.
3
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 4 OF 40
and repairs of steelwork at site as may be required to complete the
works in accordance with the Contract.
j) Specific technical requirements are given in Section –C of this document.
In case of any contradiction between Section –D and Section –C ,
requirements as given in Section –C shall prevail.
No work under this specification will be provided for by any agency other
than the contractor, unless specifically mentioned otherwise elsewhere in the
contract.
All work under this specification shall, unless otherwise specified in the
contract, conform to the requirements of the latest revision and/or
replacements of the following or any other relevant Indian Standard
specifications and codes of practice. In case any particular aspect of the work
is not specifically covered by any Indian Standard specification, any other
standard practice, as may be specified by the Engineer shall be followed:
4
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 5 OF 40
IS : 1148 - Rivet bars for structural purposes
IS : 1363 - Black hexagon bolts, nuts and lock nuts (dia. 6 to 30 mm) and
black hexagon screws (dia 6 to 24 mm)
IS : 1442 - Covered electrodes for the metal are welding of high tensile
structural steel
IS : 1477 - Code of practice for painting of ferrous metals in buildings
Part –I Preheating
Part –II Painting
IS : 1608 - Method for tensile testing of steel products other than sheet
strip, wire and tube
IS : 1730 - Dimensions for steel plate, sheet, and strip for structural and
general engineering purposes.
IS : 1731 - Dimensions for steel flats for structural and general engineering
purposes
IS : 1852 - Rolling and cutting tolerances for hot-rolled steel products
IS : 2074 - Ready mixed paint, epoxy resin based Zinc Phosphate priming
5
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 6 OF 40
The contractor shall design all connections, supply and fabricate all steelwork
and furnish all connection materials in accordance with the approved drawings
and/or as instructed by the Engineer keeping in view the maximum Utilization
of the available sizes and sections of steel materials. The methods of painting,
marking, packing and delivery of all fabricated materials shall be in
accordance with the provisions of the contract and/or as approved by the
Engineer. Provision of all relevant Indian Standard Specifications and Codes
of Practice shall be followed unless otherwise specified in the contract.
All steel materials required for the work will be supplied by the contractor
unless otherwise specified elsewhere in the contract. The materials shall be
free from all imperfections, mill scales, slag intrusions, laminations, fittings,
rusts etc. that may impair their strength, durability, and appearance. All
materials shall be of tested quality only unless otherwise permitted by the
Engineer and/or Consultant. If desired by the Engineer, Test Certificates in
respect of each consignment shall be submitted in triplicate. Whenever the
materials are required to be used from unidentified stocks, if permitted by the
Engineer, a random sample shall be tested at an approved laboratory from
each lot of 50 tones or less of any particular section.
The arc welding electrodes shall be of approved reputed manufacture and
conforming to the relevant Indian Standard Codes of Practice and
Specifications and shall be of heavily coated type and the thickness of the
coating shall be uniform and concentric. With each container of electrodes,
the manufacturer shall furnish instructions giving recommended voltage and
amperage (Polarity in case of D.C. supply) for which the electrodes are
suitable.
2.05.02 Steel
6
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 7 OF 40
All rivet steel used in construction within the purview of this Specification
shall comply with one of the following Indian Standard Specifications as may
be applicable:
b) IS : 1149 - High tensile rivet bars for structural purposes. Where high
tensile steel is specified for rivets, steps shall be taken to ensure
that the rivets are so manufactured that they can be driven and
heads formed satisfactorily without the physical properties of
steel being impaired.
2.05.04 Electrodes
7
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 8 OF 40
2.05.05 Bolts and Nuts
All bolts and nuts shall conform to the requirements of Indian Standard
Specification IS: 1367 - Technical Supply Conditions for Threaded Fasteners.
Materials for Bolts and nuts under the purview of this contract shall comply
with any of the following Indian Standard Specifications as may be applicable.
a) Mild Steel
All mild steel for bolts and nuts when tested in accordance with the
following Indian Standard Specification shall have a tensile strength of not
less than 44 Kg/mm² and a minimum elongation of 23 per cent on a gauge
length of 5.6 _/A, where "A" is the cross sectional area of the test
specimen
ii) IS: 1608: Method for tensile testing of steel products other than
sheet, strip, wire and tube
The material used for the manufacture of high tensile steel bolts and nuts
shall have the mechanical properties appropriate to the particular class of
steel as set out in IS: 1367 or as approved by the Engineer.
2.05.06 Washers
2.05.07 Paints
Paints to be used for shop coat of fabricated steel under the purview of this
contract shall conform to the Indian Standard Specification IS: 2074 - Ready
mixed Paint, epoxy resin based Zinc Phosphate Priming.
8
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 9 OF 40
2.06.02 For general requirements, fabrication and construction details IS: 9178 (Pt.l &
11) shall be followed as general guidance. The bins shall be fabricated and
erected in segments.
2.06.03 The Coal bins shall be made of mild steel plates joined together with full
strength butt weld and provided with stiffeners at regular interval. Stiffeners
shall be provided on the external face and it may be welded with external face.
2.06.04 Bending of plates and rolled sections to the required shape for fabrication shall
be done by plate bending machine or cold bending process Without resorting
to heating, hammering, angle smithy and black smithy process.
2.06.05 Poking hole (manual or pneumatic) and striking plate shall be provided to
facilitate coal flow. Poking holes shall have circular MS pipe and cover cap
as detailed in the drawing.
2.07.02 All such new erection marks shall be detailed and included in marking
schemes and fabrication carded out thereafter.
2.07.03 All such new erection marks shall be considered under item of original
fabrication work. As a result of additional structures becoming necessary if
the work is delayed beyond the time schedule stipulated, the Engineer shall
give suitable extension of time provided he is satisfied about the
reasonableness of the delay involved. However, no claim for extra payments
or revision of rates due to delay shall be entertained.
