CONSTRUCTION OF RURAL ROADS
WITH CATIONIC BITUMEN EMULSION
  BASED COLD MIX TECHNOLOGY
            Dr. N.K.S. Pundhir
         Senior Principal Scientist
          E-mail: pundhir.crri@nic.in
CSIR- Central Road Research Institute,
         New Delhi-110025
CONVENTIONAL METHOD FOR ROAD
CONSTRUCTION
¾ HOT MIX TECHNOLOGY
    Hot Applications
   Heating of Binder at 1650c
   Heating of Aggregate at 150oc
   Production of mix at 1550C
   Tack coating at 1600C
   Laying of mix at 1300C
   Compaction of mix at 1200C
DRAW BACKS OF HOT MIX TECHNOLOGY
 Environmental Degradation
High Energy Consumption
Increase in Carbon Footprint
Low Output for Mix Production
Low Laying Work in rains / cold
Limited Construction Period in a yr.
Oxidative Hardening of Binder
Heath / Safety Hazard to Labour
Emulsion Based Cold Mixes
        Overcome
   Hot Mix Problems
 BITUMEN EMULSION
 A liquid product in which a
 substantial amount of bitumen is
 suspended in a finely divided form
 of the size 4-10 microns in water in
 presence of emulsifiers
TYPES OF EMULSIFIER
 Anionic Emulsifier
• RCOOH + NaOH = RCOO - + Na + + H2O
 Cationic Emulsifier
• RNH2 + HCl = RNH3+ + Cl -
TYPES OF EMULSION
• Anionic Emulsion
                                 Emulsified Ions
• Cationic Emulsion
                       +         +
• Non Ionic Emulsion                  +
                       BITUMEN
                       DROPLET                +
                                          +
          CATIONIC BITUMEN EMULSION
 GRADES OF BITUMEN EMULSION
          Rapid Set   - RS-1 & RS-2
          Medium Set - MS
          Slow Set   - SS-1 & SS-2
RS-1 :    Tack-Coating , Penetration Grouting
RS-2 :    Surface Dressing,
MS   :    Premix carpet, Patch Repair
SS-1 :    Priming
SS-2 :    SDBC, BC, BM, Slurry Seal,
PMB/Latex Emulsion    : Micro-surfacing
Bitumen Emulsion Production
     Bitumen    Water +
    + 2% K.oil emulsifier
                              Bitumen Emulsion
           colloid
            mill
  dosage             dosage
   pump               pump
                                 emulsion
    TESTING OF EMULSIONS (IS: 8887-2004)
 Residue on 600 micron IS sieve
 Viscosity by Saybolt Furol viscometer
   Coagulation at low temperature
   Storage stability after 24 hrs.,
   Particle charge
   Stability to mixing with cement,
   Coating ability and water resistance
   Residue Test
       - Penetration
       - Ductility
       - Solubility in Trichloroethylene
          Physico-chemical Properties of Cationic Bitumen Emulsion as per IS:8887- 2004
                 Properties of Bitumen Emulsion                        Requirement of IS:8887- 2004
 S.No.
                                                            RS-1            RS-2             MS           SS-2
(i)          Residue on 600 micron IS sieve               0.05 max.       0.05 max.       0.05 max.     0.05 max.
             (% mass)
(ii)         Viscosity by Saybolt Furol Viscometer,
             seconds
             At 250C                                          -               -               -          30-150
             At 500C                                       20-100          100-300         30-300           -
(iii)        Coagulation of emulsion at low                  Nil             Nil             Nil           Nil
             temperature
(iv)         Storage stability after 24 hrs. , %, max.       2.0             1.0             1.0           2.0
(v)          Particle charge                                +ve              +ve             +ve          +ve
(vi)         Coating ability and water resistance             -               -             Good            -
             (a) Coating, dry aggregates                      -               -             Fair            -
             (b) Coating after spraying water                 -               -             Fair            -
             (c) Coating, wet aggregates                      -               -             Fair            -
             (d) Coating after spraying water
(vii)        Stability to mixing cement,                     Nil              -              Nil           2
             %coagulation
( viii)      Miscibility with water (coagulation)            No             No               No            No
                                                         Coagulation    Coagulation      Coagulation   Coagulation
(ix)         Test on residue :                             60 min.         67 min.         65 min.       60 min.
