0% found this document useful (0 votes)
49 views1 page

Film Production Schedule Plan

The production schedule outlines filming a project from November 30th through December 14th. It includes pre-production tasks like deciding the location, writing a script, and creating a crew list and schedule. The main filming will take place on December 6th at Jubilee Park, followed by editing on the 7th, 10th, and 11th. An evaluation will take place on the 14th for an interim deadline submission.

Uploaded by

api-429127056
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views1 page

Film Production Schedule Plan

The production schedule outlines filming a project from November 30th through December 14th. It includes pre-production tasks like deciding the location, writing a script, and creating a crew list and schedule. The main filming will take place on December 6th at Jubilee Park, followed by editing on the 7th, 10th, and 11th. An evaluation will take place on the 14th for an interim deadline submission.

Uploaded by

api-429127056
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Production Schedule

Please include location, time of film, what you are filming and team
members including actors

Date Plan of action Evaluation / behind


Week beginning the scenes
30th Nov Rationale
3rd Dec Decide where to film and write script
4th Dec Pre-production – Location recce
5th Dec Pre-production – Crew list and Production
schedule
6th Dec Film Jubilee park
7th Dec Edit
10th Dec Edit
11th Dec Any improvements
14th Dec Evaluation / Submission for interim
deadline