9
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 10 OF 40
2.08.00 ELECTRO FORGED STEEL GRATINGS
2.08.01 Factory made fabricated electro forged gratings unit with steel conforming to
IS: 2062 shall be supplied, fabricated, transported, erected and aligned in
floorings, platforms, drain and trench covers, walkways, passages, staircases
with edge binding strips and anti skid nosing in treads etc.
2.08.02 All grating units shall be rectangular in pattern and electro forged. The size
and the spacing of the bearing bars and cross bars shall be as detailed in
fabrication drawings. The contractor shall submit the grating design for
different spans and load intensities along with fabrication drawings. The
depth of the grating unit shall be 40 mm, unless specified otherwise.
2.08.03 The gratings shall be made up in panel units designed to coincide with the
span of the structural steel framing or openings as indicated in the design/
scope drawings. Maximum possible standardization of the grating panel sizes
shall be tried and designed.
2.08.04 The grating unit shall be accurately fabricated and finished, free from wraps,
twists, or any defects that would impair their strength, serviceability, and
appearance.
2.08.05 Grating work shall include cut outs and clearance opening for all columns,
pipes, ducts, conduits or any other installation penetrating through the grating
work. Such cut outs and clearances shall be treated as specified in subsequent
clauses.
2.08.06 The gratings shall be notched, trimmed and neatly finished around flanges and
webs of the columns, moment connections, cap plates, and such other
components of the steel structures encountered during the placement of the
gratings. In all such cases, the trimming shall be done to follow the profile of
the components encountered. After trimming, the binding strip shall be
provided on the grating to suit the profile so obtained.
2.08.07 Opening in gratings for pipes or ducts that are 150mm in size or diameter or
larger shall be provided with steel bar toe plates of not less than 5mm
thickness and appropriate width, set flush with the bottom of the bearing bars.
2.08.08 Penetrations in gratings that are more than 50mm but less than 150mm in size
or diameter shall be welded with plates of size shown in the detailed drawings
set flush with the bottom of the grating panel.
2.08.09 Unless otherwise indicated on the drawings, grating units at all penetrations
shall be made up in split section, accurately fitted and neatly finished to
provide for proper assembly and erection at the job site.
2.08.10 Grating units shall be provided with all necessary clips, bolts, nuts and lock
10
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 11 OF 40
washers required for proper assembly and rigid installation and fastening to
abutting units supporting structural steel framing members.
2.08.12 Maximum deviation in linear dimension from the approved dimension shall
not exceed 12mm.
2.08.13 All fabricated grating section and accessories shall be blast cleaned to near
white metal surface (Sa 2½) followed by either of the following two:
(a) Two coats of red lead primer and two coats of black enamel finish paint.
2.08.14 Prior to finishing all surfaces shall be cleaned, free from rust, mill scale,
grease, oil, or any other foreign matter by blast cleaning. BS: 4232 shall be
followed for blast cleaning.
2.08.15 Primer can be applied by spray guns or by brushes, however the finish paint
shall necessarily be applied by means of spray guns. The applied coatings
shall be uniform, free from voids and streaks; drilled or punched holes shall be
touched up prior to erection or assembly.
2.09.02 After the shop work is complete, the structural material shall be punched with
erection mark and be hot double dip galvanized. Before galvanizing the steel
section shall be thoroughly blast cleaned to near white metal surface (Sa 2½).
2.09.03 The weight of the zinc coating shall be at least 610 gm/m² - unless noted
otherwise.
2.09.04 The galvanized surface shall consist of a continuous and uniformly thick
coating of zinc, firmly adhering to the surface of steel. The finished surface
shall be cleaned and smooth and shall be free from defects like discoloured
patches, bare spots, unevenness of coating, spelter that is loosely attached to
the steel, blistered surface, flaking or peeling off etc. The presence of any of
these defects noticed on visual or microscopic inspection shall render the
11
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 12 OF 40
material liable to rejection.
2.09.05 There shall be no flaking or loosening when struck squarely with a chisel
faced hammer. The galvanized steel member shall withstand minimum four
one minute dips in copper sulphate solution as per IS: 2633.
2.09.06 When the steel section is removed from the galvanizing kettle, excess spelter
shall be removed by 'bumping'. The processes known as 'wiping' or
'scrapping' shall not be used for this purpose.
2.09.08 All structural steel shall be treated with sodium dichromate or an approved
equivalent solution after galvanizing; so as to prevent white storage stains.
2.09.09 If the galvanizing of any member is damaged, the Engineer shall be shown of
the extent of damage, if so directed the galvanizing may have to the redone in
the similar manner as stated above at no extra cost to the Owner.
2.10.01 Material
Material % Remarks
12
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 13 OF 40
2.10.02 Fabrication
The fabrication, erection, alignment and welding shall be carried out as per the
accepted practice and in accordance with relevant I.S. and international
specification as well as stipulations contained herein. Fabrication drawings
shall be prepared by the contractor on the basis of the design / scope drawings
furnished by Engineer. The fabrication and erection works shall be done as
per the approved fabrication drawings.
a) Fabrication drawing shall give the cutting plan for each hopper plate.
Such, cutting plan shall be based on the size of the Stainless Steel plate
available at store. In order to reduce the wastage and ensure the maximum
utilization of stainless steel plate, the cutting plan shall take in the
consideration of the reverse curvature and place the various elements of
hopper plate in opposite fashion to reduce the end wastage. Similarly the
hopper plate element having different radii shall be placed one inside the
other, to optimize the stainless steel plate use. Such optimization may also
required adjustment in the size of the each element of hopper plate and
also additional weld joints.
b) The bill of material of hopper plate shall indicate the inner surface area of
the hopper, weight of the hopper based on the inner surface area, weight of
each of the cut plate of hopper fabrication, weight of cut and scrap pieces
generated. Contractor shall return to the Owner’s store all unutilized
(surplus) stainless steel plates and all waste and cut pieces generated. Non
return of any part of the surplus/waste steel pieces to the Owner’s store
will call for the penal recovery at three (03) times the maximum
procurement rate for the weight of stainless steel pieces not returned to the
store.
