Haseeb Rehman
Haseebrehman724@gmail.com
+923139901550
 CAREER OBJECTIVE
I am looking for a good position in the field of E&I in a prestigious company where previous skills and capabilities
can be put to efficient use. I possess effective organizational skills and the ability to supervise a team and develop
the final output.
 SUMMARY OF SKILLS
       I have 3+ years of experience in project (procurements, installation, commissioning and maintenance) of
        electrical and electronics equipment’s i.e. Transformer, Motor, VFD, Cooling Tower, LV & MV panel, LV
        & MV Switchgears, HVAC plant room, Fire Alarm and Suppression system and HT & LT transmission
        lines joint.
       Proven ability to focus on minute details while performing installation, maintenance, support, documentation
        and testing activities to ensure compliance Proficient to the codes and standards i.e. BS, ISO, ASME, ANSI,
        IEC, ISA, IEEE, etc.
        Aspiring to work in a challenging and time constraint environment to utilize my core competencies and
        corporate management for the benefit of the firm.
  CAREER HISTORY
 Engineer                    Power Transmission Distribution Services                 Feb 2017 to Till Data
                                          Islamabad
Giga Mall World Trade Center Islamabad
Job responsibilities
       Lead Preventive Maintenance of the Honeywell GENT’S FireNET 2127/4127 Analog Addressable Fire
        Alarm System
       Conductor the replacement of FN-4127-NIC Network Interface Card
       Conductor the installation of the Short Circuit Isolator
       Lead the replacement of the Battery at main Control Panel
       Lead Preventive and Corrective Maintenance of Fire Detection and FM200 Fire Suppression System in the
        MV Room, Generator Room or Power House, Transformer Room
       Lead Preventive and Corrective Maintenance of Fire detection System and FM 200 Fire suppression system
        at HVAC Plant
       Replacement of the Fault Isolator and Short Circuit Isolator at different location
        Load calculations and selection of optimum cable for power sustenance and transmission.
       Lead the installation team for complete installation of 11 KV substation, HT and LT panels
       Managed the erection tram for HVAC plant, Motors and cooling tower Fan
       Conducted the insulation testing of bus Bar in HT and LT Panel that are isolate from Panel body
       Conducted insulation Testing of HV XLPE cables using Megger before laying
       Conducted the Transformer Turns Ratio (TTR) Test of different rating transformer
       Conducted the preventive maintenance of Electronic Trip Unit, Spring Charging Motor, Communication
        Module and Connection of Air Circuit Breaker (ACB)
       Supervised the commission of VFD, motor and Pump for HVAC Plant
       Participate in the installation of Cooling System for Dry Type Transformer
       Conducted the correction and preventive maintenance of TC 50 Transformer temperature controller relay for
        dry temperature i.e. 3MVA, 2MVA
      Participate in the replacement of PT100 in Dry Transformer
      Conducted XLPE and Power Cables Heat shrink joints, of different cable size
      Ensure the protection of generator using IEEE 1100 standard for Earthing of generator
      Supervised the installation of Intrinsic Safety Circuit or Relay for the safety of wiring in HVA Control
       Room and Power House or generator Room Using ISA RP 12.6 standard
      Conducted the installation of Neutral Grounding Resistor for 2000 KVA Generator
      Participate in the replacement of the WoodWard Load Sharing Module in the EMCP 4.1 Caterpillar
      Participate in the replacement RTD at Stator and Rotor of the Caterpillar Generator
      Conductor the correction and preventive maintenance of the Seismic Probe and Proximity Probe of
       Vibration
      Ensure the protection of power House or generator Room and HVAC Control Room using NFPA 12 and
       NFPA 34 standard for fire extinguishing
Margalla Building, Telenor Head Office Gulberg Green Islamabad
Job responsibilities
       Participated in the commissioning of HT panel
      Conducted the Thermographic Inspection Vacuum Circuit Breaker (VCB)
      Ensure that all control and Auxiliary circuit wiring are terminated at exist place
      Checked the Communication Module and Accessories were connected
      Conducted the Inspection of arc chutes of Circuit Breaker
      Conducted the installation of Forced Cooling System for Dry Type Transformer using TC 50 Temperature
       Controller Relay
      Conductor the installation Proximity Probe of the Vibration of the transformer
      Conducted the insulation testing of bus Bar in HT Panel that are isolate from Panel body
       Conducted the corrective maintenance of Fire Detection and Fire Suppression system
      Installation of Short Circuit Isolator in MV Room and Transformer Room
Fauji Foundation Hospitals (ten different sites in Pakistan)
Job responsibilities
      Lead installation and commission for Biomedical X-ray Generator (Model no N32HF) STEPHANIX
      Conducted the installation of MCCB Box and 100 Ampere 3 pole circuit Breaker
      Ensure the protection of X-ray Machine using IEEE 1100 standard for Earthing of generator
      Conducted the installation and eraction of 3 Phase energy Meter
      Conducted the eraction of 50 KVA Transformer at LT side
Fauji Foundation Medical College Rawalpindi
Job responsibilities
    Lead Preventive Maintenance of the Honeywell GENT’S Convention Fire Detection system
    Replacement of Battery at main Control Panel
    Checking of Smoke and Heat sensor
    Replacement of Faulty Sensor
    Replacement of Glass sheet at Manual Call Point(MCP)
 Engineer                     Ali Glass Industries Hasanabdal              Dec 2015 to Dec 2016
General responsibilities:
      Supervised the maintenance team for the overhauling of capacitor bank
      Supervised the installation and commissioning of VFDs for motors
      Weekly overhauling of UPS battery bank for optimum voltage and load.