             (a) Residue by evaporation, %                 80-150          80-150          60-150        60-120
             (b) Penetration, 250C/100 gm/5 sec.           50 min.         50 min.         50 min.       50 min.
             (c) Ductility, 270C/cm.,                      98 min.         98 min.         98 min.       98 min.
             (d) Solubility In Trichloroethylene, %
APPLICATION OF COLD MIX TECHNOLOGY
¾ Construction of BM, PMC, MSS & SDBC
¾ Surface Dressing
¾ Grouting-Penetration Macadam
¾ Priming GSB/WMM & Tack coating
¾ Crack Sealing (Black Seals)
¾ Repair of Pot- Holes & Depression
¾ Repair of Utility Cuts & Bomb Crater
¾ Sub-Base & Base Courses (Sealing)
¾ Slurry Seal Treatment / Micro surfacing
COLD MIX DESIGN
 Cold mix design of MSS, SDBC / BM :
 ¾ Evaluation of Bitumen Emulsion
 ¾ Gradation and Properties of Aggregates
 ¾ Premixing Optimum Water Content
 ¾ Preparation of Marshall Specimens
 ¾Testing of Marshall Specimens
    Determination of Premix Water Content
   Quantity of emulsion ( P) is determined as :
                  P = 0.05A+0.1B+0.5C
      Where,
      A = Percent aggregate retained on 2.8 mm sieve
      B = Percent aggregate retained on 90 micron sieve
      C = Percent aggregate passing on 90 micron sieve
 Fix quantity of emulsion, P,
 Prepare cold mix with varying water contents
  ( 2,3,4,5 %) and visually examined for coating value
  and workability
 Premix water content is determined as water
  content at which coating and workability is maximum
    Preparation of Marshall Specimens
       1100g Blended Aggregates
 4 % water content          Mix for wetting
        Addition of emulsion 7,8,9% into
  aggregates         Mixing for uniform
  coating         Cold mix in mould
            Compaction with 75 Blows       on
each face Specimens                Marshall
Specimen               Curing for 3 days at
400C            Testing for Bulk Density,
Stability, flow , Retained Stab. at 250C
TESTING OF COLD MIX
    PROPERTIES OF COLD MIX WITH EMULSION (SS-2)
    S. No.              Properties      Bitumen emulsion
                                            Content,%
                                      6.0     7.0      8.0
I            Bitumen residue, %       3.8     4.4      4.9
ii           Bulk density, gm/cc      2.26    2.27    2.25
iii          Air Voids, %             9.1     7.81    7.92
iv           Stability, kg. at 250C   480     560     530
v            Flow, mm                  6      3.5      6.5
                                               OPTIMIZATION OF EMULSION CONTENT
                                                       3 day curing (40C oven)                                                         3 day curing (40C oven)
                                   2.23                                                                                      500
D R Y B U L K D E N S IT Y
                                                                                             M AR S H A L L S T AB IL IT Y
                                   2.22                                                                                      475
                                   2.21                                                                                      450
         (g /c c .)
                                                                                                                             425
                                    2.2
                                                                                                        (k g .)
                                                                                                                             400
                                   2.19                                                                                      375
                                   2.18                                                                                      350
                                   2.17                                                                                      325
                                          6       7     8      9    10     11                                                300
                                                                                                                                   6      7     8       9     10      11
                                              BITUMEN EMULSION CONTENT (%)
                                                                                                                                       BITUMEN EMULSION CONTENT (%)
                                                    3 day curing (40C oven)                                                            3 day curing (40C oven)
                         9.0
                                                                                                                             500
                                                                                             M ARSHALL STABILITY
                                                                                                                             475
                                                                                                                             450
   A IR V O ID S ( % )
                         8.0
                                                                                                                             425
                                                                                                    (kg.)