13
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 14 OF 40
c) In case the contractor does the cutting of the stainless steel without
approved cutting plan then all the wastage (i.e. the difference between the
weight of stainless steel plate cuts and the actual finished weight
considered for the measurement for payment) shall be subjected to the
penal recovery at the rate mentioned above.
2.10.04 Cuffing
Cutting may be affected by shearing, or by using plasma. The cut edges of all
plates shall be perfectly straight and uniform through out. Cutting shall be
done as per the cutting plan shown in the fabrication drawing. Should the
Engineer find it necessary, the edges shall be ground smooth afterwards by
contractor within the unit rates quoted by him. All the edge s shall be ground
smooth before they are welded.
2.10.05 Jointing
Welding shall join stainless steel. All weld joints (along the inclined plane)
shall be staggered. Any common welding process can weld stainless steel viz.
MIG, metal arc or plasma using the covered compatible electrodes as per IS:
5206 or by inert gas arc welding as per IS: 2811. Shielding gas shall be Argon
+ Hydrogen mixture or Argon + Oxygen mixture. However, Argon + Oxygen
mixture shall be preferred. Carbon-di-oxide mixture shall be avoided. 308L
and 315L electrodes/fillers shall be used for the welding of Stainless Steel to
Stainless Steel and Stainless Steel to Mild Steel respectively. However, the
welding process and the type of the electrodes to be used for welding shall be
as per welding procedure, as approved by the Engineer. On the basis of the
welding procedure, the Contractor shall conduct qualification test.
2.10.06 Bending
The stainless steel plates shall be subjected to cold forming and bending in
order to get the desired shape and profile.
The acceptance of the fabricated structure work shall depend upon correct
dimensions and alignment, absence of distortion in the structure, satisfactory
results from the inspection and testing of the welded structure joints and the
test specimens, general workmanship being good meeting the tolerance
requirements given in IS: 7215.
14
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 15 OF 40
2.11.00 BEARINGS
a) General
The bearings shall consist of upper and lower units. The upper unit shall
include a sole plate with mirror finish stainless steel facing bonded to the
bottom surface of the sole plate. The lower unit shall consist of a relevant
laminated elastomers pad surfaced with PTFE. A rigid confining medium
substructure bonds the PTFE to the pad. When the upper and lower units
are mated the stainless steel slides on the PTFE surface with an extremely
low coefficient of friction. These bearings shall be designed as per the
performance requirements. The bearing shall be of reputed make and
manufacturer as approved by Engineer, for required vertical loads, as per
the construction drawings and for a maximum displacement of ± 50 mm.
b) Material
PTFE bearing shall be sliding against highly polished stainless steel and
the coefficient of friction between them shall be less than 0.06 at 55
kg/cm². In order to prevent cold flow in the PTFE surface it shall be
rigidly bonded by a special high temperature resistant adhesive to the
stainless steel sub-strata. The stainless steel surface, which slides against
the PTFE, is mirror polished. The stainless steel shall be bonded to the top
plate by special high strength adhesive. The thickness of the stainless steel
shall be between 1.0 to 1.5mm.
c) Installation
The seating area for PTFE bearing shall be prepared accurately level and
furnished with a thin layer of epoxy resin mortar. The bearing will be
placed on this layer while it is still workable and the bearing is levelled.
The bearing should not be displaced as the beam is lowered into position.
When the mortar and adhesive are fully set and the beam slightly above
the top of the bearing. The upper surface of the bearing shall then be
coated with sufficient thickness of epoxy resin mortar so that when the
beam is lowered on to the temporary supports it comes into full contact
with the mortar and some is squeezed out. The surplus shall be troweled
off and after the mortar is fully set the temporary supports removed.
15
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 16 OF 40
2.12.00 Storage of material
2.12.01 General
2.12.02 Steel
The steel to be used in fabrication and the resulting cut-pieces shall be stored
in separate stacks off the ground section wise and lengthwise so that they can
be easily inspected, measured, and accounted for at any time. If required by
the Engineer, the materials may have to be stored under cover and suitably
painted for protection against weather.
2.12.03 Electrodes
The electrodes for electric arc welding shall be stored in properly designed
racks, separating different types of electrodes in distinctly marked
compartments. The electrodes shall be kept in a dry and warm condition if
necessary by resorting to heating.
Bolts, nuts and washers and other fastening materials shall be stored on racks
off the ground with a coating of suitable protective oil. These shall be stored
in separate gunny bags or compartments according to diameter, length, and
quality.
2.12.05 Paints
Paints shall be stored under cover in air tight containers. Paints supplied in
sealed containers shall be used up as soon as possible once the container is
opened.
The Contractor shall establish and maintain quality control procedures for
different items of work and materials to the extent he deems necessary to
16
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 17 OF 40
ensure that all work is performed in accordance with this specification. In
addition to the Contractor's quality control procedures, materials and
workmanship at all times shall be subjected to inspection by the Engineer or
Engineer's representative. As far as possible, all inspection by the Engineer or
Engineer’s representative shall be made at the Contractor's fabrication shop
whether located at Site or elsewhere. The Contractor shall co-operate with the
Engineer or Engineer's representative in permitting access for inspection to all
places where work is being done and in providing free of cost all necessary
help in respect of tools and plants, instrument, labour and materials required to
carry out the inspection. The inspection shall be so scheduled as to provide
the minimum interruption to the work of the Contractor.
The quality control procedure shall cover but not be limited to the following
items of work
The dimensions, forms, weights and tolerances of all rolled shapes rivets,
bolts, nuts, studs, washers etc. and other members used in the fabrication of
17
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 18 OF 40
any structure shall, wherever applicable, conform to the requirements of the
latest relevant Indian Standards, wherever they exist, or, in the absence of
Indian Standards, to other equivalent standards.
