Don Antonio station is an under-construction Metro Rail Transit (MRT) station located on the MRT Line 7 (MRT-7) system along Commonwealth Avenue in Holy Spirit, Quezon City. Landmarks near the station include the Ever Gotesco Commonwealth shopping mall and Shopwise Commonwealth. Its working title was Station 5.

Don Antonio
Don Antonio station construction progress as of February 6, 2023
General information
LocationCommonwealth Avenue, Holy Spirit
Quezon City, Metro Manila
Philippines
Coordinates14°40′37″N 121°04′57″E / 14.67699°N 121.08263°E / 14.67699; 121.08263
Owned bySMC-Mass Rail Transit 7 Incorporated
Line(s)     MRT Line 7
Platforms2 side platforms
Tracks2
Construction
Structure typeElevated
Platform levels2; one concourse and one platform
AccessibleYes
Other information
StatusUnder construction
Station codeDA
History
Opening2025
Services
Preceding station Manila MRT Following station
Tandang Sora
towards North EDSA
MRT Line 7 Batasan
Don Antonio station construction as of March 2023

As of 31 January 2023, the project is 66.07% complete;[1] the station's construction is to be finished by June of the same year.[2]

References

edit
  1. ^ "HOUSE TACKLES DOTR'S RAILWAY PROJECTS STATUS, URGES AGENCY TO FIX PROJECT DELAYS". House of Representatives of the Philippines. Press and Public Affairs Bureau. 16 February 2023. Retrieved 21 February 2023.
  2. ^ Balinbin, Arjay L. (25 January 2023). "Full MRT-7 operations seen by 2nd quarter 2025". BusinessWorld. Philippines: The Philippine STAR. Retrieved 25 January 2023.
edit