                                                                                                                             400
                         7.0
                                                                                                                             375
                                                                                                                             350
                                                                                                                             325
                         6.0                                                                                                 300
                               6              7         8                 9        10   11                                         6      7     8       9     10      11
                                                    BITUMEN EMULSION CONTENT (%)                                                       BITUMEN EMULSION CONTENT (%)
FIELD TRIALS IN DIFFERENT
        CLIMATES
Available Specifications for Cold Mixes
• IRC: 14-2004   Recommended Practice for Open Graded
                 Premix Carpets (Third Revision)
•IRC:110-2005    Standard Specification and Code of
                 Practice for Design and Construction of
                 Surface Dressing
•IRC:SP:81-2008 Tentative Specification for Slurry Seal /
                Micro-surfacing
• IRC: 82-1982   Code of Practice for Maintenance of
                 Bituminous Surfaces of Highways
• IRC: SP: 20-2002 Rural Road Manual
¾ No Specifications for MSS, SDBC, BC & BM with cold
 mixes
    TEST LOCATIONS OF BRO / LOCAL PWDs
      On    NH-1A    Jammu-Srinagar       National      Highway
      in J&K under snow bound area
     On NH-44 near Silchar on Jowai - Badarpur Road
      in Assam under high rainfall area
     On    Hanumangarh-Sangeria        Road       in   Rajasthan
      in desert climate
     On NH-2 near Agra from km-228-230 in hot climate
     On Approach Road to Secratariat, Aizwal in wet climate
     Dantaur-Khajuwala Road in Rajasthan-desert climate
     By-pass Aizawl, High rainfall ( June,2007)
     NH-1A Jammu-Srinagar Road ( Sept., 2007)
     Rural Roads in Assam ( Feb. 2012)
CONSTRUCTION OF ROAD WITH COLD MIX
Tack Coating
 Bitumen Emulsion of RS-1
 Quantity @ 2.5 – 3.5 kg
  per 10 M2 area
 Pressure distributor / or
  manually
 Cleaning of holes with water
  when tack coating
  discontinued
 Spread Cold Mix when Tack
  coat turns black from brown
 Wetting of road surface
  required, in Summer
    PREPARATION OF COLD MIX IN MIXER
                      1                             2
    Charging of Aggregates      Wetting of Aggregates
                       3                           4
Bitumen Emulsion for Cold Mix   Discharging of Cold Mix
PREPARATION OF COLD MIX IN TRAY
                                  2
           1
           3                  4
      LAYING OF COLD MIX FOR MSS / PMC
                         1                           2
Tack coating with emulsion    Ferrying of cold mix
  3                                                  4
                     3
Spreading of cold mix        Laying of cold mix in rains
INEXPENSIVE SURFACE DRESSING WITH EMULSION
Preparation of road surface
• Pavement surface cleaned of dirt, dust
• Pot-holes and minor irregularity ratified
• Half width taken for surface dressing
• The road was divided into segment of
  10 m2 area.
Tack coat
• Bitumen emulsion (RS-2) with quantity @
  17 kg per 10m2 area was applied with
  perforated cans at 3mm hole apart
Spreading of Aggregate
• The first layer of aggregate of 19 mm size
  was spread over the tack coated area
• The aggregate was compacted with 8-10
   ton road roller
• The newly laid road surface was allowed
   to traffic after 4-5 hours.
  CONSTRUCTION OF
  RURAL ROADS WITH
COLD MIX TECHNOLGY
IN NORTH EAST REGION
  1                                 2
                                     4
Work Shop at Agartala on 4 / 5.02.2012
CONSTRUCTION DEMO IN AGARTALA (5.2.2012)
                1                    2
                3                     4
CONSTRUCTION OF RURAL ROAD IN
       ASSAM- Feb. 6, 2012
           1                    2
           3                    4
PERFORMANCE OF RURAL ROADS WITH COLD MIX-
     Under PMGSY IN BONGAGAON (2012)
                  1                    2
                                       4
                 3
  PERFORMANCE OBSERVATIONS
     CONDUCTED IN ASSAM
A. Rajkhowapara Road to NH-52
B. Bongshar to Solalkuche Road.
C. Kayajan to Patkata Road.
D. Bezera-Mandakta Road.
MECHANISED CONSTRUCTION
     IN VARYING CLIMATES
•   Desert (Rajasthan)
•   High Rainfall (High Rainfall)
•   Cold & Snow Bound (J&K)
PRODUCTION OF COLD MIXES WITH HMP
                             1                                         2
Adding Pre-mix Water                 Adding Emulsion in Drum Mixer
                             3                                     4
 Cold Mix on Conveyer Belt       Discharge of Cold Mix to Dumper
LAYING ROAD WITH COLD MIX IN RAJASTHAN
              1                     2
              3
                                    4
LAYING OF ROAD WITH COLD MIX IN J & K
             1                          2
              3                         4
Laying of Road with Cold Mix in Mizoram
              1                               2
             3                            4
    Materials and Energy Requirement for
         Different Type of Renewals
Specification          Aggregat     Bitumen         Energy
                           e         (Kg.)      (Kilo /Cal×108)
                        (cu.m.)