The contractor shall within thirty (30) days after the award of the Contract
submit to the Engineer the Schedule of Fabrication and erection of structural
Steelworks, for approval. Within one week after receipt of approval on design
of any steel structure (part or full), he shall prepare progressively the detailed
fabrication drawings for the corresponding structure part or full, based on the
approved design. As decided by the Engineer, six (6) copies each of some or
all of the detailed fabrication drawings will have to be submitted for approval.
These drawings shall give all the necessary information for the fabrication,
erection, and painting of the steelwork in accordance with the provisions of
this Specification. Fabrication drawings shall be made in accordance with the
best modern practice and with due regard to sequence, speed and economy in
fabrication and erection. Fabrication drawings shall give complete information
necessary for fabrication of the various components of the steelwork,
including the location, type, size, and extent of welds. These shall also clearly
distinguish between shop and field rivets, bolts, and welds and specify the
class of bolts and nuts. The drawings shall be drawn to a scale large enough to
convey all the necessary information adequately. Notes on the fabrication
18
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 19 OF 40
drawings shall indicate those joints or groups of joints in which it is
particularly important that the welding sequence and technique of welding
shall be carefully controlled to minimize the locked up stresses and distortion.
Welding symbols used shall be in accordance with the requirements of the
Indian Standard Specification. IS: 813 - Scheme of symbols for Welding, and
shall be consistent throughout. Weld lengths called for on the drawings shall
mean the net effective length.
The Contractor shall be responsible for and shall carry out at his cost any
alterations of the work due to any discrepancies, errors or omissions on the
drawings or other particulars supplied by him, whether such drawings or other
particulars have been duly approved or not in accordance with the Contract.
3.00.00 WORKMANSHIP
3.01.00 Fabrication
3.01.01 General
Rolled materials before being laid off or worked, must be clean, free from
sharp kinks, bends or twists and straight within the tolerances allowed by the
Indian Standard Specification on IS: 1552 - Specification for rolling and
cutting tolerance for hot-rolled steel products. If straightening is necessary, it
may be done by mechanical means or by the application of a limited amount
of localized heat. The temperature of heated areas, as measured by approved
methods, shall not exceed 600°C.
3.01.03 Cutting
19
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 20 OF 40
reasonably free from gouges, occasional notches or gouges not more than 4
mm deep will be permitted. Gouges greater than 4 mm that remain from
cutting shall be removed by grinding. All re-entrant corners shall be shaped
notch free to a radius of at least 12 mm. Shearing, cropping and gas cutting
shall be clean, reasonably square and free from any distortion.
3.01.05 Clearances
The erection clearance for cleated ends of members connecting steel to steel
shall preferably be not greater than 2 mm at each end. The erection clearance
at ends of beams web shall be not more than 3 mm at each end, but where for
practical reasons greater clearance is necessary, suitably designed cheatings
shall be provided.
3.02.01 Holes
Holes through more than one thickness of material for members, such as
compound stanchions and girder flanges, shall be drilled after the members are
assembled and tightly clamped or bolted together. Punching may be permitted
before assembly, if the thickness of the material is not greater than the
nominal diameter of rivet or bolt plus 3 mm subject to a maximum thickness
of 16 mm provided that the holes are punched 3 mm less in diameter than the
required size and reamed after assembly to the full diameter.
Holes for rivets or black bolts shall be not more than 1.5 mm or 2.0 mm
(depending on whether the diameter of the rivet or bolt is less or more than or
equal to 25 mm) larger in diameter than the nominal diameter of the rivet or
black bolt passing through them.
Holes for turned and fitted bolts shall be drilled to a diameter equal to the
nominal diameter of the shank or barrel subject to a tolerance grade of BS as
specified in IS: 919. Parts to be connected shall be firmly held together by
tacking welds or clamps and the holes drilled through all the thicknesses in
one operation and subsequently reamed to size. Holes not drilled through all
thickness in one operation shall be drilled to a smaller size and reamed out
after assembly.
20
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 21 OF 40
Holes for rivets or bolts shall not be formed by gas cutting process.
3.02.02 Assembly
All parts of riveted members shall be well pinned or bolted and rigidly held
together while riveting. Drifting to enlarge unmatching holes shall not
generally be permitted. In case drifting is permitted to a slight extent during
assembly, it shall not distort the metal or enlarge the holes. Holes that must be
enlarged to admit the rivets or bolts shall be reamed. Poor matching of holes
shall be cause for rejection .The component parts shall be so assembled that
they are neither twisted not otherwise damaged, and shall be so prepared that
the specified cambers, if any, are maintained.
Rivets shall ordinarily be hot driven, in which case their finished heads shall
be approximately hemispherical in shape and shall be of uniform size
throughout the work for rivets of the same size full, neatly finished and
concentric with he holes. Rivets shall be heated uniformly to a temperature not
exceeding 1 125°C they shall not be driven after their temperature has fallen
below 540°C.
Riveted members shall have all parts firmly drawn and held together before
and during riveting and special care shall be taken in this respect for all single
riveted connections. For multiple riveted connections, a service bolt shall be
provided in every third or fourth hole.
All loose, burnt, or otherwise defective rivets shall be cut out and replaced and
special care shall be taken to inspect all single riveted connections. Special
care shall also be taken in heating and driving long rivets. The Contractor
shall prove the quality of riveting by cutting some rivets chosen at random by
the Engineer. No extra payment will be made to the Contractor for such
cutting and replacing. Riveting work, for any particular section or group, will
be considered satisfactory when at least 90% of the corresponding cut rivets is
found to be sound. If the ratio is below 75%, all the rivets in the particular
section or group shall be cut, removed and replaced and tested again at the
Contractor's expense. For cases between 75% and 90% the engineer shall have
the option to instruct cutting and replacing any number of further rivets at the
Contractor's cost as he deems necessary.
