Featured Articles
Torus Named One of Fast Company's 2026 Next Big Things in Tech
Torus honored in Fast Company's Energy and Sustainability category for helping utilities manage fast-moving loads at the point of demand
The Dispatch: Security Isn't a Feature. It's How We Work.
Security isn't something you should add on, it's something you weave into the fabric of the products you build.
Torus named Battery Manufacturer of the Year for GigaOne energy storage factory
National award recognizes the 545,000-square-foot Salt Lake City plant manufacturing hybrid flywheel and battery storage systems
The Dispatch: What Helped Solve Our Permitting Challenges?
New energy technology gets approved fastest by showing regulators it already fits their existing rules, not by asking for an exception.
- Blog
Introducing Torus Foundry: AI Compute Where the Power Already Is
Instead of waiting years to bring power to the chips, we bring the chips to the power.
- Press Release
Torus Launches Modular AI Infrastructure, Foundry, to Meet Surging AI Inference Demand and Secures $500M in Funding
Foundry brings 1–20 megawatts of inference capacity per site in 12–16 weeks from contract to compute, using power the grid already has
- Blog
Meet Torus Reserve, Torus Protect, and Torus Arc
We’re renaming our flagship products
- Press Release
Torus named Battery Manufacturer of the Year for GigaOne energy storage factory
National award recognizes the 545,000-square-foot Salt Lake City plant manufacturing hybrid flywheel and battery storage systems
- Press Release
Torus Named One of Fast Company's 2026 Next Big Things in Tech
Torus honored in Fast Company's Energy and Sustainability category for helping utilities manage fast-moving loads at the point of demand
- In the News
Torus’s Chief Legal Officer Cara Baldwin named a 2026 Women Tech Award honoree
Cara Baldwin, Torus's Chief Legal Officer and Head of Product Operations, was recognized this afternoon as one of 23 honorees in the 2026 Women Tech Awards.
- Press Release
Torus GigaOne Sets Production Records Six Months After Coming Online
The 545,000-square-foot Salt Lake City facility scales American-made mesh energy infrastructure as Torus grows its workforce and manufacturing footprint.
- Blog
The Dispatch: What Helped Solve Our Permitting Challenges?
New energy technology gets approved fastest by showing regulators it already fits their existing rules, not by asking for an exception.
- Blog
Why Torus is built in the U.S. and why we'll keep building here
Torus is doubling down on what's built the company from day one: U.S. manufacturing, local hiring, and stronger energy infrastructure for our community.
Page 1 of 7, 62 articles