                       Hot Col    Hot    Cold    Hot     Cold
                             d
Two Coat Surface       85 70      9800   7280   0.99     0.74
Dressing
Premix Carpet + Seal   116 116    9100   8645   1.02     0.91
Coat
Mix Seal Surfacing     95   95    8700   8580   1.16     0.92
Semi-Dense             134 134 11000 11000      1.63     1.32
Bituminous Concrete
     Comparative Cost of Bituminous Surfacings
         With Emulsion vis-a-vis Hot Bitumen
S. N. Specification Thickness,    Binder    Cost / m2,
                       mm                     Rs.
 1      SDBC           25        Bitumen    324.08
 2      SDBC           25        Emulsion   276.21
 3      PMC            20        Bitumen    168.84
 4      PMC            20        Emulsion   104.76
 FIELD PERFORMANCE EVALUATION
METHODOLOGY
 VISUAL INSPECTION
 DISTRESS MEASUREMENTS
 BINDER’s AGING
 FUNCTIONAL CHARACTERISTICS
   UNEVENNESS OF SURFACING
   BENKELMAN BEAM DEFLECTION
PERFORMANCE OF MSS WITH EMULSION on NH-2
                  10 % Binder economy iis achieved in
                   MSS, PMC and TCSD
                               1                             2
MSS with Bitumen after 4 yrs       Mix Seal Surfacing with 20%
                                   reduced emulsion after 5 yrs
  Service Life of Mix Seal Surfacings with Emulsion and Bitumen
                       100
                       90
                       80
                       70
Performance Points,%
                       60
                       50
                                     MSS    R                  MSS     T-20
                       40
                                     MSS   T-15                MSS T-10
                       30            MSS    T-5                MSS      T-0
                       20
                       10
                        0
                             0   1            2            3            4     5   6
                                                  Service Life, Years
                       Pavement Distress with Time in Mix Seal Surfacings
                      91
                      81       MSS-R          MSS-T-20
                      71       MSS-T-15       MSS-T-10
Pavement Distress,%
                               MSS-T-5        MSS-T-0
                      61
                      51
                      41
                      31
                      21
                      11
                       1
                           0     1        2              3           4   5   6
                                               Service Life, Years
PERFORMANCE OF PMC WITH EMULSION ON NH-2
                              1                                  2
  Premix Carpet with 10% reduced         PMC with 5 % reduced emulsion
 emulsion after 5 yrs service life       after 5 yrs service life
                                         Premix Carpet with bitumen
                                         after 4 yrs service life
                                     3
                       Performance of Premix Carpet with Bitumen and
                       different Emulsion Content
                       100
                       90
                       80
                       70
Performance Point, %
                       60
                       50
                                 PMC   R      PMC      T-20       PMC     T-15
                       40
                                 PMC   T-10   PMC      T-5        PMC     T-0
                       30
                       20
                       10
                        0
                             0    1           2               3           4      5   6
                                                    Service Life, Years
PERFORMANCE OF COLD TCSD ON NH-2
                            1                                    2
TCSD with emulsion After 5 Years    TCSD with emulsion After 5 Years
                                             3
                  TCSD with Bitumen after 4 years
Performance of Two Coat Surface Dressing with Emulsion and Bitumen
                          100
                          90
                          80
  Performance Points, %
                          70
                          60
                          50
                          40        TCSD T-20   TCSD T-15        TCSD T-10
                          30        TCSD T-5    TCSD T-0         TCSD R
                          20
                          10
                           0
                                0    1          2           3             4   5   6
                                                    Service Life, Years