      Ensure the protection of UPS Room using NFPA 12 standard for fire extinguishing system
      Managed point configuration, alarms grouping, alarms configuration, loop tuning and updating HMI
          Supervised the replacement of siemens S3-700 battery, chassis, Communication modules and working
           knowledge about step 7 and Wincc.
          Ensure the protection of furnace of annealing and gradual cooling process using NFPA 86 standard for fire
           extinguishing
          Overhauling of local PLC for weight bridge cells modules
          Conduct the installation and replacement of different Thermocouples using ANSI MC 96.1 standard
          Conducted the replacement of Unground Junction Thermocouple and Exposed Junction Thermocouple
          Conducted the preventive maintenance of Micrologic Trip Unit and Thermographic Inspection of Air Circuit
           Breaker (ACB)
     Trainee Engineer            Pakistan Locomotive Factory Risalpur                   Sep 2015 to Nov 2015
[[
General responsibilities:
          Participated in the preventive maintenance of SF6 breakers, isolators, light arrestors, CT and PT in 132 KV
           grid station
          Lead installation of VFDs for motorized loads on miller machine, driller machine, cutting machine to
           optimized electric load.
          Participated in team of overhauling of control panel, metering equipment’s, ECOR
          Lead the shutdown maintenance of proximity switches.
          Participated in the vibration analysis team
          Lead the calculation for flash point of various fuels and lube oils to be used in transformer, lubricating
           engines and for cooling.
          Participated in the preventive maintenance of Electronic Trip Unit of Air Circuit Breaker (ACB)
          Participated in preventive maintenance of Switchgear at 132 KV grid station.
          Participated in the preventive maintenance and updates of existing Capacitor Bank
          Participated to conduct the inspection of all ongoing activities at the Assembly line
     Internee Engineer               Ali Glass Industries Hasanabdal                         Feb 2015 to Aug 2015
General responsibilities:
           Supervised the maintenance team for the overhauling of capacitor bank
          Supervised the installation of VFDs for motors
          Weekly overhauling of UPS battery bank for optimum voltage and load
          Managed point configuration, alarms grouping, alarms configuration, loop tuning and updating HMI
          Supervised the replacement of Siemens S3-700 battery, chassis, Communication modules and working
           knowledge about step 7 and WinCC
          Conducted the replacement of Unground Junction Thermocouple and Exposed Junction Thermocouple
          Produced SOPs for the checking of quality of the glass
          Conducted the preventive maintenance of Air Circuit Breaker (ACB)
          Participated in the produced SOPs for the checking of quality of the glass
          Working in the Control room
     Internee Engineer               Ali Engineering Services, Islamabad               July 2014 to Aug 2014
General responsibilities:
          Pakistan Council of Renewable Energy Technologies (PCRET) is the vender of Ali Engineering services.
           PCRET has funded to Ali Engineering services for this solar panel project
          Solar Panel installation
          Inverter installation
          Monitoring system installation
          Battery back-up system(Off-grid)
 PROFESSIONAL TRAINING
       PLC SCADA and HMI Designing
       Continuing Engineering Education Center University of Engineering & Technology Peshawar
            Siemens (TIA)
            Fatek
            WinCC Flexible 2008
 QUALIFICATIONS
     Bachelors of Science in Electronics Engineering (Hon’s) (February, 2015)
      Muhammad Ali Jinnah University Islamabad
      FYP: “RFID Based Car Parking System”
     F.Sc (Pre Engineering ) June 2010
      The Quaid-e-Azam College Swabi
      Board of Intermediate and Secondary Education (BISE) Mardan
     Matriculation (June 2008)
      Working Folks Grammar School Amnagarh, Nowshera
      Board of Intermediate and Secondary Education (BISE) Mardan
 KEY SKILLS
      Embedded System Design                              Project Management
      Engineering Economic                                Team Leadership
      AutoCAD Electrical 2015                             Simulation Tools
      Load Calculation                                    Programmable logic controller (PLC)
 IT & PORGRAMMING SKILL
      Good all round knowledge of Microsoft Word, Excel, PowerPoint, and Access
      Good working knowledge of Microsoft Project
      Basic knowledge of Electrical AutoCAD, Corel Draw
      C++, PsPice, MatLab, Proteus, PCB Wizard, AVR Studio 4, Arduino platform
 LANGUAGES
      Urdu- Fluent in spoken/ writing                     Pashto- Fluent in spoken
      English- fluent spoken/ writing
 PERSONAL DETAILS
Father Name:     Sadiq Rehman
Address    :     Mohallah Akhun Khail Village & P.O Shaidu,
                 Dist & Tehsil Nowshera KPK.
Date of Birth: 1st April, 1990
Place of Birth: Shaidu, Nowshera
Citizenship:    Pakistani
Passport No: KR9152331
PEC Reg No: ELECTRO/22117