21
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 22 OF 40
Bolted construction shall be permitted only in case of field connections if
called for on the Drawings and is subjected to the limitation of particular
connections as may be specified. In special cases, however, shop bolt
connections may be allowed if shown on drawing or directed by the Engineer.
3.03.01 General
Surface to be welded shall be free from loose scale, slag, rust, grease, paint,
and any other foreign material except that mill scale, which withstands
vigorous wire brushing, may remain. Joint surfaces shall be free from fins and
tears. Preparation of edges by gas cutting shall, wherever practicable, be done
by a mechanically guided torch.
3.03.03 Assembling
Parts to be fillet welded shall be brought in, as close contact as practicable and
in no event shall be separated by more than 4 mm. If the separation is 1.5 mm
or greater, the size of the fillet welds shall be increased by the amount of the
separation. The fit of joints at contact surfaces, which are not completely
sealed by, welds, shall be close enough to exclude water after painting.
Abutting parts to be butt-welded shall be carefully aligned. Misalignments
greater than 3 mm shall be corrected and in making the correction the parts
shall not be drawn into a sharper slope than two degrees (2°).
22
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 23 OF 40
distortion and minimize shrinkage stresses in the closing welds of a rigid
assembly, such closing welds shall be made in compression elements.
Groove welds shall be terminated at the ends of a joint in a manner that will
ensure their soundness. Where possible, this should be done by use of
extension bars or run-off plates. Extension bars or run-off plates need not be
removed upon completion of the weld unless otherwise specified elsewhere in
the contract.
3.03.06 Temperature
23
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 24 OF 40
precautions as recommended in relevant Indian Standard shall be taken. When
the parent material is less than 40 mm thick and the temperature is between (-)
5°C and 0°C, the surface around the joint to a distance of 100 mm or 4 times
the thickness of the material, whichever is greater, shall be preheated till it is
hand warm. When the parent material is more than 40 mm thick, the
temperature of the area mentioned above shall be in no case be less than 20°C.
All requirements regarding preheating of the parent material shall be in
accordance with the relevant Indian Standard.
3.03.07 Peening
3.03.08 Equipment
These shall be capable of producing proper current so that the operator may
produce satisfactory welds. The welding machine shall be of a type and
capacity as recommended by the manufacturers of electrodes or as may be
approved by the engineer.
3.04.00 Finish
Bases and caps fabricated out of steel slabs, except when cut material with
true surface, shall be accurately machined over the bearing surface and shall
be in effective contact with the end of the stanchion. A bearing face, which is
to be grouted direct to a foundation, need not be machined if such face is true
and parallel to the upper face.
24
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 25 OF 40
3. 12.00 Lacing bars
The ends of lacing bars shall be neat and free from burns.
3. 13.00 Separators
Provision shall be made for all necessary steel bearing plates to take up
reaction of beams and columns and the required stiffeners and gussets whether
or not specified in Drawings.
The grating units shall be finished free from warps, twists, or any other
defects. Grating work shall include cutouts and clearance openings for all
columns, pipes, ducts, conduits etc. The gratings shall be notched, trimmed,
and neatly finished around components of the steel structures encountered.
Binding strip shall be provided on the grating to suit the profile. Openings in
gratings shall be provided with steel bar toe plates of not less than 5 mm
thickness and 100 mm width.
25
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 26 OF 40
3.11.00 Architectural Clearances
3.13.00 Castings
26
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 27 OF 40
3.15.00 Shop painting
3.15.01 General
After inspection and approval and before leaving the shop, all steelwork
specified to be painted shall be cleaned by hand-wire brushing or by other
methods of loose mill scale, loose rust, weld slag or flux deposit, dirt and
other foreign matter. Oil and grease deposits shall be removed by the solvent.
Steelwork specified to have no shop paint shall, after fabrication, be cleaned
of oil or grease by solvent cleaners and be cleaned of dirt and other foreign
material by trough sweeping with a fibre brush.
Surfaces not in contact, but inaccessible after assembly, shall receive two
coats of shop paint, Positively of different colours to prove application of two
coats before assembly. This does not apply to the interior of sealed hollow
sections.
Unless otherwise provided for, surfaces within 50 of any field weld location
shall be free of materials that would prevent proper welding or produce
objectionable fumes while welding is being done.
27
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 28 OF 40
3.16.00 Galvanizing
3.16.01 General
3.16.03 Procedure
Galvanizing shall be carried out by hot dip process in a proper and uniformly
heated bath. It shall meet all the requirements when tested in accordance with
IS: 2633 - Method for testing uniformity of coating on Zinc Coated Articles
and IS: 4759 - Specification for Hot-dip zinc coatings on Structural Steel &
other allied products.
After finishing the threads of bolts, galvanizing shall be applied over the entire
surface uniformly. The threads of bolts shall not be machined after
galvanizing and shall not be clogged with zinc. The threads of nuts may be
tapped after galvanizing but care shall be taken to use oil in the threads of nuts
during erection.
The surface preparation for galvanizing and the process of galvanizing itself,
shall not adversely affect the mechanical properties of the materials to be
galvanized. Where members are of such lengths as to prevent complete
dipping in one operation, great care shall be taken to prevent warping.
Materials on which galvanizing has been damaged shall be acid stripped and
re-galvanized unless otherwise directed, but if any member becomes damaged
after leaving been dipped twice, it shall be rejected. Special care shall be taken
not to injure the skin on galvanized surfaces during transport, handling, and
28
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 29 OF 40
erection. Damages, if occur, shall be made good in accordance or as directed
by the Engineer.
4.01.00 Inspection
The Contractor shall provide free of charge, such labour, materials, electricity,
fuel, water, stores, tools and plant, apparatus and instruments as may be
required by the Engineer to carry out inspection and/or tests in accordance
with the Contract. The Contractor shall guarantee compliance with the
provisions of this Specification.