     Pavement Distress in Two Coat Surface Dressing Time
                       4.5
                       3.5
Pavement Distress, %
                        3
                                 TCSD-T-20   TCSD-T-15      TCSD-T-10
                       2.5
                        2        TCSD-T-5    TCSD-T-0       TCSD-R
                       1.5
                       0.5
                        0
                             0        1        2            3             4   5   6
                                                    Service Life, Years
PERFORMANCE OF ROADS WITH EMULSION ON NH-44
                   1                                2
SDBC with emulsion after      PMC emulsion after 4 yrs
4 yrs
                           PMC with emulsion after 5 yrs
                   3
 PERFORMANCE OF PMC ON H-S ROADS
 (RAJASTHAN)
                              1                              2
PMC with emulsion on H-S Rd       PMC with emulsion after 5 yrs
after 2 yrs
  PERFORMANCE OF SDBC ON NH-1A (J&K)
                          1                               2
SDBC with emulsion after 5 yrs   SDBC with emulsion after 5 yrs
PERFORMANCE OF BM +PMC AFTER 5 yrs
ON NEW APPROACH ROAD AIZAWL
                1                    2
                3                    4
       Reasons for Durable Road
• There is chemical interaction
  between emulsion / aggregate
• The Cationic Emulsion is
  positively charged
• Surface of Siliceous
  aggregates is having
  Negative Charge
• The strong bond formed
  between emulsion-Aggregate
• Emulsion contain Anti -
 stripping agent which reduces
 water damages
 Benefits of Emulsions Based Cold Mixes
¾ Environment Friendly and Energy Efficient
¾ Construction feasible in rains/wet and cold
  weather
¾ Extends construction period During a year
¾ Fast Production of Cold Mix
¾ 4-5 times Faster Construction by Cold Mix
¾ 15-20 % Cheaper Roads
¾ Contain in built ant-stripping agent
¾ Prevent oxidative hardening
¾ Consume targeted Budget in time
¾ Labour Intensive - Creates Jobs for Villagers
     - MNREGA
¾ Labour Friendly Technology- Health, Safety
GHG Emission Per Ton Laid Material
Energy Consumption Per Ton Laid Material
          REPAIR OF POT- HOLE
 Make rectangular shape
 Clean the pot- hole area
 Track coating the edge and area
 Prepare cold mix
 Charge the aggregate 11 mm down in
  concrete mixer
 Add 2 % Water and mix
 Add 5-6% emulsion & mix uniformly
 Pour mix in pot hole/depression
 Compact with road roller
PREPARATION OF COLD MIX FOR REPAIR
              1                      2
              3                      4
PROCESS OF REPAIR WITH COLD MIX
            11                    22
                                  4
             3
REPAIR DEMO IN MUMBAI ( Jan. 9, 2012)
               1                        2
                                        4
               3
REPAIR DEMO IN AGARTALA ( Feb. 5, 2012)
               1                     2
               3                      4
APPLICATION OF SLURRY SEAL
         ON
•   DISTRESS ROADS- CRACKED
•   VIP ROADS
               What is Slurry Seal
 The slurry seal shall consist of :
• cationic bitumen emulsion(SS-2)
• mineral aggregate
• water
                   Grading of Aggregates
  Sieve Size              % Passing (Minimum Layer Thickness)
                 Type I (2-3 mm)   Type II (4-6 mm)   Type III(6-8 mm)
  9.5 mm                                                     100
  6.3 mm                                  100              90-100
  4.75 mm               100              90-100             70-90
  2.36 mm             90-100             65-90              45-70
  1.18 mm              65-90             45-70              28-50
  600 micron           40-65             30-50              19-34
  300 micron           25-42             18-30              12-25
  150 micron           15-30             10-21              7-18
  75 micron            10-20              5-15              5-15
APPLICATION OF SLURRY SEAL
PERFORMANCE OF SLURRY SEAL
      6 MONTHS      6 MONTHS
Drafted Specifications for Development of Cold Mix
Technology and under IRC consideration
 Proposed Tentative Specification For Semi-dense Bituminous
  Concrete Using Cationic Bitumen Emulsion
 Proposed Tentative Specification of Mix Seal Surfacing
  (Dense-Graded Premix Carpet) With Cationic Bitumen Emulsion
 Proposed Specification for Bituminous Macadam (Base & Binder
  Course) with Cationic Bitumen Emulsion
 Guidelines for Construction of Roads with Emulsion Based Cold Mix
  Technology
 Guidelines for Patch and Pot hole Repair with Emulsion Based Cold
 Mix Technology
THANK YOU