Progress MS-21
Names | Progress 82P |
---|---|
Mission type | ISS resupply |
Operator | Roscosmos |
COSPAR ID | 2022-140A |
SATCAT no. | 54155 |
Mission duration | 758 days, 16 hours and 23 minutes (113 days planned) |
Spacecraft properties | |
Spacecraft | Progress MS-21 no.451 |
Spacecraft type | Progress MS |
Manufacturer | Energia |
Launch mass | 7000 kg |
Payload mass | 2.8 tons |
Start of mission | |
Launch date | 26 October 2022, 00:20:09 |
Rocket | Soyuz-2.1a |
Launch site | Baikonur, Site 31 |
Contractor | Progress Rocket Space Centre |
End of mission | |
Disposal | Deorbited (planned) |
Decay date | 2023 (planned) |
Orbital parameters | |
Reference system | Geocentric orbit |
Regime | Low Earth orbit |
Inclination | 51.65° |
Docking with ISS | |
Docking port | Poisk zenith |
Docking date | 28 October 2022, 02:49:03 UTC |
Undocking date | 18 February 2023, 02:26 (planned) |
Time docked | 756 days, 13 hours and 54 minutes (113 days planned) |
Payload | |
Cargo and SCCS part of MLM Means of Attachment of Large payloads | |
Progress ISS Resupply |
Progress MS-21 (Template:Lang-ru), Russian production No.451, identified by NASA as Progress 82P, is a Progress spaceflight launched by Roscosmos to resupply the International Space Station (ISS). It is the 174th flight of a Progress spacecraft.
History
The Progress-MS is an uncrewed freighter based on the Progress-M featuring improved avionics. This improved variant first launched on 21 December 2015. It has the following improvements:[1][2][3][4]
- New external compartment that enables it to deploy satellites. Each compartment can hold up to four launch containers. First time installed on Progress MS-03.
- Enhanced redundancy thanks to the addition of a backup system of electrical motors for the docking and sealing mechanism.
- Improved Micrometeoroid (MMOD) protection with additional panels in the cargo compartment.
- Luch Russian relay satellites link capabilities enable telemetry and control even when not in direct view of ground radio stations.
- GNSS autonomous navigation enables real time determination of the status vector and orbital parameters dispensing with the need of ground station orbit determination.
- Real time relative navigation thanks to direct radio data exchange capabilities with the space station.
- New digital radio that enables enhanced TV camera view for the docking operations.
- Unified Command Telemetry System (UCTS) replaces previous Ukrainian Chezara Kvant-V as the Progress spacecraft's on-board radio and antenna/feeder system.
- Replacement of the Kurs A with Kurs NA digital system.
Launch
On 3 February 2021, the State Commission for Testing of the Piloted Space Systems, chaired by Roskosmos head Dmitry Rogozin, approved the latest ISS schedule for 2021 and the first quarter of 2022.
A Soyuz-2.1a launched Progress MS-21 to the International Space Station from Baikonur Site 31 on 26 October 2022. Around 2 days after the launch, Progress MS-21 automatically docked with Poisk and continues its mission, supporting Expedition 68 aboard the ISS.
Cargo
The MS-21 cargo capacity is 2,520 kg (5,560 lb) as follows:
- Dry cargo: 1,357 kg (2,992 lb)
- Fuel: 702 kg (1,548 lb)
- Nitrogen: 41 kg (90 lb)
- Water: 420 kg (930 lb)
Means of attachment of large payloads
It also delivered SCCS part of MLM Means of Attachment of Large payloads to ISS. It is a 4 segment external payload interface called means of attachment of large payloads (Sredstva Krepleniya Krupnogabaritnykh Obyektov, SKKO)[5][6][7][8][9] According to plans, once the nadir end of SKKO was soft docked to Nauka and bolted down, the launch locks on SKKO would be released by the spacewalkers to allow it to be unfolded and extended with its joints self locking in the extended position to create a rigid frame. Then the Zenith end of SKKO would be soft docked to Nauka and bolted down. The three passive payload adapters and the one active payload adapter (i.e. active remote sensing payload like MIR Priroda's Travers Synthetic Aperture Radar) would then be outfitted. The SKKO was derived from the setup used on the Priroda module.[10] SKKO will be launched inside the Progress spacecraft and transferred to a temporary storage location inside one of the station modules. It would be taken outside and installed on the aft facing side of Nauka during the VKD-60 spacewalk.[11][12] LCCS part of MLM Means of Attachment of Large payloads was delivered to ISS by Progress MS-18 spacecraft.[13] It was taken outside and installed on the ERA aft facing base point on Nauka during the VKD-55 spacewalk.[14]
Coolant pressure accident
On 11 February 2023, the freighter lost coolant pressure days before undocking from ISS, with no impact to the station as cargo had been unloaded and had been loaded with waste to be discarded. This incident was similar to the Soyuz MS-22 coolant loop accident in December 2022. It still assumed to be undocked on 18 February 2023 as per was previously schedule, after which it will be allowed to burn in the Earth's atmosphere after deorbit.[15]
See also
References
- ^ Krebs, Gunter (1 December 2015). "Progress-MS 01-19". Gunter's Space Page. Retrieved 3 October 2020.
- ^ "Progress MS-20". NSSDCA. NASA. 10 February 2021. Retrieved 2 April 2021. This article incorporates text from this source, which is in the public domain.
- ^ Zak, Anatoly. "Progress-MS cargo ship series". RussianSpaceWeb. Retrieved 3 October 2020.
- ^ Blau, Patrick (1 December 2015). "Progress MS Spacecraft". Spaceflight101. Retrieved 17 November 2020.
- ^ "Schedule of ISS flight events (part 2)". forum.nasaspaceflight.com. Retrieved 31 July 2022.
- ^ "Год «Науки» на МКС".
- ^ "Sredstva Krepleniya Krupnogabaritnykh Obyektov, SKKO".
- ^ "The Russian Nauka/Multipurpose Laboratory Module (MLM) General Thread". forum.nasaspaceflight.com. Retrieved 25 March 2022.
- ^ "Russia to bump its ISS crew back to three". www.russianspaceweb.com. Retrieved 25 March 2022.
- ^ Roscosmos. "MLM-U Structure diagram". Everydayastronaut.com.
- ^ "VKD-59 spacewalk".
- ^ https://forum.nasaspaceflight.com/assets/23444.0/2094824.jpg [bare URL image file]
- ^ "The Russian Nauka/Multipurpose Laboratory Module (MLM) General Thread". forum.nasaspaceflight.com. Retrieved 15 October 2022.
- ^ Pradhan, Chirag [@chiragp87233561] (18 November 2022). "Wait whattttttttt!!!! They installed the Means of attachment of large payloads yesterday!!!!!!!!! @RaffaeleDiPalma https://t.co/Xfcgwis1KH https://t.co/cuYEfScs35" (Tweet). Retrieved 8 December 2022 – via Twitter.
- ^ "Russian spacecraft loses pressure, station crew safe". AP NEWS. 11 February 2023. Retrieved 11 February 2023.