4.02.01 General
The Contractor shall carry out sampling and testing in accordance with the
relevant Indian Standards and as supplemented herein for the following items
at his own Cost. The Contractor shall get the specimens tested in a laboratory
approved by the Engineer and submit to the Engineer the test results in
triplicate within 3 (three) days after completion of the test.
4.02.02 Steel
All steel supplied by, the Contractor shall conform, to the relevant Indian
Standards. Except otherwise mentioned in the contract, only tested quality
steel having mill test reports shall be used. In case unidentified steel materials
are permitted to be used by the Engineer, random samples of materials will be
taken from each unidentified lot of 50 M.T or less of any particular section for
tests to conform to relevant Indian Standards. Cost of all tests shall be born by
the contractor.
All material shall be free from all imperfections, mill scales, slag intrusions,
laminations, fittings, rusts etc. that may impair their strength, durability, and
appearance.
4.02.02 Welding
29
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 30 OF 40
a) The weld surface shall be cleaned with steel wire brush to remove spatter
metal, slag etc. and 100% of welds shall be inspected visually for size,
length of weldment and external defects. Weld gauges shall be used for
checking weld sizes. The surface shall be clean with regular beads and free
from slags, cracks, blow-holes etc.
All rivets, bolts, nuts, and washers shall be procured from M/s. Guest Keen
William Ltd. or equivalent and shall confirm to the relevant Indian Standards.
If desired by the Engineer, representative samples of these materials may have
to be tested in an approved laboratory and in accordance with the procedures
described in relevant Indian Standards. Cost of all such testing shall have to be
borne by the Contractor. In addition to testing the rivets by hammer, 2% (two
per cent) of the rivets done shall have to be cut off by chisels to ascertain the
fit, quality of material and workmanship. The removal of the cut rivets and re-
installing new rivets shall be done by the Contractor at his own cost.
All paints and primers shall be of standard quality and procured from
approved manufacturers and shall conform to the provisions of the relevant
Indian Standards.
4.02. 12 Galvanizing
30
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 31 OF 40
accordance with IS: 2633 - Method for testing uniformity of coating on Zinc
Coated Articles and 15: 4759 - specification for Hot-Dip Zinc Coatings on
Structural Steel & other allied products.
4.03.00 Tolerance
4.04.00 Acceptance
Should any structure or part of a structure be found not to comply with any of
the provisions of this specification, the same shall be liable to rejection. No
Structure or part of the structure once rejected, shall be offered again for test,
except in cases where the Engineer considers the defects rectifiable. The
Engineer may, at his discretion, check some of the tests at an appropriate
laboratory at the contractors cost.
When all tests to be performed in the Contractor’s shop under the terms of this
contract have been successfully carried out, the steelwork will be accepted
forthwith and the Engineer will issue acceptance certificate, upon receipt of
which, the items will be shop painted, packed and dispatched. No item to be
delivered unless an acceptance certificate for the same has been issued. The
satisfactory completion of these tests or the issue of the certificates shall not
bind the Owner to accept the work, should it, on further tests before or after
erection, be found not in compliance with the Contract.
4.05.01 General
The Contractor will deliver the fabricated structural steel materials to site with
all necessary field connection materials in such sequence as will permit the
most efficient and economical performance of the erection work. The Owner
may prescribe or control the sequence of delivery of materials, at his own
discretion.
31
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 32 OF 40
4.05.02 Marking
4.05.03 Shipping
Each bundle, bale or package delivered under this contract shall be marked on
as many sides as possible and such distinct marking (all previous irrelevant
markings being carefully obliterated) shall show the following:
All markings shall be carried out with such materials as would ensure quick
drying and indelibility.
Each packing case shall contain in duplicate in English a packing list pasted
on to the inside of the cover in a water-proof envelope, quoting especially -
d) Nomenclature of stores
e) A schedule of parts or pieces, giving the parts or piece number with
32
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 33 OF 40
reference to assembly drawings and the quantity of each.
The shipping dimensions of each packing shall not exceed the maximum
dimensions permissible for transport over the Indian Railways/Roads.
After delivery of the materials at site, all packing materials shall automatically
become the property of the Owner.
The contractor shall ship the complete materials or part on board a vessel
belonging to an agency approved by the Owner or on rail and/or road transport
as directed. The Contractor shall take all reasonable steps to ensure correct
appraisal of freight rates, weights and volumes and in no case will the Owner
be liable to pay any warehouse, wharfage, demurrage and other charges.
If, however, the Owner has to make payment of any of the above-mentioned
charges, the amount paid will be deducted from the bills of the Contractor.
Necessary advise regarding the shipment with relevant details shall reach the
Engineer at least a week in advance.
a) Progress Schedule
33
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 34 OF 40
b) Shop
After award of the Contract the successful Tenderer is to submit the following:
a) Complete fabrication drawings, material lists, cutting lists, rive and bolt
lists, field welding schedules based on the approved design drawings
prepared by him in accordance with the approved schedule.
d) Results of any test as and when conducted and as require by the engineer.
6.01.00 Rates
6.01.01 The items of work in the Schedule of items describe the work in brief. The
various items of the Schedule of items shall be read in conjunction with these
specifications including amendments and additions, general conditions of
contract, special conditions of contracts, and other tender documents, if any.
For each item of Schedule of Items, the bidder's rates shall include the
activities covered in the description of the item as well as all necessary
operations described in the Specifications.
34
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 35 OF 40
6.01.02 The bidder's rates shall include cost of all minor details which are obviously
and fairly intended and which may not have been included in the description
in these documents but are essential for the satisfactory completion of the
work. Rates shall also include for taking all safety measures.
6.01.03 The bidder's -rates for all items of schedule of items shall include complete
cost towards plant, equipment, erection and dismantling of scaffolding, men,
materials and consumables, skilled and unskilled labour, levies, taxes,
royalties, duties, transport, storage, repair/rectification/maintenance until
handing over, contingencies, overhead and all incidental items not specifically
mentioned but reasonably implied and necessary to complete the work.
