FIN.5:2 - Problem

Using a cheap loan rate for risky operating cash flows overvalues the project. Using a corporate average for a materially different project hides risk. Nominal, real, pre-tax and after-tax quantities can be combined into a number with no coherent meaning. Even correct arithmetic gives a fragile answer when the inputs’ construction is unknown.