6.01.04 No claims shall be entertained, if the details shown on the `Released for
Construction’ drawings differ from those shown on the bid/tender drawings.
6.01.06 The bidder's rates for Structural Steel shall include for fabrication and
erection, transportation to site, preparation checking collecting and
distributing of the fabrication drawings and design calculations, erection
scheme, alignment, welding, including preheating and post heating, testing of
welders, inspection of welds, visual inspection, non destructive and special
testing, rectification and correction of defective welding works, production
test plate, inspection and testing, erection scheme, protection against damage
in transit, stability of structures, etc. The rates shall also be inclusive of
providing and installing temporary structures, transport of Owner issue
material from store, return of surplus/waste steel materials including cut
pieces/waste steel, provision of additional butt/weld joint to reduce the
wastage and all other general, special, such requirements as may be required,
for the successful completion of the work.
6.01.07 The bidder's rates for foundation bolts assembly shall include fabrication
erection, installation, and alignment of complete bolt assembly with nuts,
locknuts, anchor plates, stiffener plates, protective tape, etc. This shall also
include the cost of materials not issued by the Owner.
6.01.08 The bidders rates for application of inorganic primer shall include surface
preparation to near white metal surface by blast cleaning, abrasives, touch up
painting, suitable enclosure to avoid contamination and the necessary statutory
approval from the factory inspector/pollution control board etc. regarding the
method of blast cleaning and abrasives used, and getting approval of the
specialized agency supplying the zinc silicate primer.
6.01.09 The bidder's rates for application of finish painting system shall include
surface preparation, application of intermediate (under) coat, finish coat and
final finish coat, and getting approval of the specialized agency supplying the
finish paint.
35
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 36 OF 40
6.01.10 The bidder's rates for electro-forged gratings (if specified) shall include
supply, fabrication, transportation to the site, erection and alignment of factory
made electro-forged gratings, all taxes, duties thereon etc. The rates shall also
include preparation of grating design for different spans and load intensifies,
preparation of design and fabrication drawings, edge preparation, blast
cleaning followed by finish paint.
6.01.11 The bidder's rates for galvanization of factory made electro-forged gratings (if
specified) shall include the application of hot dipped galvanization as finish
over the fabricated gratings and the treatment to be given for prevention of
white storage stains, as per the technical Aspiration.
6.01.12 The bidder’s rates for permanent mild steel bolts, nuts and washers shall
include the supply and fixing of such bolts, nuts and washers in position, for
various types of Structural Steel works, as per the technical specification.
6.01.13 The bidder’s rates for high strength structural bolts, nuts and washers shall
include the supply and fixing of such bolts, nuts and washers in position, for
various types, of Structural Steel works, as per the technical specification.
6.01.14 The bidder’s rates for dismantling, additions to, alterations in and/or
modifications shall be inclusive of all operations such as lowering of material,
carriage etc., as mentioned in the technical specification. Unutilised steel
pieces cut/removed shall be returned to the project stores free of charge. Non-
return of unublized steel pieces to the Owner's store would be considered as
wastage and recovery would be affected as per the provision of contract for
structural steel consumption. This shall not include the weight of temporarily
dismantled/supported members, connected member.
6.01.15 The bidder's rates for re-erection of erection marks after additions to,
alterations in and/or modifications shall be inclusive of all operations
mentioned in technical specification for the calculated weight of the
rectified/modified erection mark rejected at site. This shall not include the
weight of temporarily dismantled/supported members, connected member. All
the operations mentioned above for restoring such members shall be carried
out at no extra cost. The work of erection of any erection mark which has not
been dismantled but have been modified/rectified before erection shall not be
paid under this item but shall be paid under relevant item of fabrication and
erection of steel work of Schedule of items for the modified weight.
6.01.16 The bidder's rates for PTFE shall include design, supply, transportation of the
complete assembly with guides and dust protection cover and installation of
bearings in position drilling, bolting, erecting aligning etc. along with any
taxes, duties thereon etc.
6.01.17 The bidder's rates for Stainless Steel hopper (if specified) shall include
36
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 37 OF 40
fabrication and erection, transportation to site, preparation checking collecting
and distributing of the fabrication drawings and design calculations, all other
operations mentioned in the technical specification. The rates shall also
include for erection scheme, alignment, making cutting plan, cutting, jointing,
bending, rolling, grinding, drilling, bolting, assembly, edge preparation,
welding including pre-heating, post-heating, testing of welders, inspection of
welds, inspection and testing, protection against damage in transit, stability of
structures, installation of temporary structures etc. The rates shall also be
inclusive of providing and installing temporary structures, transport of Owner
issue material from store, return of surplus / waste steel materials including
cut pieces/waste steel, provision of additional butt / weld joint to reduce the
wastage and all other general, special, such requirements as may be required,
for the successful completion of the work.
6.01.18 The bidders rates for preformed flexible open ended bellow strap of neoprene
(if specified) shall include supply and transportation, installation in position,
drilling, bolting, aligning etc. complete along with any taxes, duties thereon
etc.
6.01.19 The bidder's rates for Stainless Steel Hand Rail (if specified) shall include
complete Hand Rail including, stainless steel beading, stainless steel cleats,
stainless steel fasteners, neoprene gaskets, preparation of shop drawing but
excluding the cost of glazing. The Owner for this item of work shall supply
no material.
6.02.01 The measurement for the item of foundation bolts assembly including that of
nuts; locknuts shall be based on the calculated weight of steel installed in
Metric Tonne, corrected to second place of decimal. The weight of the
foundation bolt shall be calculated in the same way as that done for the item of
fabrication, erection, alignment of structural steel. The weight of the nut /
locknut shall be taken as per actual weight supplied by the contractor and
accepted by the Engineer.
6.02.02 The measurement for the item of fabrication, erection, alignment, welding, etc.
of structural steel work shall be based on the approved weight of steel nearest
to a Kg, by applying the unit weight as adopted at the time of issue of
structural steel on the measurements worked out as given below.
6.02.03 For ISMB, ISMC, ISA, flats, round bars, square bars and pipes, length shall be
taken as per distance between planes normal to the axis of the member passing
through the extreme points of the section.
6.02.04 Gussets plates in trusses, and bracings, brackets plates, stiffeners, and skew
cuts if any in plates for butt welds the area shall be assumed as the minimum
circumscribed rectangle.
37
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 38 OF 40
6.02.06 For all other plates, where the area of any notch/skew cut in the plate is less
than 0.2 sq.m. the area of the plate shall be assumed as that of the minimum
circumscribing rectangle for the purpose of measurement and calculation of
area for the purpose of payment. However, if the area of any notch/skew cuts
in a plate is more than 0.2 sq.m. the actual profile of the plate shall be
considered for the purpose of payment.
6.02.07 No deduction shall be made for the hole in the members, if the area of
individual hole is less than 0.2 sq.m. The weight shall be calculated by
deducting the area of holes, if area of individual hole is more than 0.2 sq.m.
6.02.08 All cut-pieces and scrap generated due to cutting of holes, skew-cuts of plates,
gussets, brackets, stiffeners, etc. shall be stacked separately and handed over
to the project stores without being considered for material accounting as the
circumscribing rectangle has been considered for payment.
6.02.09 The splice plate shown in the fabrication drawing or approved by the Engineer
shall only be measured for payment.
6.02.10 The weight of permanent bolts, washers and nuts and welds shall not be
included in the weights of the members. No extra payment shall be made for
welding/bolting.
6.02.11 The bolts and nuts required for erection purpose shall not be paid for and may
be taken away by the Contractor after final welding for members. Erection
boltholes left after removal of erection bolts shall be suitably plugged with
welds.
6.02.12 The measurement for the item of application of inorganic primer including
blast cleaning of steel surfaces shall be based on the weight on which the zinc
silicate primer is applied, after blast cleaning in Metric Tonne, corrected to
third place of decimal. The weight shall be the weight as approved, for
erection mark/element of the mark painted, for payment of the item of
fabrication and erection of structural steel works.
6.02.13 The measurement for the item of application of finish primer system shall be
based on the weight on which the epoxy based finish primer is applied in
Metric Tonne, corrected to third place of decimal. The weight shall be the
weight as approved, for erection mark/element of the mark painted, for
payment of the item of fabrication and erection of structural steel works.
38
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 39 OF 40
6.02.14 The measurement for the item of gratings shall be based on the actual weight
in Kgs, corrected to second place of decimal, as supplied by the Contractor,
and accepted by the Engineer. Nothing extra shall be payable for making
cutouts, notches, openings of any profile, trimming profiles etc. in the grating
units.
6.02.15 The measurement for the item of hot dipped galvanization of gratings shall be
based on the actual weight in Kgs, corrected to second place of decimal of
gratings galvanized by the Contractor and accepted by the Engineer.
6.02.16 The measurement for the item of permanent bolts with nuts and washers shall
be based on the actual weight in Kgs, corrected to second place of decimal, as
supplied by the Contractor and accepted by the Engineer, and as per the
approved bolts and nuts schedules.
6.02.17 The measurement for the item of High Strength Structural bolts with nuts and
washers shall be based on the actual weight in Kgs, corrected to second place
of decimal, as supplied by the Contractor and accepted by the Engineer, and as
per the approved bolts and nuts schedules.
6.02.18 The measurement for the item of the work of dismantling, additions,
alterations, reerection etc. shall be as given below
6.02.19 For dismantling, the unmodified weight of the actually dismantled erection
marks shall only be measured.
6.02.20 For the work of addition to, alteration in and / or modification of 'erection
marks' either in erected position or in the fabrication yard, measurement of
weight for payment purpose shall be calculated as the arithmetic sum of
weight of steel cut and removed from the erection mark, weight of steel
reutilised out of such cut and removed pieces and weight of additional new
steel pieces added to the erection mark.
6.02.21 For re-erection the weight of the modified erection mark shall only be
measured.
6.02.22 The weight shall be measured nearest to kg. and shall be arrived in a manner
similar to the measurement for the item of fabrication, erection, alignment and
welding of structural steel.
6.02.23 The measurement for the item of PTFE bearings shall be based on the actual
weight in MT, corrected to third place of decimal, supplied by the contractor
and as accepted by the Engineer and as per the approved bearing schedule, for
the total vertical load carrying capacity, for all bearings.
6.02.24 The measurement for the item of stainless steel hopper shall be based on the
39
TITLE:2X600MW STPP DBPL SPECIFICATION NO. PE-TS-365-616-C001
CHATTISGARH VOLUME - II B
TECHNICAL SPECIFICATION FOR SECTION - D SUB-SECTIO : D17
FABRICATION OF STRUCTURAL REV.NO. 0
STEEL WORK SHEET 40 OF 40
actual finished weight of hopper weight in Kgs, corrected to second place of
decimal. The hopper weight shall be arrived by multiplying of the inner
surface area of the hopper with the unit weight of the hopper plate.
6.02.25 The measurement for the item of flexible open-ended bellows straps of
neoprene shall be based in running meter, corrected to second place of
decimal. Bellow Straps shall be supplied as per the requirement of the
approved drawings. The measurement shall be done for the inner
circumference of the bunker on which neoprene has been fixed and for the
length supplied by the Contractor 'and as accepted by the Engineer.
6.02.26 The measurement for the item of Stainless Steel Hand Railing shall be based
in Kgs corrected to second place of decimal. The weight shall also include the
weight of Stainless Steel fasteners, Stainless Steel beading, Stainless Steel
cleats etc. The weight shall be the finished weight of Hand Rail, as accepted
by the Engineer.
40